A device and method for tying steel bars of a large-section second lining in a three-lane mountain highway tunnel
By designing an automated conveyor belt and guidance system in the three-lane large section two-line steel bar binding of Shanling Expressway Tunnel, the problem of time-consuming and labor-intensive manual binding is solved, and efficient automatic winding and fixing of steel bars is achieved, and working efficiency is improved.
Patent Information
- Application Number
- CN202210526873.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-16
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-05-16
AI Technical Summary
The three-lane large section two-line steel bar binding of Shanling Expressway Tunnel mainly relies on manual operation, which is time-consuming and labor-intensive, and lacks efficient automation solutions.
A steel bar binding device including conveyor belt, rotor, motor, guide tube, guide ball and control system is designed. The conveyor belt drives the equipment box to move, and the conveyor belt speed is delayed by using guide ball and arc-shaped bent rod to realize automatic winding of the steel bar and fixed.
The flow-through operation of steel bar binding is realized, manual operation is reduced, efficiency and convenience is improved, and time and labor is saved.
Smart Images

Figure CN114856652B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of steel bar binding devices, and in particular to a steel bar binding device and method for a three-lane large-section double-lining steel bar binding device for a mountain high-speed tunnel. Background Art
[0002] Rebar refers to steel used for reinforced concrete and prestressed reinforced concrete. Its cross section is round, sometimes square with rounded corners. It includes plain round steel bars, ribbed steel bars, and twisted steel bars. Rebar for reinforced concrete refers to straight bars or coils used for reinforced concrete reinforcement. Its appearance is divided into plain round steel bars and deformed steel bars. It is delivered in straight bars and coils.
[0003] At present, after the construction of the large-section second lining reinforcement of the three-lane mountain expressway tunnel is completed, the longitudinal and transverse reinforcements need to be tied together. The reinforcement tying is currently mostly done manually, which is time-consuming and labor-intensive, and needs to be improved. Summary of the invention
[0004] The purpose of the present invention is to provide a large-section double-lining steel bar binding device and method for a three-lane high-speed mountain tunnel to solve the above-mentioned technical problems.
[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0006] A three-lane large-section double-lining steel bar binding device for a mountain expressway tunnel comprises two rotating drums, which are connected by a conveyor belt; a plurality of first motors are fixedly arranged on the outer side of the conveyor belt at the rear, a fixed plate is arranged on the inner side of the conveyor belt at the rear, a first power output end of the first motor is fixedly connected to a second electric telescopic rod, a second electric telescopic end of the second electric telescopic rod is fixedly connected to the center of the fixed plate, a device box is detachably installed on the front side of the fixed plate, a first rotating shaft is arranged in the device box, both ends of the first rotating shaft are fixedly connected to the device box, a wire drum is rotatably sleeved on the rotating shaft, and binding wire is wound on the wire drum; a wire conveying mechanism and a wire cutting mechanism are arranged in the device box in front of the wire drum.
[0007] Preferably, an arc-shaped left guide tube and an arc-shaped right guide tube are symmetrically arranged on the front side of the device box, the left guide tube and the right guide tube are combined into a U-shape, the rear ends of the left guide tube and the right guide tube are both connected to the interior of the device box; the rear ends of the left guide tube and the right guide tube are both connected to the device box through a first spring, the rear ends of the left guide tube and the right guide tube are both fixedly provided with a connecting plate, and the connecting plate is connected to the device box through a first hinge; the front sides of the left guide tube and the right guide tube are both fixedly provided with guide balls.
[0008] Preferably, the wire conveying mechanism includes two second rotating shafts, and guide wheels are fixedly sleeved on the second rotating shafts. The second rotating shaft on the left is fixedly connected to the second power output end of the second motor, and the second motor is fixedly connected to the equipment box. Both ends of the second rotating shaft on the right are rotatably connected to the equipment box.
