Assembled hybrid beam and method using steel tube concrete structure as connection node
By using steel pipe concrete structure as the connecting node in the prefabricated hybrid beam, the problem of insufficient stress performance at the node connection in the existing technology is solved, and the stress performance higher than cast-in-place and simple construction process is achieved, and the assembly is improved rate and prefabricated rate.
Patent Information
- Application Number
- CN202210926818.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-03
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2042-08-03
AI Technical Summary
The current assembled integral concrete overlapping beams and mixed beams are insufficient at the node connection, making it difficult to achieve similar strength and ductility as cast-in-place, and the construction is complicated, resulting in low assembly and prefabricating rates.
The steel pipe concrete structure is used as the connecting node. By setting steel pipe components at both ends of the mixing beam, the inner extension section is buried inside the concrete, and the outer extension section is connected to the column ox leg to form a variable cross-sectional structure. Combined with the design of the reinforced concrete beam, the node is improved. strength and stiffness.
The stress performance of the hybrid beam is higher than that of cast-in-place, the strength and ductility of the node structure are significantly improved, the construction process is simple and the quality is reliable, the overall cost-effectiveness is higher, and the construction cycle is shortened.
Smart Images

Figure CN115341714B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a prefabricated concrete beam and method for construction engineering, and in particular to an assembled hybrid beam with a steel tube concrete structure as a connection node and a construction method thereof. Background Art
[0002] Prefabricated structures not only occupy a fundamental position in the prefabricated building integrated system, but also play a leading role in achieving the goal of building industrialization. At present, the prefabricated structural system is mainly composed of prefabricated concrete structure and prefabricated steel structure. Among them, the prefabricated concrete structure technology has made a lot of research and development investment in recent years and has made certain progress, but there is still a big gap from the control targets such as quality, environmental protection, efficiency and cost. In terms of technical standard formulation, the prefabricated concrete technical standards have many restrictions or strict requirements on the applicable scope of buildings such as building height, seismic intensity, and key parts such as the bottom reinforcement area of the shear wall, the core tube, the embedded area of the upper structure, and the first-floor column, reflecting a more cautious scientific attitude towards the current prefabricated concrete structure technology; in terms of engineering application, the prefabricated concrete structure is currently dominated by the plane beam-slab system (secondary beam and floor slab), and vertical structural systems such as prefabricated integral frame structure, prefabricated integral frame-shear wall structure and prefabricated integral shear wall structure are still rarely used, resulting in the overall prefabrication rate and assembly rate of prefabricated concrete structures being low.
[0003] The current prefabricated concrete structure technology is generally divided around the technical path of "equivalent to cast-in-place". In terms of structural performance, the current prefabricated concrete structure can only be "infinitely close to cast-in-place" in theory, and according to the current technical standards, it is not easy to achieve "close to cast-in-place" in engineering practice.
[0004] Taking the assembled integral concrete composite beam as an example, the beam is connected to prefabricated components such as columns or walls through post-cast concrete and steel anchor plates. The joint surface between the prefabricated beam and the post-cast concrete composite layer should be provided with a rough surface, and the end face of the prefabricated beam should be provided with a keyway and preferably a rough surface. The shear bearing capacity of the vertical joint at the end of the composite beam is verified. Compared with the fully cast-in-place beam with the same cross-section, its stress performance is greatly weakened; in the prefabricated column composite beam frame node, the longitudinal stress-bearing steel bars in the lower part of the beam can only be anchored or connected in a limited post-cast area, especially the frame column top node, and the longitudinal stress-bearing steel bars cannot be fully anchored or connected like the cast-in-place node. When installing precast beams, temporary fixing measures such as temporary support frames, temporary steel corbels or a combination of the two are required; formwork sealing measures are required in the beam-column node area; when the beam end stirrups of the composite frame beams with seismic resistance levels one or two use integral closed stirrups, the longitudinal force-bearing steel bars in the upper part of the beam need to pass through the closed stirrups, which makes construction more difficult; when arranging torsion-resistant precast beams, the longitudinal reinforcement of the beam web needs to be extended and anchored using mechanical connection joints.
[0005] Compared with assembled integral concrete composite beams, steel-concrete assembled hybrid beams (referred to as hybrid beams) have I-beams and other steel joints at both ends, and the beam-column nodes can be connected by steel structures. They have the advantages of convenient construction, reliable connection quality, short construction period and low cost. This type of node not only realizes the standardization and modularization of building components in the factory, but also enables rapid assembly at the construction site, truly realizing standardized design, factory production and assembly construction. Current research results show that although the so-called connection transition section of the hybrid beam anchored in the reinforced concrete section adopts a steel-concrete composite structure, the connection section is mostly based on pure steel structure, which brings about problems such as the attenuation of the hybrid beam end stiffness and the lack of ductility of the node structure, and the force performance cannot reach the goal of "equivalent to cast-in-place".
[0006] In order to realize the design principle of "strong nodes, weak components" and ensure that the assembled parts in the beam-column node area have sufficient strength, rigidity and ductility to meet the requirements of bearing capacity and deformation capacity under normal use conditions and earthquake action, the present invention is based on the current design and construction technology, guided by the theory of steel-concrete composite structure, especially the theory of steel tube concrete, and takes a new approach to the connection problem of prefabricated hybrid beams and beams and wall columns, and creatively introduces steel tube concrete connection nodes, whose stress performance is "higher than cast-in-place", promoting the development of prefabricated integral concrete structures to ultimately move towards fully prefabricated concrete structures. Summary of the invention
[0007] In order to solve the problems existing in the background technology, the purpose of the present invention is to provide a steel-concrete prefabricated hybrid beam with superior structural stress performance and good economy, as well as a set of construction methods with mature technology, convenient installation and reliable connection, so as to solve the problems encountered in the design, construction and quality inspection of the current assembled integral concrete composite beams or hybrid beams with pure steel structures as connecting sections; and promote the realization of control objectives such as quality, environmental protection, efficiency and cost of prefabricated concrete structures.
[0008] The assembled hybrid beam structure described in the present invention has excellent mechanical performance, fast construction, mature and simple technology, reliable and controllable quality, and obvious comprehensive cost-effectiveness advantage.
