A method for assembling a precast concrete T-beam concrete slab beam-slab structure
Through the design of the off-layer and wrong sides of precast concrete T-beams and some floor slabs and the secondary casting of fine stone concrete, the problem of easy cracking of joints in prefabricated buildings is solved, the assembly rate and overall performance are improved, and the construction volume and cracks are reduced. width.
Patent Information
- Application Number
- CN202210390796.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-14
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2042-04-14
AI Technical Summary
In existing prefabricated buildings, the horizontal and longitudinal joints of concrete overlapping floor slabs are prone to cracking, have low assembly rate, large on-site construction project volume, and poor overall performance.
Precast concrete T-beams and some floor slabs are used to prefabricate them, and secondary pouring concrete is superimposed at the joints. The connection between precast concrete slabs and T-beams is designed with staggered layers and staggered edges. Fine stone concrete is poured on site to enhance joint strength. .
It improves the assembly rate, reduces the on-site construction volume, enhances the overall performance of the structure, reduces the crack width at the joints, and improves durability.
Smart Images

Figure CN114876116B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of assembled building engineering, and in particular relates to an assembly method of a prefabricated concrete T-beam concrete slab beam-slab structure. Background Art
[0002] At present, corrugated steel plate composite floor slabs and precast concrete composite slabs are widely used in prefabricated building projects. The corrugated steel plate composite floor slabs require a large amount of concrete pouring on site, and the concrete composite floor slabs also require concrete pouring on site to form a full thickness floor slab, and the transverse and longitudinal joints are prone to cracking. The current assembly plan is still imperfect and needs to be further improved to increase the assembly rate, reduce the amount of on-site construction work, improve the overall performance of prefabricated buildings, and improve the prefabricated construction method.
[0003] Through the above analysis, the problems and defects of the prior art are as follows:
[0004] (1) Concrete composite floor slabs are prone to cracking at transverse and longitudinal joints;
[0005] (2) The assembly rate is low and the on-site construction workload is large;
[0006] (3) Currently, the overall performance of prefabricated buildings is poor, and the prefabricated construction technology needs to be improved.
[0007] The difficulty and significance of solving the above problems are:
[0008] Based on the investigation of existing engineering design and construction status, the present invention provides an assembly method of a precast concrete T-beam concrete slab beam-slab structure for structural floor slabs, bridge structures, etc.;
[0009] The floor structure plays a very important role in the entire building structure and is the direct bearing structure of live loads. Existing prefabricated structure design schemes mostly adopt composite slab schemes, which are prefabricated to a certain thickness, transported to the project site for installation, and then poured to a certain thickness. With the development of prefabricated structures, prefabricated assembly schemes that provide higher assembly rates and have good feasibility in both theory and construction are the future development direction. Summary of the invention
[0010] In view of the problems existing in the prior art, the present invention provides an assembly method of a precast concrete T-beam concrete slab beam-slab structure.
[0011] The present invention is achieved in this way. A method for assembling a precast concrete T-beam concrete slab beam-slab structure is characterized in that the precast concrete T-beam in the assembly method is prefabricated as a whole with a beam and a part of a floor slab, the precast concrete slab adopts a partial overlapping design, and concrete is poured on-site for a second time within a certain range at the joint to form a complete floor slab; the precast concrete slab in the assembly method adopts a staggered layer and staggered side prefabrication design at the connection with the precast concrete T-beam, and the precast concrete slab can be supported on the precast concrete T-beam during assembly, and concrete is poured after the overlapping part is connected to the truss steel bars; the joints between the precast concrete slabs in the assembly method adopt a lower concrete slab prefabrication and upper on-site cast concrete overlapping design, the steel bars at the lower joints are connected by binding, mechanical connection or welding, the upper steel bars are connected by truss steel bars in the direction of the joints between the slabs, and after the force-bearing steel bars parallel to the joints are reinforced, fine stone concrete with a higher strength grade than the precast concrete slab is poured.
