A water-stopping fixing device for reverse copper sheet installed by inverted insertion and construction method

By inserting the reverse copper sheet water stop fixing device in the whole, the problem of inaccurate installation and leakage of copper sheet water stop structure during construction is solved, and efficient vertical water stop effect and construction flexibility are achieved, reducing costs and welding difficulty improve the safety and service life of water conservancy projects.

CN115233623BActive Publication Date: 2025-01-10SINOCHEM COMMUNICATIONS CONSTRUCTION (SHANGHAI) ENGINEERING CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202210994262.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-18
Publication Date
2025-01-10
Estimated Expiration
2042-08-18

AI Technical Summary

Technical Problem

During the construction process, the existing copper sheet water stop structure has problems such as inaccurate installation positioning and incomplete asphalt well filling, and the maintenance is difficult, which affects the use function and safety of water conservancy projects.

Method used

The reverse insertion of the reverse copper sheet water stop fixing device is adopted, including asphalt box, linoleum paper, copper sheet water stop and hot-dip galvanized steel plate. The reverse insertion method is used to install the reverse insertion of the reverse insertion method, combined with the reinforcement and sealing structure. Achieve accurate positioning and efficient fixation of copper sheet water stop.

Benefits of technology

Solve the problems of inaccurate positioning and leakage of copper sheet water stop installation, ensure the vertical water stop effect of overwater structures, simplify the construction process, reduce material and labor costs, improve construction flexibility and safety, and reduce welding Difficulty and on-site detection blind spots.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115233623B_ABST
    Figure CN115233623B_ABST
Patent Text Reader

Abstract

The present invention relates to an inverted integral installation reverse copper sheet water-stop fixing device and construction method, belonging to the technical field of water conservancy engineering, including an asphalt box, tar paper, a copper sheet water-stop, a hot-dip galvanized steel plate and a reinforcement. The present invention adopts the process of overall prefabrication and overall installation, which completely solves the problems of inaccurate installation positioning of the copper sheet water-stop and leakage caused by the loose one-time pouring of the asphalt well, and ensures the vertical water-stop effect of the expansion joint of the water-passing structure; the horizontal pouring inverted reverse construction method is adopted to overcome the limitation of first installing the copper sheet water-stop and then pouring the asphalt well. The on-site construction is more flexible, and the asphalt box assembled by a simple template is simple to manufacture. Moreover, the asphalt well can be quickly cycled and mass-produced according to the needs of the project, which can save materials and labor costs, and has significant economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water conservancy engineering, and in particular to an inverted integral installation reverse copper sheet water-stopping fixing device and a construction method. Background Art

[0002] As the main embedded parts of the joints of adjacent structures of water-passing structures in water conservancy projects, copper sheet water-stops have been increasingly widely used in the water-stopping system of hydraulic structures. However, in the past, people did not have a deep understanding of the functions of water-stop structures, and the quality control link in the construction process was not taken seriously, which resulted in the joints of adjacent structures of water-passing structures often becoming the main channel for water seepage, thereby reducing the normal function of the water-passing structures, service life, and safe operation of the structures. Moreover, copper sheet water-stop structures are often set at the joints of adjacent structures, making maintenance extremely difficult. If they are not repaired in time or the maintenance measures are inappropriate, it will inevitably endanger the lives and property of the people and cause immeasurable losses.

[0003] Based on the shortcomings and limitations of the existing copper sheet water-stopping structure during the construction process, this application aims to develop an inverted, integrally installed, reverse-worked copper sheet water-stopping fixing device that is economical and practical, has easy-to-guarantee water-stopping effects, is accurately installed, and can be widely promoted and applied. Summary of the invention

[0004] The purpose of the present invention is to provide an inverted integral installation reverse copper sheet water-stopping fixing device and a construction method to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] An inverted integral installation reverse copper sheet water-stopping fixing device comprises:

[0007] An asphalt box, comprising a template, wherein the template is provided with a horizontal and vertical connection node structure and a vertical asphalt well structure for injecting asphalt and maintaining the shape of the asphalt after condensation;

[0008] Felt paper, which is enclosed in the asphalt box and used as an isolation layer to quickly isolate the condensed asphalt from the asphalt box;

[0009] The copper sheet water stop comprises a horizontal copper sheet water stop and a vertical copper sheet water stop which are vertically connected to each other. The horizontal copper sheet water stop is installed in the horizontal and vertical connection node structure. One end of the vertical copper sheet water stop is arranged in the horizontal and vertical connection node structure, and the other end is arranged in the vertical asphalt well structure.

