A test device and method for the active pressure building capability of an automobile ESC

By using technologies such as a single oil pot and a gas-liquid supercharger in the automotive ESC test device, the problem of the consistency of the double oil pot is solved, and more accurate and rapid hydraulic adjustment is achieved, which improves the simulation and efficiency of the actual vehicle of the test.

CN115061445BActive Publication Date: 2024-11-19WENZHOU LICHEN AUTO PARTS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210305444.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-25
Publication Date
2024-11-19
Estimated Expiration
2042-03-25

AI Technical Summary

Technical Problem

The existing automotive ESC active pressure building capability testing device uses double oil pots to supply brake fluid separately, resulting in the level of brake fluid in the oil pot affecting the consistency of the test and cannot accurately reflect the actual vehicle situation.

Method used

A single oil pot is used to supply brake fluid from two channels of ESC oil inlets, combined with mechanical hydraulic mechanism and measurement and control mechanism, the hydraulic source is adjusted through the gas-liquid booster cylinder and the electrical proportional valve to realize arbitrary adjustment of the hydraulic source and rapid pressure supply, ensuring testing Accuracy and consistency of results.

Benefits of technology

The test results are closer to the actual vehicle situation. The hydraulic source adjustment speed is fast and the pressure adjustment is accurate, which reduces the impact of brake fluid level on the test results and improves the reliability and efficiency of the test.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115061445B_ABST
    Figure CN115061445B_ABST
Patent Text Reader

Abstract

The present invention discloses a testing device and method for the active pressure building capability of an automobile ESC. The testing device for the active pressure building capability of an automobile ESC comprises a mechanical hydraulic mechanism and a measurement and control mechanism, and the mechanical hydraulic mechanism comprises a manual ball valve, an air storage tank, an air filter, a pressure reducing valve, an oil mist collector, an electrical proportional valve, a solenoid valve, a solenoid ball valve, a gas-liquid booster cylinder, a pointer pressure gauge, an oil pot, a pressure sensor, an oil filling pump, a relief valve, a filter, a liquid storage tank and an oil tank. The testing device for the active pressure building capability of an automobile ESC adopts a single oil pot to supply brake fluid to two oil inlets of the ESC, which is consistent with the single oil pot of an actual vehicle supplying brake fluid, and the test result is closer to the actual vehicle situation, solving the problem that the level of the brake fluid in the oil pot will affect the consistency of the test of the two routes, solving the problem of slow active pressure building response speed and low control accuracy, and solving the problem that the hydraulic source can only provide three types of hydraulic pressures stored in the high-pressure accumulator, the medium-pressure accumulator and the low-pressure accumulator.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of automobile ESC, and in particular relates to a testing device for the active pressure building capability of automobile ESC. Background Art

[0002] Automobile ESC is a new type of active safety system for vehicles. It is a further extension of the functions of the automobile anti-lock braking system (ABS) and traction control system (TCS). It ensures the lateral stability of the vehicle by controlling the driving force and braking force of the front and rear wheels and the left and right wheels.

[0003] The active pressure-building capability of ESC, that is, when the driver does not actively step on the brake pedal, the ESC plunger pump reciprocates to actively build up hydraulic pressure in the wheel cylinder to achieve the ability to brake the vehicle. When ESC actively builds pressure, it is necessary to adjust the hydraulic pressure built up in the wheel cylinder to build up the pressure to the specified hydraulic pressure. Existing ESC active pressure-building capability test devices generally use dual oil pots to supply brake fluid separately, resulting in the brake fluid level in the oil pot affecting the test consistency of the two paths.

[0004] Chinese patent CN201610579040.5, filed on July 21, 2016, discloses an ABS-ESC performance test device and method, which uses dual oil tanks to supply brake fluid respectively. However, there is a defect that the brake fluid level in the oil tanks will affect the consistency of the two-way test. Summary of the invention

[0005] In view of the problems existing in the above-mentioned prior art, the present invention provides a testing device and method for the active pressure building capability of an automobile ESC, which adopts a single oil pot to supply brake fluid to two oil inlets of the ESC, which is consistent with the single oil pot supplying brake fluid in an actual vehicle. The test result is closer to the actual vehicle situation, and the problem that the brake fluid level in the oil pot will affect the test consistency of the two routes is solved.

[0006] The objective of the present invention is achieved through the following technical solutions:

[0007] A test device for the active pressure building capability of an automobile ESC is provided, comprising a mechanical hydraulic mechanism and a measurement and control mechanism, wherein the mechanical hydraulic mechanism comprises an oil pot, an oil filling pump and an oil tank;

[0008] The oil tank is connected to the oil pot through a first pipeline, and a filter, an oil filling pump, a second electromagnetic ball valve, and a third electromagnetic ball valve are arranged on the first pipeline in sequence according to the flow path of the brake fluid from the oil tank to the oil pot;

[0009] The first pipeline is connected to a first branch pipeline connected to the oil tank, and a relief valve is provided on the first branch pipeline;

[0010] The gas source generating device is connected to the oil inlet of the ESC through a second pipeline;

[0011] The second pipeline is provided with a first manual ball valve, an air filter, a pressure reducing valve, an oil mist collector, an electric proportional valve, a solenoid valve, a hydraulic pressure building device, a pointer pressure gauge, a second manual ball valve, a first pressure sensor, and a fourth solenoid ball valve in sequence according to the flow path of the gas source from the gas source generating device to the ESC;

[0012] The second pipeline is connected to the oil tank through a third pipeline, and a fifth electromagnetic ball valve is provided on the third pipeline;

[0013] The oil pot is connected to the hydraulic pressure building device via a fourth pipeline, and a first electromagnetic ball valve is provided on the fourth pipeline;