[0012] Further, the assembly method is as follows:
[0013] S101: First, leave reinforcement from the precast reinforced concrete T-beam to the beam-column joint and cast the beam-column node on site as a whole, leaving a connection structure at the flange;
[0014] S102: The precast concrete slab is designed with staggered edges and connected with the precast reinforced concrete T-beam at the flange. The flange of the precast reinforced concrete T-beam is extended to a certain length and a joint is left. The protruding part of the end of the precast concrete slab is supported in the area near the top of the beam, and the contact surface is treated with mortar for bonding.
[0015] S103: The connection positions of the precast T-beam and the upper reinforcement of the precast concrete slab are staggered, and the upper reserved truss reinforcement and the lower extended reinforcement at the joint are fixed by binding, mechanical connection or welding;
[0016] S104: Cast concrete on site, and cast concrete on site for the second time within a certain range of the joint to form a complete floor slab;
[0017] S105: The joints between precast concrete slabs are designed as composite slabs. The lower slab is precast with the upper slab connected on site, and the stress-bearing steel bars parallel to the longitudinal direction of the joints are reinforced;
[0018] S106: Fine stone concrete with a higher strength grade than that of precast concrete slabs is poured at the joints between slabs to form a slab strip with greater bending stiffness within the local width, thereby reducing the tensile stress at the bottom of the joint in the direction perpendicular to the joint, thereby reducing the width of the crack at the joint and increasing durability.
[0019] Furthermore, in S102, the contact surfaces of the precast concrete slab and the precast concrete T-beam are roughened before assembly, and need to be wetted with water and bonded with high-strength cement mortar during on-site assembly.
[0020] Furthermore, in S103, the lower steel bars of the precast concrete slab and the precast concrete T-beam are connected at the joints, the steel bars are mechanically connected or welded, the upper reserved truss steel bars are tied and overlapped, mechanically connected or welded, and superimposed and cast with a higher grade of fine stone concrete.
[0021] Further, in said S103, the reinforcement in the width direction of the flange of the precast part of the precast concrete T-beam is considered as the tensile reinforcement for the negative bending moment supported by the cantilever slab on the beam, and truss reinforcement is reserved in the upper part, which is connected to the larger gap of the precast concrete slab during assembly, and shorter truss reinforcement or overhanging reinforcement is reserved in the smaller gap of the precast concrete slab.
[0022] Furthermore, in S103, the steel bars at the bottom of the precast concrete slab are connected by welding or mechanical connection, and the upper reserved truss steel frame is tied, overlapped, mechanically connected or welded.
[0023] Furthermore, in S104 and S106, the time for pouring concrete is adjusted according to actual conditions.
[0024] Furthermore, in S103, when the precast T-beam is connected to the precast concrete slab, fine stone concrete of several grades higher is used for overlapping casting to form a slab with large local bending rigidity, thereby reducing or avoiding the tensile stress perpendicular to the gap at the joint.
[0025] In combination with the above technical solutions and the technical problems solved, please analyze the advantages and positive effects of the technical solutions to be protected by the present invention from the following aspects:
[0026] First, in view of the technical problems existing in the above-mentioned prior art and the difficulty of solving the problems, the technical solutions to be protected by the present invention and the results and data during the research and development process are closely combined to analyze in detail and deeply how the technical solutions of the present invention solve the technical problems, and some creative technical effects brought about after solving the problems. The specific description is as follows:
[0027] The precast concrete T-beam in the present invention is prefabricated in one piece with a beam and a part of the floor slab, so as to ensure the overall performance of the main structure; the precast concrete slab adopts a partial overlapping design, and the concrete is poured on site for a second time within a certain range of the joint to form a complete floor slab; the precast concrete slab adopts a staggered layer and staggered side prefabrication design at the connection with the precast concrete T-beam, which can support the floor slab in place during assembly, and the on-site construction is convenient and fast.
