Energy storage UPS system and control method thereof

Through the online dual-conversion structure and controller module, the energy bidirectional flow and power auxiliary services of the UPS system are realized, which solves the problems of poor control flexibility and safety hazards of lead-acid batteries in the existing UPS system, and improves the system's participation in power grid frequency regulation and regulation The capacity of pressing and cutting peaks and valley filling reduces redundant investment.

CN115085354BActive Publication Date: 2024-12-03SOUTHERN POWER GRID PEAK LOAD & FREQUENCY REGULATION GENERATING CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210655434.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-10
Publication Date
2024-12-03
Estimated Expiration
2042-06-10

AI Technical Summary

Technical Problem

The grid-side rectifier in the existing UPS system is a one-way rectifier, which cannot feedback energy to the power grid, resulting in poor control flexibility and inability to participate in the voltage regulation and frequency regulation of the power grid. The lead-acid battery has safety hazards and redundant investment problems.

Method used

The energy storage UPS system adopts an online dual-conversion structure. The energy inverter on the grid side can flow in both directions. The controller includes a state detection module, an optimization scheduling module and a control regulating module to realize primary frequency regulation and secondary frequency regulation of the power grid. Power auxiliary services such as pressure regulation and peak cutting and valley filling are used to replace lead-acid batteries to improve safety and flexibility.

Benefits of technology

The two-way energy flow of the UPS system is realized, which improves control flexibility, and can participate in the power grid's frequency regulation, voltage regulation and peak-cutting and valley filling, reduces redundant investment, and improves the safety and flexibility of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115085354B_ABST
    Figure CN115085354B_ABST
Patent Text Reader

Abstract

The present invention relates to an energy storage UPS system and a control method thereof, wherein the UPS system comprises: a grid-side converter, a DC bus, a load-side converter, etc.; a controller is provided inside the UPS system, and the controller comprises a state detection module, an optimization scheduling module and a control and regulation module; the state detection module is used to detect the grid state, voltage and frequency conditions, etc. when the UPS system is connected to the grid; the optimization scheduling module establishes an optimization scheduling model for maximizing the benefits of the UPS system participating in power auxiliary services according to the functions, operation modes and performance requirements of the UPS system participating in power auxiliary services; the control and regulation module issues control instructions to the UPS system and related controllable objects according to the analysis and calculation results of the optimization scheduling module to ensure that the UPS system operates according to the set requirements. The present invention can realize the peak and valley regulation of its own power consumption, and at the same time, it can realize the support of the primary frequency modulation, secondary frequency modulation, voltage regulation, demand response, etc. of the power grid through the control of the grid-connected converter.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to an energy storage UPS system, and in particular to an energy storage UPS system which adopts an online double conversion structure and can participate in power auxiliary services, namely, power backup, primary frequency regulation, secondary frequency regulation, voltage regulation and peak regulation, and a control method thereof. Background Art

[0002] UPS (Uninterruptible Power Supply) system is an uninterruptible power supply system. It is a power protection device with energy storage device, inverter as the main component, mainly composed of rectification, inversion, energy storage and static switch, and has stable voltage and frequency output. At present, UPS system has been widely used in modern industrial production, especially in data centers and IDC computer rooms. The configuration of UPS system mainly plays two roles: first, when the power fails or the power is cut off, the UPS system can continue to supply power to the IDC load stably, prevent the load from being affected by the sudden failure or power outage of the mains, avoid irreversible harm to the computer, and provide guarantee for the normal operation of the load; second, when the mains input is stable, the UPS system will stabilize the mains voltage and eliminate the surge, instantaneous high voltage and frequency deviation on the mains power grid, improve the quality of the mains power, provide high-quality power for the load, and protect the precision instruments from being damaged.

