A method for treating sudden water inrush in high-buried deep tunnels by blocking first and draining later

Through the construction of water blocking and controlling the drainage speed of deep hole curtains on the surface, the problem of sudden water surge in high-burned deep tunnels is solved, and low-cost and short-term construction is achieved, reducing the impact on the environment.

CN115045688BActive Publication Date: 2024-11-15CHINA RAILWAY 19 BUREAU GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210776775.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-04
Publication Date
2024-11-15
Estimated Expiration
2042-07-04

AI Technical Summary

Technical Problem

In the construction of high-burning and deep water-rich reverse slope drainage tunnels, sudden large water rushes lead to the conventional "discharge first and then blockage" plan with high cost and difficult to ensure the construction period, especially when the sudden water rushes are related to huge water sources, the water source is rich and difficult to replenish. Drain quickly.

Method used

The surface deep hole curtain grouting construction is adopted, and the design hole position and hole depth are adjusted through drilling analysis, and the water blocking drilling is strengthened near the cracks and fault zones to form a water blocking wall, and the water blocking construction in the tunnel is transferred to the surface. Control the speed during drainage and use infusion cement slurry to treat the seepage point.

Benefits of technology

It reduces the project cost and construction cycle, reduces the impact on the surrounding environment, reduces the investment in construction machinery and equipment and personnel, and shortens the construction period of water extraction and drainage and water blockage in the tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115045688B_ABST
    Figure CN115045688B_ABST
Patent Text Reader

Abstract

A method for treating sudden water inrush in a high-buried deep tunnel by a method of blocking first and draining later relates to a method for treating sudden water inrush in a high-buried deep tunnel by a method of blocking first and draining later. The invention is mainly to solve the problem of high construction cost of the current scheme of draining first and blocking later. Two rows of grouting holes are arranged in front of the face and on the side, and the grouting holes are divided into a grouting section and a non-grouting section. The non-grouting section is drilled to the top of the grouting section, and a casing is lowered into the non-grouting section. After all the casings are lowered, a thick slurry is used to fix and cast, and the grouting section is drilled and grouted in sections from top to bottom. 14 days after the grouting and water blocking construction is completed, the drainage construction in the tunnel begins. The branch tunnel uses a submersible pump to move forward alternately for drainage, and the main tunnel uses a release pump to drain water through a fixed pump station. When the accumulated water and seepage water in the tunnel are pumped and drained to the main tunnel face and are completely exposed, cement slurry is poured into individual water seepage points for enhanced treatment. The advantages are that the difficulty and construction cost of water blocking construction in the tunnel are reduced, and the construction period of drainage and water blocking construction in the tunnel is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field:

[0002] The invention relates to a method for treating sudden water inrush in a high-buried deep tunnel by using the method of first blocking and then draining. Background technology:

[0004] With the rapid development of my country's infrastructure technology, the construction of national transportation networks, water conservancy projects, etc. has shown rapid development. Many long-distance, high-buried, deep, water-rich reverse slope drainage tunnels have emerged. Construction in poor geological sections sometimes encounters sudden large water inrush, which causes the existing pumping and drainage system to be damaged and causes flooding. At this time, the conventional construction plan is "drainage first, then blocking", that is, first organize the pumping and drainage construction, and then carry out grouting and blocking water in the tunnel.

[0005] However, when the location of the sudden water is connected with cave water or other huge water sources, the dynamic reserve is particularly large, the water supply is abundant, and it cannot be drained away or cannot be drained away by strong drainage, the "drain first and then block" construction plan is adopted, which not only increases the project cost but also makes it difficult to guarantee the construction period. Summary of the invention:

[0007] The technical problem to be solved by the present invention is to provide a method for treating sudden water inrush in a high-buried deep tunnel by the method of first blocking and then draining, which has low engineering cost, short construction period and little impact on the surrounding environment.

[0008] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0009] First, the surface deep hole curtain grouting water plugging construction is used to treat sudden water inrush. During the construction process, the drill core is analyzed, the designed hole position and hole depth are adjusted in time, and the water plugging drilling holes are appropriately increased near the developed fissures and fault zones to reduce costs and shorten the construction period. Secondly, the drainage construction in the tunnel begins 14 days after the surface deep hole curtain grouting water plugging construction is completed. Finally, when the accumulated water and seepage water in the tunnel are pumped out to the face and completely exposed, cement slurry is poured into individual seepage points for enhanced treatment.