[0009] Preferably, the wire cutting mechanism includes a wire guide plate, which is fixedly connected to the equipment box, and a through hole is provided inside the wire guide plate, and the through hole is connected to the left guide tube; a hollow cutter guide plate is fixedly provided on the left side of the guide plate, and the cutter guide plate is connected to the through hole, and a cutter is inserted in the cutter guide plate, and the left end of the cutter is fixedly connected to the first electric telescopic end of the first electric telescopic rod, and the first electric telescopic rod is fixedly connected to the equipment box.
[0010] Preferably, connection blocks are fixedly provided on both left and right sides of the device box, and the connection blocks are connected to the fixing plate via a first connection screw.
[0011] Preferably, a guide rail is fixedly provided on the inner side of the conveyor belt located in the front, and a plurality of first threaded holes are opened on the guide rail along the length direction of the guide rail. A slider is slidably connected to the guide rail, and the slider is located above the equipment box. A second screw is threadedly connected to the right end of the slider, and the second screw is threadedly matched with the first threaded hole; the left end of the slider is connected to the lower end of the limit rod through a second hinge, and the middle part of the limit rod is connected to the slider through a second spring, and the upper end of the limit rod is fixedly connected to the lower end of the arc-shaped bent rod, and the arc-shaped bent rod is made of memory metal, and the upper end of the arc-shaped bent rod is connected to the upper end of the barb through a third hinge, and the upper end of the barb is connected to the upper end of the arc-shaped bent rod through a third spring.
[0012] Preferably, the rotating drum is fixedly sleeved on the guide tube, a third screw is threadedly connected to the guide tube, the guide tube is slidably sleeved on the guide rod, a plurality of second threaded holes are opened on the guide rod along the length direction of the guide rod, and the third screw is threadedly matched with the second threaded holes.
[0013] Preferably, the lower end of the guide rod is fixedly connected to the third power output end of the third motor, an adjusting rod is fixedly provided on the front side of the third motor, and the adjusting rod is threadedly connected to the adjusting tube; the front end of the adjusting tube is fixedly connected to the right clamping plate, a left clamping plate is provided on the left side of the right clamping plate, and arc-shaped clamping grooves are provided on the sides of the left clamping plate and the right clamping plate that are close to each other; mounting blocks are fixedly provided on the front and rear sides of the left clamping plate and the front and rear sides of the right clamping plate, and two adjacent mounting blocks are connected by a fourth screw, and a limiting nut is threadedly connected to the fourth screw.
[0014] Preferably, the first motor is wirelessly connected to the first controller, the second motor is wirelessly connected to the second controller, the first electric telescopic rod is wirelessly connected to the third controller, the third motor is wirelessly connected to the fourth controller, the second electric telescopic rod is wirelessly connected to the fifth controller, and the first controller, the second controller, the third controller, the fourth controller, and the fifth controller are all installed on a control panel.
[0015] The binding method of the large-section secondary lining steel bar binding device for a three-lane mountain highway tunnel comprises the following steps:
[0016] Step 1: Use the conveyor belt to enclose the transverse and longitudinal steel bars that need to be tied, enclose the left and right clamping plates on the bottom steel bars, and then connect the two adjacent mounting blocks through the fourth screw rod so that the left and right clamping plates are clamped on the steel bars;
[0017] Step 2: Control the third motor to start through the fourth controller, so that the third motor drives the rotating drum to rotate through the guide rod and the guide tube, and the rotating drum drives the conveyor belt to move. The conveyor belt drives the equipment box to move rightward and the arc-shaped bent rod to move leftward. When the arc-shaped bent rod contacts the longitudinal steel bar at the right end, the arc-shaped bent rod is hung on the longitudinal steel bar at the right end, thereby delaying the movement of the conveyor belt. At this time, the two guide balls are located directly behind the intersection of the transverse steel bars and the longitudinal steel bars. The second electric telescopic end of the second electric telescopic rod is driven by the fifth controller to extend to drive the equipment box to move forward. The equipment box drives the two guide balls to move forward. The two guide balls gradually separate during the contact process with the transverse steel bars and the longitudinal steel bars until the intersection of the transverse steel bars and the longitudinal steel bars is surrounded by the left guide tube and the right guide tube. At this time, the guide balls are no longer in contact with the transverse steel bars and the longitudinal steel bars. Under the action of the first spring elastic force, the left guide tube and the right guide tube are closed. The second motor is controlled to start through the second controller, so that the second motor drives the left guide wheel to rotate, and the binding wire is moved into the left guide tube and returned to the equipment box through the right guide tube.
