A Fault Ride-Through System for Flexible DC Overhead Transmission Lines
By designing a flexible DC overhead transmission line fault crossing system in a bipolar DC transmission system connected to a new energy island, the bipolar DC transmission system is solved by using fault detection and surplus power controllers to manage DC and AC currents in the fault and recovery stages, the bipolar DC transmission system is solved Coordinated control and surplus power problems in the event of failure improve the operating efficiency and stability of the system.
Patent Information
- Application Number
- CN202210577336.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-25
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2042-05-25
AI Technical Summary
The bipolar DC transmission system connected to the new energy island has difficulty in coordination and control and temporary surplus power problems in the event of a failure, resulting in inefficient system operation.
A flexible DC overhead transmission line fault crossing system is designed, including positive and negative DC transmission systems. The fault detection controller and surplus power controller can switch between DC current and AC voltage during the fault and recovery stages to ensure that the fault current is reduced to Zero and balance the surplus power using an AC energy-consuming device.
Effectively clear faults, automatically balance the surplus power of bipolar DC overhead transmission lines, and improve the energy transmission efficiency of bipolar DC transmission system and the normal operation stability of the system.
Smart Images

Figure CN115102212B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of large-scale new energy flexible direct current long-distance power transmission engineering, and in particular to a flexible direct current overhead transmission line fault ride-through system. Background Art
[0002] The new energy flexible DC transmission project has a long transmission distance and large capacity, so the fault ride-through requirements of this type of transmission project are very high. However, due to the rapid development of faults and the limited transient stress level of core equipment, the bipolar DC transmission system connected to the new energy island has problems such as difficulty in coordinated control of the bipolar DC transmission system and serious temporary surplus power problems when a fault occurs. Summary of the invention
[0003] The present application aims to solve at least one of the above-mentioned technical defects. In view of this, the present application provides a flexible DC overhead transmission line fault ride-through system, which is used to solve the technical defects of the prior art in which the bipolar DC transmission system of the new energy island is connected to the bipolar DC transmission system, such as the difficulty in coordinated control and the serious temporary surplus power problem.
[0004] A flexible DC overhead transmission line fault ride-through system, the flexible DC overhead transmission line fault ride-through system comprising: a new energy power station, a positive DC transmission system, and a negative DC transmission system;
[0005] The positive DC power transmission system comprises a positive converter at a sending-end converter station, a positive DC overhead transmission line, a positive converter at a receiving-end converter station, and a positive sending-end fault detection controller and a positive receiving-end fault detection controller;
[0006] The negative DC power transmission system comprises a negative converter at a sending-end converter station, a negative DC overhead transmission line, a negative converter at a receiving-end converter station, and a negative sending-end fault detection controller and a negative receiving-end fault detection controller;
[0007] The new energy power station is isolatedly connected to the sending-end converter station and is not connected to the AC power grid;
[0008] If the positive DC overhead line or the negative DC overhead transmission line fails, and both the positive DC transmission system and the negative DC transmission system are in operation, and the sum of the powers of the positive DC transmission system and the negative DC transmission system is less than or equal to a first preset threshold, the fault pole is the positive DC transmission system or the negative DC transmission system;
[0009] Then the fault detection controller at the sending end of the fault pole switches the DC side control of the fault pole converter of the sending end converter station from the converter submodule voltage control to zero DC current control, thereby reducing the fault current provided by the sending end converter station to zero, and switches the AC side of the fault pole converter of the sending end converter station from AC voltage control to submodule voltage control, to prevent the submodule voltage of the fault pole from exceeding the limit;
[0010] The receiving-end fault detection controller of the fault pole switches the DC side control of the fault pole converter of the receiving-end converter station from a given DC bias to zero DC current control, thereby reducing the fault current provided by the receiving-end converter station to zero; switches the AC side control of the fault pole converter of the receiving-end converter station from DC voltage control to submodule voltage control;
[0011] In the de-isolation stage, the fault detection controller at the fault pole sending end continues to keep the DC current of the fault pole DC overhead transmission line of the sending end converter station at zero, and the fault detection controller at the fault pole receiving end continues to keep the DC current of the fault pole DC overhead transmission line of the receiving end converter station at zero until the insulation state of the DC overhead transmission line of the fault pole system is restored;
[0012] During the fault recovery stage, the sending-end fault detection controller of the fault pole switches the DC side of the fault pole converter of the sending-end converter station back to submodule voltage control, and switches the AC side of the fault pole converter of the sending-end converter station back to AC voltage control; the receiving-end fault detection controller of the fault pole switches the DC side of the fault pole converter of the receiving-end converter station back to a given DC bias, and after the DC voltage returns to the rated voltage, switches the AC side of the fault pole converter of the receiving-end converter station back to DC voltage control.
[0013] Preferably, the positive DC power transmission system or the negative DC power transmission system further comprises a DC side combined controller, a surplus power controller and an AC energy consumption device;
[0014] Based on this, the flexible DC overhead transmission line fault ride-through system further includes:
[0015] The DC side combined controller is used to switch the DC side of the fault pole converter of the sending end converter station from submodule voltage control to zero DC current control, and in the de-ionization stage, keep the DC current of the fault pole DC overhead transmission line of the sending end converter station at zero continuously;
[0016] The surplus power controller is used to input the AC energy consumption devices according to the surplus power of the positive DC power transmission system and the negative DC power transmission system, and after the deionization is completed, the already put into operation AC energy consumption devices are sequentially withdrawn according to a preset time period.