[0003] In the prior art, since the rectifier used on the grid side of the UPS system is a unidirectional rectifier, energy can only flow in one direction, and the rectifier cannot feed energy back to the grid. It can only perform peak and valley regulation on the power consumption of its own ICT load, resulting in problems such as poor control flexibility of the UPS system and inability to participate in the voltage and frequency regulation of the grid. Existing UPS systems generally use lead-acid maintenance-free batteries to connect to the host, but lead-acid batteries have the problem of long-term floating charge, which poses certain safety hazards. As a backup power supply, the existing UPS system has a large amount of UPS redundant investment while being widely used, and has gradually become a "sunk asset". Summary of the invention

[0004] In view of this, the technical problem solved by the present invention is to provide an energy storage UPS system with an online double conversion structure and a control method for the energy storage UPS system to participate in power auxiliary services, and at the same time install a controller in the UPS system to solve the problems existing in the existing UPS system.

[0005] The technical solution proposed by the present invention is as follows:

[0006] An energy storage UPS system, wherein the UPS system adopts an online double conversion structure, and the UPS system comprises:

[0007] Grid-side converter, DC bus, load-side converter, static bypass branch / maintenance branch, AC / DC distribution cabinet and other auxiliary components or materials;

[0008] The grid-side converter energy can flow in both directions and has a dual operation mode of grid-connected and off-grid, and can realize continuous adjustment of active and reactive power according to control requirements; a controller is also provided inside the UPS system, and the controller mainly includes three functional modules, namely, a state detection module, an optimization scheduling module and a control and regulation module;

[0009] The state detection module is used to detect the grid state, voltage and frequency of the UPS system when it is connected to the grid, the operating state of the converter in the UPS system, the bus voltage of the UPS grid connection point, the SOC of the energy storage unit, the load curve, and the commissioning rate of reactive equipment such as AVC; the optimization scheduling module establishes an optimization scheduling model for maximizing the benefits of the UPS system participating in the power auxiliary service according to the functions, operating modes and performance requirements of the UPS system participating in the power auxiliary service, so that the UPS system can participate in the power auxiliary services of frequency regulation and voltage regulation to the maximum extent; the control and regulation module issues control instructions to the UPS system and related controllable objects according to the analysis and calculation results of the optimization scheduling module to ensure that the UPS system operates according to the set requirements.

[0010] Furthermore, the grid-side converter and the load-side converter both adopt standardized and modularized bidirectional conversion AC / DC modules.

[0011] Furthermore, the UPS system also includes a battery, and the battery is a lithium-ion battery, a lead-acid battery or a sodium-ion battery.

[0012] Furthermore, the grid-side converter and the load-side converter adopt a three-phase four-bridge-arm three-level topology structure.

[0013] Furthermore, the grid-side converter and the load-side converter adopt a single-stage topology structure, which is mainly composed of a bidirectional conversion AC / DC module, an AC-side LCL, an AC-side main relay and a soft-start circuit, an AC-side fuse, a DC-side main relay and a soft-start circuit, and a DC-side fuse.

[0014] Furthermore, the grid-side converter and the load-side converter adopt NPC three-level technology, and the bridge arm is composed of I-type three-level IGBT modules.

[0015] The present invention also proposes a control method for the energy storage UPS system, the method comprising the following steps:

[0016] 1) The UPS provides the UPS system's ability to participate in power auxiliary services and specific indicators to the optimization scheduling module in the controller through the status detection module;

[0017] 2) Determine the type and performance of the UPS system involved in power assistance;

[0018] 3) Establish an optimal dispatching model with the goal of maximizing the benefits of UPS system participating in power auxiliary services;

[0019] 4) UPS system participates in power auxiliary services;

[0020] 5) solving the optimization scheduling model;

[0021] 6) Determine the optimal situation for UPS system to participate in power auxiliary services.