[0018] Step 3: The second electric telescopic end of the second electric telescopic rod is driven to retract through the fifth controller to drive the device box to move backward, and the device box drives the two guide balls to move backward. The two guide balls are opened during the contact process with the transverse steel bars and the longitudinal steel bars, and the binding wires are hung on the intersection of the transverse steel bars and the longitudinal steel bars. When the two guide balls are separated from the transverse steel bars and the longitudinal steel bars, the first motor is controlled to start through the first controller, so that the first motor drives the device box to rotate, thereby driving the binding wires hung on the intersection of the transverse steel bars and the longitudinal steel bars to spirally wind, so that the binding wires are fixed on the intersection of the transverse steel bars and the longitudinal steel bars;
[0019] Step 4: Control the first electric telescopic rod to start by the third controller, so that the first electric telescopic rod drives the cutter to move and cut the wire in the wire guide plate;
[0020] Step 5: Under the continuous thrust of the conveyor belt, the arc-shaped bent rod is deformed and decoupled from the longitudinal steel bars. After decoupling, the arc-shaped bent rod made of memory metal returns to its original shape, and the conveyor belt drives the equipment box to move and tie other transverse steel bars and longitudinal steel bar intersections.
[0021] The beneficial effects of the present invention are:
[0022] 1. The present invention innovatively uses a conveyor belt for steel bar binding. The equipment box is transported to each binding position in turn by a moving conveyor belt. The binding operations such as wire winding, bundling, and cutting can be controlled by the controller on the control panel, realizing streamlined operation without manual binding, which is convenient, fast, time-saving and labor-saving.
[0023] 2. The present invention innovatively uses a fishhook structure to intermittently delay the conveying speed of the conveyor belt, leaving time for the steel bar binding operation. Specifically, when the two guide balls are about to move above the intersection of the steel bars, the semi-enclosed fishhook-shaped structure composed of the arc-shaped bent rod and the barbs encloses the longitudinal steel bars on the right. At this time, the movement of the arc-shaped bent rod is blocked and delayed by the longitudinal steel bars, thereby slowing down the movement speed of the conveyor belt and reserving time for the steel bar binding operation. After a period of time, under the continuous thrust of the conveyor belt, the arc-shaped bent rod is deformed and decoupled from the longitudinal steel bars. After decoupling, the arc-shaped bent rod made of memory metal returns to its original state, and the conveyor belt returns to its original moving speed. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a top view schematic diagram of the present invention;
[0025] Figure 2 For the present invention Figure 1 A magnified schematic diagram of part A;
[0026] Figure 3 For the present invention Figure 2 An enlarged schematic diagram of part E of FIG.