[0010] The specific plan is:

[0011] During the surface deep hole curtain grouting water blocking construction, the pumping of water gushing out of the tunnel shall be suspended first to provide a static water environment for the surface water blocking construction. Sudden water inrush occurs during the slag discharge process after blasting. Since the geological conditions of the face and the location of the sudden water inrush point are unclear, the arrangement of drill holes follows the principle of using one hole for multiple purposes as much as possible, so that it can be used as a geological and hydrogeological exploration hole, a test hole, an observation hole, and also a grouting and water plugging hole. Considering the surface deep hole curtain grouting and water plugging construction, the surrounding rock is reinforced at the same time. Therefore, grouting holes are arranged in a range extending 10 meters forward from the face and 10 meters on the side (tunnel contour line to the surrounding area). Two rows of grouting holes are arranged in front of the face and on the side, with a hole spacing of 3m and a row spacing of 2.5m. The holes less than 5m away from the tunnel contour line are hanging holes. In the process of construction, the core samples of the drilled holes are analyzed. The water plugging holes should be appropriately increased near the development of fractures and fault zones to cut off the supply source of the water inrush point and reduce the number of grouting and water plugging holes.

[0012] In order to reduce construction costs and shorten construction period, the grouting holes are divided into grouting sections and non-grouting sections. First, the drilling of the non-grouting sections is carried out in no particular order. According to the actual conditions on site, the hard rock of the 0.5m thick strongly weathered rock on the surface is excavated to expose the hard rock, and then the pipe is drilled from top to bottom to the top of the grouting section of the deep hole curtain grouting on the surface. Secondly, the grouting section is drilled and grouted in sections from top to bottom (the length of the grouting section is generally 5 to 10m, and each grouting hole grouting section is divided into about 7 to 10 sections, of which the hanging hole is divided into 3 to 5 sections. The previous section is grouted, and after solidification for 14 hours, the hole is swept and the next section is drilled. Grouting is performed after the hole is formed, and so on, from top to bottom until the grouting of the entire grouting section is completed).

[0013] The non-grouting section is drilled with a car drill, and the opening diameter (the diameter of the non-grouting section) is drilled to the top of the grouting section with a diameter of φ91mm. Then, a φ89mm casing is inserted into the non-grouting section. The top of the φ89mm casing hole is 20 to 30cm higher than the hard rock. The casing mouth is welded with a flange of the same specification as the hole sealer to facilitate the installation of the hole sealer during subsequent grouting construction. After all the φ89mm casings are lowered into the designed hole depth, they are fixed and cast with a thick slurry with a water-cement ratio of 0.5:1. After casting, the non-grouting section is completely isolated by the casing. After the cast casing solidifies, the grouting section construction begins.

[0014] The grouting section is drilled by a geological drill with a hole diameter of φ76mm. The holes are drilled and grouted in sections from top to bottom. The construction sequence is "blocking first and then strengthening". The outer circle holes are grouted first, and then the inner circle holes and hanging holes are grouted. The holes are constructed in two sequences. The length of the grouting section is generally 5 to 10m. It can be shortened appropriately when the rock mass is broken and the hole wall is unstable. The length of the chemical grouting period shall not exceed 10m. By analyzing the core samples of the drilled rock, the original design hole position and hole depth were adjusted, and finally the grouting was realized at the top of the high-buried tunnel extending 5m upward, the side of the tunnel extending 6m outward, and the face extending 5m forward. Finally, a water cutoff wall was formed to wrap up the sudden water gushing position of the entire tunnel, cutting off the supply channel of the external water system.

[0015] 14 days after the completion of the surface deep hole curtain grouting water blocking construction, the tunnel drainage construction began. Six submersible pumps (two spare) were used to alternately move forward for drainage in the branch tunnel. The drainage speed was strictly controlled during the drainage process. A drainage pressure relief hole with a diameter of 20 mm and a length of 20 cm to 50 cm was drilled every 2 m on the tunnel wall above 2 m from the invert (the hole depth was based on the rock surface) to prevent the tunnel from falling off or collapsing due to excessive pumping speed and "external water and internal pressure". During the drainage process, deformation observation points were set on the tunnel wall. When cracking, peeling, and shedding of shotcrete were found, 10 cm thick C30 concrete was sprayed in a lighter case. When the case was more serious, HPB300Φ8 mm @10cm×10cm steel mesh was laid, HRB400Φ22 mm, L=2.5cm random anchor rods were set, and then 10 cm thick C30 concrete was sprayed. The spraying work and drainage work could be carried out simultaneously.