[0010] A hot-dip galvanized steel plate, one end of which is pre-buried in the vertical asphalt well structure, and the other end of which is installed with steel bars. The end of the hot-dip galvanized steel plate extending out of the vertical asphalt well structure is used to cooperate with the steel bars to install and anchor the condensed asphalt in the concrete structure of the section to be poured;

[0011] The reinforcement piece is used for assembling and fixing the asphalt box.

[0012] As a further technical solution of the present invention, the reinforcement member includes:

[0013] Square wood: fixed on the outside of the asphalt box;

[0014] Steel pipe: fixed on the outside of the asphalt box, used to assemble and fix the asphalt box in conjunction with the square wood;

[0015] Fastener: installed on the steel pipe to fix the steel pipe.

[0016] As a further technical solution of the present invention, the upper structure of the asphalt box is arranged in an inverted trapezoidal shape, with a length of 1850mm, a wall thickness of 20mm, an opening size of 60mm, a closed size of 80mm, and the size of the wing panels on both sides is 100mm; the lower structure of the asphalt box is arranged in a rectangular body, with a length of 480-600mm, a width of 200-350mm, and a height of 220-500mm.

[0017] As a further technical solution of the present invention, the specification of the felt paper is 200#, the thickness is 1.0mm, and it is attached to the template.

[0018] As a further technical solution of the present invention, the asphalt adopts Grade A asphalt with a needle penetration greater than 100 mm, an elongation greater than 50 cm, and a softening point greater than 45°C.

[0019] As a further technical solution of the present invention, a copper sheet water stop elbow is fixedly installed on the side of the vertical copper sheet water stop away from the vertical asphalt well structure; copper sheet water stop pressure edges are fixedly installed on both ends of the horizontal copper sheet water stop, and the vertical copper sheet water stop is connected to the horizontal copper sheet water stop through a welding connection section.

[0020] As a further technical solution of the present invention, the length of the vertical copper sheet water stop inserted into the asphalt and the length buried in the concrete structure of the post-casting section are both 80 mm, and the copper sheet water stop elbow buried in the concrete structure of the post-casting section is bent 90 degrees toward the water-facing surface of the structure, and the bending length is 20 mm; the vertical copper sheet water stop is set at a distance of not less than 150 mm from the water-facing surface of the structure; the welded connection section is buried in the horizontal and vertical connection node structures.

[0021] As a further technical solution of the present invention, the hot-dip galvanized steel plate has a specification of Q235 1.0×1000×C and a width of 30 mm. It is symmetrically buried in the asphalt in an "L" shape with an interval of 500 mm. The total buried length is 50 mm and the length of the exposed part is 100 mm.

[0022] As a further technical solution of the present invention, a water-stopping structure is installed on one side of the vertical asphalt well, and the water-stopping structure includes:

[0023] A polyethylene closed-cell foam board, one side of which is connected to the vertical asphalt well;

[0024] The polyurethane sealant is installed on the side where the polyethylene closed-cell foam board is connected to the vertical asphalt well, and the polyurethane sealant is connected to the polyethylene closed-cell foam board through an expansion rubber waterstop.

[0025] A construction method for an inverted integral installation of a reverse copper sheet water-stopping fixing device, characterized in that the construction method uses the inverted integral installation of a reverse copper sheet water-stopping fixing device as described above, and the construction method comprises the following steps:

[0026] The reverse copper sheet water-stopping fixing device is installed as a whole during construction;

[0027] The first step of construction is to pour the concrete structure;

[0028] Post-construction concrete structure.