[0014] The oil tank is connected to each oil outlet of the corresponding ESC through each fifth pipeline, and each fifth pipeline is provided with a liquid storage tank, a second pressure sensor and a sixth electromagnetic ball valve;

[0015] The measurement and control mechanism includes a host computer, a data acquisition card, a signal processing module, a power module, a drive module and an actuator, wherein the host computer includes a data processing module, a graphics drawing module, a graphics determination module and an execution control module;

[0016] Among them, the drive module is electrically connected to all pressure sensors in the mechanical hydraulic mechanism, all electromagnetic ball valves in the mechanical hydraulic mechanism, electromagnetic valves in the mechanical hydraulic mechanism, electrical proportional valves in the mechanical hydraulic mechanism, oil injection pumps in the mechanical hydraulic mechanism, motors in the ESC and actuators respectively;

[0017] The power module is electrically connected to the drive module to control the on / off of the circuit between the power module and the actuator, all pressure sensors in the mechanical hydraulic mechanism, all electromagnetic ball valves in the mechanical hydraulic mechanism, the electromagnetic valves in the mechanical hydraulic mechanism, the electrical proportional valves in the mechanical hydraulic mechanism, the oil injection pump in the mechanical hydraulic mechanism, the motor in the ESC, and the actuator;

[0018] Each pressure sensor is electrically connected to the signal processing module; the signal processing module is electrically connected to the data acquisition card; the data acquisition card is electrically connected to the host computer;

[0019] The host computer has built-in control program software, in which the data processing module processes the digital signal transmitted by the data acquisition card according to the requirements of the control program software, and transmits the processed data to the graphics drawing module;

[0020] The graphics drawing module draws the received data into a graph and passes the graph to the graphics determination module;

[0021] The graphic determination module determines the received graphic according to the control program requirements;

[0022] The execution control module sends the digital signal to the drive module through the data line according to the control program software requirements;

[0023] The drive module controls the actions of all electromagnetic ball valves in the mechanical hydraulic mechanism, the electromagnetic valves in the mechanical hydraulic mechanism, the electrical proportional valves in the mechanical hydraulic mechanism, the oil injection pump in the mechanical hydraulic mechanism, the motor in the ESC and the actuator.

[0024] In certain embodiments, the hydraulic pressure building device includes a gas-liquid booster cylinder;

[0025] The second pipeline is provided with a first manual ball valve, an air filter, a pressure reducing valve, an oil mist collector, an electrical proportional valve, a solenoid valve, a gas-liquid booster cylinder, a pointer pressure gauge, a second manual ball valve, a first pressure sensor, and a fourth solenoid ball valve in sequence according to the flow path of the gas source from the gas source generating device to the ESC.

[0026] In some embodiments, the second pipeline includes a second main pipeline and a second branch pipeline;

[0027] The second branch pipelines are connected in parallel with each other and each has one end connected to each oil inlet of the ESC and the other end connected to one end of the second main pipeline, and the other end of the second main pipeline is connected to the gas source generating device;

[0028] The second main pipe is provided with a first manual ball valve, an air storage tank, an air filter, a pressure reducing valve, an oil mist collector, an electrical proportional valve, a solenoid valve, a gas-liquid booster cylinder, a pointer pressure gauge, a second manual ball valve, a first pressure sensor, and a fourth solenoid ball valve in sequence according to the flow path of the gas source from the gas source generating device to the ESC;

[0029] The two second branch pipelines are both provided with a seventh electromagnetic ball valve and a third pressure sensor;

[0030] The two second branch pipelines are respectively connected to the oil tank through their corresponding third pipelines, wherein each of the third pipelines is provided with a fifth electromagnetic ball valve.

[0031] In some embodiments, the oil tank is connected to the corresponding oil outlets of the ESC through four fifth pipelines, and each fifth pipeline is provided with a liquid storage tank and a second pressure sensor.

[0032] In some embodiments, the actuator includes a boost valve coil, a pressure limiting valve coil, a fluid replenishment valve coil, and a pressure reducing valve coil;

[0033] Among them, there are four boost valve coils, which are respectively mounted on the first boost valve, the second boost valve, the third boost valve and the fourth boost valve of the ESC; there are four pressure reducing valve coils, which are respectively mounted on the first pressure reducing valve, the second pressure reducing valve, the third pressure reducing valve and the fourth pressure reducing valve of the ESC; there are two liquid replenishment valve coils, which are respectively mounted on the first liquid replenishment valve and the second liquid replenishment valve of the ESC; there are two pressure limiting valve coils, which are respectively mounted on the first pressure limiting valve and the second pressure limiting valve of the ESC;

[0034] In addition, the boost valve coil is energized, the boost valve in the ESC is cut off, the boost valve coil is de-energized, and the boost valve in the ESC is turned on; the pressure reducing valve coil is energized, the pressure reducing valve in the ESC is turned on, the pressure reducing valve coil is de-energized, and the pressure reducing valve in the ESC is cut off; the refill valve coil is energized, the refill valve in the ESC is turned on, the refill valve coil is de-energized, and the refill valve in the ESC is cut off; the pressure limiting valve coil is energized, the pressure limiting valve in the ESC is cut off, the pressure limiting valve coil is de-energized, and the pressure limiting valve in the ESC is turned on.

[0035] In some embodiments, the oil pot has a graduated scale.

[0036] In some embodiments, the oil tank provides brake fluid to both oil inlets of the ESC simultaneously.

[0037] In some embodiments, the liquid storage tank is a liquid storage tank with adjustable volume.

[0038] In certain embodiments, the vertical oil inlet of the fluid storage tank is placed vertically upward.