[0009] To achieve the above object, the present invention adopts the following technical solution:
[0010] 1. An assembled hybrid beam with a steel tube concrete structure as a connection node:
[0011] The assembled hybrid beam includes a hybrid beam prefabricated unit and a connection structure between the hybrid beam prefabricated unit and the assembled hybrid column; the middle section of the hybrid beam prefabricated unit is a reinforced concrete beam, and steel pipe assemblies are respectively arranged at the left and right ends of the hybrid beam prefabricated unit. A part of the steel pipe assembly is buried in the reinforced concrete beam as an inner extension section, and the other part extends out of the reinforced concrete beam as an outer extension section and is connected to the assembled hybrid column through the column corbel, and the cross-section of the steel pipe assembly changes between the inner extension section and the outer extension section.
[0012] The reinforced concrete beam comprises precast unit concrete poured along the beam direction and upper angle bars, upper middle steel bars, lower angle bars, lower middle steel bars, longitudinal structural steel bars and stirrups embedded in the precast unit concrete; upper angle bars are respectively arranged at the upper two corners of the precast unit concrete, and upper middle steel bars are arranged between the two upper angle bars at the upper two corners; lower angle bars are respectively arranged at the lower two corners of the precast unit concrete, and lower middle steel bars are arranged between the two lower angle bars at the upper two corners; longitudinal structural steel bars are arranged between the upper angle bars and the lower angle bars on each same side of the precast unit concrete, and stirrups are arranged around the upper angle bars and the lower angle bars at the four corners; in the precast unit concrete without the steel pipe assembly, tie bars are arranged between the intersections of the stirrups and the longitudinal structural steel bars on both sides for connection.
[0013] The steel pipe assembly is formed by welding an upper flange plate, a lower flange plate and web plates symmetrically arranged on both sides to form a rectangular enclosure; shear bolts are welded on the inner sides of the upper flange plate, the lower flange plate and the web plates of the steel pipe assembly; in the extended section of the steel pipe assembly, the lower flange plate is welded and fixed to the web plates on both sides respectively, and the upper flange plate is displaced inward relative to the lower flange plate and the web plate, so that the extended section forms a "U"-shaped opening section; in the inward section of the steel pipe assembly, the upper flange plate, the lower flange plate and the web plates on both sides reduce the width of the steel plate, and stiffening ribs are welded between the upper flange plate, the lower flange plate and the web plates on both sides at the end portions buried in the reinforced concrete beam and adjacent to each other in the circumferential direction, so that variable-section chamfered areas are formed outside the stiffening ribs at the four corners of the inward section of the steel pipe assembly.
[0014] The upper corner reinforcement and the upper middle reinforcement of the reinforced concrete beam are welded to the upper flange plate of the steel pipe assembly; the lower corner reinforcement and the lower middle reinforcement of the reinforced concrete beam are welded to the lower flange plate of the steel pipe assembly; the longitudinal structural reinforcement of the reinforced concrete beam is welded to the web of the steel pipe assembly.
[0015] A feed conduit and an overflow conduit are respectively arranged in the variable cross-section chamfer area.
[0016] The connection structure between the prefabricated hybrid beam unit and the column is specifically as follows: it includes setting a column corbel, which is mainly formed by welding an upper corbel flange plate, a lower corbel flange plate and corbel webs symmetrically arranged on both sides to form a rectangular enclosure, one end of the column corbel is welded to the assembled hybrid column, and the other end is respectively welded to the extended section of the steel pipe assembly of the prefabricated hybrid beam unit.
[0017] The upper flange plate, lower flange plate and web plates of the corbel on both sides are respectively welded to the upper flange plate, lower flange plate and web plates on both sides of the extended section of the steel pipe assembly of the prefabricated hybrid beam unit by groove welds, and the cavity of the column corbel and the steel pipe assembly is poured with self-compacting concrete.
[0018] 2. A construction method of assembled hybrid beam:
[0019] The method comprises a factory production process of a hybrid beam prefabricated unit and a field assembly process of an assembled hybrid beam. The hybrid beam prefabricated unit is firstly prefabricated through the factory production process, and then the hybrid beam prefabricated unit is transported to the field for the field assembly process.
[0020] The factory production process of the hybrid beam prefabricated unit:
[0021] Step 1:
[0022] Cut and chamfer the upper flange plate, lower flange plate and web plate of the steel pipe assembly, weld shear studs, and make bolt holes on the web plate for connecting the installation connecting plate;
[0023] Step 2: The upper flange plate and the lower flange plate are welded to the web plate as the main materials, and the upper flange plate is displaced inwardly to enclose a rectangular steel pipe, and the ends of the upper flange plate, the lower flange plate and the web plate located in the inner extension section of the steel pipe assembly are welded with stiffening ribs, and a temporary fixing plate is welded between the tops of the web plates on both sides of the outer extension section of the steel pipe assembly;
[0024] Step 3: tie and make a steel cage consisting of upper angle bars, upper middle steel bars, lower angle bars, lower middle steel bars, longitudinal structural steel bars and stirrups, weld the upper angle bars and upper middle steel bars to the upper flange plate, weld the lower angle bars and lower middle steel bars to the lower flange plate, weld the longitudinal structural steel bars to the web plate, and arrange the stirrups along the entire length;
[0025] Step 4: Place the feed conduit and the overflow conduit into the chamfered area with a variable cross-section, and seal the conduit openings;
[0026] Step 5: supporting the matching steel formwork for concrete pouring of the prefabricated hybrid beam unit, wherein the matching steel formwork is embedded in the steel pipes at the left and right ends of the prefabricated unit;
[0027] Step 6: pouring concrete into the cavity of the matching steel formwork and steel pipe assembly to form prefabricated unit concrete, and vibrating and compacting it;
[0028] Step 7, demoulding after forming and curing to form a prefabricated hybrid beam unit;
[0029] Step eight, spot welding welding pads are applied to the ends of the upper flange plate and the lower flange plate at the extended section of the steel pipe assembly of the hybrid beam prefabricated unit, thereby completing the factory manufacturing process of the hybrid beam prefabricated unit.
