A mattress production management method based on order
Through the order-based production management method, the production line adjustment is judged based on the existing production line situation, and the continuous production model is adopted, which solves the problems of low production efficiency and inventory backlog of plant fiber mattresses, improves production efficiency and inventory turnover, and saves raw materials and time.
Patent Information
- Application Number
- CN202210606024.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-31
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2042-05-31
AI Technical Summary
In the existing plant fiber mattress production model, frequent adjustment of production line models leads to low production efficiency and stock backlogs, which cannot meet the needs of modern production and operation.
The order-based production management method is adopted, and by querying order information and production conditions, we can determine whether the production of the same model of mattress is added to the existing production line or schedule production schedules, reduce production line adjustments, and adopt a continuous production model to save raw materials and time.
It improves production line utilization, reduces production costs, improves production efficiency and inventory turnover, saves 3~9% of raw materials, and reduces production time and inventory backlog.
Smart Images

Figure CN115018306B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of plant fiber mattress production, in particular to an order-based mattress production management method. Background Art
[0002] Plant fiber mattress refers to a mattress made of plant fiber materials such as mountain palm, oil palm, hemp, bamboo fiber, coconut shell fiber, etc. Chinese patent 90100464.2 discloses a production method of a plant fiber mattress. After the plant fiber filaments are curled, they are blown into a three-dimensional distribution shape with air flow and then sprayed with glue to make the nodes between the palm fibers bonded to obtain a plant fiber elastic sheet, and then the elastic sheet is stacked to obtain a mattress. In the prior art, in order to meet the needs of different grades, mattresses have different models, and the thickness, fiber, latex and upper and lower packaging layers of each model are different. The traditional production model is that multiple production lines produce single-model mattresses according to plan, and put them into the warehouse after production. After obtaining the production order, the mattress model and corresponding quantity required by the order are allocated from the warehouse. If there is not enough mattress of a certain model, it will be included in the planned production task. After the task of the production line is completed, it will be produced again until the mattress model and quantity of the order are matched. The problem is that the production line adjustment of different models of mattresses will stop production for a period of time because the type of raw materials, the ratio of latex, and the auxiliary materials such as the mattress cover must be adjusted. Frequent adjustment of the production of mattress models will affect production efficiency. At the same time, excessive production of a single type of mattress will lead to inventory backlog, which is not suitable for modern production and operation needs. Summary of the invention
[0003] The purpose of the present invention is to provide an order-based mattress production management method, which can improve production line utilization, reduce production costs, improve production efficiency and reduce inventory.
[0004] The technical solution of the present invention is: a mattress production management method based on an order, comprising the following steps:
[0005] S1. Obtain the mattress production order, and separate the mattress models and corresponding quantities in the production order;
[0006] S2. Check based on the mattress model whether there are mattresses of the same model in continuous production;
[0007] S3. Determine whether to add the production of the mattress of the same model to the continuous production task or to put it into the planned production task according to the production situation.
[0008] In the above-mentioned order-based mattress production management method, S3 comprises the following steps:
[0009] S31, calculating the required production time according to the corresponding quantity in the mattress order of the same model, and querying whether the production line in the production task meets the time requirement for delayed production;
[0010] S32, calculating the required production raw materials according to the corresponding quantity in the mattress order of the same model, and querying whether the warehouse meets the increased raw material requirements;
[0011] S33. If both the time requirement and the raw material requirement are met, the production of the mattress of the same model is added to the continuous production task, otherwise it is put into the planned production task.
[0012] In the above-mentioned order-based mattress production management method, the continuous production task includes the following steps:
[0013] S21, preparing elastic sheets, and determining the number of layers of the elastic sheets required according to the thickness of the mattress;
[0014] S22, placing the bottom elastic sheet, taking the left side of the elastic sheet as a reference, and placing the second elastic sheet after translating to the right by a distance L on the bottom elastic sheet;
[0015] S23, placing a third layer of elastic sheet on the second layer of elastic sheet after continuing to translate to the right by a distance L, repeating the above steps to complete the stacking of all elastic sheets to obtain a continuous mattress core material;
[0016] S24, cutting the mattress core material according to the size to obtain a single mattress core material, packaging the mattress core material, and obtaining a mattress.
[0017] The above-mentioned order-based mattress production management method further includes step S25, wherein the first piece of mattress core material cut and the last piece of mattress core material are spliced together to obtain a complete mattress core material.
[0018] In the above-mentioned order-based mattress production management method, L=1-100 cm.
[0019] In the above-mentioned order-based mattress production management method, L=2-50 cm.
[0020] In the above-mentioned order-based mattress production management method, L=3-40 cm.