[0027] Figure 4 For the present invention Figure 1 An enlarged schematic diagram of part B;
[0028] Figure 5 For the present invention Figure 1 An enlarged schematic diagram of the C portion;
[0029] Figure 6 It is a top view of the connection structure of the third motor, the adjustment rod, the adjustment tube, the left clamping plate, and the right clamping plate of the present invention;
[0030] Figure 7 For the present invention Figure 6 An enlarged schematic diagram of the D portion;
[0031] Figure 8It is a structural schematic diagram of the guide rod of the present invention;
[0032] Fig. 9 It is a structural schematic diagram of the control panel of the present invention;
[0033] Fig.10 The rear view of the guide ball, transverse steel bars and longitudinal steel bars during the binding operation of the present invention is shown in FIG. Figure 1 ;
[0034] Fig.11 The rear view of the guide ball, transverse steel bars and longitudinal steel bars during the binding operation of the present invention is shown in FIG. Figure 2 ;
[0035] Fig.12 The rear view of the guide ball, transverse steel bars and longitudinal steel bars during the binding operation of the present invention is shown in FIG. Figure 3 ;
[0036] Figure numerals: 1, transverse steel bar; 2, longitudinal steel bar; 3, conveyor belt; 4, rotating drum; 5, first motor; 6, second electric telescopic rod; 7, connecting block; 8, first connecting screw; 9, equipment box; 10, guide ball; 11, left guide tube; 12, first electric telescopic rod; 13, rotating shaft; 14, wire drum; 15, fixing plate; 16, cutter guide plate; 17, second motor; 18, binding wire; 19, guide wheel; 20, second rotating shaft; 21, first spring; 22, connecting plate; 23, first hinge; 24, cutter; 25, first electric telescopic end; 26, right guide tube; 27, guide rod; 28, third motor; 29, adjustment rod; 30, adjusting tube; 31, limiting nut; 32, mounting block; 33, fourth screw; 34, arc-shaped clamping groove; 35, left clamping plate; 36, second threaded hole; 37, barb; 38, arc-shaped bent rod; 39, limiting rod; 40, second spring; 41, second screw; 42, guide rail; 43, slider; 44, first threaded hole; 45, third spring; 46, third screw; 47, guide tube; 48, second hinge; 49, control board; 50, wire guide plate; 51, right clamping plate; 501, first controller; 601, fifth controller; 1201, third controller; 1701, second controller; 2801, fourth controller. DETAILED DESCRIPTION
[0037] In order to make the technical means, creative features, objectives and effects of the present invention easy to understand, the present invention is further described below in conjunction with specific embodiments and drawings, but the following embodiments are only preferred embodiments of the present invention, not all. Based on the embodiments in the implementation mode, other embodiments obtained by those skilled in the art without creative work are all within the scope of protection of the present invention.
[0038] The specific embodiments of the present invention are described below with reference to the accompanying drawings.
[0039] Example 1
[0040] like Figure 1-12 As shown, a large-section double-lining steel bar binding device for a three-lane mountain high-speed tunnel includes two rotating drums 4, which are connected by a conveyor belt 3; a plurality of first motors 5 are fixedly arranged on the outer side of the conveyor belt 3 at the rear, and a fixing plate 15 is arranged on the inner side of the conveyor belt 3 at the rear; a first power output end of the first motor 5 is fixedly connected to a second electric telescopic rod 6, and a second electric telescopic end of the second electric telescopic rod 6 is fixedly connected to the center of the fixing plate 15; a device box 9 is detachably installed on the front side of the fixing plate 15, and connection blocks 7 are fixedly arranged on both the left and right sides of the device box 9, and the connection blocks 7 are connected by The first connecting screw 8 is connected to the fixing plate 15, and a first rotating shaft 13 is arranged in the equipment box 9. Both ends of the first rotating shaft 13 are fixedly connected to the equipment box 9. A wire drum 14 is rotatably sleeved on the rotating shaft 13, and a binding wire 18 is wound on the wire drum 14; a wire conveying mechanism and a wire cutting mechanism are arranged in the equipment box 9 in front of the wire drum 14; the wire conveying mechanism includes two second rotating shafts 20, and a guide wheel 19 is fixedly sleeved on the second rotating shaft 20. The second rotating shaft 20 located on the left side is fixedly connected to the second power output end of the second motor 17, and the second motor 17 is fixedly connected to the equipment box 9. The second rotating shaft 20 located on the right side is rotatably connected to the device box 9 at both ends; the wire cutting mechanism includes a wire guide plate 50, which is fixedly connected to the device box 9, and a through hole is arranged inside the wire guide plate 50, which is connected to the left guide tube 11; a hollow cutter guide plate 16 is fixedly arranged on the left side of the guide plate 50, and the cutter guide plate 16 is connected to the through hole, and a cutter 24 is inserted in the cutter guide plate 16, and the left end of the cutter 24 is fixedly connected to the first electric telescopic end 25 of the first electric telescopic rod 12, and the first electric telescopic rod 12 is fixedly connected to the device box 9; the device box 9 An arc-shaped left guide tube 11 and an arc-shaped right guide tube 26 are symmetrically arranged on the front side. The left guide tube 11 and the right guide tube 26 are combined into a U shape. The rear ends of the left guide tube 11 and the right guide tube 26 are both connected to the interior of the device box 9; the rear ends of the left guide tube 11 and the right guide tube 26 are both connected to the device box 9 through a first spring 21, and the rear ends of the left guide tube 11 and the right guide tube 26 are both fixedly provided with a connecting plate 22, and the connecting plate 22 is connected to the device box 9 through a first hinge 23; the front sides of the left guide tube 11 and the right guide tube 26 are both fixedly provided with guide balls 10.