[0022] Furthermore, in step 3), the objective function of the optimization scheduling model is expressed as:

[0023] maxy=∑ax m,n +bk m,n +cz+dq m,n +ep+fg,

[0024] in In the formula, x m,n represents the assessment index of m UPS systems participating in the nth primary frequency regulation, a is the assessment fee when participating in a single primary frequency regulation but failing to meet the frequency regulation requirements; k m,n Represents the assessment index of m UPS systems participating in the nth secondary frequency regulation, and They represent the assessment contents of the UPS system participating in the AGC service, namely, the regulation rate, regulation accuracy, response time and regulation capacity of the AGC unit; b is the compensation income obtained when the UPS system participates in a single secondary frequency regulation that meets the specified requirements; z represents the voltage of the UPS system grid connection point; c is the assessment fee when the grid connection point voltage is unqualified; q m,n represents the commissioning rate of m reactive power regulation devices participating in voltage regulation for the nth time, d is the assessment fee when the commissioning rate of reactive power regulation devices participating in voltage regulation for a single time does not meet the standard; p expresses the situation of UPS providing power restoration service when the power supply system is out of power for a large area, e is the assessment fee when the UPS system fails to complete the power restoration service due to its own reasons; g represents the situation of energy storage in the UPS system participating in load side peak shaving and valley filling when the city electricity price is at its peak or relatively expensive, f is the assessment fee when the UPS system fails to meet the peak shaving and valley filling requirements, and y represents the income of the UPS system participating in power auxiliary services.

[0025] Furthermore, in step 4), the specific process of the power auxiliary service includes:

[0026] When the status detection module in the controller detects that the grid needs a frequency modulation, the control and regulation module in the controller sends a command to the UPS system, and the UPS system participates in the frequency modulation. If it does not participate or does not meet the relevant standard requirements, it will be assessed;

[0027] When the controller receives the AGC instruction from the power grid dispatching and requires secondary frequency regulation, the UPS system can actively participate in the secondary frequency regulation to meet the requirements of the AGC regulation performance and availability of the secondary frequency regulation equipment, so as to obtain compensation benefits;

[0028] The state detection module of the controller detects the voltage of the busbar at the grid connection point of the UPS system. The UPS system sends instructions to the AVC through the adjustment control module to adjust the voltage qualification rate of the busbar at the grid connection point. When it is detected that the voltage of the busbar at the grid connection point does not meet the requirements and regulations, it is assessed according to the shortfall in its qualification rate.

[0029] During reactive power regulation, it is also necessary to detect the commissioning rate of AVC or other reactive power compensation devices. When the controller status detection module detects that the commissioning rate of AVC or other reactive power compensation devices does not meet the specified requirements, the assessment is carried out according to the shortfall in the commissioning rate.

[0030] When the city electricity price is at its peak or is relatively expensive, the UPS system supplies power to the load to achieve peak and valley regulation of the load power supply. If it does not meet the regulations, an assessment will be conducted.

[0031] The meaning of the assessment is punishment. The model includes assessment indicators. If the assessment fails to meet the requirements or fails to meet the requirements, there will be penalty fees, namely assessment.

[0032] The present invention has the following beneficial effects:

[0033] The energy storage UPS system proposed in the present invention can make full use of existing equipment, realize its own peak and valley regulation of electricity consumption, and at the same time can support primary frequency regulation, secondary frequency regulation, voltage regulation, demand response, etc. of the power grid through the control of the grid-connected converter. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 A schematic diagram of an energy storage UPS system of the present invention;

[0035] Figure 2 It is a diagram of the control method of the UPS system participating in power auxiliary service of the present invention. DETAILED DESCRIPTION

[0036] On the one hand, the present invention proposes a structure of an energy storage UPS system. The design of the energy storage uninterruptible power supply (UPS) adopts an online double conversion structure. Figure 1As shown, it generally includes a grid-side converter, a DC bus, a load-side converter, a static bypass branch / maintenance branch, an AC / DC distribution cabinet, and other necessary auxiliary components or materials. The grid-side converter can flow energy in both directions and has a grid-connected and off-grid dual operation mode. It can realize continuous adjustment of active and reactive power according to control requirements. The battery system can use, but is not limited to, lithium-ion batteries, lead-acid batteries, and sodium-ion batteries.

