A distributed photovoltaic test detection platform and detection method

Through the design of the distributed photovoltaic test and detection platform, multiple functional areas are used to connect with the photovoltaic equipment, obtain different electrical energy parameters and conduct test and detection, solving the problems of large detection limitations and low flexibility in the existing technology, and realizing the photovoltaics Flexible detection of different working states of the equipment.

CN115085670BActive Publication Date: 2024-12-06STATE GRID HUNAN ELECTRIC POWER COMPANY LIMITED +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202210767520.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-30
Publication Date
2024-12-06
Estimated Expiration
2042-06-30

AI Technical Summary

Technical Problem

The existing photovoltaic equipment testing and testing devices have problems such as large detection limitations and low flexibility, and cannot effectively detect the performance of photovoltaic equipment under different working conditions.

Method used

A distributed photovoltaic test and detection platform was designed. By setting up multiple functional areas to connect with the photovoltaic to be detected, using intelligent fusion terminals to obtain different electrical energy parameters, simulate the working state under different loads, and conducting tests, reducing detection limitations , improve detection flexibility.

Benefits of technology

It realizes flexible detection of photovoltaic equipment under different working conditions, improves the flexibility and accuracy of detection, and reduces limitations in the detection process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115085670B_ABST
    Figure CN115085670B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of photovoltaic detection technology, and discloses a distributed photovoltaic test and detection platform, comprising: a first station area, used for connecting with a first part of photovoltaics to be detected, obtaining a first electric energy parameter of the first part of photovoltaics to be detected, and also used for connecting with an intelligent fusion terminal; a second station area, used for connecting with a second part of photovoltaics to be detected, obtaining a second electric energy parameter of the second part of photovoltaics to be detected, and also used for connecting with an intelligent fusion terminal; a third station area, used for connecting with a third part of photovoltaics to be detected, obtaining a third electric energy parameter of the third part of photovoltaics to be detected, and also used for connecting with an intelligent fusion terminal; the intelligent fusion terminal performs test detection on the first part of photovoltaics to be detected according to the first electric energy parameter, performs test detection on the second part of photovoltaics to be detected according to the second electric energy parameter, and performs test detection on the third part of photovoltaics to be detected according to the third electric energy parameter. The present invention solves the problems of large detection limitations and low flexibility of existing detection devices.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of photovoltaic detection technology, and in particular to a distributed photovoltaic test detection platform and a detection method. Background Art

[0002] With the construction of new power systems, photovoltaic technology is being used more and more widely. Due to the randomness and volatility of photovoltaic equipment during use, the safety and stability of the power grid will be reduced, which will have a huge impact on the reliability of the equipment and the quality of electricity use. Therefore, it is necessary to test and detect photovoltaic equipment through test and detection devices to reduce the impact of photovoltaic equipment on the power grid system after it is connected to the power grid. At present, when testing and detecting photovoltaic equipment, most photovoltaic test and detection devices are used to detect photovoltaic equipment in operation. During the test and detection, due to the limitations of the function of the detection device itself, only one working state of the photovoltaic equipment can be detected. When the photovoltaic equipment is in a different working state, it is necessary to replace the detection device or reset the test parameters in the detection device before continuing the test and detection. It can be seen that the existing detection devices have the problems of large detection limitations and low flexibility. Summary of the invention

[0003] The present invention provides a distributed photovoltaic test detection platform and a detection method to solve the problems of large detection limitations and low flexibility of existing detection devices.

[0004] In order to achieve the above object, the present invention is implemented by the following technical solutions:

[0005] In a first aspect, the present invention provides a distributed photovoltaic test and detection platform, comprising:

[0006] The first station area is used to connect with the first part of the photovoltaic power to be detected, obtain the first electric energy parameter of the first part of the photovoltaic power to be detected, and also used to communicate with the intelligent fusion terminal;

[0007] The second station area is used to connect with the second part of the photovoltaic power to be detected, obtain the second electric energy parameter of the second part of the photovoltaic power to be detected, and is also used to communicate with the intelligent fusion terminal;

[0008] The third station area is used to connect with the third part of the photovoltaic power to be detected, obtain the third electric energy parameter of the third part of the photovoltaic power to be detected, and is also used to connect with the intelligent fusion terminal;

[0009] An intelligent fusion terminal is used to connect the first substation, the second substation and the third substation, obtain the first electric energy parameter, the second electric energy parameter and the third electric energy parameter, and test the first part of the photovoltaic to be detected according to the first electric energy parameter, test the second part of the photovoltaic to be detected according to the second electric energy parameter, and test the third part of the photovoltaic to be detected according to the third electric energy parameter.