[0041] A guide rail 42 is fixedly provided on the inner side of the conveyor belt 3 located in the front, and a plurality of first threaded holes 44 are opened on the guide rail 42 along the length direction of the guide rail 42. A slider 43 is slidably connected to the guide rail 42, and the slider 43 is located above the equipment box 9. The right end of the slider 43 is threadedly connected to the second screw 41, and the second screw 41 is threadedly matched with the first threaded hole 44; the left end of the slider 43 is connected to the lower end of the limit rod 39 through the second hinge 48, and the middle part of the limit rod 39 is connected to the slider 43 through the second spring 40, and the upper end of the limit rod 39 is fixedly connected to the lower end of the arc-shaped bent rod 38, and the arc-shaped bent rod 38 is made of memory metal, and the upper end of the arc-shaped bent rod 38 is connected to the upper end of the barb 37 through the third hinge, and the upper end of the barb 37 is connected to the upper end of the arc-shaped bent rod 38 through the third spring 45.
[0042] The rotating drum 4 is fixedly sleeved on the guide tube 47, and the third screw rod 46 is threadedly connected to the guide tube 47. The guide tube 47 is slidably sleeved on the guide rod 27. A plurality of second threaded holes 36 are penetrated and opened on the guide rod 27 along the length direction of the guide rod 27. The third screw rod 46 is threadedly matched with the second threaded holes 36. The lower end of the guide rod 27 is fixedly connected to the third power output end of the third motor 28. The height of the rotating drum 4 can be adjusted by removing the third screw rod 46 and moving the rotating drum 4 along the guide rod 27, thereby synchronously adjusting the height of the conveyor belt 3 to achieve the binding of steel bars at different heights.
[0043] The first motor 5 is wirelessly connected to the first controller 501, the second motor 17 is wirelessly connected to the second controller 1701, the first electric telescopic rod 12 is wirelessly connected to the third controller 1201, the third motor 28 is wirelessly connected to the fourth controller 2801, the second electric telescopic rod 6 is wirelessly connected to the fifth controller 601, and the first controller 501, the second controller 1701, the third controller 1201, the fourth controller 2801, and the fifth controller 601 are all installed on the control board 49.
[0044] Working principle: Use the conveyor belt 3 to enclose the transverse steel bars 1 and the longitudinal steel bars 2 that need to be tied, and control the third motor 28 to start through the fourth controller 2801, so that the third motor 28 drives the rotating drum 4 to rotate through the guide rod 27 and the guide tube 47, and the rotating drum 4 drives the conveyor belt 3 to move, and the conveyor belt 3 drives the equipment box 9 to move right and the arc-shaped bent rod 38 to move left. When the arc-shaped bent rod 38 contacts the longitudinal steel bar 2 at the right end, the arc-shaped bent rod 38 is hung on the longitudinal steel bar 2 at the right end, thereby delaying the movement of the conveyor belt 3. At this time, the two guide balls 10 are located directly behind the intersection of the transverse steel bars 1 and the longitudinal steel bars 2. The second electric telescopic end of the second electric telescopic rod 6 is driven to extend through the fifth controller 601 to drive the equipment box 9 to move forward, such as Fig.10 As shown, the device box 9 drives the two guide balls 10 to move forward, as shown in FIG. Fig.11 The two guide balls 10 gradually separate from the transverse steel