[0029] Compared with the prior art, the present invention has the following beneficial effects:

[0030] 1. The overall prefabrication and overall installation process is adopted to completely solve the problems of inaccurate installation positioning of copper sheet water-stopping and leakage caused by loose asphalt well injection at one time, and ensure the vertical water-stopping effect of the expansion joint of the water-passing structure;

[0031] 2. The horizontal pouring and inverted insertion method is adopted to overcome the limitation of installing copper sheet water stop before pouring asphalt well construction. The on-site construction is more flexible. The asphalt box assembled by simple templates is simple to make. Moreover, the asphalt well can be quickly cycled and mass-produced according to the needs of the project, which can save materials and labor costs, and has significant economic benefits.

[0032] 3. When the asphalt pouring water-stopping inverted plugging construction is carried out, the site occupied is small, and the requirements for the site foundation surface conditions are not high. The site layout is relatively flexible, and the construction can be organized on the nearest working surface as needed, which reduces the restrictions on working conditions;

[0033] 4. It is exactly the opposite of the traditional asphalt well production method, that is, the vertical water-stop asphalt well is first installed in the structure, and the anchoring side is reserved outside the structure, which avoids the deformation and peeling of the vertical water-stop due to the influence of temperature after the asphalt well is poured and formed, and also reduces the exposure time of the poured asphalt well outside;

[0034] 5. The horizontal pouring and inverted insertion construction technology can be used to control the liquid level change process and the pouring speed during asphalt pouring in real time, making it easier to ensure the pouring quality. At the same time, it can prevent the asphalt liquid from overflowing during vertical pouring of asphalt wells and causing unnecessary pollution to the installation formwork or steel bar surface;

[0035] 6. The total weight of the asphalt well made by the horizontal pouring and inverted insertion method is only 20kg, which is convenient for transportation, installation and fixing, simple to operate and easy to construct;

[0036] 7. The factory-processed and customized copper sheet waterstop has good integrity, and the welding parts can be directly tested for penetration before leaving the factory, which reduces the difficulty of on-site welding and is not restricted by on-site working conditions. It saves materials and makes it easier to ensure the quality of joints. At the same time, it also avoids the blind spot problem of on-site welding seam detection. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 Schematic diagram of the assembly structure for the wooden asphalt box;

[0038] Figure 2 This is a schematic diagram of the vertical structure of a vertical asphalt well;

[0039] Figure 3 This is a schematic diagram of the plan structure of an asphalt well;

[0040] Figure 4 It is a schematic diagram of the structure of the connection between the vertical copper sheet water stop and the horizontal copper sheet water stop.

[0041] In the figure: 1-asphalt box, 11-horizontal and vertical connection node structure, 12-vertical asphalt well structure, 13-formwork, 14-felt paper, 2-precast concrete structure, 3-postcast concrete structure, 4-copper sheet water stop, 41-horizontal copper sheet water stop, 42-vertical copper sheet water stop, 43-copper sheet water stop elbow, 44-copper sheet water stop edge pressure, 45-welded connection section, 5-asphalt, 6-hot-dip galvanized steel plate, 7-rebar, 8-water stop structure, 81-polyethylene closed-cell foam board, 82-polyurethane sealant, 83-expanded rubber water stop, 9-reinforcement, 91-square wood, 92-fastener, 93-steel pipe, 10-water facing surface. DETAILED DESCRIPTION

[0042] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0043] The embodiment of the present invention is implemented as follows: Figures 1 to 4 The inverted integral installation reverse copper sheet water-stopping fixing device shown includes:

[0044] The asphalt box 1 includes a template 13, wherein the template 13 is provided with a horizontal and vertical connection node structure 11 and a vertical asphalt well structure 12, which is used to inject asphalt 5 and maintain the shape of the asphalt 5 after condensation;

[0045] The asphalt felt paper 14 is enclosed in the asphalt box 1 and is used as an isolation layer to achieve rapid isolation of the condensed asphalt 5 from the asphalt box 1;

[0046] The copper sheet waterproofing 4 includes a horizontal copper sheet waterproofing 41 and a vertical copper sheet waterproofing 42 which are vertically connected to each other. The horizontal copper sheet waterproofing 41 is installed in the horizontal and vertical connection node structure 11. One end of the vertical copper sheet waterproofing 42 is arranged in the horizontal and vertical connection node structure 11, and the other end is arranged in the vertical asphalt well structure 12.