[0037] A controller is set up inside the UPS system, and the controller mainly includes three functional modules, namely, a state detection module, an optimization scheduling module, and a control and regulation module. The main functions of the state detection module are: through the state detection module, the grid state, voltage and frequency of the UPS system when it is connected to the grid, the operation state of the converter in the UPS system, the bus voltage of the UPS grid connection point, the SOC of the energy storage unit, the load curve, the commissioning rate of reactive equipment such as AVC, etc. can be detected; the main functions of the optimization scheduling module are: according to the functions, operation modes and performance requirements of the UPS participating in power auxiliary services, an optimization scheduling model for maximizing the benefits of the UPS system participating in power auxiliary services is established, so as to realize the maximum participation of the UPS in power auxiliary services such as frequency regulation and voltage regulation; the control and regulation module can issue control instructions to the UPS system and related controllable objects, such as the grid-connected switch on the grid-connected side, according to the analysis and calculation results of the optimization scheduling module, to ensure that the UPS system operates according to the set requirements.

[0038] Among them, the grid-side converter and the load-side converter both use standardized, modularized bidirectional conversion AC / DC modules, which are convenient for flexible expansion and maintenance. In order to improve the off-grid operation support capability of the grid side and the unbalanced control capability of the ICT load side, the converter module can adopt a three-phase four-bridge-arm three-level topology structure, with 100% three-phase unbalanced load capacity, strong adaptability and high reliability.

[0039] The modular converter can adopt a single-stage topology structure, which is mainly composed of a bidirectional AC / DC, an AC side LCL, an AC side main relay and a soft-start circuit, an AC side fuse, a DC side main relay and a soft-start circuit, a DC side fuse, and the like.

[0040] The modular converter can adopt NPC three-level technology, and the bridge arm is composed of type I three-level IGBT modules. The three-level technology has obvious advantages in reducing filter inductance and output ripple, and has become the mainstream solution for modular converters. The AC main incoming line is a three-phase four-wire system, and the main circuit topology adopts a three-phase four-bridge arm structure, with the N line led out from the fourth bridge arm. Compared with the three-phase four-wire system with split capacitor midpoint, this topology can not only improve the direct voltage utilization rate, but also reduce the capacity of the DC filter capacitor, and can effectively avoid the risk of uncontrollable DC capacitor voltage balancing caused by excessive zero-sequence current when the load is unbalanced.

[0041] The AC output filter uses an LCL filter. Under the condition of the same filtering effect, the total inductance is about one-third of that of a single inductor filter. Therefore, the volume of the filter branch can be greatly reduced. The addition of a zero line inductor can further reduce the output ripple.

[0042] The modular converter has both AC side soft start and DC side soft start branches, and has three-phase AC fuse protection and DC fuse protection.

[0043] Considering the functions of batteries in energy storage UPS, in addition to realizing the basic function of "backup power", it is necessary to consider the "energy storage" function requirements of batteries in peak shaving and valley filling and participating in various auxiliary services, and have high requirements for their cycle life, charging and discharging efficiency, and high current charging and discharging capabilities. The energy storage UPS system proposed in the present invention can select lithium iron phosphate batteries to adapt to the scene requirements, and replace lead-acid batteries with lithium batteries with high energy density. Compared with lead-acid batteries and nickel-cadmium batteries, more energy storage capacity can be configured in the same area, which improves the flexibility of system design.

[0044] The energy storage UPS system proposed in the present invention can make full use of existing equipment, can achieve its own peak and valley regulation of electricity consumption, and can also support frequency and voltage regulation, demand response, etc. of the power grid through the control of the grid-connected converter.

[0045] When the power grid is normal, the static bypass switch and the manual maintenance bypass switch are disconnected, and energy flows in the grid-side bidirectional converter - battery - ICT load-side converter - ICT load power supply channel, providing stable and reliable power supply to the ICT load, while charging the lithium battery system or performing peak shaving and valley filling, AGC auxiliary services, etc., to perform energy storage functions.

[0046] When the grid is powered off or abnormal, the grid-side bidirectional converter is locked, and the battery supplies power to the load through the ICT load-side converter, performing the function of uninterrupted power supply.

[0047] When the UPS fails, the static bypass switch is closed and the AC power directly supplies power to the load. When the UPS and static bypass switch are maintained or overhauled, the manual maintenance bypass switch is closed and the AC power directly supplies power to the load through the manual maintenance bypass.