[0016] The initial support deformation section is supported by HW150 steel (the distance between the frames depends on the situation). The side walls and top arches are arranged in a plum blossom shape with HRB400Φ22mm@1.2×1.2m, L=3.0m system anchors, and HPB300Φ8mm@20cm×20cm steel mesh is laid. Each arch frame is equipped with 12 HRB400Φ22mm, L=3.0m locking anchors, and 20cm thick C30 concrete is sprayed. After the support is completed, observation points are arranged. If the surrounding rock and initial support deformation further "deteriorate", the deformation section is first treated by pouring cement slurry on the premise of ensuring safety, and then the second lining concrete construction is immediately carried out on this section. During the second lining concrete construction, the drainage pump will not continue to move forward, and the pumping volume will be controlled to prevent the water level from dropping, so that the tunnel body can maintain a stable pressure. After the deformation section is treated, the drainage work will continue. The main tunnel uses 4 release pumps (2 spares) to pump out water through a fixed pumping station located near the intersection. The treatment measures for shotcrete cracking, peeling, shedding and initial support deformation are the same as those for the branch tunnel.

[0017] When the water in the tunnel and the seepage water are pumped out to the main tunnel face and completely exposed, cement slurry is poured into individual seepage points for reinforcement treatment. Following the excavation work principle of "exploration when in doubt, exploration before excavation", the surrounding rock and water content ahead are detected by using advance exploration holes and advance geological forecasts before excavation. In order to ensure safe passage through the sudden water gushing section, the step excavation method + reserved core soil method is used for excavation construction.

[0018] The advantages of the present invention are: when the sudden water inrush position of a high-buried deep tunnel is connected to karst water or other huge water sources, the dynamic reserve is particularly large, and the water supply is abundant, the water blocking in the tunnel is transferred to the surface for construction, which reduces the difficulty of water blocking construction in the tunnel and shortens the construction period of water pumping and water blocking in the tunnel. In addition, it also has the characteristics of reducing the total amount of water pumping and water drainage, reducing the impact on the surrounding environment, reducing the investment in construction machinery and equipment and personnel, and reducing construction costs. Description of the drawings:

[0020] Figure 1 is a schematic diagram of a grouting hole in the present invention;

[0021] In the figure, 1 is a non-grouting section, 2 is a grouting section, 3 is a casing, 4 is a grouting hole of the non-grouting section, 5 is a grouting hole of the grouting section, and 6 is a drilling tool. Specific implementation method:

[0023] Combine the following Figure 1 The present invention is further described;

[0024] First, the surface deep hole curtain grouting water plugging construction is used to treat sudden water inrush. During the construction process, the drill core is analyzed, the designed hole position and hole depth are adjusted in time, and the water plugging drilling holes are appropriately increased near the developed fissures and fault zones to reduce costs and shorten the construction period. Secondly, the drainage construction in the tunnel begins 14 days after the surface deep hole curtain grouting water plugging construction is completed. Finally, when the accumulated water and seepage water in the tunnel are pumped out to the face and completely exposed, cement slurry is poured into individual seepage points for enhanced treatment.

[0025] The specific plan is:

[0026] During the surface deep hole curtain grouting water blocking construction, the pumping of water gushing out of the tunnel shall be suspended first to provide a static water environment for the surface water blocking construction. Sudden water inrush occurs during the slag discharge process after blasting. Since the geological conditions of the face and the location of the sudden water inrush point are unclear, the arrangement of drill holes follows the principle of using one hole for multiple purposes as much as possible, so that it can be used as a geological and hydrogeological exploration hole, a test hole, an observation hole, and also a grouting and water plugging hole. Considering the surface deep hole curtain grouting and water plugging construction, the surrounding rock is reinforced at the same time. Therefore, grouting holes are arranged in a range extending 10 meters forward from the face and 10 meters on the side (tunnel contour line to the surrounding area). Two rows of grouting holes are arranged in front of the face and on the side, with a hole spacing of 3m and a row spacing of 2.5m. The holes less than 5m away from the tunnel contour line are hanging holes. In the process of construction, the core samples of the drilled holes are analyzed. The water plugging holes should be appropriately increased near the development of fractures and fault zones to cut off the supply source of the water inrush point and reduce the number of grouting and water plugging holes.