[0017] Preferably, if the positive DC overhead line or the negative DC overhead transmission line fails, and both the positive DC transmission system and the negative DC transmission system are in operation, and the sum of the power of the positive DC transmission system and the negative DC transmission system is greater than the first preset threshold, the method further includes:
[0018] The fault detection controller of the sending-end converter station of the fault pole switches the DC side of the fault pole converter of the sending-end converter station from the submodule voltage control to zero DC current control; switches the AC side of the fault pole converter from the AC voltage control to the submodule voltage control to prevent the submodule voltage of the fault pole from exceeding the limit;
[0019] The fault detection controller of the receiving-end converter of the fault pole switches the DC side of the fault pole converter of the receiving-end converter station from a given DC bias to zero DC current control, and reduces the fault current provided by the receiving-end converter station to zero; switches the AC side of the fault pole converter of the receiving-end converter station from DC voltage control to submodule voltage control;
[0020] In the de-ionization stage, the DC side combined controller continuously maintains the DC current of the fault pole DC overhead transmission line of the sending end converter station at zero, and the receiving end fault detection controller of the fault pole continuously maintains the DC current of the fault pole DC overhead transmission line of the receiving end converter station at zero until the insulation state of the faulty DC overhead transmission line is restored;
[0021] After the insulation state of the faulty DC overhead transmission line is restored, the DC side combined controller of the faulty pole switches the DC side of the faulty pole DC overhead transmission line of the sending-end converter station back to the submodule voltage control of the hybrid bridge module of the faulty pole converter, and switches the AC side of the faulty pole DC overhead transmission line of the sending-end converter station back to the AC voltage control;
[0022] After the insulation state of the faulty DC overhead transmission line is restored, the fault detection controller at the receiving end of the fault pole switches the DC side of the faulty DC overhead transmission line at the receiving end converter station back to a given DC bias, and after the DC voltage recovers, switches the AC side of the faulty DC overhead transmission line at the receiving end converter station back to being controlled by the DC voltage;
[0023] The surplus power controller puts the AC energy consuming devices into operation according to the surplus power of the positive DC power transmission system and the negative DC power transmission system, and after deionization is completed, the put-in-operation AC energy consuming devices are sequentially withdrawn according to a preset time period.
[0024] Preferably, if the positive DC overhead line or the negative DC overhead transmission line fails and only the monopolar DC transmission system is in operation, the method further includes:
[0025] The monopolar DC power transmission system is a positive DC power transmission system or a negative DC power transmission system;
[0026] The fault detection controller at the sending end of the fault pole switches the DC side of the fault pole converter of the sending end converter station from submodule voltage control to zero DC current control, reducing the fault current provided by the sending end converter station to zero, and the AC side of the fault pole converter of the sending end converter station is still controlled by AC voltage and frequency;
[0027] The receiving-end fault detection controller of the fault pole switches the DC side of the fault pole converter of the receiving-end converter station from a given DC bias to zero DC current control, reduces the fault current provided by the receiving-end converter station to zero, and switches the AC side of the fault pole converter of the receiving-end converter station from DC voltage control to submodule voltage control;
[0028] When the power transmitted by the faulty DC power transmission system is interrupted, the surplus power controller puts the AC energy consumption device into operation according to the surplus power of the faulty DC power transmission system, and after de-ionization is completed, the put-in-operation AC energy consumption device is sequentially withdrawn according to a preset time period.
[0029] Preferably, when the power transmitted by the fault-pole DC power transmission system is interrupted, the surplus power controller puts the AC energy consumption device into operation according to the surplus power of the fault-pole DC power transmission system, and after the de-ionization is completed, sequentially withdraws the put-in AC energy consumption devices according to a preset time period, including:
[0030] When the power transmitted by the fault-pole DC power transmission system is interrupted, the surplus power controller controls the input of the AC energy consumption device according to the surplus power of the positive DC power transmission system and the negative DC power transmission system;
[0031] Acquire the faulty pole converter submodule voltage of the sending-end converter station in real time, and determine the relationship between the real-time acquired faulty pole converter submodule voltage of the sending-end converter station and a second preset threshold value;
[0032] If the voltage of the fault pole converter submodule of the sending-end converter station obtained in real time is greater than the second preset threshold, another set of AC energy consumption devices is put into use;
[0033] If the real-time acquired voltage of the faulty pole converter submodule of the sending-end converter station is less than or equal to the second preset threshold, the surplus power controller will withdraw a group of AC energy consuming devices from the put-in-use AC energy consuming devices.
[0034] Preferably, the fault-pole DC power transmission system includes a positive DC power transmission system and the negative DC power transmission system, and the process in which the surplus power controller controls the input of the AC energy consumption device according to the surplus power of the positive DC power transmission system and the negative DC power transmission system includes:
[0035] The surplus power controller calculates the number of groups of AC energy consuming devices required to be put into operation according to the surplus power of the positive DC power transmission system and the negative DC power transmission system and the energy consumption power of each group of AC energy consuming devices;
[0036] The surplus power controller puts into operation a plurality of groups of AC energy consuming devices on the AC side of the sending-end converter station according to the number of groups of AC energy consuming devices required to be put into operation.
[0037] Preferably, if the positive DC overhead line or the negative DC overhead transmission line fails, and both the positive DC transmission system and the negative DC transmission system are in operation, the surplus power controller calculates the number of AC energy consuming devices that need to be put into operation using a formula including:
[0038]
[0039] N represents the number of AC energy-consuming devices that need to be put into use, and N is a positive integer;
[0040] P s Indicates the real-time power of bipolar DC overhead transmission lines;
[0041] P d It represents the maximum power of a single-stage DC overhead transmission line;
[0042] P j Indicates the power of each group of AC energy consuming devices.