[0039] A method for testing the active pressure building capability of an automobile ESC, applicable to a testing device for the active pressure building capability of an automobile ESC, comprises the following steps:

[0040] Step (1): Adjust the volumes of the four liquid storage tanks to be the same as the actual vehicle volumes;

[0041] Step (2): the second electromagnetic ball valve and the third electromagnetic ball valve are energized, and the oil filling pump is energized to pump the brake fluid in the oil tank into the oil pot, so that the brake fluid in the oil pot reaches a specified scale;

[0042] Step (3): the second electromagnetic ball valve and the third electromagnetic ball valve are powered off;

[0043] Step (4): the first electromagnetic ball valve and the third electromagnetic ball valve are energized, and the brake fluid in the oil pot enters the gas-liquid booster cylinder;

[0044] Step (5): The first electromagnetic ball valve and the third electromagnetic ball valve are powered off, and the electrical proportional valve is adjusted to build up the pressure of the gas-liquid booster cylinder to 10 MPa;

[0045] Step (6): The solenoid valve is energized, the fourth solenoid ball valve and the two seventh solenoid ball valves are energized, and the gas-liquid booster cylinder pushes the brake fluid and the air in the pipeline through the ESC into the four fluid storage tanks. After stabilizing the pressure for 5 seconds, the fourth solenoid ball valve and the two seventh solenoid ball valves are de-energized, the solenoid valve is de-energized, and the four sixth solenoid ball valves are energized to discharge the brake fluid and air in the fluid storage tanks together;

[0046] Step (7): the four sixth electromagnetic ball valves are powered off;

[0047] Step (8): Repeat steps (6) and (7) three times to exhaust the air in the pipeline;

[0048] Step (9): Repeat steps (2) and (3) once;

[0049] Step (10): The third electromagnetic ball valve, the fourth electromagnetic ball valve and the two seventh electromagnetic ball valves are energized, the liquid replenishment valve coil in the actuator is energized, the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized by 1A respectively, and the motor in the ESC is energized for 2s;

[0050] Step (11): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are powered off, and the motor in the ESC is powered off for 2 seconds;

[0051] Step (12): The first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized with 1.1A respectively, and the motor in the ESC is energized for 2s;

[0052] Step (13): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are powered off, and the motor in the ESC is powered off for 2 seconds;

[0053] Step (14): The first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized with 1.2A respectively, and the motor in the ESC is energized for 2s;

[0054] Step (15): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are powered off, and the motor in the ESC is powered off for 2 seconds;

[0055] Step (16): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized with 1.3A, and the motor in the ESC is energized for 2s;

[0056] Step (17): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are powered off, and the motor in the ESC is powered off for 2 seconds;

[0057] Step (18): The first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized with 1.4A respectively, and the motor in the ESC is energized for 2s;

[0058] Step (19): the first pressure limiting valve coil, the second pressure limiting valve coil, the liquid replenishing valve coil and the motor in the ESC in the actuator are powered off;

[0059] Step (20): collecting pressure data of the first pressure sensor, the second pressure sensor and the two third pressure sensors in steps (10) to (19), drawing a pressure curve, and determining the pressure magnitude;

[0060] Step (21): the third electromagnetic ball valve, the fourth electromagnetic ball valve and the two seventh electromagnetic ball valves are powered off, and the two fifth electromagnetic ball valves and the four sixth electromagnetic ball valves are powered on;

[0061] Step (22): The two fifth solenoid ball valves and the four sixth solenoid ball valves are powered off to complete the test.

[0062] The testing device for the active pressure building capability of the automobile ESC of the present invention has at least the following beneficial effects:

[0063] 1. The hydraulic source of the present invention adopts a gas-liquid booster cylinder and an electric proportional valve, which can adjust the hydraulic source arbitrarily within the working range. The prior art can only use a hydraulic pump to build pressure and store it in a high-pressure accumulator, a medium-pressure accumulator or a low-pressure accumulator, and can only provide three specified hydraulic pressures;

[0064] 2. The hydraulic source of the present invention adopts a gas-liquid booster cylinder, which can directly supply pressure and has a fast test speed. The existing technology needs to first build up pressure to the accumulator, and then the accumulator supplies pressure, which has a slow test speed;

[0065] 3. The present invention uses a single oil pot to supply brake fluid to the two oil inlets of ESC, which is consistent with the single oil pot of the actual vehicle supplying brake fluid, and the test results are closer to the actual vehicle situation. The prior art uses two oil pots to supply brake fluid respectively, and the level of brake fluid in the oil pot will affect the test consistency of the two paths;

[0066] 4. The present invention controls the wheel cylinder pressure by adjusting the coil current of the pressure limiting valve, that is, different coil currents result in different liquid pressures that can be closed by the pressure limiting valve, and the pressure is linearly related. The adjustment response speed is fast and the pressure adjustment is accurate. The prior art adjusts the wheel cylinder pressure by adjusting the motor voltage, which has a slow response speed and a large influence on the pressure building by the movement resistance of the motor and the pump.

[0067] 5. The present invention provides a scale ruler on the oil pot, which can ensure that the brake fluid level is within the specified range during each test, thereby reducing the influence of the brake fluid level on the test results;

[0068] 6. The present invention adopts graphics to display and judge the test results, which is more intuitive;

[0069] 7. The present invention provides a manual ball valve and a pointer pressure gauge in front of the gas pressure boosting cylinder, which can quickly calibrate the pressure value of the gas-liquid boosting cylinder;

[0070] 8. The oil inlet of the present invention adopts the fourth electromagnetic ball valve and two seventh electromagnetic ball valves to perform two-way sealing, which makes the sealing more reliable;

[0071] 9. The liquid storage tank of the present invention is placed vertically upward, and the bubbles move upward during pressure stabilization. The air in the liquid storage tank can be discharged from the device pipeline through four sixth solenoid valve ball valves, reducing the impact on the test. BRIEF DESCRIPTION OF THE DRAWINGS