[0010] Optionally, the first station area includes a first energy storage device, a first charging pile, a load cabinet, a first busbar and a branch box;

[0011] The first busbar is used to connect the first part of the photovoltaic power to be detected and the first energy storage device, and transmit the electric energy signal generated by the first part of the photovoltaic power to be detected to the first energy storage device;

[0012] The branch box is used to connect the first part of the photovoltaic power to be detected and the first charging pile, and transmit the electric energy signal generated by the first part of the photovoltaic power to be detected to the first charging pile, and is also used to connect the load cabinet;

[0013] The load cabinet is used to simulate line load.

[0014] Optionally, the first substation further includes a line impedance simulation cabinet, which is used to connect to the first bus and simulate line impedance.

[0015] Optionally, the second station area includes a second busbar, a third busbar, a second charging pile, a third charging pile, a fourth charging pile, a second energy storage device and an energy router;

[0016] The second busbar is used to connect the second part of the photovoltaic power to be detected and the second charging pile, and transmit the electric energy signal generated by the second part of the photovoltaic power to be detected to the second charging pile, and is also used to connect the energy router;

[0017] The energy router is used to connect the second bus and the third bus, and after adjusting and converting the electric energy signal generated by the second part of the photovoltaic to be detected in the second bus, transmit the adjusted and converted electric energy signal to the third bus, and is also used to connect the second part of the photovoltaic to be detected, the third charging pile and the second energy storage device, and after adjusting and converting the electric energy signal generated by the second part of the photovoltaic to be detected, transmit the adjusted and converted electric energy signal to the third charging pile and the second energy storage device;

[0018] The third bus is used to connect the third charging pile and the energy router, and transmit the electric energy signal after condition conversion by the energy router to the fourth charging pile.

[0019] Optionally, the second station further includes a power module, a first load module and a second load module;

[0020] The power module is used to connect to the third busbar and provide power to the second station area;

[0021] The first load module is used to connect to the second busbar and provide line load for the second busbar;

[0022] The second load module is used to be connected to the third busbar and provide line load to the third busbar.

[0023] Optionally, the third station area includes a fourth busbar and a third energy storage device;

[0024] The fourth busbar is used to connect the third part of the photovoltaic power to be detected and the third energy storage device, and transmit the electric energy signal generated by the third part of the photovoltaic power to be detected to the third energy storage device.

[0025] Optionally, the platform further includes a flexible interconnection device, and the intelligent fusion terminal includes a first fusion terminal, a second fusion terminal and a third fusion terminal;

[0026] The first fusion terminal is used to connect to the first station area, obtain the first power parameter in the first station area, and generate a first station area control instruction according to the first power parameter, and is also used to connect to the flexible interconnection device and send the first station area control instruction to the flexible interconnection device;

[0027] The second fusion terminal is used to connect to the second station area, obtain the second electric energy parameter in the second station area, and generate a second station area control instruction according to the second electric energy parameter, and is also used to connect to the flexible interconnection device and send the second station area control instruction to the flexible interconnection device;

[0028] The third fusion terminal is used to connect to a third station area and obtain the third electric energy parameter in the third station area.

[0029] Optionally, the flexible interconnection device is used to control the first station area and the second station area to perform power mutual assistance according to the first station area control instruction and the second station area control instruction;

[0030] When the control instruction of the first area is a heavy load instruction and the control instruction of the second area is a normal load instruction, the flexible interconnection device connects the first area and the second area, and controls the power in the second area to be transmitted to the first area;

[0031] When the control instruction of the first area is a normal load instruction and the control instruction of the second area is a heavy load instruction, the flexible interconnection device connects the first area and the second area, and controls the power in the first area to be transmitted to the second area;

[0032] When the first zone instruction is a normal load instruction and the second zone control instruction is a normal load instruction, the flexible interconnection device disconnects the first zone from the second zone.

