A ventilation method for long and large tunnels connected in series with fans and a ventilation room structure
By modifying the cross-traffic passage into the air room, combining the fan and air purification device, the problems of insufficient air volume and pollution in tunnel construction are solved, and efficient ventilation solutions are provided, simplifying management and reducing costs.
Patent Information
- Application Number
- CN202210452841.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-27
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-04-27
AI Technical Summary
Traditional tunnel construction ventilation methods have problems such as insufficient air volume, pollution of dust and wind, easy equipment damage and complex management. Especially in long-distance construction, the joint connection method of the series fan leads to a decrease in air supply and mixing in dust and wind.
Use modified cross-traffic passages as the air room, and are equipped with fan, air purification device and electrostatic dust removal device. Through horizontal and vertical air ducts, rigid air ducts and guide fans, fresh air and purify dirty air to ensure the air supply in the tunnel. and air clean.
It has achieved the provision of sufficient fresh purified air during the construction of Changda tunnels, avoid pollution, simplified management, reduced costs, and saved space for mechanical and electrical equipment layout and convenient maintenance.
Smart Images

Figure CN114856672B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel construction ventilation, and in particular to a tunnel construction ventilation method and an air room structure for a long and large tunnel connected in series with fans. Background Art
[0002] The ventilation methods for tunnel construction are generally pressure-in, extraction, mixed and tunnel. The above traditional ventilation methods have the following defects:
[0003] (1) Injection ventilation requires a very large air volume during long-distance construction, and the return air will pollute the entire tunnel; (2) The effective suction range of exhaust ventilation is short, and the air duct is easily damaged during drilling and blasting construction. Fresh air flows through the entire tunnel and is no longer fresh when it reaches the working face; (3) The construction management of mixed and tunnel ventilation is complex; and the cost of tunnel ventilation is relatively high.
[0004] At present, some tunnels are using the ventilation method of series-connected fans. However, the series connection of the two fans is too simple. Basically, they are directly connected using joints, which seriously affects the air supply after the series connection and is easy to mix with polluted air in the tunnel at the joints. Summary of the invention
[0005] The purpose of the present invention is to provide a long tunnel construction ventilation method with fans in series, which is used to solve the above technical problems. The present invention innovatively uses the tunnel vehicle / pedestrian cross passage as the wind room of the fans in series. The wind room can be equipped with electromechanical equipment and air purification devices of the fans at the same time; it can provide sufficient air volume for the tunnel while avoiding the influence of polluted air, and can also save the layout space of electromechanical equipment.
[0006] In order to achieve the above object, the present invention adopts the following technical solutions:
[0007] A method for ventilation of a long tunnel connected in series with a fan is provided, comprising the following steps:
[0008] Before the tunnel construction reached 1,200 meters, the pressure ventilation method was used;
[0009] After the tunnel construction reached 1,200 meters, the series ventilation method was adopted, and the vehicle cross passage close to the tunnel face was converted into a wind room.
[0010] The present invention also provides a ventilation room for long and large tunnels connected in series with fans for tunnel construction, wherein the ventilation room is converted from a vehicle cross passage close to the tunnel face;
[0011] The air room comprises: an air inlet and an air outlet;
[0012] A horizontal air duct, a vertical air duct and a rigid air duct are sequentially arranged between the air inlet and the air outlet;
[0013] The horizontal air duct is also provided with a tunnel polluted air inlet;
[0014] A dust filtering device and an air purification device are installed inside the vertical air duct;
[0015] A guide fan is also installed between the air purification device and the rigid air duct.
[0016] Further preferably, the air inlet is connected to an air duct, and a first axial flow fan is installed at one end of the air duct away from the air inlet;
[0017] The first axial flow fan is located outside the tunnel.
[0018] Further preferably, the air outlet is connected to an air duct, and a second axial flow fan is installed inside the air duct;
[0019] The air outlet of the air duct is located in the tunnel.
[0020] Further preferably, the output end of the rigid air duct is connected to the air outlet via an air duct interface.
[0021] Further preferably, an electrostatic dust removal device is also installed at the tunnel polluted air inlet.
[0022] Further preferably, the electrostatic precipitator comprises a DC power supply, the positive electrode of the DC power supply is connected to a positive discharge element, and the negative electrode is connected to a negative discharge element;
[0023] A grounded dust collecting component is provided between the positive discharge component and the negative discharge component, and the grounded dust collecting component is connected to the ground.
[0024] Further preferably, the air purification device includes 4 layers of filter screens containing okara catalyst.