[0072] Figure 1 1 is a schematic diagram of the oil circuit structure of a test bench of a test device for the active pressure building capability of an automobile ESC in one embodiment of the present invention;

[0073] Figure 2 1 is a schematic diagram of the structure of the ESC oil circuit of a device for testing the active pressure building capability of an automobile ESC in one embodiment of the present invention;

[0074] Figure 3 It is a structural schematic diagram of the electronic control part of a test device for the active pressure building capability of an automobile ESC in one embodiment of the present invention;

[0075] Figure 4 It is a pressure test curve diagram in one embodiment of the present invention. DETAILED DESCRIPTION

[0076] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0077] like Figure 1 and Figure 3 As shown, in one embodiment, a test device for the active pressure building capability of an automobile ESC is provided, comprising a mechanical hydraulic mechanism 1 and a measurement and control mechanism, wherein the mechanical hydraulic mechanism 1 comprises an oil pot 10, an oil filling pump 20 and an oil tank 40;

[0078] The oil tank 40 is connected to the oil pot 10 through a first pipeline 50. The first pipeline 50 is provided with a filter 60, an oil filling pump 20, a second electromagnetic ball valve 80, and a third electromagnetic ball valve 90 in sequence according to the flow path of the brake fluid from the oil tank 40 to the oil pot 10;

[0079] The first pipeline 50 is connected to a first branch pipeline 100 connected to the oil tank 40 , and a relief valve 110 is provided on the first branch pipeline 100 ;

[0080] The gas source generating device 120 is connected to the oil inlet of ESC30 (for example, the oil inlet of ESC30 is the MC1 port and the MC2 port of ESC30) through the second pipeline 130; ESC30 includes a boost valve, a pressure reducing valve, a pressure limiting valve, a liquid replenishing valve, a pump, a motor, a one-way valve and an accumulator; the pump and the motor are connected together through a mechanical structure.

[0081] The second pipeline 130 is provided with a first manual ball valve 140, an air filter 150, a pressure reducing valve 160, an oil mist collector 170, an electrical proportional valve 180, a solenoid valve 190, a hydraulic pressure building device 200, a pointer pressure gauge 210, a second manual ball valve 220, a first pressure sensor 230, and a fourth solenoid ball valve 240 in sequence according to the flow path of the gas source from the gas source generating device 120 to the ESC 30;

[0082] The second pipeline 130 is connected to the oil tank 40 through the third pipeline 250, and a fifth electromagnetic ball valve 260 is provided on the third pipeline 250;

[0083] The oil pot 10 is connected to the hydraulic pressure building device 200 through a fourth pipeline 70, and a first electromagnetic ball valve 270 is provided on the fourth pipeline 70;

[0084] like Figure 2 As shown, the oil tank 40 is connected to each oil outlet of the corresponding ESC 30 through each fifth pipeline 280 , and each fifth pipeline 280 is provided with a liquid storage tank 290 , a second pressure sensor 300 and a sixth electromagnetic ball valve 310 .

[0085] A single oil pot 10 is used to supply brake fluid to the two oil inlets of ESC30, which is consistent with the single oil pot 10 of the actual vehicle supplying brake fluid, and the test result is closer to the actual vehicle situation. The existing technology uses two oil pots 10 to supply brake fluid separately, and the brake fluid level in the oil pot 10 will affect the test consistency of the two routes.

[0086] like Figure 3 As shown, the measurement and control mechanism includes a host computer, a data acquisition card, a signal processing module, a power module, a drive module and an actuator, wherein the host computer includes a data processing module, a graphics drawing module, a graphics determination module and an execution control module;

[0087] Among them, the drive module is electrically connected to all pressure sensors in the mechanical hydraulic mechanism, all electromagnetic ball valves in the mechanical hydraulic mechanism, electromagnetic valves in the mechanical hydraulic mechanism, electrical proportional valves in the mechanical hydraulic mechanism, oil injection pumps in the mechanical hydraulic mechanism, motors in the ESC and actuators respectively;

[0088] The power module is electrically connected to the drive module to control the on / off of the circuit between the power module and the actuator, all pressure sensors in the mechanical hydraulic mechanism, all electromagnetic ball valves in the mechanical hydraulic mechanism, the electromagnetic valves in the mechanical hydraulic mechanism, the electrical proportional valves in the mechanical hydraulic mechanism, the oil injection pump in the mechanical hydraulic mechanism, the motor in the ESC, and the actuator;

[0089] Each pressure sensor is electrically connected to the signal processing module; the signal processing module is electrically connected to the data acquisition card; the data acquisition card is electrically connected to the host computer; the pressure sensor collects the test bench liquid pressure, converts it into an electrical signal, and transmits the electrical signal to the signal processing module through a wire. The signal processing module transmits the filtered and amplified electrical signal to the data acquisition card through a wire. The data acquisition card converts the electrical signal into a digital signal and transmits the digital signal to the host computer through a data line.

[0090] The host computer has built-in control program software, in which the data processing module processes the digital signal transmitted by the data acquisition card according to the requirements of the control program software, and transmits the processed data to the graphics drawing module;

[0091] The graphics drawing module draws the received data into a graph and passes the graph to the graphics determination module;

[0092] The graphic judgment module judges the received graphics according to the requirements of the control program; the use of graphics to display and judge the test results is more intuitive.

[0093] The execution control module sends the digital signal to the drive module through the data line according to the control program software requirements;

[0094] The drive module controls the actions of all electromagnetic ball valves in the mechanical hydraulic mechanism, the electromagnetic valves in the mechanical hydraulic mechanism, the electrical proportional valves in the mechanical hydraulic mechanism, the oil injection pump in the mechanical hydraulic mechanism, the motor in the ESC and the actuator.