[0030] On-site assembly process of the fabricated hybrid beam:
[0031] Step 1: Complete the installation of the assembled hybrid column and its column corbels in advance, weld the lower flange plate and the corbel web of the column corbel to the assembled hybrid column, and do not weld the upper flange plate of the corbel temporarily. A temporary fixing plate is welded to the upper part of the corbel web on both sides, and the corbel web is connected to one side of the installation connecting plate with installation bolts;
[0032] Step 2: transport the prefabricated hybrid beam unit to the construction site;
[0033] Step 3: Lift the prefabricated hybrid beam unit, align the web of the steel tube assembly with the web of the column corbel, connect the installation connecting plate with the web of the steel tube assembly by tightening the installation bolts, and put the prefabricated hybrid beam unit in place accurately; then cut off the temporary fixing plates between the webs of the corbels on both sides and between the webs on both sides;
[0034] Step 4: The web of the steel pipe assembly and the web of the corbel are welded correspondingly with groove welds using the installation connection plate as a pad;
[0035] Step 5: insert a welding gun through the opening of the "U"-shaped section of the extended section of the steel pipe assembly, and weld the lower flange plate of the bracket and the lower flange plate of the steel pipe assembly with a groove weld;
[0036] Step 6: Weld the ends of the upper flange plate of the corbel to the upper flange plates of the assembled hybrid column and the steel pipe assembly by groove welds, and weld the upper flange plate of the corbel to the web plate of the corbel and the web plate of the steel pipe assembly to form a rectangular steel pipe connection cavity in the column corbel and the steel pipe assembly;
[0037] Step 7, repeat steps 3, 4, 5, and 6 to complete the assembly and welding of all prefabricated hybrid beam units and hybrid column brackets;
[0038] Step eight, injecting self-compacting concrete into the cavity of the rectangular steel pipe through the feed conduit, and stopping the injection when the overflow conduit overflows the concrete;
[0039] Step nine: After the poured self-compacting concrete reaches the designed strength and passes the inspection, cut off the exposed feed duct and overflow duct to complete the on-site construction process of the entire prefabricated hybrid beam.
[0040] According to the theory of steel-concrete composite structure, the composite structure can give full play to the mechanical properties of the two materials through reasonable combination and matching, and achieve better structural performance; as a branch steel tube concrete structure of the composite structure, the two materials of steel tube and concrete interact with each other during the stress process, that is, the restraint effect of the steel tube on its core concrete puts the concrete in a complex stress state, thereby increasing the strength of the concrete and improving its plasticity and ductility; at the same time, due to the presence of concrete, it can delay or avoid the premature local yielding of the steel tube, thereby ensuring that its material properties are fully utilized. The two materials of steel tube concrete make up for each other's weaknesses and give full play to each other's strengths, so that the steel tube concrete component has a higher bearing capacity, which is generally higher than the sum of the bearing capacity of the steel tube and the core concrete that constitute the steel tube concrete. The theory of steel tube concrete structure has been verified through a large number of structural tests and has been widely used in engineering practice.
[0041] The assembled hybrid beam with steel tube concrete structure as the connection node described in the present invention can be defined as: a steel-concrete composite beam with steel tube concrete at both ends, which is effectively connected with the middle reinforced concrete section. According to the different forces and materials, the hybrid beam can be divided into a steel tube concrete connection section, a steel-concrete composite transition section, a reinforced concrete section, etc. The steel tube concrete connection section is effectively combined with the inner concrete by the outer rectangular steel tube through shear studs; the steel-concrete composite transition section (or steel tube anchor section) is effectively combined with the concrete by the upper and lower flange plates and web plates of the variable cross-section steel tube through shear studs and stiffening ribs. The continuity and transition of the stressed steel bars are ensured by batch welding of the upper and lower steel bars and the longitudinal structural steel bars with the upper and lower flange plates and web plates. The transition section not only solves the anchoring of the steel tube in the connection section, but also slows down the sudden change in stiffness when transitioning from the steel tube concrete connection section to the reinforced concrete section; the reinforced concrete section does not contain steel bones and is no different from reinforced concrete.
[0042] Compared with the assembled integral concrete composite beam with the same cross-section or the hybrid beam with a pure steel structure as the connecting section, the hybrid beam described in the present invention, because its connecting section is a steel tube concrete structure, the effective cross-section for resisting bending, shearing and torsion will not be weakened, and can be strengthened by adjusting the thickness of the steel tube flange plate and the web plate, so as to have better structural rigidity, bearing capacity and deformation resistance. In terms of structure, the upper flange plate of the connecting section is a span cover plate, which is offset from the joints of the lower flange plate and the web plate. The construction joint of the self-compacting concrete injected for the second time, the construction joint at the junction of the new and old concrete is also offset from the steel tube butt weld, that is, there is a whole steel plate on the outside of the concrete construction joint, and there is whole poured concrete on the inside of the steel plate butt weld. Both of these offset joints can make up for construction defects and enhance the reliability of the connection. Therefore, it can be guaranteed in theory and practice that the connection performance of the hybrid beam can be higher than that of the cast-in-place reinforced concrete beam.
[0043] Another important advantage of the present invention is reflected in the construction of prefabricated hybrid beams. From the factory production of prefabricated hybrid beam units, the on-site hoisting and splicing of prefabricated hybrid beam units, to the formation of prefabricated hybrid beams, conventional construction techniques and conventional testing methods are used to ensure the construction quality of the prefabricated hybrid beams.
[0044] There are very mature construction technologies and testing methods for the welding of steel components at both ends of the prefabricated hybrid beam unit, double-sided or single-sided welding of steel bars and steel tube flange plates and webs, binding and spot welding of steel bar skeletons in the prefabricated units, formwork support, and concrete pouring. The on-site hoisting and splicing of the prefabricated hybrid beam unit uses installation connecting plates and installation bolts to connect the web of the corbel and the web of the steel tube component of the prefabricated hybrid beam unit to ensure the accurate positioning of the prefabricated hybrid beam unit. The upper flange plate of the corbel is a span cover plate, which is welded after the lower flange plate is completed to avoid overhead welding of the lower flange plate. The upper and lower flange plates and webs of the corbel are butt-jointed with the upper and lower flange plates and webs of the steel tube component of the prefabricated hybrid beam unit by groove welding, which is a commonly used construction method for box-type steel beams. Pouring self-compacting concrete in the steel tube cavity is a commonly used construction method for steel tube concrete structures. Therefore, the entire construction process of the assembled hybrid column is mature, simple, and even plain, with strong controllability and high reliability. Compared with the current prefabricated concrete structure technology, it does not require support, calibration of steel bars, or complex connection processes such as sleeve grouting, grout-anchor lap joints, and joint grouting.
