An assembled track structure

By adopting embedded connected trapezoidal filling layer and viscoelastic cushion layer in ballless tracks, combined with modular design, the problems of high construction difficulty and frequent structural diseases are solved, and the drainage performance and mechanics of the track structure are improved Performance reduces construction costs and maintenance difficulties.

CN115387163BActive Publication Date: 2024-11-22NAT ENG LAB FOR HIGH SPEED RAILWAY CONSTR +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211166547.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-23
Publication Date
2024-11-22
Estimated Expiration
2042-09-23

AI Technical Summary

Technical Problem

During the construction process, the existing ballastless tracks have problems such as poor drainage performance, frequent structural diseases, high construction difficulty and high cost, which affects the safety and comfort of high-speed trains.

Method used

Adopt an assembled track structure including track plates, rails, fasteners, leveling layers and filling layers. The filling layer is connected in an embedded manner with the track plate, and is equipped with a trapezoidal table and a viscoelastic cushion to improve drainage and mechanical properties, and through Modular design simplifies construction.

Benefits of technology

It improves the drainage function and mechanical properties of the rail structure, reduces construction difficulty and cost, extends the stability and durability of the structure, and simplifies maintenance and bridge structure optimization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115387163B_ABST
    Figure CN115387163B_ABST
Patent Text Reader

Abstract

The present invention provides a new type of assembled track structure, including a track plate, a steel rail laid on the track plate, a fastener for pressing the steel rail on the track plate, a leveling layer arranged on the roadbed, and a filling layer arranged between the track plate and the leveling layer; a groove for embedding the filling layer is provided on the end surface of the track plate for contacting the filling layer, and the filling layer is connected to the track plate by mutual embedding. The new type of assembled track structure provided by the present invention adds a drainage function between the layers of the track structure on the basis of the existing structure, improves the overall performance of the structure, optimizes the mechanical properties between the layers, and effectively controls the occurrence of diseases between the layers and the weak parts of the plate ends; at the same time, it simplifies the construction difficulty, reduces the environmental requirements of the construction site, reduces the construction cost, saves the construction period, and has good rigidity, strength, stability and anti-deterioration properties.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of track structures, and in particular to an assembled track structure suitable for high-speed railways, national railways, urban railways and urban rail transit. Background Art

[0002] As the basic structure of high-speed railway transportation, ballastless track directly bears the train load and is required to have good service performance to ensure the safety and comfort of high-speed train operation. At present, there are three types of slab ballastless track in my country, namely CRTSⅠ, CRTSⅡ and CRTSⅢ. The specific structures of the three types of slab ballastless track mentioned above generally include rails, prefabricated track plates 1, filling layers, concrete bases and other parts, and have the characteristics of high stability, reliability, smoothness, durability and other characteristics, and have been widely used.

[0003] The ballastless track in the prior art has the following characteristics:

[0004] (I) Ballastless track mainly uses an integral concrete foundation structure to replace the gravel roadbed to increase the service life of the track structure and reduce the workload of maintenance and repair, but it also increases the production cost, the difficulty of on-site construction control and the frequency of structural defects.

[0005] (ii) Ballastless tracks often use closed materials to fill the track, which has poor drainage performance. Rainwater can easily penetrate between the base plate and the surface of the roadbed, causing problems between layers and weak parts of the plate ends, such as interlayer separation and slurry seepage. Under the action of train loads, slurry seepage will become more serious. Repeated impact of loads will also cause the filling layer of the prefabricated track structure to deteriorate, thereby reducing the overall stability and service life of the track structure, seriously affecting the safety, comfort and smoothness of high-speed train operation.

[0006] (III) During the construction of ballastless track, common base plate defects such as collapse and cracks in the side walls of the limit grooves, offset expansion joints or unsightly linear expansion joints will occur, affecting the construction quality, cost and construction period of the overall structure. Currently, there are no control measures that can completely avoid this.