[0025] The present invention has at least the following beneficial effects:
[0026] The present invention provides part of the fresh air outside the tunnel through the air inlet, and the wind from the tunnel dirty air inlet flows through the electrostatic dust removal device - the harmful gas purification device (including the dust filtering device and the air purification device) - the guide fan - the air outlet, so as to provide purified tunnel circulating air. The air finally provided to the heading face includes fresh air and purified circulating air, thereby ensuring the air supply volume and the cleanliness of the air.
[0027] Compared with the tunnel-type ventilation management, the present invention is more convenient and has lower cost; the present invention saves more space and is convenient for maintenance by arranging the electromechanical equipment in the wind room. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying any creative work.
[0029] Figure 1 It is a schematic diagram of the push-in ventilation method;
[0030] Figure 2 It is a schematic diagram of the ventilation method of series fans;
[0031] Figure 3 This is a schematic diagram of the main section of the wind room;
[0032] Figure 4 This is a side view of the wind room;
[0033] Figure 5 Schematic diagram of electrostatic precipitator.
[0034] In the figure: 101, first axial flow fan; 102, air duct; 103, air room; 104, second axial flow fan; 105, tunnel trolley; 106, tunnel face; 107, harmful gas purification device; 108, electromechanical equipment; 1, air inlet; 2, dirty air inlet; 3, dust filtering device; 4, air purification device; 5, guide fan; 6, rigid air duct; 7, air duct interface; 8, air outlet; 201, negative discharge component; 202, positive discharge component; 203, grounded dust collecting component; 204, DC power supply; 205, earth. DETAILED DESCRIPTION
[0035] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0036] Embodiment 1:
[0037] See also Figure 1-5 The present invention specifically relates to a ventilation method for long and large tunnels with fans connected in series.
[0038] Before the tunnel construction reached 1200 meters, the tunnel used pressure ventilation method, such as Figure 1 .
[0039] After the construction reaches 1200 meters, the serial ventilation method is adopted. The vehicle cross passage close to the tunnel face is converted into a wind room, such as Figure 2 .
[0040] As shown in the figure:
[0041] There is a tunnel trolley 105 working in front of the tunnel face 106. We converted the vehicle cross passage close to the tunnel face into a wind room 103. In the series ventilation system, a plurality of air ducts 102 are arranged on one side of the wind room 103, and a first axial flow fan 101 is arranged at one end of each air duct 102 away from the wind room 103; a plurality of air ducts 102 are also arranged on the other side of the wind room 103, and a second axial flow fan 104 is installed inside the air duct 102.
[0042] In addition, mechanical and electrical equipment 108 and a harmful gas purification device 107 are installed inside the wind room 103 .
[0043] It can be understood that the first axial flow fan 101 is arranged outside the tunnel, and the air outside the tunnel is sucked into the tunnel by the first axial flow fan 101.
[0044] For details, please refer to Figure 3 and 4 .
[0045] The air room 103 comprises: an air inlet 1, and the input end of the air inlet 1 is connected to the air duct 102 for introducing air outside the tunnel, and the output end of the air inlet 1 is connected to a vertical air duct through a horizontal air duct;
[0046] The horizontal air duct is also provided with a tunnel polluted air inlet 2 for introducing air into the tunnel;
[0047] The vertical air duct is installed with a dust filter 3 and an air purification device 4 in sequence. Specifically, the dust filter and the air purification device are both mature existing technologies. In the specific application process, they can be freely purchased from the market, and this application will not elaborate on them.
[0048] Among them, the arrangement of the air purification device is preferably provided with 4 layers of filter screens containing hopal catalysts, which are used to oxidize nitrogen oxides and carbon oxides that may exist in the polluted air, thereby purifying toxic gases.
[0049] At the output end of the air purification device 4 , a guide fan 5 is further provided, and the output end of the guide fan 5 is connected to a rigid air duct 6 , and the output end of the rigid air duct 6 is connected to an air outlet 8 via an air duct interface 7 .
[0050] Specifically, the air outlet 8 is connected to the air duct 102 connected to the second axial flow fan 104, and the air outlet end of the air duct 102 is located inside the tunnel.
[0051] In addition, the diameters of the air outlet 8 and the air inlet 1 are determined according to the air ducts of the axial flow fans used at the construction site, and the air duct with a diameter of 1.5 to 2 m is the commonly used air duct diameter in tunnels.
[0052] In addition, the tunnel polluted air inlet 2 is the inlet for polluted gases in the tunnel, and an electrostatic dust removal device needs to be installed at the tunnel polluted air inlet 2.
[0053] The structure of the air electrostatic dust removal device is as follows: Figure 5 The invention comprises a DC power supply 204 , wherein the positive electrode of the DC power supply 204 is connected to a positive discharge component 202 , and the negative electrode is connected to a negative discharge component 201 ; a grounded dust collecting component 203 is arranged between the positive discharge component 202 and the negative discharge component 201 , and the grounded dust collecting component 203 is connected to the earth 205 .