[0045] The use of assembled hybrid beams can greatly shorten the construction period. After the steel pipe components of the hybrid beam prefabricated units are butt-welded with the column brackets, they have a certain structural rigidity and bearing capacity. The assembly and welding of the hybrid beam prefabricated units can be completed from bottom to top. Before the prefabricated floor slab is laid, the self-compacting concrete in the steel pipe cavity is poured and the conduit is cut off. Similar to the hybrid beam with pure steel structure as the connecting section, it bears the structural deadweight and construction load during the installation period, and there is no need to wait until the self-compacting concrete in the steel pipe cavity reaches the design strength before subsequent construction.
[0046] Prefabricated hybrid beams have good economy and higher comprehensive cost performance. Compared with the current assembled integral frame beams, the amount of steel used will increase because the assembled hybrid beams contain some steel tube concrete combined connection nodes. However, from the theory of steel tube concrete, it can be known that steel tube concrete uses the most economical materials when the same performance target is met as a comparison condition; specifically, the assembled hybrid beams of the present invention do not require support, and do not have complex connection processes such as sleeve grouting, grout anchor lap joints, and joint grouting, which can save part of the material and construction costs, especially the shorter construction period and higher construction efficiency, which can save a lot of financial costs and labor costs; considering the price influencing factors such as materials, labor and construction period, the assembled hybrid beams are more cost-effective than the current assembled integral frame beams.
[0047] Compared with the prior art, the present invention has the following characteristics and beneficial effects:
[0048] The present invention is guided by the theory of steel-concrete composite structure, especially the theory of steel tube concrete, and takes a new approach to the connection problem of prefabricated concrete beams and columns. It creatively introduces steel tube concrete structure as a connection node to solve the technical problems of existing prefabricated concrete beams.
[0049] The present invention is an assembled hybrid beam with a steel tube concrete connection node, which can be applicable to existing assembled concrete structures, such as assembled frame structures, assembled frame-shear wall structures, etc.; it can also be used in super high-rise buildings such as assembled concrete frame-core tube structures and assembled tube-in-tube structures.
[0050] The innovative features and beneficial effects of the present invention are:
[0051] 1. The extended section of the steel tube component 2 of the prefabricated unit of the assembled hybrid beam is butt-welded with the bracket of the hybrid column to form a rectangular steel tube. Self-compacting concrete is poured into the cavity of the rectangular steel tube, so that the connecting section of the assembled hybrid beam and the assembled hybrid column becomes a steel tube concrete structure. Therefore, it has better structural rigidity, bearing capacity and deformation resistance, and can achieve the goal of "stronger than cast-in-place".
[0052] 2. In terms of the structural measures of the inner extension section of the steel pipe assembly 2, the cross-sections of the upper flange plate 2.1, the lower flange plate 2.2 and the web plate 2.3 are reduced in the inner extension section, which not only allows the upper steel bars 1.1 and 1.2, the lower steel bars 1.3 and 1.4, and the longitudinal structural steel bars 1.5 of the reinforced concrete beam to be cut and welded in batches, but also reduces the degree of stiffness mutation from the inner extension section to the reinforced concrete section. In addition, with the assistance of the studs 2.5 and the stiffening ribs 2.4, the connection between the inner extension section of the steel pipe assembly 2 and the reinforced concrete is firm and smooth, ensuring the overall performance of the assembled hybrid beam.
[0053] 3. The extended section web 2.3 of the steel pipe assembly 2 of the prefabricated unit of the assembled hybrid beam and the corbel web 3.3 of the hybrid column are installed in place through the installation connecting plate 5 and the installation bolts 6, without the need for a support system, which not only has a fast installation speed but also a high installation accuracy.
[0054] 4. By retreating the upper flange plate 2.1 of the steel pipe assembly 2, a "U"-shaped cross-section opening is reserved to facilitate the welding of the lower flange plate 2.2 of the steel pipe assembly 2 and the lower flange plate 3.2 of the corbel, avoid overhead welding, reduce construction difficulty, and ensure welding quality; the upper flange plate 3.1 of the corbel serves as a "cover plate" and the post-cast self-compacting concrete both spans the joints of the web and the lower flange plate, thereby enhancing the reliability of the construction of the connection parts.
[0055] 5. The space in the chamfered area of the inner extension section of the steel pipe assembly 2 with a variable cross-section is used to place the feed conduit 9 and the overflow conduit 10, so as to realize the pouring of self-compacting concrete in a convenient way, with almost no "wet work" on site and a good working environment.
[0056] 6. Since most of the prefabricated units of the assembled hybrid beam are made of ordinary reinforced concrete materials, and only contain some steel components at the two ends, its material consumption is between that of the assembled reinforced concrete composite beam and the assembled steel beam, and is close to that of the assembled reinforced concrete composite beam.
[0057] 7. Since the steel parts have few exposed surfaces and are box-shaped, the anti-corrosion and fire-proof materials can be directly sprayed or applied, and the painting work is small.
[0058] In summary, the prefabricated hybrid beam described in the present invention has superior stress-bearing performance, economical materials, reliable and controllable quality, efficient and convenient construction, and a good working environment. It has a higher comprehensive cost-effectiveness than the current prefabricated reinforced concrete composite beams, prefabricated steel beams and pure steel-connected hybrid beams. When used in conjunction with prefabricated hybrid columns or prefabricated hybrid column walls, it can greatly improve the assembly rate or prefabrication rate index of the structure, and has great market promotion value. BRIEF DESCRIPTION OF THE DRAWINGS
[0059] Figure 1 Schematic diagram of the prefabricated unit structure of the hybrid beam.
[0060] Figure 2 It is the connection between the hybrid beam and the hybrid column with corbel.
[0061] Figure 3 for Figure 1 AA profile.
[0062] Figure 4 for Figure 1 BB profile.
[0063] Figure 5 for Figure 1 CC profile.
[0064] Figure 6 for Figure 1 DD profile.
[0065] Figure 7 for Figure 2 EE profile.