[0095] The actuator includes a boost valve coil, a pressure limiting valve coil, a liquid replenishing valve coil and a pressure reducing valve coil;

[0096] Among them, there are four boost valve coils, which are respectively mounted on the first boost valve, the second boost valve, the third boost valve and the fourth boost valve of the ESC; there are four pressure reducing valve coils, which are respectively mounted on the first pressure reducing valve, the second pressure reducing valve, the third pressure reducing valve and the fourth pressure reducing valve of the ESC; there are two liquid replenishment valve coils, which are respectively mounted on the first liquid replenishment valve and the second liquid replenishment valve of the ESC; there are two pressure limiting valve coils, which are respectively mounted on the first pressure limiting valve and the second pressure limiting valve of the ESC;

[0097] In addition, the boost valve coil is energized, the boost valve in the ESC is cut off, the boost valve coil is de-energized, and the boost valve in the ESC is turned on; the pressure reducing valve coil is energized, the pressure reducing valve in the ESC is turned on, the pressure reducing valve coil is de-energized, and the pressure reducing valve in the ESC is cut off; the refill valve coil is energized, the refill valve in the ESC is turned on, the refill valve coil is de-energized, and the refill valve in the ESC is cut off; the pressure limiting valve coil is energized, the pressure limiting valve in the ESC is cut off, the pressure limiting valve coil is de-energized, and the pressure limiting valve in the ESC is turned on.

[0098] like Figure 1As shown, in one embodiment, the hydraulic pressure building device 200 uses a gas-liquid booster cylinder;

[0099] The second pipeline 130 is provided with a first manual ball valve 140, an air storage tank 340, an air filter 150, a pressure reducing valve 160, an oil mist collector 170, an electrical proportional valve 180, a solenoid valve 190, a gas-liquid booster cylinder, a pointer pressure gauge 210, a second manual ball valve 220, a first pressure sensor 230, and a fourth solenoid ball valve 240 in sequence according to the flow path of the gas source from the gas source generating device 120 to the ESC30.

[0100] The hydraulic source adopts a gas-liquid booster cylinder and an electric proportional valve 180, which can adjust the hydraulic source arbitrarily within the working range. The existing technology can only use a hydraulic pump to build pressure and store it in a high-pressure accumulator, a medium-pressure accumulator or a low-pressure accumulator, and can only provide three specified hydraulic pressures;

[0101] The hydraulic source adopts a gas-liquid booster cylinder, which can directly supply pressure and has a fast test speed. The existing technology needs to build up pressure to the accumulator first, and then the accumulator supplies pressure, which has a slow test speed.

[0102] like Figure 1 and Figure 3 As shown, in one embodiment, the second pipeline 130 includes a second main pipeline 1301 and a second branch pipeline 1302;

[0103] The second branch pipelines 1302 are connected in parallel and one end of each branch pipeline is connected to each oil inlet of the ESC 30 and the other end is connected to one end of the second main pipeline 1301. The other end of the second main pipeline 1301 is connected to the gas source generating device 120.

[0104] The second main pipeline 1301 is provided with a first manual ball valve 140, a gas storage tank 340, an air filter 150, a pressure reducing valve 160, an oil mist collector 170, an electrical proportional valve 180, a solenoid valve 190, a gas-liquid booster cylinder, a pointer pressure gauge 210, a second manual ball valve 220, a first pressure sensor 230, and a fourth solenoid ball valve 240 in sequence according to the flow path of the gas source from the gas source generating device 120 to the ESC30; the manual ball valve and the pointer pressure gauge 210 are provided in front of the gas pressure booster cylinder to quickly calibrate the pressure value of the gas-liquid booster cylinder;

[0105] The two second branch pipelines 1302 are both provided with a seventh electromagnetic ball valve 320 and a third pressure sensor 330; the oil inlet adopts a fourth electromagnetic ball valve 240 and two seventh electromagnetic ball valves 320 to perform two-way sealing, and the sealing is more reliable;

[0106] The two second branch pipelines 1302 are respectively connected to the oil tank 40 through their corresponding third pipelines 250 , wherein each third pipeline 250 is provided with a fifth electromagnetic ball valve 260 .

[0107] like Figure 1 As shown, in one embodiment, the oil tank 40 is connected to the corresponding oil outlets of the ESC 30 through four fifth pipelines 280 , and each fifth pipeline 280 is provided with a liquid storage tank 290 and a second pressure sensor 300 .

[0108] like Figure 1 As shown, in one embodiment, the liquid storage tank 290 is a liquid storage tank 290 with adjustable volume.

[0109] like Figure 1 As shown, in one embodiment, the oil pot 10 has a scale. The scale is set on the oil pot 10 to ensure that the brake fluid level is within a specified range during each test, thereby reducing the impact of the brake fluid level on the test results.

[0110] like Figure 1 As shown, in one embodiment, the oil tank 10 provides brake fluid to two oil inlets of the ESC 30 at the same time.

[0111] like Figure 1 As shown, in one embodiment, the active pressure building test of ESC is realized by adjusting the coil current of the pressure limiting valve of the test bench. The wheel cylinder pressure is controlled by adjusting the coil current of the pressure limiting valve, that is, different coil currents result in different liquid pressures that can be closed by the pressure limiting valve, and the relationship is linear. The adjustment response speed is fast and the pressure adjustment is accurate. The prior art adjusts the wheel cylinder pressure by adjusting the motor voltage, which has a slow response speed and a large influence on the pressure building pressure by the movement resistance of the motor and the pump.