[0007] It can be seen that in order to reduce construction costs, shorten construction period and improve construction quality, the existing prefabricated rail structure has high requirements for on-site construction environment and technical capabilities. Summary of the invention

[0008] The present invention provides an assembled track structure, comprising a track plate, a steel rail laid on the track plate, a fastener for pressing the steel rail onto the track plate, a leveling layer arranged on a roadbed, and a filling layer arranged between the track plate and the leveling layer; a groove for embedding the filling layer is provided on the end surface of the track plate for contacting with the filling layer, and the filling layer is connected to the track plate by mutual embedding.

[0009] Optionally, the filling layer includes a first trapezoidal platform and a second trapezoidal platform connected to each other from top to bottom, and the first trapezoidal platform and the second trapezoidal platform are connected to each other to form a structure that gradually increases from top to bottom.

[0010] Optionally, the gradient of the inclined surface of the first trapezoidal terrace is set to 1 / 1.5-1 / 2.5, and the gradient of the inclined surface section of the second trapezoidal terrace is set to 1 / 3.

[0011] Optionally, an isolation layer is further provided on the plane portion of the first trapezoidal platform, and a second viscoelastic cushion layer is further provided on the inclined portions of the first trapezoidal platform and the second trapezoidal platform.

[0012] Optionally, the block is prefabricated with C40 concrete, and a steel bar hole is reserved at the bottom of the block and a reserved steel sleeve is provided in the steel bar hole.

[0013] Optionally, a lifting assembly for connecting to the lifting device is provided on the track plate.

[0014] Optionally, the track plate is provided with multiple pieces, and the multiple track plates are arranged in sequence along the extension direction of the rail, and two adjacent track plates are connected to each other through a block; the rail is provided with two rails arranged at an interval, and each rail is provided with multiple fasteners distributed in sequence along the extension direction of the rail.

[0015] Optionally, an expansion joint and a first viscoelastic cushion layer are further provided between the track plate and the stop block.

[0016] Optionally, a plurality of connecting pieces are provided on the end surface of the filling layer for contacting and connecting with the leveling layer, and the plurality of connecting pieces are distributed in sequence along the extension direction of the rail.

[0017] Optionally, a sleeve is also embedded in the track plate.

[0018] Compared with the prior art, the present invention has the following beneficial effects:

[0019] (1) The prefabricated track structure provided by the present invention adds a drainage function between the track structure layers on the basis of the existing structure, thereby improving the overall performance of the structure, optimizing the mechanical properties between the layers, and effectively controlling the occurrence of disease problems in the weak parts between the layers and the ends of the plates; at the same time, it simplifies the construction difficulty, reduces the environmental requirements for the construction site, reduces the construction cost, saves construction time, and has good stiffness, strength, stability and anti-deterioration properties.

[0020] (2) The prefabricated track structure provided by the present invention adopts a modular structure, in which all components are prefabricated before being installed on site, thereby avoiding the waste of construction materials such as concrete and steel bars during on-site construction. The prefabricated construction process not only facilitates construction and reduces environmental requirements for the construction site, but also facilitates the operation and maintenance of the track structure in the later stage. At the same time, since the deadweight of the prefabricated track structure is reduced, the static load of the foundation structure such as the bridge is further reduced, and the bridge structure can be further optimized.

[0021] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0023] Figure 1 It is a partial axonometric schematic diagram of the overall structure of an assembled track structure in an embodiment of the present invention;

[0024] Figure 2 It is a partially exploded axonometric schematic diagram of one end of the overall structure of an assembled track structure in an embodiment of the present invention;

[0025] Figure 3 yes Figure 1 Axonometric diagram of the concrete filling layer.