[0066] Figure 8 for Figure 2 FF section.
[0067] Fig. 9 for Figure 2 GG profile.
[0068] Reference numerals:
[0069] 1 Precast unit concrete, 1.1 upper angle reinforcement, 1.2 upper middle reinforcement, 1.3 lower angle reinforcement, 1.4 lower middle reinforcement, 1.5 longitudinal structural reinforcement, 1.6 stirrups, 1.7 tension reinforcement;
[0070] 2 steel pipe assembly, 2.1 upper flange plate, 2.2 lower flange plate, 2.3 web plate, 2.4 stiffening ribs, 2.5 shear studs, 2.6 bolt holes;
[0071] 3 assembled hybrid column, 3.1 corbel upper flange plate, 3.2 corbel lower flange plate, 3.3 corbel web plate;
[0072] 4 temporary fixing plate, 5 connecting plate for installation, 6 bolts for installation, 7 pad for welding, 8 groove weld, 9 feed duct, 10 overflow duct, 11 self-compacting concrete. DETAILED DESCRIPTION
[0073] The present invention will be further described below in conjunction with the accompanying drawings and specific implementations.
[0074] The present invention also discloses a connection node with a steel tube concrete structure using a prefabricated hybrid beam, which connects the prefabricated hybrid beam and a concrete column.
[0075] The assembled hybrid beam comprises a hybrid beam prefabricated unit and a connection structure between the hybrid beam prefabricated unit and a column.
[0076] Precast hybrid beam unit Figure 1 As shown in the figure, the middle section of the precast hybrid beam unit is a reinforced concrete beam. The cross section of the reinforced concrete beam is shown in Figure 3 As shown, steel pipe assemblies 2 are respectively arranged at the left and right ends of the hybrid beam prefabricated unit, and each end of the two ends of the reinforced concrete beam is connected to the steel pipe assembly 2. A part of the steel pipe assembly 2 is buried in the reinforced concrete beam as an inner extension section, and the other part extends out of the reinforced concrete beam as an outer extension section and is connected to the steel tube concrete column through the column corbel. The cross-section of the steel pipe assembly 2 changes between the inner extension section and the outer extension section.
[0077] The reinforced concrete beam comprises a precast unit concrete 1 cast along the beam direction and an upper angle bar 1.1, an upper middle steel bar 1.2, a lower angle bar 1.3, a lower middle steel bar 1.4, a longitudinal structural steel bar 1.5 and a stirrup 1.6 embedded in the precast unit concrete 1; Figure 5As shown, upper corners of the precast unit concrete 1 are respectively provided with upper corner bars 1.1 along the beam direction, and two upper middle steel bars 1.2 are provided between the two upper corner bars 1.1 at the upper corners, and the upper corner bars 1.1 and the upper middle steel bars 1.2 are located on the same straight line; lower corners of the precast unit concrete 1 are respectively provided with lower corner bars 1.3 along the beam direction, and two lower middle steel bars 1.4 are provided between the two lower corner bars 1.3 at the upper corners, and the lower The corner reinforcement 1.3 and the lower middle reinforcement 1.4 are located on the same straight line; longitudinal structural reinforcement 1.5 is arranged between the upper corner reinforcement 1.1 and the lower corner reinforcement 1.3 on each same side of the precast unit concrete 1, stirrups 1.6 are arranged on the outer periphery of the upper corner reinforcement 1.1 and the lower corner reinforcement 1.3 at the four corners, and the upper corner reinforcement 1.1, the upper middle reinforcement 1.2, the lower corner reinforcement 1.3, the lower middle reinforcement 1.4 and the longitudinal structural reinforcement 1.5 are all welded to the stirrups 1.6.
[0078] In the precast unit concrete 1 without the steel pipe assembly 2, the stirrups 1.6 on both sides and the intersection of the longitudinal structural steel bars 1.5 are connected by the tie bars 1.7. The tie bars 1.7 can be selectively provided and the number can be selected. At the intersection, the stirrups 1.6, the longitudinal structural steel bars 1.5 and the tie bars 1.7 are welded.
[0079] The steel pipe assembly 2 is formed by welding an upper flange plate 2.1, a lower flange plate 2.2 and web plates 2.3 arranged symmetrically on both sides to form a rectangular enclosure. Figure 5 As shown; the upper flange plate 2.1, the lower flange plate 2.2 and the inner side of the web 2.3 of the steel pipe assembly 2 are all welded with shear studs 2.5.
[0080] In the extended section of the steel pipe assembly 2, the lower flange plate 2.2 is welded and fixed to the web plates 2.3 on both sides, and the upper flange plate 2.1 is retracted relative to the lower flange plate 2.2 and the web plate 2.3, so that the extended section forms a "U"-shaped opening section. Figure 6 As shown; the inward displacement means that the upper flange plate 2.1 is moved relative to the lower flange plate 2.2 and the web plate 2.3 toward the center of the reinforced concrete beam, so that its position is misaligned with the lower flange plate 2.2 and the web plate 2.3.
[0081] In the inner extension section of the steel pipe assembly 2, the upper flange plate 2.1, the lower flange plate 2.2 and the web plates 2.3 on both sides are all of variable cross-section, and the chamfers are used to reduce the width of the steel plate. Stiffening ribs 2.4 are welded between the upper flange plate 2.1, the lower flange plate 2.2 and the web plates 2.3 on both sides at the end portions of the upper flange plate 2.1, the lower flange plate 2.2 and the web plates 2.3 on both sides at the ends of the reinforced concrete beams embedded therein, and between the adjacent two along the circumferential direction. Figure 1 , Figure 4 As shown, variable cross-section chamfered areas are formed outside the stiffening ribs 2.4 at the four corners of the inner extension section of the steel pipe component 2.
[0082] The upper corner reinforcement 1.1 and the upper middle reinforcement 1.2 of the reinforced concrete beam are welded to the upper flange plate 2.1 of the steel pipe assembly 2, and the upper middle reinforcement 1.2 is welded to the upper flange plate 2.1 of the inner extension section. Figure 1 , Figure 8 As shown; the lower angle reinforcement 1.3 and the lower middle reinforcement 1.4 of the reinforced concrete beam are welded to the lower flange plate 2.2 of the steel pipe assembly 2, and the lower middle reinforcement 1.4 is welded to the lower flange plate 2.2 of the inner extension section, see Figure 1 , Fig. 9 As shown; the longitudinal structural reinforcement 1.5 of the reinforced concrete beam is welded to the web 2.3 of the steel pipe assembly 2.