[0112] The pipe volume from the fourth electromagnetic ball valve 240 to the MC1 port of the ESC 30 is consistent with the pipe volume from the fourth electromagnetic ball valve 240 to the MC2 port of the ESC 30. The pipe volumes from each oil outlet of the ESC 30 (for example, the oil outlet of the ESC 30 is the RR port, RL port, FR port and FL port of the ESC 30) to each corresponding liquid storage tank 290 are consistent.

[0113] like Figure 1 As shown, in one embodiment, the vertical oil inlet of the liquid storage tank 290 is placed vertically upward. The liquid storage tank 290 is placed vertically upward, and bubbles go upward during pressure stabilization. The air in the liquid storage tank 290 can be discharged from the device pipeline through the four sixth electromagnetic ball valves 310 to reduce the impact on the test.

[0114] like Figure 2 As shown, the specific structure of ESC is as follows:

[0115] The MC2 port of the testing device is connected to the inlet of the first liquid replenishing valve and the inlet of the first pressure limiting valve through the oil channel.

[0116] The outlet of the first liquid replenishing valve is connected to the inlet of the first pump through the oil channel, the outlet of the first pump is connected to the inlets of the first boosting valve and the second boosting valve through a pipeline, the outlet of the first boosting valve is connected to the FL port of the test device and the inlet of the first pressure reducing valve through a pipeline, and the outlet of the second boosting valve is connected to the FR port of the test device and the inlet of the second pressure reducing valve through a pipeline.

[0117] The first pressure reducing valve outlet is connected to the first check valve inlet.

[0118] The second pressure reducing valve outlet is connected to the first check valve inlet and the first pressure reducing valve outlet.

[0119] The first one-way valve outlet is connected to the first pump inlet.

[0120] The first pressure limiting valve outlet is connected to the first pump outlet, the first boosting valve inlet and the second boosting valve inlet through an oil passage.

[0121] The MC1 port of the testing device is connected to the inlet of the second liquid replenishing valve and the inlet of the second pressure limiting valve through the oil channel.

[0122] The outlet of the second fluid replenishing valve is connected to the inlet of the second pump through the oil channel, the outlet of the second pump is connected to the inlets of the third boosting valve and the fourth boosting valve through pipelines, the outlet of the third boosting valve is connected to the RL port of the test device and the inlet of the third pressure reducing valve through pipelines, and the outlet of the fourth boosting valve is connected to the RR port of the test device and the inlet of the fourth pressure reducing valve through pipelines.

[0123] The third pressure reducing valve outlet is connected to the second one-way valve inlet.

[0124] The fourth pressure reducing valve outlet is connected to the second one-way valve inlet and the third pressure reducing valve outlet.

[0125] The second one-way valve outlet is connected to the second pump inlet.

[0126] The outlet of the second pressure-limiting valve is connected to the outlet of the second pump, the inlet of the third boosting valve and the inlet of the fourth boosting valve through an oil passage.

[0127] The motor drives the first pump and the second pump to perform reciprocating motion through the eccentric device.

[0128] A method for testing the active pressure building capability of an automobile ESC, applicable to a testing device for the active pressure building capability of an automobile ESC, comprises the following steps:

[0129] Step (1): Adjust the volumes of the four liquid storage tanks to be the same as the actual vehicle volumes;

[0130] Step (2): the second electromagnetic ball valve and the third electromagnetic ball valve are energized, and the oil filling pump is energized to pump the brake fluid in the oil tank into the oil pot, so that the brake fluid in the oil pot reaches a specified scale;

[0131] Step (3): the second electromagnetic ball valve and the third electromagnetic ball valve are powered off;

[0132] Step (4): the first electromagnetic ball valve and the third electromagnetic ball valve are energized, and the brake fluid in the oil pot enters the gas-liquid booster cylinder;

[0133] Step (5): The first electromagnetic ball valve and the third electromagnetic ball valve are powered off, and the electrical proportional valve is adjusted to build up the pressure of the gas-liquid booster cylinder to 10 MPa;

[0134] Step (6): The solenoid valve is energized, the fourth solenoid ball valve and the two seventh solenoid ball valves are energized, and the gas-liquid booster cylinder pushes the brake fluid and the air in the pipeline through the ESC into the four fluid storage tanks. After stabilizing the pressure for 5 seconds, the fourth solenoid ball valve and the two seventh solenoid ball valves are de-energized, the solenoid valve is de-energized, and the four sixth solenoid ball valves are energized to discharge the brake fluid and air in the fluid storage tanks together;

[0135] Step (7): the four sixth electromagnetic ball valves are powered off;

[0136] Step (8): Repeat steps (6) and (7) three times to exhaust the air in the pipeline;

[0137] Step (9): Repeat steps (2) and (3) once;

[0138] Step (10): The third electromagnetic ball valve, the fourth electromagnetic ball valve and the two seventh electromagnetic ball valves are energized, the liquid replenishment valve coil in the actuator is energized, the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized by 1A respectively, and the motor in the ESC is energized for 2s;

[0139] Step (11): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are powered off, and the motor in the ESC is powered off for 2 seconds;

[0140] Step (12): The first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized with 1.1A respectively, and the motor in the ESC is energized for 2s;

[0141] Step (13): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are powered off, and the motor in the ESC is powered off for 2 seconds;

[0142] Step (14): The first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized with 1.2A respectively, and the motor in the ESC is energized for 2s;

[0143] Step (15): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are powered off, and the motor in the ESC is powered off for 2 seconds;

[0144] Step (16): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized with 1.3A, and the motor in the ESC is energized for 2s;

[0145] Step (17): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are powered off, and the motor in the ESC is powered off for 2 seconds;

[0146] Step (18): The first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized with 1.4A respectively, and the motor in the ESC is energized for 2s;

[0147] Step (19): the first pressure limiting valve coil, the second pressure limiting valve coil, the liquid replenishing valve coil and the motor in the ESC in the actuator are powered off;

[0148] Step (20): Collect the pressure data of the first pressure sensor, the second pressure sensor and the two third pressure sensors in steps (10) to (19) and draw a pressure curve, such as Figure 4 As shown, the pressure is judged; the judgment is made by the graphic judgment module of the control program installed in the host computer, which is specifically implemented by software. It is to judge whether the pressure building pressure meets the requirements by comparing the specified pressure value with the curve drawn by the collected data;

[0149] Step (21): the third electromagnetic ball valve, the fourth electromagnetic ball valve and the two seventh electromagnetic ball valves are powered off, and the two fifth electromagnetic ball valves and the four sixth electromagnetic ball valves are powered on;

[0150] Step (22): The two fifth solenoid ball valves and the four sixth solenoid ball valves are powered off to complete the test.