[0021] Beneficial effects of the present invention: The present invention determines whether to add the mattress production of the order to the production line in progress by combining the mattress type and quantity in the order with the actual production situation. If it can be added, the production can continue without adjusting the production line, saving production time. The corresponding orders can also be completed faster, improving the inventory turnover rate. At the same time, the production of a single model of mattress core material is changed to continuous production, which reduces the cutting parts on both sides of the mattress core material. Only the remaining two sides need to be cut. According to calculations, this can save 3-9% of raw materials. Continuously producing a single model of mattress core material can reduce the adjustment of the production line and save production time. The more mattresses are produced continuously, the more raw materials are saved. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the mattress production of the present invention;
[0023] Figure 2 It is a schematic diagram of the elastic sheets of the present invention stacked together. DETAILED DESCRIPTION
[0024] The present invention will be further described below in conjunction with the embodiments, but they are not intended to limit the present invention.
[0025] Embodiment 1. A mattress production management method based on an order comprises the following steps:
[0026] S1. Obtain the mattress production order, and separate the mattress models and corresponding quantities in the production order;
[0027] S2. Check based on the mattress model whether there are mattresses of the same model in continuous production;
[0028] S3. Determine whether to add the production of the mattress of the same model to the continuous production task or to put it into the planned production task according to the production situation.
[0029] Further, the S3 comprises the following steps:
[0030] S31. Calculate the required production time based on the corresponding quantity in the order of mattresses of the same model, and check whether the production line currently in production can meet the time requirements of deferred production. The production time needs to consider the delivery date of the production order corresponding to the current mattress production, and whether the production and delivery of mattresses for all orders can be completed in the case of deferred production. It should also consider the changes in the daily delivery quantity caused by the adjustment of production line workers and shifts. If the deferred production does not affect the delivery time, it can be included.
[0031] S32. Calculate the required production raw materials according to the corresponding quantity in the order for the same model of mattresses, and query whether the warehouse can meet the increased raw material requirements; the production raw materials include the raw materials in the warehouse and the raw materials that can arrive within the corresponding production time.
[0032] S33. If both the time requirement and the raw material requirement are met, the production of the mattress of the same model is added to the continuous production task, otherwise it is put into the planned production task.
[0033] More preferably, the continuous production task includes the following steps:
[0034] S21, preparing elastic sheets, and determining the number of layers of the elastic sheets required according to the thickness of the mattress;
[0035] S22, placing the bottom elastic sheet, taking the left side of the elastic sheet as a reference, and placing the second elastic sheet after translating to the right by a distance L on the bottom elastic sheet;
[0036] S23, continue to translate to the right a distance L on the second layer of elastic sheet and place the third layer of elastic sheet, repeat the above steps, complete the stacking of all elastic sheets, and obtain a continuous mattress core material, such as Figure 1 and 2 As shown;
[0037] S24, cutting the mattress core material according to the size to obtain a single mattress core material, packaging the mattress core material, and obtaining a mattress.
[0038] This production method reduces the cutting parts on both sides of the mattress core material, and only needs to cut the remaining two sides, which is more cost-effective.
[0039] The method also includes step S25, splicing the first piece of mattress core material cut and the last piece of mattress core material together to obtain a complete mattress core material.
[0040] Through experiments, the L=1-100 cm.
[0041] More preferably, L=2-50 cm.
[0042] More preferably, L=3-40 cm.
[0043] The elastic sheet is made of plant fiber materials such as mountain palm, oil palm, hemp, bamboo fiber, coconut shell fiber, etc. The plant fiber filaments are curled and blown into a three-dimensional distribution shape by air flow and then sprayed with glue to make the nodes between the palm fibers bonded to obtain the plant fiber elastic sheet.
[0044] The cut mattress core material is subjected to subsequent processes of hot pressing and vulcanization to finally obtain a mattress.
[0045] Embodiment 2. A mattress production management method based on an order comprises the following steps:
[0046] S1. Obtain the mattress production order, and separate the mattress models and corresponding quantities in the production order;
[0047] S2. Check based on the mattress model whether there are mattresses of the same model in continuous production;
[0048] S3. Determine whether to add the production of the mattress of the same model to the continuous production task or to put it into the planned production task according to the production situation.
[0049] The S3 comprises the following steps:
[0050] S31. Calculate the required production time based on the corresponding quantity in the order of mattresses of the same model, and check whether the production line currently in production can meet the time requirements of deferred production. The production time needs to consider the delivery date of the production order corresponding to the current mattress production, and whether the production and delivery of mattresses for all orders can be completed in the case of deferred production. It should also consider the changes in the daily delivery quantity caused by the adjustment of production line workers and shifts. If the deferred production does not affect the delivery time, it can be included.
