Method for determining the amount of new asphalt mixture in hot-in-place recycled asphalt pavement
Through three-dimensional digital information analysis and calculation, the amount of new asphalt mixture during on-site thermal regeneration of asphalt pavement is accurately determined, which solves the problem that the amount of dosage in the existing technology is difficult to accurately determine, and achieves efficient utilization of resources and improvement of construction efficiency.
Patent Information
- Application Number
- CN202210423363.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-21
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2042-04-21
AI Technical Summary
The prior art is difficult to accurately determine the amount of new asphalt mixture during on-site thermal regeneration of asphalt pavement, resulting in waste of resources and reduced construction efficiency.
By collecting three-dimensional digital information on the road surface, analyzing the volume, compaction degree and theoretical maximum density of the original pavement surface, combining the theoretical maximum density of the new asphalt mixture and the regenerated pavement compaction degree, the quality of the new material to fill the rut and the original pavement compaction are calculated. The quality of new materials added and the total mass of regenerated asphalt mixture caused by the difference, so as to accurately calculate the amount of new asphalt mixture.
The accurate calculation of the amount of new asphalt mixture is achieved, which reduces resource waste, improves construction efficiency, and makes the mix ratio design closer to the actual situation, and improves the durability of the regenerated road surface.
Smart Images

Figure CN114858236B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of road engineering, and in particular to a method for determining the dosage of new asphalt mixture in in-situ hot-regenerated asphalt pavement. Background Art
[0002] After years of use, asphalt pavement will be further compacted and produce rutting under load. In addition, after repeated friction between tires and the road surface, the original road surface will also produce a certain amount of wear, thus forming asphalt pavement rutting. When the asphalt pavement is hot-regenerated in situ, in order to restore the original road surface, a part of new asphalt mixture needs to be added to fill the rutting. At the same time, due to poor construction quality control of some asphalt pavements, the compaction degree of the original road surface is low. In order to ensure that the compaction degree of the regenerated road surface meets the design requirements, some new asphalt mixture needs to be added during the hot-regeneration of the asphalt pavement in situ to ensure the compaction effect of the regenerated road surface. Therefore, when the asphalt pavement is hot-regenerated in situ, it is generally necessary to add new asphalt mixture to ensure that the road surface can be restored to a better use effect after hot-regeneration in situ.
[0003] When designing the mix ratio of hot-in-situ recycling of asphalt pavement, a certain amount of new asphalt mixture needs to be added. Previous studies have shown that the amount of new asphalt mixture has a great influence on the performance of recycled asphalt mixture. Therefore, preparing to determine the amount of new asphalt mixture has important guiding significance for the design of hot-in-situ recycling mix ratio of asphalt pavement. In addition, in actual construction, new asphalt mixture usually needs to be transported to the site by a transport vehicle after production at the mixing plant. If the amount of new asphalt mixture cannot be accurately determined, it is easy to cause excess or insufficient new asphalt mixture produced on the day. Excessive new asphalt mixture will cause waste of resources, and insufficient production of new asphalt mixture will cause a decrease in construction efficiency. It can be seen that it is very important to accurately determine the amount of new asphalt mixture.
[0004] In response to the above problems, technicians have proposed a number of solutions, but they mainly use a 3m ruler to measure the rutting depth of the original road surface according to a section of 5-10m, and then use mathematical statistical analysis to propose the dosage of the new asphalt mixture. However, the road rutting is irregular. No matter how accurately the 3m ruler is used to measure, only the geometric dimensions of the rutting section and the volume of the rutting within the range of the measuring point spacing are approximately estimated, and the true volume of the rutting cannot be accurately determined. In addition, the existing method does not take into account the impact of the compaction of the original road surface, the theoretical maximum density of the original road surface, the theoretical maximum density of the new asphalt mixture, and the compaction of the regenerated road surface. Therefore, in actual application, the dosage of the new asphalt mixture determined by the existing method is generally difficult to achieve the ideal effect, and there is a certain difference from the dosage of the new asphalt mixture used in actual engineering. Therefore, it is urgent to propose a method for determining the dosage of the new asphalt mixture for in-situ hot regeneration of asphalt pavement. Summary of the invention
[0005] In view of the above problems, the present invention aims to provide a method for determining the dosage of new asphalt mixture in in-situ hot-regenerated asphalt pavement, which can accurately calculate the dosage value and reduce the waste of asphalt mixing.