[0083] Stirrups 1.6 are arranged around the inner extension section of the steel pipe assembly 2, while no stirrups 1.6 are arranged around the outer extension section of the steel pipe assembly 2.
[0084] By utilizing the space in the chamfered area of the inner extension section of the steel pipe assembly 2, a feed conduit 9 and an overflow conduit 10 are respectively arranged in the chamfered area of the variable cross section. Figure 1 , Figure 5 Specifically, an overflow conduit 10 is arranged at an upper corner of the variable cross-section chamfered area, and a feed conduit 9 is arranged at a lower corner.
[0085] Connection structure between prefabricated hybrid beam units and columns Figure 2 As shown, specifically:
[0086] The column corbel is mainly formed by welding a corbel upper flange plate 3.1, a corbel lower flange plate 3.2 and a corbel web plate 3.3 symmetrically arranged on both sides to form a rectangular enclosure, one end of the column corbel is welded to the assembled hybrid column 3, and the other end is respectively welded to the extended section of the steel pipe assembly 2 of the hybrid beam prefabricated unit. The corbel upper flange plate 3.1 is arranged near one end of the hybrid beam prefabricated unit and extends toward the hybrid beam prefabricated unit.
[0087] Shear studs are also welded to the inner sides of the upper flange plate 3.1 of the corbel, the lower flange plate 3.2 of the corbel and the web plate 3.3 of the corbel.
[0088] The upper flange plate 3.1 of the corbel, the lower flange plate 3.2 of the corbel and the web plates 3.3 of the corbel on both sides are respectively welded with the upper flange plate 2.1, the lower flange plate 2.2 and the web plates 2.3 of the extended section of the steel tube assembly 2 of the prefabricated hybrid beam unit by groove welds 8, and the column corbel surrounded by the upper flange plate 3.1, the lower flange plate 3.2 and the web plates 3.3 of the corbel on both sides and the cavity of the steel tube assembly 2 surrounded by the upper flange plate 2.1, the lower flange plate 2.2 and the web plates 2.3 on both sides are poured with self-compacting concrete 11, see Figure 2 , Figure 7 shown.
[0089] The web plate 2.3 of the steel pipe assembly 2 and the corbel web plate 3.3 of the column corbel are fixedly connected by means of an installation connection plate 5 and bolts.
[0090] The construction process of the present invention includes a factory production process of a hybrid beam prefabricated unit and an on-site assembly process of an assembled hybrid beam. The hybrid beam prefabricated unit is first prefabricated through the factory production process, and then the hybrid beam prefabricated unit is transported to the site for the on-site assembly process.
[0091] The construction method of the assembled hybrid beam using the steel tube concrete structure as the connection node of the present invention comprises the following specific steps:
[0092] 1) Factory production process of hybrid beam prefabricated unit:
[0093] Step 1:
[0094] The upper flange plate 2.1, the lower flange plate 2.2 and the web plate 2.3 of the steel pipe assembly 2 are cut and chamfered, and shear studs 2.5 are welded on the plates, and bolt holes for connecting the mounting connecting plate 5 are made on the web plate 2.3;
[0095] Prefabricated stiffening ribs 2.4, temporary fixing plates 4, installation connecting plates 5, welding pads 7, feed ducts 9, and overflow ducts 10 are placed in categories.
[0096] Step 2: The upper flange plate 2.1 and the lower flange plate 2.2 are welded to the web plate 2.3 as the main materials, and the upper flange plate 2.1 is displaced inward to enclose a rectangular steel pipe, and the upper flange plate 2.1, the lower flange plate 2.2 and the ends of the web plate 2.3 located in the inner extension section of the steel pipe assembly 2 are welded with stiffening ribs 2.4, and the temporary fixing plates 4 are welded between the tops of the web plates 2.3 on both sides of the outer extension section of the steel pipe assembly 2;
[0097] Step 3: tie and make a steel cage consisting of an upper angle bar 1.1, an upper middle steel bar 1.2, a lower angle bar 1.3, a lower middle steel bar 1.4, a longitudinal structural steel bar 1.5 and a stirrup 1.6, weld the upper angle bar 1.1, the upper middle steel bar 1.2 and the upper flange plate 2.1, weld the lower angle bar 1.3, the lower middle steel bar 1.4 and the lower flange plate 2.2, weld the longitudinal structural steel bar 1.5 and the web 2.3, and arrange the stirrup 1.6 along the entire length of the prefabricated unit of the hybrid beam;
[0098] Step 4: Place the feed conduit 9 and the overflow conduit 10 into the variable cross-section chamfered area, and seal the conduit openings;
[0099] Step 5: supporting the matching steel formwork for concrete pouring of the prefabricated hybrid beam unit, wherein the matching steel formwork is embedded in the steel pipes at the left and right ends of the prefabricated unit;
[0100] Step 6: pour concrete into the cavity of the matching steel formwork and steel pipe assembly 2 to form the prefabricated unit concrete 1, and vibrate and compact it;
[0101] Step 7, demoulding after forming and curing to form a prefabricated hybrid beam unit;
[0102] Step eight, spot-weld the welding pads 7 on the bottom surfaces of the upper flange plate 2.1 and the lower flange plate 2.2 at the extended section of the steel pipe assembly 2 of the hybrid beam prefabricated unit, thereby completing the factory manufacturing process of the hybrid beam prefabricated unit.