[0054] The air flow direction and dust flow direction in the figure are shown by the arrows.
[0055] Its working principle is as follows: an electric field is generated between the positive discharge element 202 and the grounded dust collecting component 203. Under the action of the electric field, the dust-containing gas is ionized and generates positive ions. The positive ions collide and combine with the dust to make the dust positively charged. At the same time, an electric field is generated between the negative discharge element 201 and the grounded dust collecting component 203. Under the action of the electric field, the dust-containing gas is ionized and generates negative ions. The negative ions collide and combine with the dust to make the dust negatively charged. The smaller dust with positive charge and the smaller dust with negative charge meet in the dust collecting opening and condense into larger dust due to opposite electrical properties. The larger dust falls under the action of its weight and adheres to the grounded dust collecting component 203.
[0056] It can be seen that the air inlet 1 of the present application provides part of the fresh air outside the tunnel; the wind from the tunnel dirty air inlet 2 passes through the electrostatic dust removal device - the harmful gas purification device 107 (including the dust filter device 3 and the air purification device 4) - the guide fan 5 - the air outlet 8, and provides the purified tunnel circulating air. The air finally provided to the face includes fresh air and purified circulating air.
[0057] In order to ensure that the air supply to the face meets the demand, the position of the axial flow fan 1 and the amount of dirty air entering the tunnel need to be strictly controlled. Since the outlet wind pressure of fans produced by different manufacturers is different, it is assumed that the outlet wind speed of the axial flow fan is H1; through the empirical formula of the field experiment, the wind speed of the axial flow fan in the air duct changes linearly and satisfies the following formula:
[0058]
[0059] v is the wind speed at the duct outlet (m / s); ρ is the air density (kg / m3).
[0060] When the wind pressure Hin at the air inlet of the air room is greater than the wind pressure Hout at the air outlet of the air room, the dirty air inlet is closed; if the wind pressure Hin at the air inlet of the air room is less than the wind pressure Hout at the air outlet of the air room, the dirty air inlet is opened.
[0061] It can be seen that the present invention has the following beneficial effects:
[0062] 1. It can provide sufficient air volume for the tunnel construction face.
[0063] 2. Avoid contamination from tunnel dirty air at the fan joint, i.e., the air room of this method.
[0064] 3. This method is more convenient and less costly than tunnel ventilation management.
[0065] 4. The fan electromechanical equipment is arranged in the wind room to save space and facilitate maintenance.
[0066] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.
Claims
1. A ventilation method for long and large tunnels connected in series with fans, characterized in that: The following steps are involved: Before the tunnel construction reached 1,200 meters, the pressure ventilation method was used; After the tunnel construction reached 1,200 meters, the serial ventilation method was adopted, and the vehicle cross passage close to the tunnel face was converted into a wind room; The wind room is converted from a vehicle cross passage close to the tunnel face; The air room comprises: an air inlet and an air outlet; A horizontal air duct, a vertical air duct and a rigid air duct are sequentially arranged between the air inlet and the air outlet; The horizontal air duct is also provided with a tunnel polluted air inlet; A dust filtering device and an air purification device are installed inside the vertical air duct; A guide fan is also installed between the air purification device and the rigid air duct; An electrostatic dust removal device is also installed at the tunnel polluted air inlet; The electrostatic precipitator comprises a DC power supply, the positive electrode of the DC power supply is connected to a positive discharge element, and the negative electrode of the DC power supply is connected to a negative discharge element; A grounded dust collecting component is provided between the positive discharge component and the negative discharge component, and the grounded dust collecting component is connected to the ground; The output end of the rigid air duct is connected to the air outlet through an air duct interface; The air purification device comprises 4 layers of filter screens containing okara catalyst.
2. A long tunnel construction ventilation method with fans connected in series according to claim 1, characterized in that: The air inlet is connected to an air duct, and a first axial flow fan is installed at one end of the air duct away from the air inlet; The first axial flow fan is located outside the tunnel.
3. A long tunnel construction ventilation method with fans connected in series according to claim 2, characterized in that: The air outlet is connected to an air duct, and a second axial flow fan is installed inside the air duct; The air outlet of the air duct is located in the tunnel.
4. A long tunnel construction ventilation method with fans in series according to claim 1, characterized in that: Mechanical and electrical equipment is also arranged inside the wind room.
Citation Information
Patent Citations
Dedusting smoke-removing assistant ventilating device for tunnel construction
CN106761890A
Ventilation and dustproof method used for tunnel construction
CN109958467A
Tunnel press-in type ventilation relay system
CN113685219A
Ventilating house
CN202090939U
Median septum air duct type railway double-hole tunnel
CN211230483U