[0051] S32. Calculate the required production raw materials according to the corresponding quantity in the order for the same model of mattresses, and query whether the warehouse can meet the increased raw material requirements; the production raw materials include the raw materials in the warehouse and the raw materials that can arrive within the corresponding production time.
[0052] S33. If both the time requirement and the raw material requirement are met, the production of the mattress of the same model is added to the continuous production task, otherwise it is put into the planned production task.
[0053] The continuous production task includes the following steps:
[0054] S21, preparing elastic sheets, and determining the number of layers of the elastic sheets required according to the thickness of the mattress;
[0055] S22, placing the bottom elastic sheet, taking the left side of the elastic sheet as a reference, and placing the second elastic sheet after translating to the right by a distance L on the bottom elastic sheet;
[0056] S23. Place the third layer of elastic sheet on the second layer of elastic sheet after moving it to the right by a distance of L, repeat the above steps to complete the stacking of all elastic sheets to obtain a continuous mattress core material; the L=8, 20, 20, 40, 50 or 60 cm.
[0057] S24, cutting the mattress core material according to the size to obtain a single mattress core material, packaging the mattress core material, and obtaining a mattress.
[0058] S25, the first mattress core material cut and the last mattress core material are spliced together to obtain a complete mattress core material.
[0059] Embodiment 3. A mattress production management method based on an order, comprising the following steps:
[0060] S1. Obtain the mattress production order, and separate the mattress models and corresponding quantities in the production order;
[0061] S2. Check based on the mattress model whether there are mattresses of the same model in continuous production;
[0062] S3. Determine whether to add the production of the mattress of the same model to the continuous production task or to put it into the planned production task according to the production situation.
[0063] The S3 comprises the following steps:
[0064] S31. Calculate the required production time based on the corresponding quantity in the order of mattresses of the same model, and check whether the production line currently in production can meet the time requirements of deferred production. The production time needs to consider the delivery date of the production order corresponding to the current mattress production, and whether the production and delivery of mattresses for all orders can be completed in the case of deferred production. It should also consider the changes in the daily delivery quantity caused by the adjustment of production line workers and shifts. If the deferred production does not affect the delivery time, it can be included.
[0065] S32. Calculate the required production raw materials according to the corresponding quantity in the order for the same model of mattresses, and query whether the warehouse can meet the increased raw material requirements; the production raw materials include the raw materials in the warehouse and the raw materials that can arrive within the corresponding production time.
[0066] S33. If both the time requirement and the raw material requirement are met, the production of the mattress of the same model is added to the continuous production task, otherwise it is put into the planned production task.
Claims
1. A mattress production management method based on orders, Features: The following steps are included: S1. Obtain the mattress production order, and separate the mattress models and corresponding quantities in the production order; S2. Check based on the mattress model whether there are mattresses of the same model in continuous production; S3. Determine whether to add the production of the same model mattress to the continuous production task or to put it into the planned production task according to the production situation; The continuous production task includes the following steps: S21, preparing elastic sheets, and determining the number of layers of the elastic sheets required according to the thickness of the mattress; S22, placing the bottom elastic sheet, taking the left side of the elastic sheet as a reference, and placing the second elastic sheet after translating to the right by a distance L on the bottom elastic sheet; S23, placing a third layer of elastic sheet on the second layer of elastic sheet after continuing to translate to the right by a distance L, repeating the above steps to complete the stacking of all elastic sheets to obtain a continuous mattress core material; S24, cutting the mattress core material according to the size to obtain a single mattress core material, packaging the mattress core material, and obtaining a mattress.
2. The mattress production management method based on order according to claim 1, Features: The S3 comprises the following steps: S31, calculating the required production time according to the corresponding quantity in the mattress order of the same model, and querying whether the production line currently in production meets the time requirement for delayed production; S32, calculating the required production raw materials according to the corresponding quantity in the mattress order of the same model, and querying whether the warehouse meets the increased raw material requirements; S33. If both the time requirement and the raw material requirement are met, the production of the mattress of the same model is added to the continuous production task, otherwise it is put into the planned production task.
3. The mattress production management method based on order according to claim 1, Features: The method also includes step S25, splicing the first piece of mattress core material cut and the last piece of mattress core material together to obtain a complete mattress core material.
4. The mattress production management method based on orders according to claim 1, Features: The L=1-100 cm.
5. The mattress production management method based on orders according to claim 4, Features: The L=2-50 cm.
6. The order-based mattress production management method according to claim 4, Features: The L=3-40 cm.
Citation Information
Patent Citations
Production method of palm fibre elastic material
CN1053462A
Integrated production method and device for plant fiber mattress
CN102079497A
Order scheduling, allocating and dispatching method and system
CN110955206A
Production scheduling method, equipment, device and storage medium
CN113393092A
Fully-wrapped plant fiber mattress core material
CN113520100A