bars 1 and the longitudinal steel bars 2 during the contact process. Fig.12 As shown in the figure, until the intersection of the transverse steel bar 1 and the longitudinal steel bar 2 is enclosed by the left guide tube 11 and the right guide tube 26, at this time, the guide ball 10 is no longer in contact with the transverse steel bar 1 and the longitudinal steel bar 2, and the left guide tube 11 and the right guide tube 26 are closed under the elastic force of the first spring 21, and the second motor 17 is controlled by the second controller 1701 to start, so that the second motor 17 drives the left guide wheel 19 to rotate, and the binding wire 18 is moved into the left guide tube 11 and returned to the equipment box 9 through the right guide tube 26; the second electric telescopic end of the second electric telescopic rod 6 is driven to retract by the fifth controller 601 to drive the equipment box 9 to move backward, and the equipment box 9 drives the two guide balls 10 to move backward, and the two guide balls 10 are opened during the contact process with the transverse steel bars 1 and the longitudinal steel bars 2, and the binding wire 18 is hung on the transverse steel bars 1 and At the intersection of the longitudinal steel bars 2, when the two guide balls 10 are separated from the transverse steel bars 1 and the longitudinal steel bars 2, the first controller 501 controls the first motor 5 to start, so that the first motor 5 drives the equipment box 9 to rotate, thereby driving the binding wire hung on the intersection of the transverse steel bars 1 and the longitudinal steel bars 2 to spirally wind, so that the binding wire is fixed at the intersection of the transverse steel bars 1 and the longitudinal steel bars 2; the third controller 1201 controls the first electric telescopic rod 12 to start, so that the first electric telescopic rod 12 drives the cutter 24 to move and cut the wire in the wire guide plate 50; under the continuous thrust of the conveyor belt 3, the arc bent rod 38 is deformed and decoupled from the longitudinal steel bars 2. After decoupling, the arc bent rod 38 made of memory metal material returns to its original state, and the conveyor belt 3 drives the equipment box to move and bind other intersections of the transverse steel bars 1 and the longitudinal steel bars 2.
[0045] Example 2
[0046] like Figure 6-7 As shown, when other parts are the same as those in Example 1, the difference between this embodiment and Example 1 is that: an adjusting rod 29 is fixedly provided on the front of the third motor 28, and the adjusting rod 29 is threadedly connected to the adjusting tube 30; the front end of the adjusting tube 30 is fixedly connected to the right clamping plate 51, and a left clamping plate 35 is provided on the left side of the right clamping plate 51, and an arc-shaped clamping groove 34 is provided on the side where the left clamping plate 35 and the right clamping plate 51 are close to each other; mounting blocks 32 are fixedly provided on the front and rear sides of the left clamping plate 35 and the front and rear sides of the right clamping plate 51, and two adjacent mounting blocks 32 are connected by a fourth screw 33, and a limiting nut 31 is threadedly connected to the fourth screw 33; the left clamping plate 35 and the right clamping plate 51 are enclosed on the steel bar at the bottom, and then the two adjacent mounting blocks 32 are connected by the fourth screw 33, so that the left clamping plate 35 and the right clamping plate 51 can be clamped on the steel bar in cooperation, thereby fixing the position of the third motor 28, and further fixing the position of the rotating drum 4 and the conveyor belt 3.