[0033] In a second aspect, an embodiment of the present application provides an electric distributed photovoltaic test detection method, comprising:

[0034] The first area acquires a first electric energy parameter of the first part of the photovoltaic power to be detected, the second area acquires a second electric energy parameter of the second part of the photovoltaic power to be detected, and the third area acquires a third electric energy parameter of the third part of the photovoltaic power to be detected;

[0035] The first electric energy parameter, the second electric energy parameter and the third electric energy parameter are obtained through the intelligent fusion terminal, and the first part of the photovoltaic to be detected is tested according to the first electric energy parameter, the second part of the photovoltaic to be detected is tested according to the second electric energy parameter, and the third part of the photovoltaic to be detected is tested according to the third electric energy parameter.

[0036] Beneficial effects:

[0037] The distributed photovoltaic test and detection platform provided by the present invention divides the detection platform into three different functional areas by setting up the first area, the second area and the third area, and utilizes the first area to be connected with the first part of the photovoltaic to be detected, the second area to be connected with the second part of the photovoltaic to be detected, and the third area to be connected with the third part of the photovoltaic to be detected. In the process of testing and detecting photovoltaics, the platform simulates different working states of photovoltaics under different loads by connecting different functional areas with the photovoltaics to be detected, and tests and detects photovoltaics in different working states through the intelligent fusion terminal, which reduces the limitations of the photovoltaic detection process and makes the detection process of photovoltaic equipment more flexible. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 This is a schematic diagram of the structure of a distributed photovoltaic test and detection platform according to a preferred embodiment 1 of the present invention;

[0039] Figure 2 This is a schematic diagram of the structure of the first area in the distributed photovoltaic test and detection platform of the preferred embodiment 1 of the present invention;

[0040] Figure 3 This is a schematic diagram of the structure of the second area in the distributed photovoltaic test and detection platform of the preferred embodiment 1 of the present invention;

[0041] Figure 4 This is a schematic diagram of the structure of the third station area in the distributed photovoltaic test and detection platform of the preferred embodiment 1 of the present invention;

[0042] Figure 5 This is a schematic diagram of the connection of the distributed photovoltaic test and detection platform equipment according to the preferred embodiment 1 of the present invention;

[0043] Figure 6 This is a flow chart of the distributed photovoltaic test detection method of the preferred embodiment 1 of the present invention. DETAILED DESCRIPTION

[0044] The technical solution of the present invention is described clearly and completely below. Obviously, the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] Unless otherwise defined, the technical terms or scientific terms used in the present invention shall have the usual meanings understood by persons with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. Similarly, words such as "one" or "one" do not indicate quantity restrictions, but indicate the existence of at least one. Words such as "connect" or "connected" are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship also changes accordingly.

[0046] Example 1: Please see Figure 1-5 The present application embodiment provides a distributed photovoltaic test and detection platform, including:

[0047] The first station area is used to connect with the first part of the photovoltaic power to be detected, obtain the first electric energy parameter of the first part of the photovoltaic power to be detected, and also used to communicate with the intelligent fusion terminal;

[0048] The second station area is used to connect with the second part of the photovoltaic power to be detected, obtain the second electric energy parameter of the second part of the photovoltaic power to be detected, and is also used to communicate with the intelligent fusion terminal;

[0049] The third station area is used to connect with the third part of the photovoltaic power to be detected, obtain the third electric energy parameter of the third part of the photovoltaic power to be detected, and is also used to connect with the intelligent fusion terminal;

[0050] An intelligent fusion terminal is used to connect the first substation, the second substation and the third substation, obtain the first electric energy parameter, the second electric energy parameter and the third electric energy parameter, and test the first part of the photovoltaic to be detected according to the first electric energy parameter, test the second part of the photovoltaic to be detected according to the second electric energy parameter, and test the third part of the photovoltaic to be detected according to the third electric energy parameter.