[0006] To achieve the technical purpose, the solution of the present invention is: a method for determining the dosage of new asphalt mixture in in-situ hot-regenerated asphalt pavement, the specific steps are as follows:
[0007] S1, collecting three-dimensional digital information of the road surface, analyzing and obtaining the rutting volume V within the specified regeneration length L of the original road surface, and the regeneration width is y;
[0008] S2, detecting and determining the compaction degree γ1 and theoretical maximum density λ1 of the original road surface;
[0009] S3, determining the h1 harrowing depth of the original road surface and the thickness h2 of the road surface after regeneration;
[0010] S4, detecting and determining the theoretical maximum density λ2 of the new asphalt mixture;
[0011] S5, determining the compaction degree γ2 of the regenerated road surface;
[0012] S6. The mass m1 of the new material for filling ruts, the mass m2 of the new material added due to the compaction difference of the original road surface, and the total mass m3 of the recycled asphalt mixture are calculated using the above parameters and the dosage β. The dosage β of the new asphalt mixture is determined using the following formula: β = (m1 + m2) / m3 (1).
[0013] As a preferred embodiment, the mass m1 of the new material for filling the rut is: m1=Vγ2λ2 (2);
[0014] The mass m2 of the new material added due to the compaction difference of the original road surface is:
[0015] m2=Lyh1(γ2-γ1)β(x2-x1)+Lyh1(γ2-γ1)λ1 (3);
[0016] The total mass m3 of recycled asphalt mixture is:
[0017] m3=Lyh2γ2β(λ2-λ1)+Lyh2γ2λ1 (4);
[0018] Substituting formula (1)-(3) into the calculation formula (1) of the dosage β, we obtain:
[0019]
[0020] Solving formula (5), we can get the dosage β of the new asphalt mixture as follows:
[0021]
[0022] Preferably, in step S1, a three-dimensional holographic inspection vehicle with a laser probe is used to collect three-dimensional digital information of the original road surface, and the rutting volume V of the original road surface is calculated according to 300-800m as an evaluation section.
[0023] Preferably, the original road surface compaction degree γ1 in step S2 is cored according to 300-800m as one evaluation section, with no less than 3 core samples.
[0024] Preferably, the theoretical maximum density λ1 of the original pavement in step S2 is obtained by taking a plate according to 300-800m as an evaluation section, and after the mixture is fully mixed indoors, the vacuum test method T0711-2011 is used to obtain the density.
[0025] Preferably, the theoretical maximum density λ2 of the new asphalt mixture in step S5 is obtained using vacuum test method T0711-2011.
[0026] The beneficial effects of the present invention are that the application can accurately calculate the dosage of new asphalt mixture, which can make the mix design closer to the actual situation and more refined, thereby facilitating improving the durability of the regenerated pavement; at the same time, the engineering dosage obtained by this method is more accurate, which can make the discharge of the mixing station more accurate and avoid the waste of new asphalt mixture. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a structural schematic diagram of the present invention;
[0028] Figure 2 It is a three-dimensional scan of the original road surface and a simulated rutting map of the present invention;
[0029] Figure 3 It is the curve of the simulated rutting of the present invention. DETAILED DESCRIPTION
[0030] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0031] like Figure 1-3 As shown, the specific embodiment of the present invention is a method for determining the amount of new asphalt mixture in in-situ hot-regenerated asphalt pavement, and the specific steps are as follows:
[0032] S101, using a digital holographic three-dimensional detection vehicle to detect the three-dimensional shape of the original road surface, obtain the three-dimensional shape of the original road surface, simulate paving the rutting plane based on the three-dimensional shape, use digital software to calculate the area between the plane and each section of the original road surface three-dimensional shape, perform corresponding integration of the area along the forward direction of the detection vehicle, and determine the rutting volume V, regeneration length L and regeneration width y of the original road surface;
[0033] like Figure 2 and 3 As shown, Figure 3 The sinusoidal graph of is the curve simulating the rutting. 1. M is Figure 3 The horizontal line corresponding to the vertical axis 1 is the simulated flat rutting plane; 2. MeanDepth is the height between 0 and 1 on the vertical axis (i.e. Figure 3 The height between the double arrow lines in the figure is the average depth of the simulated overlay. 3. The overlay area is the area between the sine curve and the horizontal line corresponding to the vertical axis 1. The simulation calculation is as follows:
[0034] M=max(f(x))=mean(f fit (x))+MeanDepth
[0035]
[0036] S102, detecting and determining the compaction degree γ1 (based on the theoretical maximum density) and the theoretical maximum density λ1 of the original road surface;
[0037] S103, determining the h1 harrowing depth of the original road surface and the thickness h2 of the road surface after regeneration;
[0038] S104, detecting and determining the theoretical maximum density λ2 of the new asphalt mixture;
[0039] S105, determining the compaction degree γ2 of the regenerated road surface;
[0040] S106. Calculate and determine the dosage β of the new asphalt mixture.