[0027] In order to reduce construction costs and shorten construction period, the grouting holes are divided into grouting sections and non-grouting sections. First, the drilling of the non-grouting sections is carried out in no particular order. According to the actual conditions on site, the hard rock of the 0.5m thick strongly weathered rock on the surface is excavated to expose the hard rock, and then the pipe is drilled from top to bottom to the top of the grouting section of the deep hole curtain grouting on the surface. Secondly, the grouting section is drilled and grouted in sections from top to bottom (the length of the grouting section is generally 5 to 10m, and each grouting hole grouting section is divided into about 7 to 10 sections, of which the hanging hole is divided into 3 to 5 sections. The previous section is grouted, and after solidification for 14 hours, the hole is swept and the next section is drilled. Grouting is performed after the hole is formed, and so on, from top to bottom until the grouting of the entire grouting section is completed).

[0028] The non-grouting section is drilled with a car drill, and the opening diameter (the diameter of the non-grouting section) is drilled to the top of the grouting section with a diameter of φ91mm. Then, a φ89mm casing is inserted into the non-grouting section. The top of the φ89mm casing hole is 20 to 30cm higher than the hard rock. The casing mouth is welded with a flange of the same specification as the hole sealer to facilitate the installation of the hole sealer during subsequent grouting construction. After all the φ89mm casings are lowered into the designed hole depth, they are fixed and cast with a thick slurry with a water-cement ratio of 0.5:1. After casting, the non-grouting section is completely isolated by the casing. After the cast casing solidifies, the grouting section construction begins.

[0029] The grouting section is drilled by a geological drill with a hole diameter of φ76mm. The holes are drilled and grouted in sections from top to bottom. The construction sequence is "blocking first and then strengthening". The outer circle holes are grouted first, and then the inner circle holes and hanging holes are grouted. The holes are constructed in two sequences. The length of the grouting section is generally 5 to 10m. It can be shortened appropriately when the rock mass is broken and the hole wall is unstable. The length of the chemical grouting period shall not exceed 10m. By analyzing the core samples of the drilled rock, the original design hole position and hole depth were adjusted, and finally the grouting was realized at the top of the high-buried tunnel extending 5m upward, the side of the tunnel extending 6m outward, and the face extending 5m forward. Finally, a water cutoff wall was formed to wrap up the sudden water gushing position of the entire tunnel, cutting off the supply channel of the external water system.

[0030] 14 days after the completion of the surface deep hole curtain grouting water blocking construction, the tunnel drainage construction began. Six submersible pumps (two spare) were used to alternately move forward for drainage in the branch tunnel. The drainage speed was strictly controlled during the drainage process. A drainage pressure relief hole with a diameter of 20 mm and a length of 20 cm to 50 cm was drilled every 2 m on the tunnel wall above 2 m from the invert (the hole depth was based on the rock surface) to prevent the tunnel from falling off or collapsing due to excessive pumping speed and "external water and internal pressure". During the drainage process, deformation observation points were set on the tunnel wall. When cracking, peeling, and shedding of shotcrete were found, 10 cm thick C30 concrete was sprayed in a lighter case. When the case was more serious, HPB300Φ8 mm @10cm×10cm steel mesh was laid, HRB400Φ22 mm, L=2.5cm random anchor rods were set, and then 10 cm thick C30 concrete was sprayed. The spraying work and drainage work could be carried out simultaneously.

[0031] The initial support deformation section is supported by HW150 steel (the distance between the frames depends on the situation). The side walls and top arches are arranged in a plum blossom shape with HRB400Φ22mm@1.2×1.2m, L=3.0m system anchors, and HPB300Φ8mm@20cm×20cm steel mesh is laid. Each arch frame is equipped with 12 HRB400Φ22mm, L=3.0m locking anchors, and 20cm thick C30 concrete is sprayed. After the support is completed, observation points are arranged. If the surrounding rock and initial support deformation further "deteriorate", the deformation section is first treated by pouring cement slurry on the premise of ensuring safety, and then the second lining concrete construction is immediately carried out on this section. During the second lining concrete construction, the drainage pump will not continue to move forward, and the pumping volume will be controlled to prevent the water level from dropping, so that the tunnel body can maintain a stable pressure. After the deformation section is treated, the drainage work will continue. The main tunnel uses 4 release pumps (2 spare ones) to pump out water through a fixed pumping station located near the intersection. The treatment measures for shotcrete cracking, peeling, shedding and initial support deformation are the same as those for the branch tunnel.

[0032] When the water in the tunnel and the seepage water are pumped out to the main tunnel face and completely exposed, cement slurry is poured into individual seepage points for reinforcement treatment. Following the excavation work principle of "exploration when in doubt, exploration before excavation", the surrounding rock and water content ahead are detected by using advance exploration holes and advance geological forecasts before excavation. In order to ensure safe passage through the sudden water gushing section, the step excavation method + reserved core soil method is used for excavation construction.