[0051] In the above embodiment, the detection platform is divided into three different functional areas by setting up the first area, the second area and the third area, and the first area is connected to the first part of the photovoltaic to be detected, the second area is connected to the second part of the photovoltaic to be detected, and the third area is connected to the third part of the photovoltaic to be detected. In the process of testing the photovoltaic, the platform simulates different working states of the photovoltaic under different loads through different functional areas connected to the photovoltaic to be detected, and obtains the first electric energy parameter generated by the first part of the photovoltaic to be detected, the second electric energy parameter generated by the second part of the photovoltaic to be detected, and the third electric energy parameter generated by the third part of the photovoltaic to be detected through the intelligent fusion terminal, so as to test and detect the photovoltaic in different working states, reduce the limitations of the photovoltaic detection process, and make the detection process of photovoltaic equipment more flexible.

[0052] Optionally, the first station area includes a first energy storage device, a first charging pile, a load cabinet, a first busbar and a branch box;

[0053] The first busbar is used to connect the first part of the photovoltaic power to be detected and the first energy storage device, and transmit the electric energy signal generated by the first part of the photovoltaic power to be detected to the first energy storage device;

[0054] The branch box is used to connect the first part of the photovoltaic power to be detected and the first charging pile, and transmit the electric energy signal generated by the first part of the photovoltaic power to be detected to the first charging pile, and is also used to connect the load cabinet;

[0055] The load cabinet is used to simulate line load.

[0056] In the above embodiment, the first substation mainly simulates a 380V / 220V rural household photovoltaic decentralized access distribution network test simulation platform. The transformer connected to the first substation is a wide-range on-load voltage regulation distribution transformer with a capacity of 200kVA. The distribution box is equipped with an intelligent reactive power compensation device. At the same time, the high-voltage side of the transformer is connected to a primary and secondary deep fusion circuit breaker. The primary and secondary deep fusion circuit breaker can monitor the power parameters in the first substation in real time. When the power parameters are abnormal during the monitoring process, the primary and secondary deep fusion circuit breakers can disconnect the circuit in the first substation in time, thereby protecting the equipment in the first substation. The load cabinet in the first substation can simulate various line load conditions such as RLC load, harmonic load, and three-phase unbalanced load, thereby creating an unbalanced line load state in the first substation.

[0057] At the same time, the first part of the photovoltaics to be tested is divided into two groups, one group is connected to the first bus, and the other group is connected to the branch box. By grouping the first part of the photovoltaics to be tested, the diversity of load conditions during the test and inspection of photovoltaic equipment in the first substation is increased.

[0058] Optionally, the first substation further includes a line impedance simulation cabinet, which is used to connect to the first bus and simulate line impedance.

[0059] In the above embodiment, there can be two sets of line impedance simulation cabinets, one set is connected between the line outlet of the first substation and the first bus, and the other set is connected between the first bus and the branch box. Through the line impedance setting, the access positions of different distributed photovoltaics in the substation can be simulated. This is only an example and is not limited.

[0060] Optionally, the second station area includes a second busbar, a third busbar, a second charging pile, a third charging pile, a fourth charging pile, a second energy storage device and an energy router;

[0061] The second busbar is used to connect the second part of the photovoltaic power to be detected and the second charging pile, and transmit the electric energy signal generated by the second part of the photovoltaic power to be detected to the second charging pile, and is also used to connect the energy router;

[0062] The energy router is used to connect the second bus and the third bus, and after adjusting and converting the electric energy signal generated by the second part of the photovoltaic to be detected in the second bus, transmit the adjusted and converted electric energy signal to the third bus, and is also used to connect the second part of the photovoltaic to be detected, the third charging pile and the second energy storage device, and after adjusting and converting the electric energy signal generated by the second part of the photovoltaic to be detected, transmit the adjusted and converted electric energy signal to the third charging pile and the second energy storage device;

[0063] The third bus is used to connect the third charging pile and the energy router, and transmit the electric energy signal after condition conversion by the energy router to the fourth charging pile.

[0064] In the above embodiment, the second substation is a photovoltaic DC access and substation flexible interconnection simulation platform. The energy router in the second substation can regulate and convert the electric energy signal generated by the photovoltaic equipment. When the electric energy signal generated by the second part of the photovoltaic to be detected is of low quality and high fluctuation, the energy router can convert the low-quality and high-fluctuation electric energy signal into a high-quality and low-fluctuation electric energy signal, thereby ensuring the quality of the electric energy signal in the second substation.