[0043] Preferably, if the positive DC overhead line or the negative DC overhead transmission line fails and only the monopolar DC overhead transmission line is in operation, the surplus power controller calculates the formula for the number of AC energy consuming devices required to be put into operation, including:
[0044] When the voltage of the fault pole converter submodule of the sending-end converter station obtained in real time is greater than the preset second threshold, the surplus power controller calculates the number of AC energy consuming devices required to be put into operation using the formula:
[0045]
[0046] N represents the number of AC energy-consuming devices that need to be put into use, and N is a positive integer;
[0047] P i Indicates the real-time power of a single-pole DC overhead transmission line;
[0048] P j Indicates the power of each group of AC energy consuming devices.
[0049] Preferably, the value range of the first preset threshold is the maximum allowable transmission power of the monopole direct current transmission system.
[0050] A bipolar flexible direct current transmission system with pure island access to new energy is applied to the flexible direct current overhead transmission line fault ride-through system described in any one of the above-mentioned items.
[0051] It can be seen from the above technical scheme that the present application may include: a new energy power station, a positive DC transmission system, and a negative DC transmission system; the positive DC transmission system includes a positive converter of a sending-end converter station, a positive DC overhead transmission line, a positive converter of a receiving-end converter station, and a positive sending-end fault detection controller and a positive receiving-end fault detection controller;
[0052] The negative DC power transmission system includes a negative converter at a sending-end converter station, a negative DC overhead transmission line, a negative converter at a receiving-end converter station, and a negative sending-end fault detection controller and a negative receiving-end fault detection controller; the new energy power station is island-connected to the sending-end converter station and is not connected to the AC power grid, so as to ensure that the electric energy of the new energy power station is sent out through the sending-end converter station.
[0053] If the positive DC overhead line or the negative DC overhead transmission line fails, and the positive DC transmission system and the negative DC transmission system are both in operation and the sum of the power of the positive DC transmission system and the negative DC transmission system is less than or equal to the first preset threshold, wherein the fault pole is the positive DC transmission system or the negative DC transmission system, so as to improve the efficiency of long-distance transmission of electric energy. It means that the DC overhead transmission line may have a power surplus, and it is necessary to allocate power to the fault pole DC overhead transmission line to achieve fault crossing. Since the positive DC transmission system and the negative DC transmission system are both in operation and the sum of the power of the positive DC transmission system and the negative DC transmission system is less than or equal to the first preset threshold. The surplus power of the DC overhead transmission line with a fault can be transferred to the DC overhead transmission line without a fault. Therefore, the sending-end fault detection controller of the fault pole can switch the DC side control of the fault pole converter of the sending-end converter station from the converter submodule voltage control to the zero DC current control, thereby reducing the fault current provided by the sending-end converter station to zero, and can switch the AC side of the fault pole converter of the sending-end converter station from the AC voltage control to the submodule voltage control to prevent the submodule voltage of the fault pole from exceeding the limit; and the receiving-end fault detection controller of the fault pole can switch the DC side control of the fault pole converter of the receiving-end converter station from a given DC bias to zero DC current control, thereby reducing the fault current provided by the receiving-end converter station to zero; and can also switch the AC side control of the fault pole converter of the receiving-end converter station from the DC voltage control to the submodule voltage control; in the de-ionization stage, the fault pole sending-end fault detection controller can continue to The DC current of the fault pole DC overhead transmission line of the sending end converter station is continuously kept at zero, and the receiving end fault detection controller of the fault pole can continue to keep the DC current of the fault pole DC overhead transmission line of the receiving end converter station at zero until the insulation state of the DC overhead transmission line of the fault pole system is restored; in the fault recovery stage, the sending end fault detection controller of the fault pole can switch the DC side of the fault pole converter of the sending end converter station back to the submodule voltage control, and can switch the AC side of the fault pole converter of the sending end converter station back to the AC voltage control; the receiving end converter station fault detection controller of the fault pole can switch the DC side of the fault pole converter of the receiving end converter station back to the given DC bias, and after the DC voltage returns to the rated voltage, can switch the AC side of the fault pole converter of the receiving end converter station back to the DC voltage control. At this time, the power of the fault pole DC overhead transmission line is restored, the power of the non-fault pole DC overhead transmission line is reduced, and the power of the bipolar DC overhead transmission line can be automatically balanced.
[0054] Based on the above fault ride-through strategy, in addition to effectively clearing the fault of the faulty DC overhead transmission line, the surplus power of the bipolar DC overhead transmission line can also be automatically balanced. The bipolar DC transmission system with the access of new energy islands can be effectively coordinated and controlled, which is helpful to maintain the normal operation of the bipolar DC transmission system with the access of new energy islands and improve the energy transmission efficiency of the bipolar DC transmission system. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0056] Figure 1 A schematic diagram of an optional system architecture for implementing fault ride-through of a flexible DC overhead transmission line provided in an embodiment of the present application. DETAILED DESCRIPTION
[0057] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0058] Combine the following Figure 1 , introducing an optional system architecture provided in an embodiment of the present application that can realize fault riding of flexible DC overhead transmission lines. The flexible DC overhead transmission line fault riding system provided in the present application can be applied to a bipolar flexible DC transmission system for new energy island access.
[0059] like Figure 1 As shown, the system architecture of the flexible DC overhead transmission line fault ride-through system provided in the present application may include: a new energy power station, a positive DC transmission system, and a negative DC transmission system.
[0060] The positive DC power transmission system may include a positive converter at a sending-end converter station, a positive DC overhead transmission line, a positive converter at a receiving-end converter station, and a positive sending-end fault detection controller and a positive receiving-end fault detection controller;
[0061] The negative DC power transmission system may include a negative converter at a sending-end converter station, a negative DC overhead transmission line, a negative converter at a receiving-end converter station, and a negative sending-end fault detection controller and a negative receiving-end fault detection controller.
[0062] The new energy power station can be island-connected to the sending-end converter station and not connected to the AC power grid, so as to ensure that the electric energy generated by the new energy power station is sent out through the sending-end converter station.