[0028] The precast concrete slab in the present invention is connected with the precast reinforced concrete T-beam at the flange; the flange plate of the precast reinforced concrete T-beam is extended outward by a certain length, the protruding part of the end of the precast concrete slab is supported in the area near the top of the beam, the contact surface is roughened and bonded with mortar, the connection positions of the precast T-beam and the upper steel bars of the precast concrete slab are staggered, the upper and lower truss steel bars and the extended steel bars at the joint are fixed by binding, mechanical connection or welding, concrete is poured on site, and concrete is poured on site for the second time within a certain range at the joint to form a complete floor slab.
[0029] The joints between the precast concrete slabs in the present invention are designed as a composite slab, the lower steel bars are tied, mechanically connected or welded, and the upper steel bars are connected to the truss steel bars in the direction perpendicular to the joints between the slabs. Then, fine stone concrete with a higher strength grade than the precast concrete slabs is poured at the joints between the slabs to form a slab belt with greater bending stiffness within the local width, thereby reducing the tensile stress at the bottom of the joint in the direction perpendicular to the joint, thereby reducing the crack width at the joint and increasing durability.
[0030] Second, considering the technical solution as a whole or from the perspective of the product, the technical effects and advantages of the technical solution to be protected by the present invention are described in detail as follows:
[0031] Precast concrete beams and slabs Comprehensive consideration of precast concrete T-beams can strengthen the bearing capacity of major components and increase the overall performance of the structure.
[0032] Precast concrete T-beams and precast concrete slabs adopt a partial overlapping assembly scheme, which improves the assembly rate and reduces the amount of on-site engineering.
[0033] The joints between precast concrete T-beams and precast concrete slabs take into account both construction convenience and structural integrity. They are precast in factories with minimal increase in complexity.
[0034] The plate-to-plate joint method can be promoted in similar assembly structures to reduce the width of the bottom joints between plates or avoid cracking.
[0035] Third, as auxiliary evidence of the inventiveness of the claims of the present invention, it is also reflected in the following important aspects:
[0036] (1) The expected benefits and commercial value of the technical solution of the present invention after transformation are:
[0037] The technical solution of the present invention is an overall prefabrication and assembly solution for floor slabs, which can be directly transformed and applied in concrete structures and adopted in various types of urban buildings. The technical method is easy to transform and promote, and is convenient for forming a streamlined prefabrication and construction organization, thereby promoting the development of building industrialization.
[0038] (2) The technical solution of the present invention fills the technical gap in the industry at home and abroad:
[0039] This plan proposes a partially prefabricated composite assembled floor slab, taking the beam and slab into consideration as a whole. The prefabricated T-section beams increase the overall performance of the main components. The flange width is determined based on actual conditions, which is flexible and practical. The prefabricated slabs adopt a staggered edge and staggered layer design, taking into account the overall structural performance after construction and assembly.
[0040] (3) Whether the technical solution of the present invention solves the technical problems that people have been eager to solve but have not been able to solve successfully:
[0041] This technical solution improves the overall performance of prefabricated buildings. The staggered edge and staggered layer design of prefabricated T-beams and prefabricated panels can be easily promoted and used under other engineering conditions, solving the prominent contradictions of complex prefabricated component manufacturing, cumbersome assembly construction and poor overall performance after assembly.
[0042] (4) Whether the technical solution of the present invention overcomes technical prejudice;
[0043] This technical solution proposes a prefabrication and assembly solution from the perspective of the overall structure, overcoming the traditional thinking of prefabrication and reassembly of individual components, and providing a new reference and innovative solution for prefabricated building design. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 It is a flow chart of an assembly method of a precast concrete T-beam concrete slab beam-slab structure provided by an embodiment of the present invention.
[0045] Figure 2 It is a plan view of the beam-slab structure assembly provided by an embodiment of the present invention.
[0046] Figure 3 It is a cross-sectional view of the beam-slab structure assembly provided by an embodiment of the present invention.
[0047] Figure 4 It is a cross-sectional view of a precast concrete T-beam provided in an embodiment of the present invention.