[0065] At the same time, the second part of photovoltaics to be tested is divided into two groups, one group is connected to the second bus, and the other group is connected to the energy router. By grouping the second part of photovoltaics to be tested, the diversity of load conditions during the test and detection of photovoltaic equipment in the second substation is increased.

[0066] Optionally, the second station further includes a power module, a first load module and a second load module;

[0067] The power module is used to connect to the third busbar and provide power to the second station area;

[0068] The first load module is used to connect to the second busbar and provide line load for the second busbar;

[0069] The second load module is used to be connected to the third busbar and provide line load to the third busbar.

[0070] In the above embodiment, the line load in the second substation can be provided by the first load module and the second load module, so as to simulate the grid line load in the actual use process and make the test detection process more realistic.

[0071] Optionally, the third station area includes a fourth busbar and a third energy storage device;

[0072] The fourth busbar is used to connect the third part of the photovoltaic power to be detected and the third energy storage device, and transmit the electric energy signal generated by the third part of the photovoltaic power to be detected to the third energy storage device.

[0073] In the above embodiment, the third substation is a simulated distributed photovoltaic 10kV centralized grid-connected simulation platform. The third substation is connected to a transformer and the transformer is connected to a primary and secondary deep fusion circuit breaker. The primary and secondary deep fusion circuit breakers can monitor the electric energy parameters in the first substation in real time. When the electric energy parameters are abnormal during the monitoring process, the primary and secondary deep fusion circuit breakers can disconnect the circuit in the first substation in time, thereby protecting the equipment in the first substation.

[0074] Optionally, the platform further includes a flexible interconnection device, and the intelligent fusion terminal includes a first fusion terminal, a second fusion terminal and a third fusion terminal;

[0075] The first fusion terminal is used to connect to the first station area, obtain the first power parameter in the first station area, and generate a first station area control instruction according to the first power parameter, and is also used to connect to the flexible interconnection device and send the first station area control instruction to the flexible interconnection device;

[0076] The second fusion terminal is used to connect to the second station area, obtain the second electric energy parameter in the second station area, and generate a second station area control instruction according to the second electric energy parameter, and is also used to connect to the flexible interconnection device and send the second station area control instruction to the flexible interconnection device;

[0077] The third fusion terminal is used to connect to a third station area and obtain the third electric energy parameter in the third station area.

[0078] In the above embodiment, the intelligent fusion terminal is divided into a first fusion terminal, a second fusion terminal and a third fusion terminal. The first fusion terminal is connected to the first substation to detect and control the electric energy parameters in the first substation. The second fusion terminal is connected to the second substation to detect and control the electric energy parameters in the second substation. The third fusion terminal is connected to the third substation to detect and control the electric energy parameters in the third substation. After the platform is divided into different functional areas, the electric energy parameters in different functional areas can be independently detected and controlled by the first fusion terminal, the second fusion terminal and the third fusion terminal, so as to avoid the influence caused by the confusion of the electric energy parameters in different functional areas.

[0079] Optionally, the flexible interconnection device is used to control the first station area and the second station area to perform power mutual assistance according to the first station area control instruction and the second station area control instruction;

[0080] When the control instruction of the first area is a heavy load instruction and the control instruction of the second area is a normal load instruction, the flexible interconnection device connects the first area and the second area, and controls the power in the second area to be transmitted to the first area;

[0081] When the control instruction of the first area is a normal load instruction and the control instruction of the second area is a heavy load instruction, the flexible interconnection device connects the first area and the second area, and controls the power in the first area to be transmitted to the second area;

[0082] When the first zone instruction is a normal load instruction and the second zone control instruction is a normal load instruction, the flexible interconnection device disconnects the first zone from the second zone.

[0083] In the above embodiment, the flexible interconnection device can connect and complement the first area and the second area. When an overload situation occurs in the first area, the control instruction of the first area is an overload instruction reflecting the overload situation in the first area. At this time, the first area and the second area can be connected through the flexible interconnection device, and the electric energy power in the second area can be controlled to be transmitted to the first area through the flexible interconnection device, thereby solving the overload situation in the first area. Conversely, the electric energy power in the first area can be controlled to be transmitted to the second area through the flexible interconnection device, thereby solving the overload situation in the second area.