[0047] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A large-section secondary lining steel bar binding device for a three-lane mountain highway tunnel, characterized by: It comprises two rotating drums (4), wherein the two rotating drums (4) are connected via a conveyor belt (3); A plurality of first motors (5) are fixedly arranged on the outside of the conveyor belt (3) at the rear, and a fixing plate (15) is arranged on the inside of the conveyor belt (3) at the rear. The first power output end of the first motor (5) is fixedly connected to the second electric telescopic rod (6), and the second electric telescopic end of the second electric telescopic rod (6) is fixedly connected to the center of the fixing plate (15). A device box (9) is detachably mounted on the front of the fixing plate (15). A first rotating shaft (13) is arranged in the device box (9), and both ends of the first rotating shaft (13) are fixedly connected to the device box (9). A wire drum (14) is rotatably sleeved on the first rotating shaft (13), and a binding wire (18) is wound around the wire drum (14); A wire conveying mechanism and a wire cutting mechanism are arranged in the device box (9) on the front side of the wire reel (14); The front face of the device box (9) is symmetrically provided with an arc-shaped left guide tube (11) and an arc-shaped right guide tube (26); the left guide tube (11) and the right guide tube (26) are combined to form a U shape; the rear ends of the left guide tube (11) and the rear ends of the right guide tube (26) are both connected to the interior of the device box (9); The rear ends of the left guide tube (11) and the right guide tube (26) are both connected to the device box (9) via a first spring (21); the rear ends of the left guide tube (11) and the right guide tube (26) are both fixedly provided with a connecting plate (22); the connecting plate (22) is connected to the device box (9) via a first hinge (23); The front sides of the left guide tube (11) and the right guide tube (26) are both fixedly sleeved with guide balls (10); The wire conveying mechanism comprises two second rotating shafts (20), a guide wheel (19) being fixedly sleeved on the second rotating shafts (20), the second rotating shaft (20) located on the left side being fixedly connected to the second power output end of the second motor (17), the second motor (17) being fixedly connected to the device box (9), and both ends of the second rotating shaft (20) located on the right side being rotatably connected to the device box (9); The wire cutting mechanism comprises a wire guide plate (50), the wire guide plate (50) being fixedly connected to the device box (9), a through hole being arranged inside the wire guide plate (50), and the through hole being in communication with the left guide tube (11); A hollow cutter guide plate (16) is fixedly provided on the left side of the wire guide plate (50), the cutter guide plate (16) is in communication with the through hole, a cutter (24) is inserted into the cutter guide plate (16), a left end of the cutter (24) is fixedly connected to a first electric telescopic end (25) of a first electric telescopic rod (12), and the first electric telescopic rod (12) is fixedly connected to a device box (9); The device box (9) is provided with connection blocks (7) on both left and right sides, and the connection blocks (7) are connected to the fixing plate (15) via a first connection screw (8); A guide rail (42) is fixedly arranged on the inner side of the conveyor belt (3) located at the front, and a plurality of first threaded holes (44) are opened on the guide rail (42) along the length direction of the guide rail (42). A slider (43) is slidably connected to the guide rail (42), and the slider (43) is located above the device box (9). A second screw rod (41) is threadedly connected to the right end of the slider (43), and the second screw rod (41) is threadedly matched with the first threaded hole (44); The left end of the slider (43) is connected to the lower end of the limit rod (39) through a second hinge (48), the middle part of the limit rod (39) is connected to the slider (43) through a second spring (40), the upper end of the limit rod (39) is fixedly connected to the lower end of the arc-shaped curved rod (38), the arc-shaped curved rod (38) is made of memory metal, the upper end of the arc-shaped curved rod (38) is connected to the upper end of the barb (37) through a third hinge, and the upper end of the barb (37) is connected to the upper end of the arc-shaped curved rod (38) through a third spring (45); The rotating drum (4) is fixedly sleeved on the guide tube (47), a third screw rod (46) is threadedly connected to the guide tube (47), the guide tube (47) is slidably sleeved on the guide rod (27), a plurality of second threaded holes (36) are formed on the guide rod (27) along the length direction of the guide rod (27), and the third screw rod (46) is threadedly matched with the second threaded holes (36); The lower end of the guide rod (27) is fixedly connected to the third power output end of the third motor (28); an adjustment rod (29) is fixedly provided on the front of the third motor (28); and the adjustment rod (29) is threadedly connected to the adjustment tube (30); The front end of the regulating tube (30) is fixedly connected to the right clamping plate (51), a left clamping plate (35) is arranged on the left side of the right clamping plate (51), and arc-shaped clamping grooves (34) are provided on the sides of the left clamping plate (35) and the right clamping plate (51) that are close to each other; Mounting blocks (32) are fixedly provided on both the front and rear sides of the left clamping plate (35) and the front and rear sides of the right clamping plate (51). Two adjacent mounting blocks (32) are connected via a fourth screw rod (33). The fourth screw rod (33) is threadedly connected to a limit nut (31).