[0047] A hot-dip galvanized steel plate 6, one end of which is pre-buried in the vertical asphalt well structure 12, and a steel bar 7 is installed at the other end. The end of the hot-dip galvanized steel plate 6 extending out of the vertical asphalt well structure 12 is used to cooperate with the steel bar 7 to install and anchor the condensed asphalt 5 in the concrete structure of the section to be poured;

[0048] The reinforcement member 9 is used to assemble and fix the asphalt box 1 .

[0049] In actual application, the present invention is assembled and fixed with the asphalt box 1 through the reinforcement piece 9. After the fixing is completed, the felt paper 14 is attached inside. It can be assembled and fixed after being attached inside according to the situation, and the asphalt 5 is injected. During the injection of the asphalt 5, the copper sheet water stop 4 and the hot-dip galvanized steel plate 6 are installed. The asphalt 5 improves the water-stopping effect of the expansion joint by the gripping effect of the copper sheet water stop 4. That is, the flat pouring and inverted insertion reverse construction technology is adopted, and the liquid level change process and the pouring speed during the asphalt 5 pouring can be controlled in real time, which makes it easier to ensure the pouring quality. At the same time, it can prevent the asphalt 5 liquid from overflowing when the asphalt well structure is vertically poured, causing unnecessary pollution to the installation template 13 or the surface of the steel bar 7.

[0050] Furthermore, the upper structure of the asphalt box 1 is arranged in an inverted trapezoidal shape, see Figure 2 or Figure 4, length is 1850mm, wall thickness is 20mm, opening size is 60mm, closing size is 80mm, and the size of the wing plates on both sides is 100mm; the lower structure of the asphalt box 1 is a rectangular body with a length of 480-600mm, a width of 200-350mm, and a height of 220-250mm; the specification model of the asphalt felt paper 14 is 200#, the thickness is 1.0mm, and it is attached to the template 13; the asphalt 5 adopts Grade A asphalt 5, with a needle penetration greater than 100mm, an elongation greater than 50cm, and a softening point greater than 45°C.

[0051] Furthermore, a copper sheet water stop elbow 43 is fixedly installed on the side of the vertical copper sheet water stop 42 away from the vertical asphalt well structure 12; copper sheet water stop pressure edges 44 are fixedly installed at both ends of the horizontal copper sheet water stop 41, and the vertical copper sheet water stop 42 is connected to the horizontal copper sheet water stop 41 through a welding connection section 45; the length of the vertical copper sheet water stop 42 inserted into the asphalt 5 and the length buried in the post-casting section concrete structure 3 are both 80mm, and the copper sheet water stop elbow 43 buried in the post-casting section concrete structure 3 is bent 90° toward the water facing surface 10 of the structure, and the bending length is 20mm; the vertical copper sheet water stop 42 is set at a position not less than 150mm away from the water facing surface 10 of the structure; the welding connection section 45 is buried in the horizontal and vertical connection node structure 11; one end of the horizontal copper sheet water stop 41 is built into the horizontal and vertical connection node structure 11, and is not less than 50mm away from the outer edge of the horizontal and vertical connection node structure 11 of the asphalt box 1, and the other end extends out of the horizontal and vertical connection node structure 11, and the length of the exposed part is 50mm; the vertical copper sheet water stop 42 is welded and connected at a distance of 50mm from the end of the horizontal copper sheet water stop 41, and is buried 80mm into the horizontal and vertical connection node structure 11; the exposed part of the horizontal copper sheet water stop 41 of the horizontal and vertical connection node structure 11 and the welding part of the exposed horizontal copper sheet water stop 41 pre-embedded in the concrete bottom plate are set in the reserved groove of the bottom plate.