[0103] 2) On-site assembly process of prefabricated hybrid beams:
[0104] Step 1: Complete the installation of the assembled hybrid column 3 and its column corbels in advance, weld the lower flange plate 3.2 and the corbel web 3.3 in the column corbels to the assembled hybrid column 3, and do not weld the upper flange plate 3.1 of the corbels temporarily. A temporary fixing plate 4 is welded to the upper part of the corbel web 3.3 on both sides, and the corbel web 3.3 is connected to one side of the installation connecting plate 5 by using the installation bolts 6;
[0105] Step 2: transport the prefabricated hybrid beam units to the construction site, classify and number them, and wait for installation;
[0106] Step 3: Lift the prefabricated hybrid beam unit, align the web 2.3 of the steel tube assembly 2 with the web 3.3 of the column corbel, connect the mounting connection plate 5 with the web 2.3 of the steel tube assembly 2 by tightening the mounting bolts 6, and put the prefabricated hybrid beam unit in place accurately; cut off the temporary fixing plates 4 between the corbel webs 3.3 on both sides and between the webs 2.3 on both sides;
[0107] Step 4: The web 2.3 of the steel pipe assembly 2 and the corbel web 3.3 are welded correspondingly by using the groove weld 8 with the installation connecting plate 5 as a backing plate;
[0108] Step 5, insert a welding gun through the opening of the "U"-shaped cross section of the extended section of the steel pipe assembly 2, and weld the lower flange plate 3.2 of the bracket to the lower flange plate 2.2 of the steel pipe assembly 2 using a groove weld 8;
[0109] Step 6: weld the ends of the upper flange plate 3.1 of the corbel to the assembled hybrid column 3 and the upper flange plate 2.1 of the steel pipe assembly 2 by groove weld 8, weld the upper flange plate 3.1 of the corbel to the web plate 3.3 of the corbel and the web plate 2.3 of the steel pipe assembly 2, and form a rectangular steel pipe connection cavity in the column corbel and the steel pipe assembly 2;
[0110] Step 7, repeat steps 3, 4, 5, and 6 to complete the assembly and welding of the prefabricated hybrid beam unit and the hybrid column bracket;
[0111] Step eight, injecting self-compacting concrete 11 into the rectangular steel tube cavity through the feed conduit 9, and stopping injection when the overflow conduit 10 overflows the concrete;
[0112] Step nine, when the poured self-compacting concrete 11 reaches the designed strength and passes the inspection, the exposed feed conduit 9 and overflow conduit 10 are cut off to complete the on-site construction process of the assembled hybrid beam.
[0113] Through specific implementation, it can be known that the prefabricated hybrid beam described in the present invention has superior stress-bearing performance, economical materials, reliable and controllable quality, efficient and convenient construction, and a good working environment. It has a higher comprehensive cost performance than the current prefabricated reinforced concrete composite beams, prefabricated steel beams and pure steel-connected hybrid beams. When used in conjunction with prefabricated hybrid columns or prefabricated hybrid column walls, it can greatly improve the assembly rate or prefabrication rate index of the structure, and has great market promotion value.
Claims
1. A construction method for an assembled hybrid beam, characterized in that: The method is based on an assembled hybrid beam, wherein the assembled hybrid beam comprises a hybrid beam prefabricated unit and a connection structure between the hybrid beam prefabricated unit and an assembled hybrid column; the middle section of the hybrid beam prefabricated unit is a reinforced concrete beam, and steel pipe assemblies (2) are respectively arranged at the left and right ends of the hybrid beam prefabricated unit, a part of the steel pipe assembly (2) is embedded in the reinforced concrete beam as an inner extension section, and the other part extends out of the reinforced concrete beam as an outer extension section and is connected to the assembled hybrid column via a column corbel; The reinforced concrete beam comprises a precast unit concrete (1) cast along the beam direction, and upper corner bars (1.1), upper middle steel bars (1.2), lower corner bars (1.3), lower middle steel bars (1.4), longitudinal structural steel bars (1.5) and stirrups (1.6) embedded in the precast unit concrete (1); upper corner bars (1.1) are respectively arranged at the upper two corners of the precast unit concrete (1), and upper middle steel bars (1.2) are arranged between the two upper corner bars (1.1) at the upper two corners; lower corner bars (1.3) are respectively arranged at the lower two corners of the precast unit concrete (1). Angle bars (1.3), lower intermediate steel bars (1.4) are arranged between the two lower angle bars (1.3) at the two upper corners; longitudinal structural steel bars (1.5) are arranged between the upper angle bars (1.1) and the lower angle bars (1.3) on each same side of the precast unit concrete (1), and stirrups (1.6) are arranged around the upper angle bars (1.1) and the lower angle bars (1.3) at the four corners; in the precast unit concrete (1) without the steel pipe assembly (2), tie bars (1.7) are arranged between the intersections of the stirrups (1.6) and the longitudinal structural steel bars (1.5) on both sides for connection; The steel pipe assembly (2) is formed by welding an upper flange plate (2.1), a lower flange plate (2.2) and web plates (2.3) symmetrically arranged on both sides to form a rectangular enclosure; the upper flange plate (2.1), the lower flange plate (2.2) and the web plates (2.3) of the steel pipe assembly (2) are welded with shear studs (2.5) on the inner sides; in the extended section of the steel pipe assembly (2), the lower flange plate (2.2) is respectively welded and fixed to the web plates (2.3) on both sides, and the upper flange plate (2.1) is displaced inwardly relative to the lower flange plate (2.2) and the web plates (2.3), so that the extended section forms a "U"-shaped opening section; in the extended section of the steel pipe assembly (2), the upper flange plate (2.1), the lower flange plate (2.2) and the web plates (2.3) on both sides reduce the width of the steel plate, and the upper flange plate (2.1), the lower flange plate (2.2) and The webs (2.3) on both sides are embedded in the end portions of the reinforced concrete beam, and stiffening ribs (2.4) are welded between the two adjacent webs in the circumferential direction, so that variable-section chamfered areas are formed outside the stiffening ribs (2.4) at the four corners of the inner extension section of the steel pipe assembly (2); the upper corner bars (1.1) and the upper middle steel bars (1.2) of the reinforced concrete beam are welded to the upper flange plate (2.1) of the steel pipe assembly (2); the lower corner bars (1.3) and the lower middle steel bars (1.4) of the reinforced concrete beam are welded to the lower flange plate (2.2) of the steel pipe assembly (2); the longitudinal structural steel bars (1.5) of the reinforced concrete beam are welded to the webs (2.3) of the steel pipe