[0151] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments. Various changes can be made within the knowledge of ordinary technicians in the technical field without departing from the purpose of the present invention. In addition, the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict.

Claims

1. A test device for the active pressure building capability of an automobile ESC, comprising a mechanical hydraulic mechanism and a measurement and control mechanism, Features: The mechanical hydraulic mechanism comprises an oil pot, an oil injection pump and an oil tank; The oil tank is connected to the oil pot through a first pipeline, and a filter, an oil filling pump, a second electromagnetic ball valve, and a third electromagnetic ball valve are arranged on the first pipeline in sequence according to the flow path of the brake fluid from the oil tank to the oil pot; The first pipeline is connected to a first branch pipeline connected to the oil tank, and a relief valve is provided on the first branch pipeline; The gas source generating device is connected to the oil inlet of the ESC through a second pipeline; The second pipeline is provided with a first manual ball valve, an air filter, a pressure reducing valve, an oil mist collector, an electric proportional valve, a solenoid valve, a hydraulic pressure building device, a pointer pressure gauge, a second manual ball valve, a first pressure sensor, and a fourth solenoid ball valve in sequence according to the flow path of the gas source from the gas source generating device to the ESC; The second pipeline is connected to the oil tank through a third pipeline, and a fifth electromagnetic ball valve is provided on the third pipeline; The oil pot is connected to the hydraulic pressure building device via a fourth pipeline, and a first electromagnetic ball valve is provided on the fourth pipeline; The oil tank is connected to each oil outlet of the corresponding ESC through each fifth pipeline, and each fifth pipeline is provided with a liquid storage tank, a second pressure sensor and a sixth electromagnetic ball valve; The measurement and control mechanism includes a host computer, a data acquisition card, a signal processing module, a power module, a drive module and an actuator, wherein the host computer includes a data processing module, a graphics drawing module, a graphics determination module and an execution control module; Among them, the drive module is electrically connected to all pressure sensors in the mechanical hydraulic mechanism, all electromagnetic ball valves in the mechanical hydraulic mechanism, electromagnetic valves in the mechanical hydraulic mechanism, electrical proportional valves in the mechanical hydraulic mechanism, oil injection pumps in the mechanical hydraulic mechanism, motors in the ESC and actuators respectively; The power module is electrically connected to the drive module to control the on / off of the circuit between the power module and the actuator, all pressure sensors in the mechanical hydraulic mechanism, all electromagnetic ball valves in the mechanical hydraulic mechanism, the electromagnetic valves in the mechanical hydraulic mechanism, the electrical proportional valves in the mechanical hydraulic mechanism, the oil injection pump in the mechanical hydraulic mechanism, the motor in the ESC, and the actuator; Each pressure sensor is electrically connected to the signal processing module; the signal processing module is electrically connected to the data acquisition card; the data acquisition card is electrically connected to the host computer; The host computer has built-in control program software, in which the data processing module processes the digital signal transmitted by the data acquisition card according to the requirements of the control program software, and transmits the processed data to the graphics drawing module; The graphics drawing module draws the received data into a graph and passes the graph to the graphics determination module; The graphic determination module determines the received graphic according to the control program requirements; The execution control module sends the digital signal to the drive module through the data line according to the control program software requirements; The drive module controls the actions of all electromagnetic ball valves in the mechanical hydraulic mechanism, the electromagnetic valves in the mechanical hydraulic mechanism, the electrical proportional valves in the mechanical hydraulic mechanism, the oil injection pump in the mechanical hydraulic mechanism, the motor in the ESC and the actuator.

2. The vehicle ESC active pressure building capability testing device according to claim 1, It is characterized in that The hydraulic pressure building device includes a gas-liquid booster cylinder; The second pipeline is provided with a first manual ball valve, an air filter, a pressure reducing valve, an oil mist collector, an electrical proportional valve, a solenoid valve, a gas-liquid booster cylinder, a pointer pressure gauge, a second manual ball valve, a first pressure sensor, and a fourth solenoid ball valve in sequence according to the flow path of the gas source from the gas source generating device to the ESC.

3. The vehicle ESC active pressure building capability testing device according to claim 2, It is characterized in that The second pipeline includes a second main pipeline and a second branch pipeline; The second branch pipelines are connected in parallel with each other and each has one end connected to each oil inlet of the ESC and the other end connected to one end of the second main pipeline, and the other end of the second main pipeline is connected to the gas source generating device; The second main pipe is provided with a first manual ball valve, an air storage tank, an air filter, a pressure reducing valve, an oil mist collector, an electrical proportional valve, a solenoid valve, a gas-liquid booster cylinder, a pointer pressure gauge, a second manual ball valve, a first pressure sensor, and a fourth solenoid ball valve in sequence according to the flow path of the gas source from the gas source generating device to the ESC; The two second branch pipelines are both provided with a seventh electromagnetic ball valve and a third pressure sensor; The two second branch pipelines are respectively connected to the oil tank through their corresponding third pipelines, wherein each of the third pipelines is provided with a fifth electromagnetic ball valve.