[0048] Figure 5 It is a plan view of a precast concrete floor provided by an embodiment of the present invention.
[0049] Figure 6 It is a cross-sectional view of a precast concrete panel 3-3 provided in an embodiment of the present invention.
[0050] Figure 7 It is a cross-sectional view of a precast concrete panel 4-4 provided in an embodiment of the present invention.
[0051] Figure 8 It is a cross-sectional view of a precast concrete panel 6-6 provided in an embodiment of the present invention.
[0052] Fig. 9 It is a cross-sectional view of a precast concrete panel 5-5 provided in an embodiment of the present invention.
[0053] Fig.10 It is a detailed view of the longitudinal joint of the precast concrete slab provided in an embodiment of the present invention.
[0054] In the figure: 1. Precast concrete T-beam; 2. Precast concrete slab; 3. Reserved truss reinforcement; 4. Beam-slab overlapping connection area; 5. Post-cast high-strength concrete. DETAILED DESCRIPTION
[0055] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0056] 1. Explanatory Examples In order to enable those skilled in the art to fully understand how to implement the present invention, this section provides an illustrative example that expands and describes the technical solution of the claims.
[0057] The present invention belongs to the technical field of prefabricated building engineering, and discloses an assembly method of a precast concrete T-beam concrete slab beam-slab structure. The precast concrete T-beam in the present invention is prefabricated as a whole with a beam and a part of a floor slab to ensure the overall performance of the main structure; the precast concrete slab adopts a partial overlapping design, and concrete is poured on-site for a second time within a certain range at the joint to form a complete floor slab; the precast concrete slab adopts a staggered layer and staggered side prefabrication design at the connection with the precast concrete T-beam, and the precast concrete slab can be supported on the precast concrete T-beam during assembly, and the overlapping part is connected to the truss Concrete is poured after the reinforcement is erected, and the on-site construction is convenient and quick. The joints between precast concrete slabs are designed with the lower concrete slab prefabricated and the upper concrete slab cast on site. The reinforcement at the lower joint is connected by binding, mechanical connection or welding, and the upper reinforcement is connected by truss reinforcement in the direction of the joint between the slabs. After the load-bearing reinforcement parallel to the joint is reinforced, fine stone concrete with a higher strength grade than the precast concrete slab is poured, forming a slab with a larger bending stiffness within the local width, which reduces the tensile stress at the bottom of the joint, reduces the width of the crack at the joint, and increases durability.
[0058] like Figure 1 As shown, the assembly method in the present invention is as follows:
[0059] S101: First, leave reinforcement from the precast reinforced concrete T-beam to the beam-column joint and cast the beam-column node on site as a whole, leaving a connection structure at the flange;
[0060] S102: The precast concrete slab is designed with staggered edges and connected with the precast reinforced concrete T-beam at the flange. The flange of the precast reinforced concrete T-beam is extended to a certain length and a joint is left. The protruding part of the end of the precast concrete slab is supported in the area near the top of the beam, and the contact surface is treated with mortar for bonding.
[0061] S103: The connection positions of the precast T-beam and the upper reinforcement of the precast concrete slab are staggered, and the upper reserved truss reinforcement and the lower extended reinforcement at the joint are fixed by binding, mechanical connection or welding;
[0062] S104: Cast concrete on site, and cast concrete on site for the second time within a certain range of the joint to form a complete floor slab;
[0063] S105: The joints between precast concrete slabs are designed as composite slabs. The lower slab is precast with the upper slab connected on site, and the stress-bearing steel bars parallel to the longitudinal direction of the joints are reinforced;
[0064] S106: Fine stone concrete with a higher strength grade than that of precast concrete slabs is poured at the joints between slabs to form a slab strip with greater bending stiffness within the local width, thereby reducing the tensile stress at the bottom of the joint in the direction perpendicular to the joint, thereby reducing the width of the crack at the joint and increasing durability.
[0065] In S102, the contact surfaces of the precast concrete slab and the precast concrete T-beam are roughened before assembly, and need to be wetted with water and bonded with high-strength cement mortar during on-site assembly.