assembly (2); the inner side of the longitudinal structural steel bars (1.5) is welded to the outer side of the webs (2.3), and the outer side of the longitudinal structural steel bars (1.5) is wrapped with stirrups (1.6); The continuity and transition of the stress-bearing steel bars are ensured by batch welding of the upper angle bars (1.1), the upper middle steel bars (1.2), the lower angle bars (1.3), the lower middle steel bars (1.4), the longitudinal structural steel bars (1.5) with the upper flange plate (2.1), the lower flange plate (2.2), and the web plate (2.3) of the reinforced concrete beam; A feed conduit (9) and an overflow conduit (10) are respectively arranged in the variable cross-section chamfered area; The connection structure between the hybrid beam prefabricated unit and the column specifically comprises: a column corbel, which is mainly formed by welding a corbel upper flange plate (3.1), a corbel lower flange plate (3.2) and corbel web plates (3.3) symmetrically arranged on both sides to form a rectangular enclosure; one end of the column corbel is welded to the assembled hybrid column (3), and the other end is respectively welded to the extended section of the steel pipe assembly (2) of the hybrid beam prefabricated unit; The upper flange plate (3.1) of the corbel, the lower flange plate (3.2) of the corbel and the web plates (3.3) on both sides are respectively welded to the upper flange plate (2.1), the lower flange plate (2.2) and the web plates (2.3) on both sides of the extended section of the steel pipe assembly (2) of the prefabricated hybrid beam unit by groove welds (8), and the cavity of the column corbel and the steel pipe assembly (2) is poured with self-compacting concrete (11); The method includes a factory manufacturing process of a hybrid beam prefabricated unit and a field assembly process of an assembled hybrid beam, wherein the hybrid beam prefabricated unit is firstly prefabricated through the factory manufacturing process, and then the hybrid beam prefabricated unit is transported to the field for the field assembly process; The factory production process of the hybrid beam prefabricated unit: Step 1: Cutting and chamfering the plates of the upper flange plate (2.1), the lower flange plate (2.2) and the web plate (2.3) of the steel pipe assembly (2), and welding shear studs (2.5) are performed, and bolt holes for connecting the mounting connection plate (5) are made on the web plate (2.3); Step 2: The upper flange plate (2.1) and the lower flange plate (2.2) are welded to the web plate (2.3) as the main materials, and the upper flange plate (2.1) is displaced inwardly to enclose a rectangular steel pipe, and the upper stiffening ribs (2.4) are welded to the ends of the upper flange plate (2.1), the lower flange plate (2.2) and the web plate (2.3) located in the inner extension section of the steel pipe assembly (2), and the temporary fixing plate (4) is welded between the tops of the web plates (2.3) on both sides of the outer extension section of the steel pipe assembly (2); Step 3: tie and make a steel cage consisting of an upper angle bar (1.1), an upper middle steel bar (1.2), a lower angle bar (1.3), a lower middle steel bar (1.4), a longitudinal structural steel bar (1.5) and stirrups (1.6); weld the upper angle bar (1.1), the upper middle steel bar (1.2) and the upper flange plate (2.1); weld the lower angle bar (1.3), the lower middle steel bar (1.4) and the lower flange plate (2.2); weld the longitudinal structural steel bar (1.5) and the web plate (2.3); and arrange the stirrups (1.6) along the entire length; Step 4, placing the feed conduit (9) and the overflow conduit (10) into the chamfered area with a variable cross-section, and sealing the conduit openings; Step 5: supporting the matching steel formwork for concrete pouring of the prefabricated hybrid beam unit, wherein the matching steel formwork is embedded in the steel pipes at the left and right ends of the prefabricated unit; Step 6: pouring concrete into the cavity of the matching steel formwork and steel pipe assembly (2) to form prefabricated unit concrete (1), and vibrating and compacting it; Step 7, demoulding after forming and curing to form a prefabricated hybrid beam unit; Step eight, spot welding the welding pads (7) at the ends of the upper flange plate (2.1) and the lower flange plate (2.2) at the extended section of the steel pipe assembly (2) of the hybrid beam prefabricated unit, thereby completing the factory manufacturing process of the hybrid beam prefabricated unit; On-site assembly process of the fabricated hybrid beam: Step 1: Complete the installation of the assembled hybrid column (3) and its column corbels in advance, weld the lower flange plate (3.2) and the corbel web (3.3) of the column corbels to the assembled hybrid column (3), and do not weld the upper flange plate (3.1) of the corbels temporarily. A temporary fixing plate (4) is welded to the upper part of the corbel webs (3.3) on both sides, and the corbel webs (3.3) are connected to one side of the installation connecting plate (5) by using installation bolts (6); Step 2: transport the prefabricated hybrid beam unit to the construction site; Step 3: hoist the prefabricated hybrid beam unit, align the web (2.3) of the steel tube assembly (2) with the web (3.3) of the column corbel, connect the mounting connection plate (5) with the web (2.3) of the steel tube assembly (2) by tightening the mounting bolts (6), and place the prefabricated hybrid beam unit in place accurately; then cut off the temporary fixing plates (4) between the webs (3.3) of the corbels on both sides and between the webs (2.3) on both sides; Step 4: The web (2.3) of the steel pipe assembly (2) and the corbel web (3.3) are welded correspondingly with groove welds (8) using the mounting connection plate (5) as a backing plate; Step 5, insert a welding gun through the opening of the "U"-shaped cross section of the extended section of the steel pipe assembly (2), and weld the lower flange plate (3.2) of the bracket and the lower flange plate (2.2) of the steel pipe assembly (2) using a groove weld (8); Step 6: Weld the ends of the upper flange plate (3.1) of the corbel to the assembled hybrid column (3) and the upper flange plate (2.1) of the steel pipe assembly (2) using groove welds (8), and weld the upper flange plate (3.1) of the corbel to the web plate (3.3) of the corbel and the web plate (2.3) of the steel pipe assembly (2), so as to form a rectangular steel pipe connection cavity in the column corbel and the steel pipe assembly (2); Step 7, repeat steps 3, 4, 5, and 6 to complete the assembly and welding of all prefabricated hybrid beam units and hybrid column brackets; Step eight, injecting self-compacting concrete (11) into the cavity of the rectangular steel pipe through the feed conduit (9), and stopping injection when the concrete overflows from the overflow conduit (10); Step nine: After the poured self-compacting concrete (11) reaches the designed strength and passes the inspection, the exposed feed conduit (9) and overflow conduit (10) are cut off, and the on-site construction process of the entire assembled hybrid beam is completed.