[0048] On the other hand, the present invention proposes a control method for energy storage UPS to participate in power auxiliary services: the UPS system can participate in system power auxiliary services, such as backup power, frequency regulation, voltage regulation, black start and load side peak shaving and valley filling. The backup power of the UPS system is mainly to ensure the reliability of ICT load power supply. On this basis, because the charging and discharging of its internal energy storage has a certain power regulation capability, it can respond to dispatch instructions within the specified time to participate in power auxiliary services such as frequency regulation, voltage regulation and black start; in addition, it can also realize peak shaving and valley filling of its own electricity consumption according to the peak-valley difference of electricity prices.

[0049] Primary frequency regulation means that when the mains frequency deviates from the target frequency, the energy storage inside the UPS system achieves inertial response and rapid frequency regulation through the control of the grid-side converter, and reduces the frequency deviation by quickly adjusting the active output. This process is the local response of the energy storage and grid-side converter - spontaneous behavior.

[0050] Secondary frequency regulation refers to the UPS system using the automatic power control technology in the power system dispatching system, including automatic generation control AGC, automatic power control APC, etc., to adjust the power generation and consumption in real time according to a certain regulation rate based on the power dispatching instructions to prevent power supply problems caused by frequency changes in the power supply system.

[0051] The UPS system participates in voltage regulation, that is, voltage control service, which can also be called reactive power balancing service. The UPS system participates in voltage control service to ensure the stability of the grid voltage. According to the reactive output, voltage and other instructions issued by the dispatcher, it injects or absorbs reactive power into the grid through automatic voltage control AVC and other methods, thereby adjusting the reactive power distribution of the grid.

[0052] The UPS system's participation in black start power auxiliary service refers to the service provided by the UPS system to restore system power supply when there is a large-scale power outage in the system and there is no external power support.

[0053] Peak shaving and valley filling means that when the city electricity price is at its peak or relatively expensive, the UPS system can be used to supply power to loads such as data centers, thereby participating in the peak and valley regulation of the load.

[0054] However, when the system requires the UPS system to participate in frequency regulation, voltage regulation and load-side peak-valley regulation at the same time, in order to ensure safe and reliable power supply to the system, the UPS system shall give priority to participating in frequency regulation and voltage regulation.

[0055] The following is a detailed introduction to the control methods of energy storage UPS system participating in primary frequency regulation, secondary frequency regulation, voltage regulation and load side peak and valley regulation. Figure 2 As shown: First, the ability and specific indicators of the UPS system participating in power auxiliary services are provided to the optimization management module in the controller. The information provided should meet the relevant national regulations and meet the local power supply requirements. Secondly, the type and performance of the UPS participating in power assistance are determined, and an optimization scheduling model is established with the goal of maximizing the benefits of the UPS system participating in power auxiliary services.

[0056] The objective function is maxy = ∑ax m,n +bk m,n +cz+dq m,n +ep+fg, where

[0057] In the formula, x m,nrepresents the assessment index of m UPS systems participating in the nth primary frequency regulation, a is the assessment fee when participating in a single primary frequency regulation but failing to meet the frequency regulation requirements; k m,n Represents the assessment index of m UPS systems participating in the nth secondary frequency regulation, and They represent the assessment contents of the UPS system participating in the AGC service, namely the regulation rate, regulation accuracy, response time and regulation capacity of the AGC unit. b is the compensation income obtained when the UPS system participates in a single secondary frequency regulation and meets the specified requirements; z represents the voltage of the UPS system grid connection point, and c is the assessment fee when the grid connection point voltage is unqualified; q m,n represents the commissioning rate of m reactive power regulation devices participating in voltage regulation for the nth time, d is the assessment fee when the commissioning rate of reactive power regulation devices participating in voltage regulation for a single time does not meet the standard; p expresses the situation of UPS providing system power restoration service when the power supply system is out of power for a large area, e is the assessment fee when the UPS system fails to complete the system power restoration service due to its own reasons; g represents the situation of energy storage in the UPS system participating in load-side peak shaving and valley filling when the city electricity price is at its peak or relatively expensive, f is the assessment fee when the UPS system fails to meet the peak shaving and valley filling requirements. However, it should be noted that when frequency regulation, voltage regulation and load-side peak shaving and valley filling are required at the same time, frequency regulation and voltage regulation shall be given priority; y represents the income of the UPS system from participating in power auxiliary services.