[0052] Furthermore, the hot-dip galvanized steel plate 6 has a specification of Q235 1.0×1000×C and a width of 30 mm. It is symmetrically buried in the asphalt 5 in an "L" shape at intervals of 500 mm. The total buried length is 50 mm, and the length of the exposed part is 100 mm. The reinforcement 9 includes: square wood 91, fixed to the outside of the asphalt box 1; steel pipe 93, fixed to the outside of the asphalt box 1, used to cooperate with the square wood 91 to assemble and fix the asphalt box 1; fastener 92, installed on the steel pipe 93, used to fix the steel pipe 93; through the cooperation of multiple steel pipes 93, square wood 91 and fastener 92, the asphalt box 1 is stably supported.

[0053] like Figure 3As shown, as another preferred embodiment of the present invention, a water stop structure 8 is installed on one side of the vertical asphalt well, and the water stop structure 8 includes:

[0054] A polyethylene closed-cell foam board 81, one side of which is connected to the vertical asphalt well;

[0055] The polyurethane sealant 82 is installed on the side of the polyethylene closed-cell foam board 81 connected to the vertical asphalt well. The polyurethane sealant 82 is connected to the polyethylene closed-cell foam board 81 through an expansion rubber waterstop 83 .

[0056] In one case of this embodiment, water stopping is achieved by combining a polyethylene closed-cell foam board 81 and a polyurethane sealant 82 , which has a simple structure and is easy to operate.

[0057] A construction method for an inverted integral installation of a reverse copper sheet water-stopping fixing device comprises the following steps:

[0058] Step 1: construct the reverse copper sheet water-stopping fixing device as described in the above embodiment by inverted insertion and overall installation

[0059] Specifically, when installing the reverse copper sheet water-stopping fixture as a whole:

[0060] (1) Fold the felt paper 14 according to the internal structural dimensions of the wooden asphalt box 1, and leave a 50 mm flange on each side to extend out of the asphalt box 1;

[0061] (2) Apply the folded felt paper 14 to the inner wall of the wooden asphalt box 1 so that the felt paper 14 is completely in contact with the inner wall of the asphalt box 1, so as to facilitate rapid demoulding after the asphalt 5 is condensed;

[0062] (3) Pour the heated asphalt 5 into the horizontal and vertical connection node structures 11 of the wooden asphalt box 1 using a special conical funnel container. When the pouring reaches a height of 120 mm, reversely insert the copper sheet water stop 4 and continue pouring to the top of the wooden asphalt box 1;

[0063] (4) The heated asphalt 5 in the horizontal and vertical connection node structures 11 of the wooden asphalt box 1 and the vertical asphalt well structure 12 should be poured synchronously;

[0064] (5) After the heated asphalt 5 is condensed and solidified, demoulding is immediately performed, and then subsequent production is organized;

[0065] (6) Install one side of the vertical asphalt well structure 12 in the first-cast concrete structure 2, and set the anchoring side in the second-cast concrete structure 3;

[0066] (7) The exposed portion of the hot-dip galvanized steel plate 6 disposed in the condensed solidified asphalt 5 is welded and fixed to the steel bars 7 in the precast concrete structure 2 to ensure that the vertical asphalt well structure 12 is installed accurately and firmly;

[0067] (8) Before pouring concrete for the first concrete structure 2, the stability of the installed formwork 13, the binding position of the steel bars 7, the location of the expansion rubber water stop 83, and the installation of other embedded parts should be inspected and accepted.