[0033] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for treating sudden water inrush in a high-buried deep tunnel by first blocking and then draining, characterized by: During the surface deep hole curtain grouting water plugging construction, first suspend the drainage of water in the tunnel to provide a static water environment for surface water plugging construction; grouting holes are arranged in a range of 10 meters forward from the face and 10 meters from the side wall, and two rows of grouting holes are arranged in front of the face and on the side wall, with a hole spacing of 3m and a row spacing of 2.5m. The holes less than 5m away from the tunnel outline are hanging holes. During the construction process, the core samples of the drilled holes are analyzed, and the water plugging holes are denser near the developed fractures and fault zones to cut off the supply source of the water burst point and reduce the number of grouting water plugging holes; The grouting holes are divided into grouting sections and non-grouting sections. First, the drilling of the non-grouting sections is carried out in no particular order. The hard rock of the 0.5m thick strongly weathered rock on the surface is excavated to expose the hard rock. Then, the pipe is drilled from top to bottom to the top of the grouting section of the deep hole curtain grouting on the surface. Secondly, the grouting section is drilled and grouted in sections from top to bottom. The length of the grouting section is 5 to 10m. Each grouting hole is grouted in 7 to 10 sections, of which the hanging hole is divided into 3 to 5 sections. After the previous section is grouted and solidified for 14 hours, the hole is swept and the next section is drilled. After the hole is formed, grouting is carried out. This process is repeated from top to bottom until the grouting of the entire grouting section is completed. The non-grouting section is drilled with a car drill, and the hole is drilled to the top of the grouting section with a φ91mm diameter. Then, a φ89mm casing is inserted into the non-grouting section. The top of the φ89mm casing hole is 20 to 30cm higher than the hard rock. The casing mouth is welded with a flange of the same specification as the hole sealer to facilitate the installation of the hole sealer during subsequent grouting construction. After the φ89mm casing is fully inserted into the designed hole depth, it is fixed and cast with thick slurry. After casting, the non-grouting section is completely isolated by the casing. After the cast casing solidifies, the grouting section construction begins. The grouting section is drilled with a geological drill, with a hole diameter of φ76mm. The holes are drilled and grouted in sections from top to bottom. The outer circle holes are grouted first, and then the inner circle holes and the hanging holes. The holes are constructed in two sequences. The grouting section is 5 to 10m long, and the chemical grouting section shall not be longer than 10m. By analyzing the core samples of the drilled holes, the original designed hole position and hole depth were adjusted, and finally the grouting was realized at the top of the high-buried tunnel extending 5m upward, the side of the tunnel extending 6m outward, and the face extending 5m forward. Finally, a water cutoff wall was formed to wrap the sudden water gushing position of the entire tunnel, cutting off the supply channel of the external water system. 14 days after the completion of the surface deep hole curtain grouting water blocking construction, the drainage construction in the tunnel began; 6 submersible pumps were used to alternately move forward for drainage in the branch tunnel, and the drainage speed was strictly controlled during the drainage. A drainage and pressure relief hole with a diameter of 20mm and a length of 20cm to 50cm was drilled every 2m on the tunnel wall more than 2m away from the invert. During the drainage process, a deformation observation point was set on the tunnel wall. When cracking, peeling, and shedding of the shotcrete were found, 10cm thick C30 concrete was sprayed if the situation was minor. If the situation was serious, steel mesh was laid and hung, random anchors were set, and then 10cm thick C30 concrete was sprayed. The spraying work and drainage work could be carried out simultaneously; In the initial support deformation section, steel support side walls and top arches are set up with plum blossom-shaped system anchors, steel mesh is laid, 12 locking anchors are set for each arch frame, and 20cm thick C30 concrete is sprayed; after the support is completed, observation points are arranged. If the deformation of the surrounding rock and the initial support further deteriorates, the deformation section is first treated by pouring cement slurry on the premise of ensuring safety, and then the second lining concrete construction is immediately carried out on the deformation section; when the second lining concrete construction is carried out, the drainage pump will not continue to move forward, and the pumping volume will be controlled so that the water level will not drop, so that the tunnel body can maintain a stable pressure, and the drainage work will continue after the deformation section treatment is completed; When the accumulated water and seepage water in the tunnel are pumped out to the main tunnel face and are completely exposed, cement slurry is poured into individual seepage points for enhanced treatment; before excavation, the surrounding rock and water content ahead are detected using advance exploration holes and advance geological forecasts. In order to ensure safe passage through the sudden water gushing section, the step excavation method plus the reserved core soil method is used for excavation construction.