[0063] Generally speaking, the entire DC overhead transmission line fault ride-through can be divided into three stages, namely the initial fault stage, the de-free stage, and the fault recovery stage.
[0064] So as to ensure that the electric energy of the new energy power station is sent out through the sending-end converter station.
[0065] If the positive DC overhead line or the negative DC overhead transmission line fails, and the positive DC transmission system and the negative DC transmission system are both in operation and the sum of the power of the positive DC transmission system and the negative DC transmission system is less than or equal to the first preset threshold, wherein the fault pole is the positive DC transmission system or the negative DC transmission system, so as to improve the efficiency of long-distance transmission of electric energy. It means that the DC overhead transmission line may have a power surplus, and it is necessary to allocate power to the fault pole DC overhead transmission line to achieve fault crossing. Since the positive DC transmission system and the negative DC transmission system are both in operation and the sum of the power of the positive DC transmission system and the negative DC transmission system is less than or equal to the first preset threshold. The surplus power of the DC overhead transmission line with a fault can be transferred to the DC overhead transmission line without a fault.
[0066] The value range of the first preset threshold may be the maximum allowable transmission power of the monopolar direct current transmission system.
[0067] For example, the first preset threshold may be set to 0.5 pu.
[0068] Therefore, a fault ride-through strategy provided by this application may be as follows:
[0069] In the early stage of the fault, therefore, the sending-end fault detection controller of the fault pole can switch the DC side control of the fault pole converter of the sending-end converter station from the converter submodule voltage control to the zero DC current control, thereby reducing the fault current provided by the sending-end converter station to zero, and can switch the AC side of the fault pole converter of the sending-end converter station from the AC voltage control to the submodule voltage control to prevent the submodule voltage of the fault pole from exceeding the limit; and the receiving-end fault detection controller of the fault pole can switch the DC side control of the fault pole converter of the receiving-end converter station from a given DC bias to zero DC current control, thereby reducing the fault current provided by the receiving-end converter station to zero; and can also switch the AC side control of the fault pole converter of the receiving-end converter station from the DC voltage control to the submodule voltage control.
[0070] Therefore, the power of the fault-pole DC transmission system can be automatically transferred to the non-fault-pole DC transmission system. Since the power of the positive or negative DC transmission system is less than or equal to 0.5pu at this time, the non-fault-pole DC transmission system can absorb all the power of the non-fault-pole DC transmission system.
[0071] During the de-ionization stage, in order to restore the insulation state of the DC overhead transmission line of the fault pole transmission system, the fault pole sending-end fault detection controller can continue to keep the DC current of the fault pole DC overhead transmission line of the sending-end converter station at zero, and the fault pole receiving-end fault detection controller can continue to keep the DC current of the fault pole DC overhead transmission line of the receiving-end converter station at zero until the insulation state of the DC overhead transmission line of the fault pole system is restored.
[0072] The duration of the de-ionization phase may generally be 400 ms.
[0073] After the de-free phase is finished, the fault travel reaches the fault recovery phase. At this time, in order to restore the power of the fault pole DC transmission system and reduce the power of the non-fault pole DC transmission system, the power of the positive or negative DC transmission system is automatically balanced. The fault detection controller at the sending end of the fault pole can switch the DC side of the fault pole converter of the sending end converter station back to the submodule voltage control, and can switch the AC side of the fault pole converter of the sending end converter station back to the AC voltage control; the fault detection controller at the receiving end converter station of the fault pole can switch the DC side of the fault pole converter of the receiving end converter station back to the given DC bias, and after the DC voltage returns to the rated voltage, the AC side of the fault pole converter of the receiving end converter station can be switched back to the DC voltage control. At this time, the power of the fault pole DC overhead transmission line is restored, the power of the non-fault pole DC overhead transmission line is reduced, and the power of the bipolar DC overhead transmission line can be automatically balanced.
[0074] Wherein, the fault pole may be a positive DC transmission system or a negative DC transmission system. Using a bipolar DC transmission system for power transmission can improve the efficiency of long-distance power transmission.
[0075] From the technical solutions introduced above, it can be known that the embodiments of the present application can not only effectively clear the fault of the faulty DC overhead transmission line, but also automatically balance the surplus power of the bipolar DC overhead transmission line. It can effectively realize the coordinated control of the bipolar DC transmission system connected to the new energy island, help maintain the normal operation of the bipolar DC transmission system connected to the new energy island, and improve the energy transmission efficiency of the bipolar DC transmission system.
[0076] In actual application, considering that if any DC transmission system fails, surplus power may be generated, in order to absorb the surplus power generated by the failed DC transmission system, the positive DC transmission system or the negative DC transmission system also includes a DC side combined controller.
[0077] Among them, the DC side combined controller can be used to switch the DC side of the fault pole converter of the sending-end converter station from sub-module voltage control to zero DC current control, and in the de-ionization stage, the DC current of the fault pole DC overhead transmission line of the sending-end converter station can be continuously kept at zero to restore the insulation state of the transmission line.
[0078] The surplus power controller can be used to put the AC energy consumption device into operation according to the surplus power of the positive DC power transmission system and the negative DC power transmission system, and after the deionization is completed, the put-in AC energy consumption devices are sequentially withdrawn according to a preset time period, so that the AC energy consumption device can be used to consume the surplus power in the DC power transmission system due to a fault.
[0079] It can be seen from the technical solution introduced above that in the de-ionization stage, the embodiment of the present application can use the DC side combined controller to continuously keep the DC current of the fault pole DC overhead transmission line of the sending end converter station at zero to restore the insulation state of the transmission line. After the de-ionization is completed, the AC energy consumption devices that have been put into use can be sequentially withdrawn according to a preset time period, so that the AC energy consumption devices can be used to consume the surplus power in the DC transmission system due to the fault.