[0058] The constraints of the model mainly include the backup power constraints of the UPS system, the active output constraints of the energy storage system in the UPS system, the SOC constraints, the active power and reactive power constraints of the converter in the UPS system, the availability of the AGC equipment, etc.; the decision variables may be the changes in the active power and reactive power of the UPS system participating in power auxiliary services.

[0059] The specific process of UPS participating in power assistance: First, when the status detection module in the controller detects that the power grid needs primary frequency modulation, it will send instructions to the UPS system through the control and regulation module in the controller. The UPS must participate in primary frequency modulation to ensure stable power supply to the system. If it does not participate or does not meet the relevant standards, it will be assessed; when the controller receives the power grid dispatch AGC instruction requiring secondary frequency modulation, the UPS system can actively participate in the secondary frequency modulation to meet the regulation performance indicators and availability requirements of the secondary frequency modulation equipment AGC, so as to obtain compensation benefits; the controller status module detects the UPS system grid connection point The bus voltage condition, the UPS system sends instructions to AVC by adjusting the voltage qualification rate of the grid-connected bus through the adjustment control module. When it is detected that the voltage of the grid-connected bus does not meet the requirements and regulations, it is assessed according to the shortfall of its qualification rate; when reactive power regulation is carried out, the commissioning rate of AVC or other reactive compensation devices must also be considered. When the controller status detection module detects that the commissioning rate of AVC and other devices does not meet the specified requirements, it is assessed according to the shortfall of its commissioning rate; in addition, the energy storage in the UPS system supplies power to the load when the city electricity price is at its peak or more expensive, realizing internal peak-valley regulation, and it is assessed if it does not meet the specified requirements. Then, the particle swarm optimization algorithm, ant colony algorithm, genetic algorithm and LINGO software can be used to solve the optimization scheduling model, and finally determine the optimal situation for the UPS system to participate in power auxiliary services.

[0060] The above implementation modes are only for illustrating the technical idea of ​​the present invention, and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution in accordance with the technical idea proposed by the present invention shall fall within the protection scope of the present invention.

Claims

1. An energy storage UPS system, characterized in that: The UPS system adopts an online double conversion structure, and the UPS system includes: Grid-side converter, DC bus, load-side converter, static bypass branch / maintenance branch and AC / DC distribution cabinet; The grid-side converter can flow energy in both directions and has both grid-connected and off-grid operation modes, and can realize continuous adjustment of active and reactive power according to control requirements; The UPS system is also provided with a controller, which mainly includes three functional modules, namely, a state detection module, an optimization scheduling module and a control and regulation module; The state detection module is used to detect the grid state, voltage and frequency of the UPS system when it is connected to the grid, the operating state of the converter in the UPS system, the bus voltage of the UPS grid connection point, the SOC of the energy storage unit, the load curve and the commissioning rate of the AVC reactive equipment; the optimization scheduling module establishes an optimization scheduling model for maximizing the benefits of the UPS system participating in the power auxiliary service according to the functions, operation modes and performance requirements of the UPS system participating in the power auxiliary service, so that the UPS system can participate in the power auxiliary services of frequency regulation and voltage regulation to the maximum extent; the control and regulation module issues control instructions to the UPS system and related controllable objects according to the analysis and calculation results of the optimization scheduling module to ensure that the UPS system operates according to the set requirements; The objective function of the optimization scheduling model is expressed as: , in ; In the formula, x m,n represents the assessment index of m UPS systems participating in the nth primary frequency regulation, a is the assessment fee when participating in a single primary frequency regulation but failing to meet the frequency regulation requirements; k m,n Represents the assessment index of m UPS systems participating in the nth secondary frequency regulation, , , and They represent the assessment contents of the UPS system participating in the AGC service, namely, the regulation rate, regulation accuracy, response time and regulation capacity of the AGC unit; b is the compensation income obtained when the UPS system participates in a single secondary frequency regulation that meets the specified requirements; z represents the voltage of the UPS system grid connection point; c is the assessment fee when the grid connection point voltage is unqualified; q m,n represents the commissioning rate of m reactive power regulation devices participating in voltage regulation for the nth time, d is the assessment fee when the single commissioning rate of reactive power regulation devices participating in voltage regulation does not meet the standard; p expresses the situation of UPS providing power restoration service when the power supply system is out of power for a large area, e is the assessment fee when the UPS system fails to complete the power restoration service due to its own reasons; g represents the situation of energy storage in the UPS system participating in load side peak shaving and valley filling when the city electricity price is at its peak or relatively expensive, f is the assessment fee when the UPS system fails to meet the peak shaving and valley filling requirements, and y represents the income of the UPS system participating in power auxiliary services.