[0068] Step 2: Construction of the first pouring concrete structure 2

[0069] Specifically, when constructing the reverse copper sheet water-stop first cast concrete structure 2:

[0070] (1) When pouring concrete in layers, the concrete structure 2 of the first pouring section should be vibrated to enhance the concrete density at the contact part with the vertical asphalt well structure 12;

[0071] (2) After the construction of the precast concrete structure 2 is completed and demoulding is completed, the polyethylene closed-cell foam board 81 is installed and fixed;

[0072] (3) After the first-casting concrete structure 2 and the water-stop structure 8 are installed, the post-casting concrete structure 3 is constructed;

[0073] (4) Before pouring concrete for the post-casting concrete structure 3, the anchoring position of the vertical copper sheet water stop 42 should be re-determined to ensure the accuracy of the position;

[0074] (5) Before pouring concrete for the post-casting concrete structure 3, the stability of the installed formwork 13, the binding position of the steel bars 7, the setting position of the expansion rubber waterstop 83, the installation of other embedded parts and other process links should be inspected and accepted.

[0075] Step 3: Construction of post-cast concrete structure 3

[0076] Specifically, when constructing the reverse copper sheet water-stopping post-casting concrete structure 3:

[0077] (1) During the pouring of the concrete structure 3 of the post-casting section, the concrete vibration of the anchoring part of the vertical copper sheet water stop 42 should be strengthened to improve the concrete density of the anchoring part of the vertical copper sheet water stop 42;

[0078] (2) After the concrete pouring of the post-casting section concrete structure 3 is completed and the formwork is removed and cured, the surface of the expansion joint is sealed with polyurethane sealant 82, and the sealing thickness is usually 20 mm;

[0079] (3) The exposed part of the horizontal copper sheet waterproofing 41 of the horizontal and vertical connection node structure 11 of the wooden asphalt box 1 is connected to the exposed horizontal copper sheet waterproofing 41 embedded in the concrete base plate by welding.

[0080] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0081] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A construction method for installing a reverse copper sheet water-stopping fixing device by inverted insertion as a whole, characterized in that: The inverted integral installation reverse copper sheet water-stopping fixing device used in the construction method comprises: An asphalt box, comprising a template, wherein the template is provided with a horizontal and vertical connection node structure and a vertical asphalt well structure for injecting asphalt and maintaining the shape of the asphalt after condensation; Felt paper, which is enclosed in the asphalt box and used as an isolation layer to quickly isolate the condensed asphalt from the asphalt box; The copper sheet water stop comprises a horizontal copper sheet water stop and a vertical copper sheet water stop which are vertically connected to each other. The horizontal copper sheet water stop is installed in the horizontal and vertical connection node structure. One end of the vertical copper sheet water stop is arranged in the horizontal and vertical connection node structure, and the other end is arranged in the vertical asphalt well structure. A hot-dip galvanized steel plate, one end of which is pre-buried in the vertical asphalt well structure, and the other end of which is installed with a steel bar. The end of the hot-dip galvanized steel plate extending out of the vertical asphalt well structure is used to cooperate with the steel bar to install and anchor the condensed asphalt in the concrete structure of the section to be poured; A reinforcement piece is used to assemble and fix the asphalt box. A copper sheet water stop elbow is fixedly installed on the side of the vertical copper sheet water stop away from the vertical asphalt well structure; copper sheet water stop pressure edges are fixedly installed on both ends of the horizontal copper sheet water stop. The vertical copper sheet water stop is connected to the horizontal copper sheet water stop through a welding connection section. The length of the vertical copper sheet water stop inserted into the asphalt and the length buried in the concrete structure of the post-casting section are both 80mm, and the copper sheet water stop elbow buried in the concrete structure of the post-casting section is bent 90 degrees toward the water-facing surface of the structure, with a bending length of 20mm; the vertical copper sheet water stop is set at a distance of not less than 150mm from the water-facing surface of the structure; the welding The connecting section is buried in the horizontal and vertical connection node structure, one end of the horizontal copper sheet water stop is built into the horizontal and vertical connection node structure, and is not less than 50mm away from the asphalt box and the outer edge of the horizontal and vertical connection node structure, and the other end extends out of the horizontal and vertical connection node structure, and the length of the exposed part is 50mm; the vertical copper sheet water stop is welded and connected at a distance of 50mm from the end of the horizontal copper sheet water stop, and is buried 80mm in the horizontal and vertical connection node structure; the exposed part of the horizontal copper sheet water stop of the horizontal and vertical connection node structure and the welding part of the exposed horizontal copper sheet water stop pre-buried in the concrete bottom plate are set in the reserved groove of the bottom plate; The construction method comprises the following steps: The construction is to invert the overall installation of the reverse copper sheet water-stopping fixing device, specifically: fold the tarpaulin paper according to the structural size of the wooden asphalt box, and reserve 50mm flanges on each side to extend out of the asphalt box, apply the folded tarpaulin paper to the inner wall of the wooden asphalt box, so that the tarpaulin and the inner wall of the asphalt box are completely fitted, and use a special conical funnel container to pour the heated asphalt into the horizontal and vertical connection nodes of the wooden asphalt box. When the pouring reaches a height of 120mm, the copper sheet water-stop is reversed and pressed in, and then poured to the upper mouth of the wooden asphalt box. The horizontal and vertical connection node structure of the wooden asphalt box and the vertical asphalt well structure The heated asphalt in the concrete is poured synchronously, and the demoulding is immediately carried out after the heated asphalt is condensed and solidified, and then the subsequent production is organized. The side with the vertical asphalt well structure is installed in the concrete structure of the first pouring section, and the anchoring side is set in the concrete structure of the second pouring section. The exposed part of the hot-dip galvanized steel plate set in the condensed and solidified asphalt is welded and fixed to the steel bars in the concrete structure of the first pouring section. Before pouring concrete, the concrete structure of the first pouring section should also be inspected and accepted for the stability of the installed formwork, the steel bar binding position, the setting position of the expansion rubber water stop belt, and the installation of other embedded parts; The first step of construction is to pour the concrete structure; Post-construction concrete structure.