[0041] The calculation formula of the amount of new asphalt mixture β is derived as follows: the mass of the new material for filling the ruts m1, the mass of the new material added due to the compaction difference of the original road surface m2, the total mass of the recycled asphalt mixture m3, and β = (m1 + m2) / m3 (1);
[0042] The mass m1 of the new material filling the rut is: m1=Vγ2λ2 (2);
[0043] The mass m2 of the new material added due to the compaction difference of the original road surface is:
[0044] m2=Lyh1(γ2-γ1)β(x2-x1)+Lyh1(γ2-γ1)λ1 (3);
[0045] The total mass m3 of recycled asphalt mixture is:
[0046] m3=Lyh2γ2β(λ2-λ1)+Lyh2γ2λ1 (4);
[0047] Substituting formula (1)-(3) into the calculation formula (1) of the dosage β, we obtain:
[0048]
[0049] Solve formula (5) and expand formula (5) to obtain a quadratic equation about β, which is expanded as follows:
[0050] Lyh2γ2(λ2-λ1)β 2 +Lyh2γ2λ1β-Lyh1(γ2-γ1)(λ2-λ1)β+Lyh1x1(γ1-γ2)-Vγ2λ2=0According to the solution formula of the quadratic equation:
[0051] Among them: A=Lyh2γ2(λ2-λ1);
[0052] B=[Lyh2γ2λ1-Lyh1(γ2-γ1)(λ2-λ1)];
[0053] C=Lyh1x1(γ1-γ2)-Vγ2λ2;
[0054] The final dosage β of the new asphalt mixture is:
[0055]
[0056] As a preferred embodiment, in step S1, a three-dimensional holographic inspection vehicle with a laser probe is used to collect three-dimensional digital information of the original road surface, and the rutting volume V of the original road surface is calculated according to 300-800m as an evaluation section.
[0057] As a preferred embodiment, the original road surface compaction degree γ1 in step S2 is cored according to 300-800m as one evaluation section, and the number of core samples is not less than 3.
[0058] As a preferred embodiment, the theoretical maximum density λ1 of the original pavement in step S2 is obtained by taking a plate according to 300-800m as an evaluation section, and after the mixture is fully mixed indoors, the vacuum method test method T0711-2011 is used to obtain the theoretical maximum density λ2 of the new asphalt mixture in step S5 using the vacuum method test method T0711-2011.
[0059] Embodiment 1:
[0060] The asphalt pavement of a certain highway was subjected to in-situ hot regeneration treatment due to the degradation of its road performance. The original pavement surface layer was 4.0 cm, and 800 m was selected for in-situ hot regeneration. The thickness of the regenerated surface was 5.0 cm. It was tested before construction, and the new asphalt mixture ratio was calculated. After actual completion, the new asphalt mixture ratio was verified, and the results are shown in the following table.
[0061] Table 1 Calculation and verification results of new asphalt mixture dosage for hot-recycled asphalt pavement
[0062]
[0063]
[0064] It can be seen from the above table that for the original pavement of 4cm, the pavement thickness after regeneration is 5cm, that is, new materials need to be added to increase the original pavement thickness. This calculation method has good applicability when the thickness of the pavement after regeneration is quite different from the original pavement thickness. The factors considered by the method of this application are more comprehensive. The deviation between the calculated dosage and the new asphalt mixture dosage obtained by actual engineering usage is only 0.7%. It can be seen that the accuracy of the new asphalt mixture dosage calculated by this method is relatively high.
[0065] Embodiment 2:
[0066] The asphalt pavement of a certain highway was subjected to in-situ hot regeneration treatment due to the degradation of its road performance. The original pavement surface layer was 3.7 cm, and 708 m was selected for in-situ hot regeneration. The thickness of the rear layer after regeneration was 4.0 cm. It was tested before construction, and the new asphalt mixture content was calculated and verified after actual completion. The results are shown in Table 2.
[0067] Table 2 Calculation and verification results of new asphalt mixture dosage for hot-in-place recycled asphalt pavement
[0068]
[0069]
[0070] It can be seen from the above table that since this method takes into account the influence of the compaction of the original pavement, the theoretical maximum density of the original pavement, the theoretical maximum density of the new asphalt mixture and the compaction of the recycled pavement, the results obtained are relatively accurate and also have good applicability to the situation where the difference between the original pavement thickness and the thickness after recycling is small. The deviation between the calculated dosage and the new asphalt mixture dosage obtained by actual engineering usage is only 0.4%. It can be seen that this method has a high accuracy in calculating the new asphalt mixture dosage.
[0071] Embodiment three:
[0072] A highway needs to be hot-regenerated on site. Before construction, this calculation method and the traditional 3m ruler measurement method were used to determine the dosage of the new asphalt mixture. The calculation results are shown in Table 3 below.