[0066] In S103, the lower steel bars of the precast concrete slab and the precast concrete T-beam are connected at the joints, the steel bars are mechanically connected or welded, and the upper reserved truss steel bars are tied, overlapped, mechanically connected or welded, and superimposed and cast with fine stone concrete of a higher grade.
[0067] In S103, the reinforcement in the width direction of the flange of the precast part of the precast concrete T-beam is considered as the tensile reinforcement for the negative bending moment supported by the cantilever slab on the beam. Truss reinforcement is reserved in the upper part and connected to the larger gap of the precast concrete slab during assembly. Shorter truss reinforcement or overhanging reinforcement is reserved in the smaller gap of the precast concrete slab.
[0068] In S103, the steel bars at the bottom of the precast concrete slab are connected by welding or mechanical connection, and the upper reserved truss steel frame is tied and overlapped, mechanically connected or welded.
[0069] In S104 and S106, the time for pouring concrete is adjusted according to the actual situation.
[0070] In S103, when the precast T-beam is connected to the precast concrete slab, fine stone concrete of several grades higher is used for overlapping casting to form a slab with large local bending stiffness, thereby reducing or avoiding the tensile stress perpendicular to the gap at the joint.
[0071] In the present invention, the precast concrete T-beam is prefabricated in one piece with a part of the floor slab, so as to ensure the overall performance of the main structure; the precast concrete slab adopts a partial overlapping design, and the concrete is poured on site for the second time within a certain range of the joint to form a complete floor slab; the precast concrete slab adopts a staggered layer and staggered side prefabrication design at the connection with the precast concrete T-beam, which can support the floor slab in place during assembly, and the on-site construction is convenient and quick.
[0072] The precast concrete slab joints in the present invention adopt an upper and lower staggered design, the lower steel bars are welded, and the upper concrete vacant positions are connected to the exposed truss steel bars in the direction of the vertical slab-slab joints, and then post-cast high-strength concrete with a higher strength grade than the precast concrete slab is poured to form a slab strip with a large bending stiffness in the local width, thereby reducing the tensile stress at the bottom of the joint, reducing the crack width at the joint, and increasing durability.
[0073] The longitudinal plate seam connection in the present invention leaves a gap of a certain width at the bottom, adds longitudinal steel bars after the bottom steel bars are welded and connected, and the top steel bars are tied and overlapped, and then high-strength concrete is used for secondary pouring on site to form a plate belt with large local bending stiffness at the longitudinal seam, thereby reducing or avoiding the bottom transverse tensile stress.
[0074] 2. Application Examples: In order to prove the creativity and technical value of the technical solution of the present invention, this section provides application examples of the technical solution of the claims on specific products or related technologies.
[0075] This technical solution is used for prefabricated assembled floor slabs of reinforced concrete structures. It can prefabricate concrete T-beams and prefabricate concrete partially laminated floor slabs. After assembling the T-beams on site, the prefabricated concrete slabs are assembled, and then the steel bars at the joints are connected and concrete is poured. Temporary supports are used during construction to ensure structural performance while improving the assembly rate to a certain extent.
[0076] For prefabricated concrete beams, precast concrete T-beams alone can be used in corridors, overpasses and other buildings in industrial or civil buildings. After assembling the precast concrete T-beams, the space between the flanges and the vacant parts on the upper part of the flanges are cast as a whole on site to form a complete beam-slab structure.
[0077] Under other supporting conditions, such as masonry weighing structures, partially composite prefabricated floor slabs can be used alone in various buildings and structures, and the prefabricated slabs are constructed near the supports or at the joints between the slabs using this technical solution.
[0078] The joints between various prefabricated panels in existing prefabricated buildings are constructed using this technical solution, and the structural performance of the joints between the panels is better.
[0079] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any modifications, equivalent substitutions and improvements made by any technician familiar with the technical field within the technical scope disclosed by the present invention and within the spirit and principle of the present invention should be covered by the protection scope of the present invention.