2. The construction method of the reverse copper sheet water-stopping fixing device for inverted integral installation according to claim 1 is characterized in that: The reinforcement member comprises: Square wood, fixed on the outside of the asphalt box; A steel pipe fixed on the outside of the asphalt box and used to assemble and fix the asphalt box in cooperation with the square wood; A fastener is installed on the steel pipe and is used to fix the steel pipe.

3. The construction method of the reverse copper sheet water-stopping fixing device for inverted integral installation according to claim 1 is characterized in that: The upper structure of the asphalt box is in an inverted trapezoidal shape, with a length of 1850mm, a wall thickness of 20mm, an opening size of 60mm, a closed size of 80mm, and the size of the wing panels on both sides is 100mm; the lower structure of the asphalt box is in a rectangular shape, with a length of 480-600mm, a width of 200-350mm, and a height of 220-250mm.

4. The construction method of the reverse copper sheet water-stopping fixing device for inverted integral installation according to claim 1 is characterized in that: The specification of the felt paper is 200#, the thickness is 1.0mm, and it is attached to the template.

5. The construction method of the reverse copper sheet water-stopping fixing device for inverted integral installation according to claim 1 is characterized in that: The asphalt is grade A asphalt, with a needle penetration greater than 100 mm, an elongation greater than 50 cm, and a softening point greater than 45°C.

6. The construction method of the reverse copper sheet water-stopping fixing device for inverted integral installation according to claim 1 is characterized in that: The hot-dip galvanized steel plates have specifications of Q235 1.0×1000×C and a width of 30 mm. They are symmetrically buried in the asphalt in an "L" shape with an interval of 500 mm, with a total buried length of 50 mm and an exposed portion length of 100 mm.

7. The construction method of the reverse copper sheet water-stopping fixing device for inverted integral installation according to claim 1 is characterized in that: A water-stop structure is installed on one side of the vertical asphalt well, and the water-stop structure includes: A polyethylene closed-cell foam board, one side of which is connected to the vertical asphalt well; The polyurethane sealant is installed on the side where the polyethylene closed-cell foam board is connected to the vertical asphalt well, and the polyurethane sealant is connected to the polyethylene closed-cell foam board through an expansion rubber waterstop.