[0084] In the above embodiment, the flexible interconnection device is applied to the control strategy of reverse heavy overload, wherein the control strategy of reverse heavy overload is:

[0085] Give the first fusion terminal a start-up power through the first station area, so that the first fusion terminal enters the reverse heavy overload coordinated control operation;

[0086] When the first and second stations are under normal load conditions, they will operate according to the existing status without changing the operating status;

[0087] When the load of the second substation is overloaded, the first fusion terminal and the second fusion terminal transmit the load information of the first substation and the load information of the second substation to the flexible interconnection device respectively, and the flexible interconnection device controls the online power of the first substation to be transmitted to the second substation;

[0088] If the amount of electricity transmitted to the second area has reached the limit (the flexible interconnection device detects that the gateway electricity transmission value of the second area is 0), the electricity of the energy storage device and the charging pile in the second area is collected. If the electricity has not reached the maximum value, the energy storage device and the charging pile are charged by the transmitted electricity; if the current has reached the maximum value, the photovoltaic output power is continuously adjusted in real time through the intelligent fusion terminal;

[0089] When the load in the first and second substations is overloaded, the photovoltaic grid-connected switch is directly cut off.

[0090] See also Figure 6 :The present application also provides a distributed photovoltaic test detection method, including:

[0091] The first area acquires a first electric energy parameter of the first part of the photovoltaic power to be detected, the second area acquires a second electric energy parameter of the second part of the photovoltaic power to be detected, and the third area acquires a third electric energy parameter of the third part of the photovoltaic power to be detected;

[0092] The first electric energy parameter, the second electric energy parameter and the third electric energy parameter are obtained through the intelligent fusion terminal, and the first part of the photovoltaic to be detected is tested according to the first electric energy parameter, the second part of the photovoltaic to be detected is tested according to the second electric energy parameter, and the third part of the photovoltaic to be detected is tested according to the third electric energy parameter.

[0093] Embodiment 2: The platform can mainly carry out tests and inspections on power quality (high voltage, broadband oscillation), protection control, flexible consumption (DC access, flexible interconnection, coordinated interaction between source, grid, load and storage in substations, isolated grid operation), distributed resource digital monitoring system, detection and system joint debugging, among which:

[0094] The main method of the high / low voltage test of power quality is: relying on the first substation, the flexible interconnection device and interconnection switch of the first and second substations are shut down, the interconnection switch of the second bus and the third bus in the second substation is disconnected, the third bus and the fourth bus interconnection switch of the third substation, the first substation branch box and the fourth bus interconnection switch can be opened or closed according to the test requirements for load or photovoltaic access capacity, and the load under the third bus in the second substation or the photovoltaic under the fourth bus in the third substation is transferred to the first substation as needed. The two line impedance simulation cabinets in the first substation simulate different power supply radii and low-voltage line diameters in the substation through parameter adjustment. By adjusting the disconnection of the photovoltaic grid-connected intelligent circuit breaker in the first substation, the change of grid-connected photovoltaic capacity is simulated. The electric vehicle charging piles and energy storage devices in the first substation can be set to charge, discharge, and shut down according to the test requirements. The AC load cabinet is set to a three-phase unbalanced state to simulate the three-phase unbalanced load situation in the substation. The on-load voltage regulation distribution transformer can adjust the distribution transformer outlet voltage level according to actual conditions.

[0095] The operation mode of the broadband oscillation test in power quality is as follows: the flexible interconnection devices and interconnection switches of the first and second substations are shut down, and the branch boxes of the first substation and the fourth busbar interconnection switches of the third substation can be opened or closed according to the photovoltaic access capacity requirements during the test, and the photovoltaic power under the third substation is transferred to the first substation as needed. By adjusting the parameters of the impedance cabinet under the first substation and the investment and withdrawal of the reactive compensation device, it is used to simulate the different impedance characteristics of the substation. By adjusting the opening and closing of the photovoltaic grid-connected intelligent circuit breaker, different inverter combinations and multiple inverters in parallel are simulated. The AC load cabinet is set to a three-phase unbalanced state to simulate the three-phase unbalanced load condition of the substation.