[0080] In actual application, when the positive DC overhead line or the negative DC overhead transmission line fails, although the positive DC transmission system and the negative DC transmission system are both in operation, the sum of the power of the positive DC transmission system and the negative DC transmission system may be greater than the first preset threshold value. Based on this, the fault ride-through strategy of the present application will also be different. Next, another fault ride-through strategy is introduced in detail. The strategy can be as follows:
[0081] At the initial stage of the fault, the fault detection controller of the fault pole sending-end converter station can switch the DC side of the fault pole converter of the sending-end converter station from the submodule voltage control to zero DC current control; and can switch the AC side of the fault pole converter from AC voltage control to submodule voltage control, so as to prevent the submodule voltage of the fault pole from exceeding the limit. The fault detection controller of the fault pole receiving-end converter station switches the DC side of the fault pole converter of the receiving-end converter station from a given DC bias to zero DC current control, and reduces the fault current provided by the receiving-end converter station to zero; and switches the AC side of the fault pole converter of the receiving-end converter station from DC voltage control to submodule voltage control.
[0082] Therefore, the power of the fault-pole DC transmission system can be automatically transferred to the non-fault-pole DC transmission system. Since the power of the positive or negative DC transmission system is greater than 0.5pu, the power loss of the fault-pole DC transmission system is greater than the maximum power that the non-fault-pole DC transmission system can bear. Generally speaking, the maximum power that the non-fault-pole DC transmission system can bear is 0.5pu. The non-fault-pole DC transmission system cannot absorb all the power of the non-fault-pole DC transmission system, and it is necessary to invest in AC energy consumption devices to consume the surplus power of the non-fault-pole DC transmission system to achieve power balance.
[0083] Therefore, during the de-ionization stage, in order to restore the insulation state of the DC overhead transmission line of the fault pole transmission system, the DC side combined controller continuously maintains the DC current of the fault pole DC overhead transmission line of the sending-end converter station at zero, and the receiving-end fault detection controller of the fault pole continuously maintains the DC current of the fault pole DC overhead transmission line of the receiving-end converter station at zero until the insulation state of the faulty DC overhead transmission line is restored.
[0084] After the insulation state of the faulty DC overhead transmission line is restored, the fault ride-through reaches the fault recovery stage. At this time, in order to restore the power of the faulty DC transmission system and reduce the power of the non-faulty DC transmission system, the power of the positive or negative DC transmission system is automatically balanced. The DC side combined controller of the faulty pole can switch the DC side of the faulty DC overhead transmission line of the sending-end converter station back to the submodule voltage control of the hybrid bridge module of the faulty pole converter, and can switch the AC side of the faulty DC overhead transmission line of the sending-end converter station back to the AC voltage control.
[0085] At the same time, after the insulation state of the faulty DC overhead transmission line is restored, the fault detection controller at the receiving end of the fault pole can switch the DC side of the fault pole DC overhead transmission line of the receiving end converter station back to a given DC bias, and after the DC voltage recovers, the AC side of the fault pole DC overhead transmission line of the receiving end converter station can be switched back to DC voltage control.
[0086] The surplus power controller can invest the AC energy consumption device according to the surplus power of the positive DC power transmission system and the negative DC power transmission system, and after the de-ionization is completed, the invested AC energy consumption devices are sequentially withdrawn according to the preset time period. In this way, the power of the fault DC power transmission system can be restored, and the power of the non-fault DC power transmission system can be reduced, so that the power of the positive or negative DC power transmission system can be automatically balanced.
[0087] For example, the put-in-use AC energy-consuming devices can be shut down in sequence at intervals of 20ms to restore the power of the faulty DC transmission system and reduce the power of the non-faulty DC transmission system, so that the power of the positive or negative DC transmission system can be automatically balanced.
[0088] It can be seen from the technical solutions introduced above that the embodiments of the present application can effectively clear the fault of the fault-pole DC overhead transmission line when the fault-pole DC overhead transmission line fails, and the positive DC transmission system and the negative DC transmission system are both in operation, and the sum of the power of the positive DC transmission system and the negative DC transmission system is greater than the first preset threshold value. In addition, the surplus power of the bipolar DC overhead transmission line can be automatically balanced. The bipolar DC transmission system with new energy island access can be effectively coordinated and controlled, which helps to maintain the normal operation of the bipolar DC transmission system with new energy island access and improves the energy transmission efficiency of the bipolar DC transmission system.
[0089] In actual application, when the positive DC overhead line or the negative DC overhead transmission line fails, it is possible that only the monopolar DC transmission system is in operation. Based on this, the fault ride-through strategy provided by this application will also be different. Next, another fault ride-through strategy is introduced in detail. The fault ride-through strategy can be as follows:
[0090] The monopolar direct current power transmission system may be a positive direct current power transmission system or a negative direct current power transmission system.
[0091] From the above introduction, it can be seen that if the DC transmission system is in the state where only the positive DC transmission system is operating or only the negative DC transmission system is operating, if a fault occurs at this time, the power lost by the faulty DC transmission system will not be able to be transferred to the other DC transmission system. It may be necessary to invest in AC energy consumption devices to completely absorb the surplus power of the faulty DC transmission system. In order to ensure that the DC transmission system can still operate normally, the faulty DC transmission system also needs to provide AC voltage and frequency control.
[0092] Based on this, the sending-end fault detection controller switches the DC side of the fault pole converter of the sending-end converter station from sub-module voltage control to zero DC current control, and reduces the fault current provided by the sending-end converter station to zero, while the AC side of the fault pole converter of the sending-end converter station remains controlled by AC voltage and frequency.
[0093] The receiving-end fault detection controller can switch the DC side of the fault-pole converter of the receiving-end converter station from a given DC bias to zero DC current control, and can reduce the fault current provided by the receiving-end converter station to zero, and can switch the AC side of the fault-pole converter of the receiving-end converter station from DC voltage control to sub-module voltage control.