[0073] Table 3 Comparison of calculation results of new asphalt mixture dosage for hot-recycled asphalt pavement
[0074] This application method 3m Ruler Method New asphalt mixture content (%) 9.8 15.3
[0075] The new asphalt mixture dosage obtained by this method and 3m ruler was used for mix design, and the performance indicators of the recycled asphalt mixture are shown below.
[0076] Table 4 Performance of recycled asphalt mixture obtained by different measurement methods
[0077] This application method 3m Ruler Method New asphalt mixture content (%) 9.8 15.3 Void ratio (%) 4.2 5.8 Residual stability after immersion in water (%) 98.1 87.2 Dynamic stability (times / mm) 10012 8790 Freeze-thaw splitting strength ratio (%) 92.1 83.7
[0078] Table 5 Differences between the amount of new asphalt mixture obtained by different calculation methods and the actual amount
[0079]
[0080] As can be seen from the table above, the difference in the amount of new asphalt mixture produced by different measurement methods has caused great differences in the performance of recycled asphalt mixtures, especially in the dynamic stability of recycled asphalt mixtures. Obviously, accurate new asphalt mixture dosage can make the mix design closer to the actual situation, making the mix design more refined and facilitating the improvement of the durability of recycled pavement. In addition, by comparing the actual engineering dosage and the new asphalt mixture dosage obtained by different calculation methods, it can be seen that the engineering dosage obtained by this method is more accurate, which can make the mixing station discharge more accurate and avoid the waste of new asphalt mixture.
[0081] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any slight modification, equivalent substitution and improvement made to the above embodiment based on the technical essence of the present invention should be included in the protection scope of the technical solution of the present invention.
Claims
1. A method for determining the amount of new asphalt mixture in hot-in-situ regenerated asphalt pavement, characterized in that: The specific steps are as follows: S1, collecting three-dimensional digital information of the road surface, analyzing and obtaining the rutting volume V within the specified regeneration length L of the original road surface, and the regeneration width is y; S2, detecting and determining the compaction degree γ1 and theoretical maximum density λ1 of the original road surface; S3, determining the h1 harrowing depth of the original road surface and the thickness h2 of the road surface after regeneration; S4, detecting and determining the theoretical maximum density λ2 of the new asphalt mixture; S5, determining the compaction degree γ2 of the regenerated road surface; S6. The mass m1 of the new material for filling the ruts, the mass m2 of the new material added due to the compaction difference of the original road surface, and the total mass m3 of the recycled asphalt mixture are calculated by the above parameters and the dosage β. The dosage β of the new asphalt mixture is determined by the above mass calculation, and the calculation formula is: β = (m1 + m2) / m3 (1); The mass m1 of the new material filling the rut is: m1=Vγ2λ2 (2); The mass m2 of the new material added due to the compaction difference of the original road surface is: m2=Lyh1(γ2-γ1)β(x2-x1)+Lyh1(γ2-γ1)λ1 (3); The total mass m3 of recycled asphalt mixture is: m3=Lyh2γ2β(λ2-λ1)+Lyh2γ2λ1 (4); Substituting formula (1)-(3) into the calculation formula (1) of the dosage β, we obtain: Solving formula (5), we can get the dosage β of the new asphalt mixture as follows:
2. The method for determining the amount of new asphalt mixture in the in-situ hot-regenerated asphalt pavement according to claim 1 is characterized in that: In step S1, a three-dimensional holographic detection vehicle with a laser probe is used to collect three-dimensional digital information of the original road surface, and the rutting volume V of the original road surface is calculated according to 300-800m as an evaluation section.
3. The method for determining the amount of new asphalt mixture in the in-situ hot-regenerated asphalt pavement according to claim 1 is characterized in that: The original road surface compaction degree γ1 in step S2 is cored according to 300-800m as one evaluation section, with no less than 3 core samples.
4. The method for determining the amount of new asphalt mixture in the hot-in-situ regenerated asphalt pavement according to claim 1 is characterized in that: In step S2, the theoretical maximum density λ1 of the original pavement is obtained by taking a plate according to 300-800m as an evaluation section, and after the mixture is fully mixed indoors, the vacuum test method T0711-2011 is used to obtain it.
5. The method for determining the amount of new asphalt mixture in the in-situ hot-regenerated asphalt pavement according to claim 1 is characterized in that: The theoretical maximum density λ2 of the new asphalt mixture in step S5 is obtained using the vacuum test method T0711-2011.
Citation Information
Patent Citations
Mix proportion design method of remixed in-place hot recycled asphalt mixture
CN111916158A
Mix proportion design method of hot mix plant recycled asphalt mixture
CN113024161A