[0096] The test operation mode of protection control is: the first substation, the second substation, the third substation and the supply equipment operate normally, and the platform's photovoltaic inverters, energy routers, primary and secondary fusion circuit breakers, low-voltage photovoltaic intelligent circuit breakers, flexible interconnection devices and other controls exchange information with RTDS through linkage devices and power amplifiers. A distribution network framework including 10 kV, 380V and DC is established in RTDS, and the penetration rate, access location, line fault type, etc. of different distributed photovoltaics are simulated and set, and dynamic analog and digital analog hybrid simulation is performed.

[0097] The operation mode of the DC access related test is as follows: the second substation and the first substation are connected through a flexible interconnection device, the AC interconnection switch between the second bus and the third bus of the second substation is disconnected, and the AC interconnection switch between the third bus of the second substation and the fourth bus of the third substation is disconnected. The AC and DC bus, energy router, charging pile, energy storage, photovoltaic, etc. of the second substation are in operation, and the communication with the intelligent fusion terminal of the second substation is controlled, and the communication and interaction with the RTDS simulation platform are communicated;

[0098] The operation mode of the flexible interconnection test of the substation is as follows: the second substation and the first substation are connected through a flexible interconnection device, the first busbar of the first substation and the second busbar of the second substation are disconnected, and the second busbar of the second substation and the third busbar are disconnected. The interconnection switch of the third busbar of the second substation and the fourth busbar of the third substation, and the interconnection switch of the fourth busbar of the third substation and the branch box of the first substation can be opened or closed according to the test requirements for load or photovoltaic access capacity, and the load under the third busbar or the photovoltaic under the third substation is transferred to the first substation as needed. The photovoltaic, energy storage, charging piles and other equipment connected to the first and second substations are controlled in operation status as needed.

[0099] The operation mode of the platform source-grid-load-storage coordinated interactive test is as follows: the interconnection switches and flexible interconnection devices between the first substation and the second substation are disconnected, and the second bus and third bus interconnection switches of the second substation are disconnected. The interconnection switches of the third bus of the second substation and the fourth bus of the third substation, and the interconnection switches of the fourth bus of the third substation and the branch box of the first substation can be opened or closed according to the test requirements for load or photovoltaic access capacity, and the load under the third bus or the photovoltaic under the third substation can be transferred to the first substation as needed. The photovoltaic, energy storage, charging piles and other equipment connected to the third bus of the first substation, the third substation and the second substation are controlled in operation status as needed.

[0100] The operation mode of the platform island operation test is as follows: the first substation and the second substation are connected through a flexible interconnection device, the second substation and the second substation third bus interconnection switch are closed, and the second substation third bus and the third substation fourth bus interconnection switch are closed. The first and second deep fusion switches on the high-voltage side of the first substation, the second substation and the third substation are controlled by the distribution automation master station system to open, and the entire platform is in an off-grid operation state. Under this operating condition, the island mode is technically demonstrated.

[0101] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.