[0094] When the power transmitted by the fault-pole transmission system is interrupted, the surplus power controller can invest the AC energy consumption device according to the surplus power of the fault-pole DC transmission system to absorb the surplus power of the fault-pole DC transmission system. After the AC energy consumption device is invested, since the number of AC energy consumption devices is configured in groups, if the DC transmission system is in a state where only the positive DC transmission system is running or only the negative DC transmission system is running, it is easy for too many AC energy consumption devices to be invested.
[0095] Different from the case where both the positive and negative DC transmission systems are in operation, when only the positive DC transmission system or only the negative DC transmission system is in operation, there is no non-fault pole to balance the power generated by excessive AC energy consumption devices. At this time, the submodule voltage of the fault pole DC transmission system may be too low or too high. Therefore, the number of AC energy consumption devices to be invested needs to be determined according to actual needs.
[0096] In the de-ionization stage, in order to prevent the submodule voltage of the fault pole DC transmission system from being too high or too low, the AC energy consumption device is switched in and out according to the submodule voltage of the fault pole. When the submodule voltage of the fault pole DC transmission system is greater than the preset threshold value, a group of AC energy consumption devices are switched in. At this time, the power consumed by the AC energy consumption device is greater than the power provided by the new energy plant, and the submodule voltage of the fault pole DC transmission system at the sending end will gradually decrease; when the submodule voltage of the fault pole DC transmission system is lower than the preset threshold value, a group of AC energy consumption devices needs to be cut off. At this time, the power consumed by the AC energy consumption device is greater than the power provided by the new energy plant, and the submodule voltage of the fault pole DC transmission system at the sending end will gradually increase. In the whole process, energy balance can be achieved by controlling the change of the submodule voltage of the fault pole DC transmission system.
[0097] After the deionization is completed, in order to restore the power of the faulty DC power transmission system, the AC energy consuming devices that have been put into operation can be sequentially shut down according to a preset time period, so as to restore the power of the faulty DC power transmission system.
[0098] As can be seen from the technical solutions introduced above, the embodiments of the present application can effectively clear the fault of the fault-pole DC overhead transmission line when the fault-pole DC overhead transmission line fails and only the positive DC transmission system or the negative DC transmission system is in operation, and can also automatically balance the surplus power of the bipolar DC overhead transmission line. The bipolar DC transmission system for the access of new energy islands can be effectively coordinated and controlled, which helps to maintain the normal operation of the bipolar DC transmission system for the access of new energy islands, and improves the energy transmission efficiency of the bipolar DC transmission system.
[0099] As can be seen from the above introduction, when the power transmitted by the fault pole transmission system is interrupted, the surplus power controller can put the AC energy consumption device into operation according to the surplus power of the fault pole, and after the de-ionization is completed, the put-in AC energy consumption devices are sequentially exited according to the preset time period. The process is described below, and the process may include the following:
[0100] When the power transmitted by the fault-pole DC power transmission system is interrupted, the surplus power controller can control the activation of the AC energy consumption device according to the surplus power of the positive DC power transmission system and the negative DC power transmission system.
[0101] The voltage of the faulty pole converter submodule of the sending-end converter station can be obtained in real time, and the relationship between the real-time obtained voltage of the faulty pole converter submodule of the sending-end converter station and the second preset threshold value can be judged in real time; if the real-time obtained voltage of the faulty pole converter submodule of the sending-end converter station is greater than the second preset threshold value, another group of AC energy consuming devices will be put into use; if the real-time obtained voltage of the faulty pole converter submodule of the sending-end converter station is less than or equal to the second preset threshold value, the surplus power controller will withdraw a group of AC energy consuming devices from the AC energy consuming devices that have been put into use.
[0102] The second preset threshold can be set according to actual needs.
[0103] For example, the second preset threshold may be set to 1pu-1.5pu.
[0104] As can be seen from the above introduction, in the embodiment of the present application, when the power transmitted by the fault pole transmission system is interrupted, the surplus power controller can put the AC energy consumption device into operation according to the surplus power of the fault pole, and after the de-ionization is completed, the put-in AC energy consumption devices are sequentially withdrawn according to the preset time period, so as to ensure that the energy balance can be achieved by controlling the change of the submodule voltage of the DC transmission system of the fault pole.
[0105] As can be seen from the above introduction, the surplus power controller can input the AC energy consumption device according to the surplus power of the positive DC power transmission system and the negative DC power transmission system. The process is described below, and the process may include the following:
[0106] The surplus power controller can calculate the number of groups of AC energy consuming devices that need to be put into operation according to the surplus power of the positive DC power transmission system and the negative DC power transmission system and the energy consumption power of each group of AC energy consuming devices.
[0107] Among them, the method of calculating the number of groups of AC energy consuming devices that need to be put into operation is different for different fault conditions.
[0108] For example, if the positive DC overhead line or the negative DC overhead transmission line fails, and both the positive DC transmission system and the negative DC transmission system are in operation, the surplus power controller calculates the number of AC energy consuming devices that need to be put into operation by the following formula (1):
[0109]
[0110] Wherein, in formula (1):
[0111] N represents the number of AC energy-consuming devices that need to be put into use, and N is a positive integer;
[0112] P s Indicates the real-time power of bipolar DC overhead transmission lines;
[0113] P d It represents the maximum power of a single-stage DC overhead transmission line;
[0114] P j Indicates the power of each group of AC energy consuming devices.