Claims
1. A method for assembling a precast concrete T-beam precast concrete slab beam-slab structure, It is characterized in that The precast concrete T-beam in the assembly method is prefabricated as a whole with a beam and a part of the floor slab, and the precast concrete slab adopts a partial overlapping design, and concrete is poured on-site for a second time within a certain range at the joint to form a complete floor slab; the precast concrete slab in the assembly method adopts a staggered layer and staggered side prefabrication design at the connection with the precast concrete T-beam, and the precast concrete slab can be supported on the precast concrete T-beam during assembly, and concrete is poured after the overlapping part is connected to the truss steel bars; the joints between the precast concrete slabs in the assembly method adopt a lower concrete slab prefabricated and upper concrete poured on-site overlapping design, the steel bars at the lower joints are connected by binding, mechanical connection or welding, the upper steel bars are connected by truss steel bars in the direction of the joints between the slabs, and after the force-bearing steel bars parallel to the joints are reinforced, fine stone concrete with a higher strength grade than the precast concrete slabs is poured; The assembly method is as follows: S101: First, leave reinforcement from the precast reinforced concrete T-beam to the beam-column joint and cast the beam-column node on site as a whole, leaving a connection structure at the flange; S102: The precast concrete slab is designed with staggered edges and connected with the precast reinforced concrete T-beam at the flange. The flange of the precast reinforced concrete T-beam is extended to a certain length and a joint is left. The protruding part of the end of the precast concrete slab is supported in the area near the top of the beam, and the contact surface is treated with mortar for bonding. S103: The connection positions of the upper reinforcements of the precast concrete T-beam and the precast concrete slab are staggered, and the upper reserved truss reinforcements and the lower extended reinforcements at the joints are fixed by binding, mechanical connection or welding; S104: Cast concrete on site, and cast concrete on site for the second time within a certain range of the joint to form a complete floor slab; S105: The joints between precast concrete slabs are designed as composite slabs. The lower slab is precast with the upper slab connected on site, and the stress-bearing steel bars parallel to the longitudinal direction of the joints are reinforced; S106: Fine stone concrete with a higher strength grade than that of precast concrete slabs is poured at the joints between slabs to form a slab strip with greater bending stiffness within the local width, thereby reducing the tensile stress at the bottom of the joint in the direction perpendicular to the joint, thereby reducing the width of the crack at the joint and increasing durability.
2. The method for assembling the precast concrete T-beam and precast concrete slab beam-slab structure according to claim 1, It is characterized in that In the above S102, the contact surfaces of the precast concrete slab and the precast concrete T-beam are roughened before assembly, and need to be wetted with water and bonded with high-strength cement mortar during on-site assembly.
3. The method for assembling the precast concrete T-beam and precast concrete slab beam-slab structure according to claim 1, It is characterized in that In S103, a higher grade of fine stone concrete is used for overlapping pouring.
4. The method for assembling the precast concrete T-beam and precast concrete slab beam-slab structure according to claim 1, It is characterized in that In the above S103, the reinforcement in the width direction of the flange of the precast part of the precast concrete T-beam is considered as the tensile reinforcement for the negative bending moment supported by the cantilever slab on the beam, and truss reinforcement is reserved at the upper part, which is connected to the larger gap of the precast concrete slab during assembly, and shorter truss reinforcement or overhanging reinforcement is reserved at the smaller gap of the precast concrete slab.
5. The method for assembling the precast concrete T-beam and precast concrete slab beam-slab structure according to claim 1, It is characterized in that In S104 and S106, the time for pouring concrete is adjusted according to the actual situation.
6. The method for assembling the precast concrete T-beam and precast concrete slab beam-slab structure according to claim 1, It is characterized in that In S103, when the precast T-beam is connected to the precast concrete slab, fine stone concrete of several grades higher is used for overlapping casting to form a slab with large local bending rigidity, thereby reducing or avoiding the tensile stress perpendicular to the gap at the joint.