2. The energy storage UPS system according to claim 1, characterized in that: The grid-side converter and the load-side converter both adopt standardized and modularized bidirectional conversion AC / DC modules.

3. The energy storage UPS system according to claim 1, characterized in that: The UPS system further comprises a battery, which comprises a lithium-ion battery, a lead-acid battery or a sodium-ion battery.

4. The energy storage UPS system according to claim 1, characterized in that: The grid-side converter and the load-side converter both adopt standardized and modular bidirectional conversion AC / DC modules. The grid-side converter and the load-side converter adopt a three-phase four-bridge-arm three-level topology structure to improve the off-grid operation support capability of the grid side and the unbalanced control capability of the load side.

5. The energy storage UPS system according to claim 1, characterized in that: The grid-side converter and the load-side converter adopt NPC three-level technology, and the bridge arm is composed of I-type three-level IGBT modules.

6. A control method for an energy storage UPS system according to any one of claims 1 to 5, characterized in that: The method comprises the following steps: 1) The UPS system provides the ability and specific indicators of the UPS system to participate in power auxiliary services to the optimization scheduling module in the controller through the status detection module; 2) Determine the type and performance of the UPS system involved in power assistance; 3) Establish an optimal dispatching model with the goal of maximizing the benefits of UPS system participating in power auxiliary services; 4) UPS system participates in power auxiliary services; 5) solving the optimization scheduling model; 6) Determine the optimal situation for UPS system to participate in power auxiliary services.

7. The control method of an energy storage UPS system according to claim 6, characterized in that: In step 4), the power auxiliary service includes: When the status detection module in the controller detects that the grid needs a frequency modulation, the control and regulation module in the controller sends a command to the UPS system, and the UPS system participates in the frequency modulation. If it does not participate or does not meet the relevant standard requirements, it will be assessed; When the controller receives the AGC instruction from the power grid dispatching and requires secondary frequency regulation, the UPS system can actively participate in the secondary frequency regulation to meet the regulation performance index and availability index requirements of the AGC of the secondary frequency regulation equipment, so as to obtain compensation benefits; The state detection module of the controller detects the voltage of the busbar at the grid connection point of the UPS system. The UPS system sends instructions to the AVC through the adjustment control module to adjust the voltage qualification rate of the busbar at the grid connection point. When it is detected that the voltage of the busbar at the grid connection point does not meet the requirements and regulations, it is assessed according to the shortfall in its qualification rate. During reactive power regulation, the operation rate of AVC or other reactive power compensation devices is detected. When the controller status detection module detects that the operation rate of AVC or other reactive power compensation devices does not meet the specified requirements, the shortfall in the operation rate is used for assessment. When the city electricity price is at its peak or is relatively expensive, the UPS system supplies power to the load to achieve peak and valley regulation of the load power supply. If it does not meet the regulations, an assessment will be conducted.

Citation Information

Patent Citations

  • A grid hybrid rolling dispatching method considering congestion and energy storage TOU price

    AU2020102245A4

  • Mixed UPS (uninterrupted power supply) energy storage system and method thereof

    CN106451513A