[0115] If the positive DC overhead line or the negative DC overhead transmission line fails, and only the unipolar DC overhead transmission line is in operation, when the real-time acquired voltage of the faulty pole converter submodule of the sending-end converter station is greater than the preset second threshold, the surplus power controller calculates the number of AC energy consuming devices required to be put into operation, which can be determined by the following formula (2):
[0116]
[0117] Wherein, in formula (2):
[0118] N represents the number of AC energy-consuming devices that need to be put into use, and N is a positive integer;
[0119] P i Indicates the real-time power of a single-pole DC overhead transmission line;
[0120] P j Indicates the power of each group of AC energy consuming devices.
[0121] After determining the number of AC energy consuming devices that need to be put into operation, the surplus power controller can also put into operation a plurality of groups of the AC energy consuming devices at the AC side of the sending-end converter station according to the number of AC energy consuming devices that need to be put into operation.
[0122] When the power transmitted by the fault pole transmission system is interrupted, the surplus power controller can put the AC energy consumption device into operation according to the surplus power of the fault pole, and after the de-ionization is completed, the put-in-operation AC energy consumption devices are sequentially withdrawn according to a preset time period.
[0123] For example, when the real-time acquired voltage of the fault pole converter submodule of the sending-end converter station is less than or equal to the preset second threshold, and after de-ionization is completed, the surplus power controller can withdraw the put-in-place AC energy consuming devices from a group of AC energy consuming devices according to a preset time period.
[0124] As can be seen from the above description, the embodiments of the present application can be used for different fault types, and can use different methods to determine the number of AC energy consumption devices required according to actual needs, so as to absorb the surplus power generated by the faulty DC transmission system.
[0125] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0126] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0127] The above description of the disclosed embodiments enables professionals and technicians in the field to implement or use the present application. Various modifications to these embodiments will be apparent to professionals and technicians in the field, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. The various embodiments can be combined with each other. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A flexible DC overhead transmission line fault ride-through system, characterized in that: The flexible DC overhead transmission line fault ride-through system includes: a new energy power station, a positive DC transmission system, and a negative DC transmission system; The positive DC power transmission system comprises a positive converter at a sending-end converter station, a positive DC overhead transmission line, a positive converter at a receiving-end converter station, and a positive sending-end fault detection controller and a positive receiving-end fault detection controller; The negative DC power transmission system comprises a negative converter at a sending-end converter station, a negative DC overhead transmission line, a negative converter at a receiving-end converter station, and a negative sending-end fault detection controller and a negative receiving-end fault detection controller; The new energy power station is isolatedly connected to the sending-end converter station and is not connected to the AC power grid; If the positive DC overhead line or the negative DC overhead transmission line fails, and both the positive DC transmission system and the negative DC transmission system are in operation, and the sum of the powers of the positive DC transmission system and the negative DC transmission system is less than or equal to a first preset threshold, the fault is the positive DC transmission system or the negative DC transmission system; Then the fault detection controller at the sending end of the fault pole switches the DC side control of the fault pole converter of the sending end converter station from the converter submodule voltage control to zero DC current control, thereby reducing the fault current provided by the sending end converter station to zero, and switches the AC side of the fault pole converter of the sending end converter station from AC voltage control to submodule voltage control, to prevent the submodule voltage of the fault pole from exceeding the limit; The receiving-end fault detection controller of the fault pole switches the DC side control of the fault pole converter of the receiving-end converter station from a given DC bias to zero DC current control, thereby reducing the fault current provided by the receiving-end converter station to zero; switches the AC side control of the fault pole converter of the receiving-end converter station from DC voltage control to submodule voltage control; In the de-isolation stage, the fault detection controller at the fault pole sending end continues to keep the DC current of the fault pole DC overhead transmission line of the sending end converter station at zero, and the fault detection controller at the fault pole receiving end continues to keep the DC current of the fault pole DC overhead transmission line of the receiving end converter station at zero until the insulation state of the DC overhead transmission line of the fault pole system is restored; In the fault recovery stage, the fault detection controller at the sending end of the fault pole switches the DC side of the fault pole converter of the sending end converter station back to the submodule voltage control, and switches the AC side of the fault pole converter of the sending end converter station back to the AC voltage control; the fault detection controller at the receiving end of the fault pole switches the DC side of the fault pole converter of the receiving end converter station back to the given DC bias, and after the DC voltage returns to the rated voltage, switches the AC side of the fault pole converter of the receiving end converter station back to the DC voltage control; The positive DC power transmission system or the negative DC power transmission system further includes a DC side combined controller, a surplus power controller and an AC energy consumption device; Based on this, the flexible DC overhead transmission line fault ride-through system further includes: The DC side combined controller is used to switch the DC side of the fault pole converter of the sending end converter station from submodule voltage control to zero DC current control, and in the de-ionization stage, keep the DC current of the fault pole DC overhead transmission line of the sending end converter station at zero continuously; The surplus power controller is used to input the AC energy consumption device according to the surplus power of the positive DC power transmission system and the negative DC power transmission system, and after the deionization is completed, the already input AC energy consumption devices are sequentially withdrawn according to a preset time period; If the positive DC overhead line or the negative DC overhead transmission line fails, and both the positive DC transmission system and the negative DC transmission system are in operation, and the sum of the power of the positive DC transmission system and the negative DC transmission system is greater than the first preset threshold, the method further includes: The fault detection controller of the sending-end converter station of the fault pole switches the DC side of the fault pole converter of the sending-end converter station from the submodule voltage control to zero DC current control; switches the AC side of the fault pole converter from the AC voltage control to the submodule voltage control to prevent the submodule voltage of the fault pole from exceeding the limit; The fault detection controller of the receiving-end converter of the fault pole switches the DC side of the fault pole converter of the receiving-end converter station from a given DC bias to zero DC current control, and reduces the fault current provided by the receiving-end converter station to zero; switches the AC side of the fault pole converter of the receiving-end converter station from DC voltage control to submodule voltage control; In the de-ionization stage, the DC side combined controller continuously maintains the DC current of the fault pole DC overhead transmission line of the sending end converter station at zero, and the receiving end fault detection controller of the fault pole continuously maintains the DC current of the fault pole DC overhead transmission line of the receiving end converter station at zero until the insulation state of the faulty DC overhead transmission line is restored; After the insulation state of the faulty DC overhead transmission line is restored, the DC side combined controller of the faulty pole switches the DC side of the faulty pole DC overhead transmission line of the sending-end converter station back to the submodule voltage control of the hybrid bridge module of the faulty pole converter, and switches the AC side of the faulty pole DC overhead transmission line of the sending-end converter station back to the AC voltage control; After the insulation state of the faulty DC overhead transmission line is restored, the fault detection controller at the receiving end of the fault pole switches the DC side of the faulty DC overhead transmission line at the receiving end converter station back to a given DC bias, and after the DC voltage recovers, switches the AC side of the faulty DC overhead transmission line at the receiving end converter station back to being controlled by the DC voltage; The surplus power controller puts the AC energy consuming devices into operation according to the surplus power of the positive DC power transmission system and the negative DC power transmission system, and after deionization is completed, the put-in-operation AC energy consuming devices are sequentially withdrawn according to a preset time period.