4. The vehicle ESC active pressure building capability testing device according to claim 3, It is characterized in that The oil tank is connected to the corresponding oil outlets of the ESC through four fifth pipelines, and each fifth pipeline is provided with a liquid storage tank and a second pressure sensor.

5. The vehicle ESC active pressure building capability testing device according to claim 1, It is characterized in that The actuator includes a boost valve coil, a pressure limiting valve coil, a liquid replenishment valve coil and a pressure reducing valve coil; Among them, there are four boost valve coils, which are respectively mounted on the first boost valve, the second boost valve, the third boost valve and the fourth boost valve of the ESC; there are four pressure reducing valve coils, which are respectively mounted on the first pressure reducing valve, the second pressure reducing valve, the third pressure reducing valve and the fourth pressure reducing valve of the ESC; there are two liquid replenishment valve coils, which are respectively mounted on the first liquid replenishment valve and the second liquid replenishment valve of the ESC; there are two pressure limiting valve coils, which are respectively mounted on the first pressure limiting valve and the second pressure limiting valve of the ESC; In addition, the boost valve coil is energized, the boost valve in the ESC is cut off, the boost valve coil is de-energized, and the boost valve in the ESC is turned on; the pressure reducing valve coil is energized, the pressure reducing valve in the ESC is turned on, the pressure reducing valve coil is de-energized, and the pressure reducing valve in the ESC is cut off; the refill valve coil is energized, the refill valve in the ESC is turned on, the refill valve coil is de-energized, and the refill valve in the ESC is cut off; the pressure limiting valve coil is energized, the pressure limiting valve in the ESC is cut off, the pressure limiting valve coil is de-energized, and the pressure limiting valve in the ESC is turned on.

6. The vehicle ESC active pressure building capability testing device according to claim 1, It is characterized in that The oil pot is provided with a scale.

7. The vehicle ESC active pressure building capability testing device according to claim 3, It is characterized in that The oil tank provides brake fluid to two oil inlets of the ESC at the same time.

8. The vehicle ESC active pressure building capability testing device according to claim 1, It is characterized in that The liquid storage tank is a liquid storage tank with adjustable volume.

9. The vehicle ESC active pressure building capability testing device according to claim 1, It is characterized in that The vertical oil inlet of the liquid storage tank is placed vertically upward.

10. A method for testing the active pressure-building capability of an automobile ESC, applicable to the testing device for the active pressure-building capability of an automobile ESC as claimed in claim 5, It is characterized in that The following steps are involved: Step (1): Adjust the volumes of the four liquid storage tanks to be the same as the actual vehicle volumes; Step (2): the second electromagnetic ball valve and the third electromagnetic ball valve are energized, and the oil filling pump is energized to pump the brake fluid in the oil tank into the oil pot, so that the brake fluid in the oil pot reaches a specified scale; Step (3): the second electromagnetic ball valve and the third electromagnetic ball valve are powered off; Step (4): the first electromagnetic ball valve and the third electromagnetic ball valve are energized, and the brake fluid in the oil pot enters the gas-liquid booster cylinder; Step (5): The first electromagnetic ball valve and the third electromagnetic ball valve are powered off, and the electrical proportional valve is adjusted to build up the pressure of the gas-liquid booster cylinder to 10 MPa; Step (6): The solenoid valve is energized, the fourth solenoid ball valve and the two seventh solenoid ball valves are energized, and the gas-liquid booster cylinder pushes the brake fluid and the air in the pipeline through the ESC into the four fluid storage tanks. After stabilizing the pressure for 5 seconds, the fourth solenoid ball valve and the two seventh solenoid ball valves are de-energized, the solenoid valve is de-energized, and the four sixth solenoid ball valves are energized to discharge the brake fluid and air in the fluid storage tanks together; Step (7): the four sixth electromagnetic ball valves are powered off; Step (8): Repeat steps (6) and (7) three times to exhaust the air in the pipeline; Step (9): Repeat steps (2) and (3) once; Step (10): The third electromagnetic ball valve, the fourth electromagnetic ball valve and the two seventh electromagnetic ball valves are energized, the liquid replenishment valve coil in the actuator is energized, the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized by 1A respectively, and the motor in the ESC is energized for 2s; Step (11): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are powered off, and the motor in the ESC is powered off for 2 seconds; Step (12): The first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized with 1.1A respectively, and the motor in the ESC is energized for 2s; Step (13): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are powered off, and the motor in the ESC is powered off for 2 seconds; Step (14): The first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized with 1.2A respectively, and the motor in the ESC is energized for 2s; Step (15): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are powered off, and the motor in the ESC is powered off for 2 seconds; Step (16): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized with 1.3A, and the motor in the ESC is energized for 2s; Step (17): the first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are powered off, and the motor in the ESC is powered off for 2 seconds; Step (18): The first pressure limiting valve coil and the second pressure limiting valve coil in the actuator are energized with 1.4A respectively, and the motor in the ESC is energized for 2s; Step (19): the first pressure limiting valve coil, the second pressure limiting valve coil, the liquid replenishing valve coil and the motor in the ESC in the actuator are powered off; Step (20): collecting pressure data of the first pressure sensor, the second pressure sensor and the two third pressure sensors in steps (10) to (19), drawing a pressure curve, and determining the pressure magnitude; Step (21): the third electromagnetic ball valve, the fourth electromagnetic ball valve and the two seventh electromagnetic ball valves are powered off, and the two fifth electromagnetic ball valves and the four sixth electromagnetic ball valves are powered on; Step (22): The two fifth solenoid ball valves and the four sixth solenoid ball valves are powered off to complete the test.