[0026] in:

[0027] 1. Track plate, 2. Concrete filling layer, 2.1. First trapezoidal platform, 2.2. Second trapezoidal platform, 3. Isolation layer, 4. Viscoelastic cushion layer, 5. Rails, 6. Fasteners, 7. H-shaped block, 8. Lifting assembly, 9. Leveling layer. DETAILED DESCRIPTION

[0028] In order to make the above-mentioned purposes, features and advantages of the present invention more clear and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings. It should be noted that the drawings of the present invention are all simplified and use non-precise proportions, which are only used to conveniently and clearly assist in explaining the implementation of the present invention; the "number" mentioned in the present invention is not limited to the specific number in the examples in the accompanying drawings; the directions or positional relationships indicated by "front", "middle", "back", "left", "right", "up", "down", "top", "bottom", "middle", etc. mentioned in the present invention are based on the directions or positional relationships shown in the drawings of the present invention, and do not indicate or imply that the devices or components referred to must have a specific direction, nor can they be understood as limitations on the present invention.

[0029] This embodiment:

[0030] See also Figures 1 to 3 As shown, an assembled track structure includes a track plate 1, a steel rail 5 laid on the track plate 1, a fastener 6 for buckling the steel rail 5 on the track plate 1, a leveling layer 9, and a concrete filling layer 2 arranged between the track plate 1 and the leveling layer 9;

[0031] The track plate 1 is provided with a plurality of pieces, and the plurality of track plates 1 are arranged in sequence along the extension direction of the rail 5, and two adjacent track plates 1 are connected to each other via an H-shaped stopper 7;

[0032] The steel rails 5 are provided with two rails 5 spaced apart from each other, and each rail 5 is provided with a plurality of fasteners 6 distributed in sequence along the extending direction of the rail 5 .

[0033] Optionally, the H-shaped stopper 7 is cast with C40 concrete, and the height of the H-shaped stopper 7 is the same as the height of the track structure (the track structure includes the track plate 1 and the concrete filling layer 2). Preferably, in order to facilitate the installation of the H-shaped stopper 7, a steel bar hole is reserved at the bottom of the H-shaped stopper 7, and a reserved steel sleeve is provided in the steel bar hole.

[0034] Optionally, the specific structure of the fastener 6 is prior art.

[0035] Optionally, in order to realize the transportation of the track plate 1 during loading and unloading, a lifting assembly 8 for interconnecting with a lifting device is provided on the track plate 1. The lifting assembly 8 is preferably configured as lifting rings respectively provided on both side surfaces of the track plate 1.

[0036] Optionally, in order to adapt to the deformation of the track plate 1 during the application of the assembled track structure, an expansion joint and a first viscoelastic pad layer are further provided between the track plate 1 and the H-shaped stop block 7, so that it is convenient for the installation of the track plate 1 and can effectively reduce the deformation of the track plate 1 under the action of temperature. At the same time, the deformation effect of the assembled track structure is coordinated through the first viscoelastic pad layer.

[0037] Optionally, in order to prevent the frequent separation and peeling of the end positions of the track plate 1, a groove for embedding the concrete filling layer 2 is provided on the end surface of the track plate 1 for contacting the concrete filling layer 2. The concrete filling layer 2 is connected to the track plate 1 by mutual embedding, thereby ensuring the effective horizontal and vertical connection between the track plate 1 and the concrete filling layer 2. Preferably, the concrete filling layer 2 comprises a first trapezoidal platform 2.1 and a second trapezoidal platform 2.2 which are interconnected from top to bottom, and the first trapezoidal platform 2.1 and the second trapezoidal platform 2.2 are interconnected to form a structure which gradually increases from top to bottom, so that it can effectively prevent harmful media such as rainwater from corroding the interlayer interface between the track plate 1 and the concrete filling layer 2, thereby preventing the occurrence of defects such as edge separation and hollowing of the track plate 1; it can also improve the stress form of the track plate 1, and the normal contact area can be increased by adopting a trapezoidal cross-section, and the compressive strength of concrete is used instead of shear resistance to increase the durability of the track plate 1; at the same time, by setting the thickness of the two ends of the track plate 1 to be greater than the thickness of its central part, the two ends of the track plate 1 have a larger cross-sectional area and obtain a greater resistance to reduce the occurrence of defects on the end surface of the track plate 1.