2. The three-lane large-section double-lining steel bar binding device for a mountain highway tunnel according to claim 1 is characterized by: The first motor (5) is wirelessly connected to a first controller (501), the second motor (17) is wirelessly connected to a second controller (1701), the first electric telescopic rod (12) is wirelessly connected to a third controller (1201), the third motor (28) is wirelessly connected to a fourth controller (2801), the second electric telescopic rod (6) is wirelessly connected to a fifth controller (601), and the first controller (501), the second controller (1701), the third controller (1201), the fourth controller (2801), and the fifth controller (601) are all mounted on a control panel (49).
3. The method for tying a large-section double-lining steel bar tying device for a three-lane mountain highway tunnel according to claim 2 is characterized in that: The steps include: Step 1: using a conveyor belt (3) to enclose the transverse steel bars (1) and the longitudinal steel bars (2) to be tied, enclosing the left clamping plate (35) and the right clamping plate (51) on the bottom steel bars, and then connecting two adjacent mounting blocks (32) through a fourth screw rod (33) so that the left clamping plate (35) and the right clamping plate (51) are clamped on the steel bars in cooperation; Step 2: The third motor (28) is started by controlling the fourth controller (2801), so that the third motor (28) drives the rotating drum (4) to rotate through the guide rod (27) and the guide tube (47), and the rotating drum (4) drives the conveyor belt (3) to move, and the conveyor belt (3) drives the device box (9) to move rightward and the arc-shaped curved rod (38) to move leftward. When the arc-shaped curved rod (38) contacts the longitudinal steel bar (2) at the right end, the arc-shaped curved rod (38) is hung on the longitudinal steel bar (2) at the right end, thereby delaying the movement of the conveyor belt (3). At this time, the two guide balls (10) are located directly behind the intersection of the transverse steel bar (1) and the longitudinal steel bar (2). The second electric telescopic end of the second electric telescopic rod (6) is driven to extend through the fifth controller (601) to drive the device box (9) to move forward. The device box (9) drives the two guide balls (10) to move forward, and the two guide balls (10) gradually separate from the transverse reinforcement (1) and the longitudinal reinforcement (2) during the contact process, until the intersection of the transverse reinforcement (1) and the longitudinal reinforcement (2) is surrounded by the left guide tube (11) and the right guide tube (26). At this time, the guide balls (10) are no longer in contact with the transverse reinforcement (1) and the longitudinal reinforcement (2). Under the elastic force of the first spring (21), the left guide tube (11) and the right guide tube (26) are closed, and the second controller (1701) controls the second motor (17) to start, so that the second motor (17) drives the left guide wheel (19) to rotate, and the binding wire (18) is moved into the left guide tube (11), and returned to the device box (9) through the right guide tube (26); Step 3: The second electric telescopic end of the second electric telescopic rod (6) is driven to retract by the fifth controller (601) to drive the device box (9) to move backwards, and the device box (9) drives the two guide balls (10) to move backwards. The two guide balls (10) are opened during the contact process with the transverse steel bars (1) and the longitudinal steel bars (2), and the binding wire (18) is hung on the intersection of the transverse steel bars (1) and the longitudinal steel bars (2). When the two guide balls (10) are separated from the transverse steel bars (1) and the longitudinal steel bars (2), the first controller (501) controls the first motor (5) to start, so that the first motor (5) drives the device box (9) to rotate, thereby driving the binding wire hung on the intersection of the transverse steel bars (1) and the longitudinal steel bars (2) to spirally wind, so that the binding wire is fixed on the intersection of the transverse steel bars (1) and the longitudinal steel bars (2); Step 4: controlling the first electric telescopic rod (12) to start up through the third controller (1201), so that the first electric telescopic rod (12) drives the cutter (24) to move and cut the wire in the wire guide plate (50); Step 5: Under the continuous thrust of the conveyor belt (3), the arc-shaped bent rod (38) is deformed and decoupled from the longitudinal steel bar (2). After decoupling, the arc-shaped bent rod (38) made of memory metal material returns to its original shape, and the conveyor belt (3) drives the device box (9) to move and tie other intersections of the transverse steel bars (1) and the longitudinal steel bars (2).