2. The flexible DC overhead transmission line fault ride-through system according to claim 1, characterized in that: If the positive DC overhead line or the negative DC overhead transmission line fails and only the monopolar DC transmission system is in operation, the method further includes: The monopolar DC power transmission system is a positive DC power transmission system or a negative DC power transmission system; The fault detection controller at the sending end of the fault pole switches the DC side of the fault pole converter of the sending end converter station from submodule voltage control to zero DC current control, reducing the fault current provided by the sending end converter station to zero, and the AC side of the fault pole converter of the sending end converter station is still controlled by AC voltage and frequency; The receiving-end fault detection controller of the fault pole switches the DC side of the fault pole converter of the receiving-end converter station from a given DC bias to zero DC current control, reduces the fault current provided by the receiving-end converter station to zero, and switches the AC side of the fault pole converter of the receiving-end converter station from DC voltage control to submodule voltage control; When the power transmitted by the faulty DC power transmission system is interrupted, the surplus power controller puts the AC energy consumption device into operation according to the surplus power of the faulty DC power transmission system, and after de-ionization is completed, the put-in-operation AC energy consumption device is sequentially withdrawn according to a preset time period.
3. The flexible DC overhead transmission line fault ride-through system according to claim 2, characterized in that: The process of the surplus power controller putting the AC energy consuming device into operation according to the surplus power of the faulty DC power transmission system when the power transmitted by the faulty DC power transmission system is interrupted, and after the de-ionization is completed, the put-in-operation AC energy consuming device is sequentially withdrawn according to a preset time period, includes: When the power transmitted by the fault-pole DC power transmission system is interrupted, the surplus power controller controls the input of the AC energy consumption device according to the surplus power of the positive DC power transmission system and the negative DC power transmission system; Acquire the faulty pole converter submodule voltage of the sending-end converter station in real time, and determine the relationship between the real-time acquired faulty pole converter submodule voltage of the sending-end converter station and a second preset threshold value; If the voltage of the fault pole converter submodule of the sending-end converter station obtained in real time is greater than the second preset threshold, another set of AC energy consumption devices is put into use; If the real-time acquired voltage of the faulty pole converter submodule of the sending-end converter station is less than or equal to the second preset threshold, the surplus power controller will withdraw a group of AC energy consuming devices from the put-in-use AC energy consuming devices.
4. The flexible DC overhead transmission line fault ride-through system according to claim 3, characterized in that: The fault-pole DC power transmission system includes a positive DC power transmission system and a negative DC power transmission system, and the surplus power controller controls the input of the AC energy consumption device according to the surplus power of the positive DC power transmission system and the negative DC power transmission system, including: The surplus power controller calculates the number of groups of AC energy consuming devices required to be put into operation according to the surplus power of the positive DC power transmission system and the negative DC power transmission system and the energy consumption power of each group of AC energy consuming devices; The surplus power controller puts into operation a plurality of groups of AC energy consuming devices on the AC side of the sending-end converter station according to the number of groups of AC energy consuming devices required to be put into operation.
5. The flexible DC overhead transmission line fault ride-through system according to claim 4, characterized in that: If the positive DC overhead line or the negative DC overhead transmission line fails, and both the positive DC transmission system and the negative DC transmission system are in operation, the surplus power controller calculates the number of AC energy consuming devices required to be put into operation, including: ; N represents the number of AC energy-consuming devices that need to be put into use, and N is a positive integer; Indicates the real-time power of bipolar DC overhead transmission lines; It represents the maximum power of a single-stage DC overhead transmission line; Indicates the power of each group of AC energy consuming devices.
6. The flexible DC overhead transmission line fault ride-through system according to claim 4, characterized in that: If the positive DC overhead line or the negative DC overhead transmission line fails, and only the monopolar DC overhead transmission line is in operation, the surplus power controller calculates the number of AC energy consuming devices required to be put into operation, including: When the real-time acquired voltage of the fault pole converter submodule of the sending-end converter station is greater than the second preset threshold, the surplus power controller calculates the number of AC energy consuming devices required to be put into operation using the formula: ; N represents the number of AC energy-consuming devices that need to be put into use, and N is a positive integer; Indicates the real-time power of a single-pole DC overhead transmission line; Indicates the power of each group of AC energy consuming devices.
7. The flexible DC overhead transmission line fault ride-through system according to any one of claims 1 to 3, characterized in that: The value range of the first preset threshold is the maximum allowable transmission power of the monopole direct current transmission system.
8. A bipolar flexible direct current transmission system with pure island access to new energy, characterized in that: Applicable to the flexible DC overhead transmission line fault ride-through system as described in any one of claims 1-7.