[0038] Optionally, an isolation layer 3 is provided on the plane of the first trapezoidal platform 2.1, and a second viscoelastic cushion layer 4 is provided on the inclined surfaces of the first trapezoidal platform 2.1 and the second trapezoidal platform 2.2 to coordinate the deformation effect of the assembled track structure. Preferably, the isolation layer is preferably set to a geotextile with a thickness of 1mm-2mm.

[0039] Optionally, the gradient of the inclined surface of the first trapezoidal step 2.1 is set to 1 / 1.5-1 / 2.5, and the gradient of the inclined surface section of the second trapezoidal step 2.2 is set to 1 / 3.

[0040] Optionally, multiple connectors are provided on the end surface of the concrete filling layer 2 for contacting and connecting with the leveling layer 9, and the multiple connectors are distributed in sequence along the extension direction of the rail 5 to ensure the overall stability of the assembled track structure. Preferably, the connector is preferably a steel bar structure.

[0041] In addition to the above structure, a sleeve is also pre-buried in the track plate 1 to facilitate the subsequent installation of a measuring prism or other device for measuring the assembled track structure.

[0042] The specific process of installing and constructing the above-mentioned assembled track structure is as follows:

[0043] 1) The elevation and plane control network is the basic basis for measurement and positioning in ballastless track construction. Based on the secondary leveling control network of the national elevation control network, a third-level leveling control network is laid out using total stations and levels, and the accuracy of the three-level elevation control points is combined, and the average error of each three-level elevation control point is calculated (specifically: the error of the three-level plane control point should not be greater than ±2.5mm / km);

[0044] 2) When installing the above-mentioned assembled track structure, first lay a layer of asphalt mortar on the roadbed, bridge or tunnel base (i.e. lay a leveling layer first) to facilitate fine adjustment of the assembled track structure;

[0045] 3) Use the elevation measurement system to lay out the center coordinates of the assembled track structure and the installation points of the track plate on the surface of the leveling layer, and lay out the asphalt mortar construction according to the assembly simulation results of the assembled track structure, and spread the asphalt mortar layer (further, ① in order to avoid damage and contamination of the asphalt layer, ensure that the base layer is clean and meets the drainage slope conditions, and the base layer should be cleaned; ② spray the tack coat oil on the cleaned base layer, and do a good job of protecting the finished product while spraying the tack coat oil, and the spraying should be uniform and sufficient; ③ when paving asphalt, the paving vehicle should maintain a stable speed and spraying amount, and the transportation distance cannot be too long when paving the mixture. ④ Since the asphalt will come out of the oven in sequence during asphalt paving, there will inevitably be gaps. In order to ensure that the asphalt is tight and smooth, a small vibrator should be used to press the edge in time after the asphalt concrete is paved to ensure the edge is flat; ⑤ During asphalt paving, in order to ensure the thickness of the asphalt paving, sampling should be used after the paver spreads the asphalt to check the asphalt paving thickness; ⑥ After the asphalt is compacted, it is necessary to use a level meter to sample and detect the elevation of the asphalt layer based on the pre-arranged three-level leveling control points, and the offset should be adjusted in time);

[0046] 4) Set up the total station, place the measuring frame on the track structure to be adjusted, and perform initial orientation and fine-tuning software data initialization on the total station;

[0047] 5) Use the elevation measurement system to lay out the track structure elevation network. Six standard frames are required for fine-tuning, which are placed on the second row of rail support platforms and the penultimate row of rail support platforms of the track plate to be adjusted. After the instrument is oriented, it enters the fine-tuning system to measure the prism on the track plate (the nylon sleeve that can be installed at the fastener position), and adjusts the fine-tuning device using a fine-tuning wrench according to the deviation between the software calculated value and the measured data.