Claims

1. A distributed photovoltaic test and detection platform, characterized in that: include: The first substation is used to connect to the first part of the photovoltaic power generation unit to be detected, obtain the first power parameter of the first part of the photovoltaic power generation unit to be detected, and also to communicate with the intelligent fusion terminal; The second substation is used to connect to the second part of the photovoltaic power plants to be tested, obtain the second electric energy parameters of the second part of the photovoltaic power plants to be tested, and also to communicate with the intelligent fusion terminal; The third substation is used to connect to the third part of the photovoltaic power plants to be tested, obtain the third electric energy parameters of the third part of the photovoltaic power plants to be tested, and connect to the intelligent fusion terminal; an intelligent fusion terminal, configured to connect to the first substation, the second substation, and the third substation, obtain the first electric energy parameter, the second electric energy parameter, and the third electric energy parameter, and perform a test on a first portion of photovoltaic cells to be detected according to the first electric energy parameter, perform a test on a second portion of photovoltaic cells to be detected according to the second electric energy parameter, and perform a test on the third portion of photovoltaic cells to be detected according to the third electric energy parameter; The first station area includes a first energy storage device, a first charging pile, a load cabinet, a first busbar and a branch box; The first busbar is used to connect the first part of the photovoltaic cells to be tested and the first energy storage device, and transmit the electric energy signal generated by the first part of the photovoltaic cells to be tested to the first energy storage device; The branch box is used to connect the first part of the photovoltaic power to be detected and the first charging pile, and transmit the power signal generated by the first part of the photovoltaic power to be detected to the first charging pile, and is also used to connect the load cabinet; The load cabinet is used to simulate line load; The second station area includes a second busbar, a third busbar, a second charging pile, a third charging pile, a fourth charging pile, a second energy storage device and an energy router; The second busbar is used to connect the second part of the photovoltaic cells to be tested and the second charging pile, and transmit the electric energy signal generated by the second part of the photovoltaic cells to be tested to the second charging pile, and is also used to connect to the energy router; The energy router is used to connect the second busbar and the third busbar, and after adjusting and converting the electric energy signal generated by the second part of the photovoltaic power generation to be detected in the second busbar, transmit the adjusted and converted electric energy signal to the third busbar, and is also used to connect the second part of the photovoltaic power generation to be detected, the third charging pile and the second energy storage device, and after adjusting and converting the electric energy signal generated by the second part of the photovoltaic power generation to be detected, transmit the adjusted and converted electric energy signal to the third charging pile and the second energy storage device; The third busbar is used to connect the third charging pile and the energy router, and transmit the power signal after the condition conversion of the energy router to the fourth charging pile; The third station area includes a fourth busbar and a third energy storage device; The fourth busbar is used to connect the third part of the photovoltaic cells to be tested and the third energy storage device, and transmit the electric energy signal generated by the third part of the photovoltaic cells to be tested to the third energy storage device; The platform further includes a flexible interconnection device, and the intelligent fusion terminal includes a first fusion terminal, a second fusion terminal and a third fusion terminal; The first fusion terminal is used to connect to the first substation, obtain the first power parameter in the first substation, and generate a first substation control instruction according to the first power parameter, and is also used to connect to the flexible interconnection device and send the first substation control instruction to the flexible interconnection device; The second fusion terminal is used to connect to the second substation, obtain the second electric energy parameter in the second substation, and generate a second substation control instruction according to the second electric energy parameter, and is also used to connect to the flexible interconnection device and send the second substation control instruction to the flexible interconnection device; The third fusion terminal is used to connect to the third substation and obtain the third electric energy parameter in the third substation; The flexible interconnection device is used to control the first and second substations to perform power mutual assistance according to the first substation control instruction and the second substation control instruction; When the control instruction of the first area is a heavy load instruction and the control instruction of the second area is a normal load instruction, the flexible interconnection device connects the first area and the second area, and controls the power in the second area to be transmitted to the first area; When the control instruction of the first area is a normal load instruction and the control instruction of the second area is a heavy load instruction, the flexible interconnection device connects the first area and the second area, and controls the power in the first area to be transmitted to the second area; When the first zone instruction is a normal load instruction and the second zone control instruction is a normal load instruction, the flexible interconnection device disconnects the first zone and the second zone.

2. The distributed photovoltaic test and detection platform according to claim 1 is characterized in that: The first substation further includes a line impedance simulation panel cabinet, which is used to connect to the first bus and simulate line impedance.

3. The distributed photovoltaic test and detection platform according to claim 1 is characterized in that: The second section further includes a power module, a first load module and a second load module; The power module is used to connect to the third bus and provide power to the second station area; The first load module is used to connect to the second busbar and provide line load for the second busbar; The second load module is used to be connected to the third busbar and provide line load to the third busbar.

4. A distributed photovoltaic test and detection method, applied to a distributed photovoltaic test and detection platform as claimed in claim 1, characterized in that: Detection methods include: Acquire a first electric energy parameter of a first part of the photovoltaic system to be detected through the first station, acquire a second electric energy parameter of a second part of the photovoltaic system to be detected through the second station, and acquire a third electric energy parameter of a third part of the photovoltaic system to be detected through the third station; The first electric energy parameter, the second electric energy parameter and the third electric energy parameter are obtained through the intelligent fusion terminal, and the first part of the photovoltaic to be detected is tested according to the first electric energy parameter, the second part of the photovoltaic to be detected is tested according to the second electric energy parameter, and the third part of the photovoltaic to be detected is tested according to the third electric energy parameter.