[0048] 6) Hoist the filling layer to the corresponding position of the foundation structure (i.e. the leveling layer), then lay the track plate on it, connect the track plate and the filling layer into an integral structure, and perform rough paving of the assembled track structure; during the initial paving, attention should be paid to reserving gaps to facilitate the pouring of H-shaped blocks;

[0049] 7) During the fine-tuning process of the track plate, it should be noted that both sides of the left side need to be adjusted at the same time. When adjusting one side, the other side will be subjected to excessive force, which will damage the track structure. The fine-tuning device should be seamlessly attached to the side of the track plate to ensure uniform force.

[0050] 8) After the track plate is fine-tuned, the plane position and elevation of each track plate must be checked. The lateral deviation is within 0.5mm, and the elevation deviation is within 0.5mm. The relative height difference and plane position allowable deviation of the joints of adjacent track plates from the top surface of the rail platform are both 0.5mm.

[0051] 9) After the track slab is laid, it is connected to the foundation structure to ensure the integrity and stability of the assembled track structure.

[0052] 10) A viscoelastic cushion is arranged between two adjacent track plates, and the adjacent track plates are connected by H-shaped blocks, wherein the H-shaped blocks are vertically cast with the steel bar connectors at the reserved holes on the surface of the foundation structure (specifically: four embedded sleeves are generally provided to facilitate the disassembly and replacement of the track structure during assembly; specifically, the installation process of the H-shaped blocks is as follows: the H-shaped blocks are prefabricated in the prefabrication yard, and steel bar holes connected to the track structure are reserved on the side of the H-shaped blocks, and the H-shaped blocks are arranged along the direction of the rails, and the prestressed steel bars are passed through the holes and prestressed. After the stress reinforcement is tensioned, a viscoelastic cushion is filled between the track structure and the H-shaped block; the H-shaped block is connected to the roadbed with a pile foundation; a steel hole is reserved at the bottom of the H-shaped block, and a steel sleeve is reserved. During the construction phase, the pile foundation reserved steel bars are inserted into the reserved steel sleeve, and the steel sleeve is injected with anchoring glue, and then the steel bar anchor is performed; so that the pile foundation and the H-shaped block form a common force transmission structure); after the concrete is injected into the reserved track plate gap, a small vibrator is used to vibrate to ensure the density of the concrete; finally, a 28-day maintenance is carried out;

[0053] 11) Install the rails on the track plate through fasteners, measure the track, analyze and calculate the smoothness of the track, and adjust the fasteners by rough and fine adjustment to ensure that the geometric smoothness requirements of the assembled track structure are met;

[0054] 12) Complete the installation of the assembled track structure.

[0055] The assembled track structure provided by the present invention has a high degree of mechanization, reduced construction difficulty, easy construction quality, and can save a lot of construction time in the installation process by using a paving machine to pave the track structure. In terms of maintenance and repair, the assembled track structure provided by the present invention is paved by various modules, and only the corresponding damaged modules need to be disassembled, repaired and replaced during maintenance, which is simpler than traditional ballastless tracks. In terms of track structure design, the assembled track structure provided by the present invention eliminates the base plate part, and the prefabricated assembled track structure is directly laid on the roadbed surface. The double-layer trapezoidal concrete structure adopted at the same time can make the track structure more integrated and the internal force distribution more reasonable. While reducing the use of materials, its strength and stiffness can meet the requirements. The designed H-shaped block can well limit the horizontal and vertical displacement of the track plate; in the design of various components of the track structure, the filling layer adopts a double trapezoidal embedded structure. On the one hand, the first trapezoid adopts a smaller slope from bottom to top, which can facilitate the smooth discharge of interlayer water accumulation in the track structure and will not cause secondary damage such as degassing and freezing and thawing to the track structure; on the other hand, the second trapezoid with a larger slope can improve the stress form of the track structure. The traditional track plate type mainly relies on the bonding effect between layers to resist the cyclic effect of train loads. Since this interlayer interaction is very fragile, it often leads to cracks and other diseases. The use of a trapezoidal section can effectively increase the bending stiffness of the structure. When subjected to vertical loads such as train loads, the trapezoidal section with a small top side and a large bottom side can well provide the area of ​​the lower tensile zone, and has a larger bending stiffness under the same cross-sectional area, making the stress of the track structure more uniform. At the same time, the trapezoidal cross section increases the normal contact area, uses the compressive strength of concrete instead of shear resistance, and increases the durability of the track structure. The track plate is embedded in the filling layer, which increases the thickness of the track plate end and plate side, increases the concrete cross-sectional area of ​​the most vulnerable part of the track plate, improves the bending, shear strength and durability of the track plate, and suppresses the risk of interlayer debonding. In addition, the track plate and the filling layer are embedded in each other to improve the limiting performance of the track structure, effectively reduce the lateral displacement of the track plate, and increase driving stability. The H-shaped block structure is innovatively designed on the limiting device. The limit blocks on both sides of the H-shaped block have a larger contact area with the track plate, so it can provide greater lateral stiffness and increase the stability of the track structure under the lateral load of the train. At the same time, the blocks on both sides are connected by the middle crossbeam, which can effectively limit the relative displacement of the blocks on both sides and provide additional lateral limiting stiffness. Filling flexible materials between the track structure and the H-shaped block is conducive to adjusting the problem of track structure instability under the overall temperature rise and temperature drop. The use of H-shaped blocks as the limiting structure can avoid the problem of damaging the overall concrete structure caused by the design of the CRTSⅢ type plate limiting boss, maintain the integrity of the track structure, avoid local stress concentration, and make the track structure more evenly stressed.

[0056] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An assembled track structure, characterized in that: It comprises a track plate (1), a steel rail (5) laid on the track plate (1), a fastener (6) for fastening the steel rail (5) to the track plate (1), a leveling layer (9) arranged on the roadbed, and a filling layer arranged between the track plate (1) and the leveling layer (9); A groove for embedding the filling layer is provided on the end surface of the track plate (1) for contacting the filling layer, and the filling layer is connected to the track plate (1) by mutual embedding; The filling layer comprises a first trapezoidal platform (2.1) and a second trapezoidal platform (2.2) which are connected to each other from top to bottom, wherein the first trapezoidal platform (2.1) and the second trapezoidal platform (2.2) are connected to each other to form a structure which gradually increases from top to bottom; The gradient of the inclined surface of the first trapezoidal platform (2.1) is set to 1 / 1.5-1 / 2.5, and the gradient of the inclined surface section of the second trapezoidal platform (2.2) is set to 1 / 3; An isolation layer (3) is also provided on the plane portion of the first trapezoidal platform (2.1), and a second viscoelastic cushion layer (4) is also provided on the inclined portions of the first trapezoidal platform (2.1) and the second trapezoidal platform (2.2).

2. The assembled track structure according to claim 1, characterized in that: A lifting assembly (8) for connecting to the lifting device is provided on each track plate (1).

3. The assembled track structure according to claim 2, characterized in that: The track plate (1) is provided with a plurality of pieces, the plurality of track plates (1) are arranged in sequence along the extension direction of the steel rail (5), and two adjacent track plates (1) are connected to each other via a stopper (7); The steel rails (5) are provided with two rails spaced apart from each other, and each steel rail (5) is provided with a plurality of fasteners (6) distributed in sequence along the extension direction of the steel rail (5).

4. The assembled track structure according to claim 3, characterized in that: An expansion joint and a first viscoelastic cushion layer are also provided between the track plate (1) and the stopper (7).

5. The assembled track structure according to claim 4, characterized in that: The stopper (7) is prefabricated with C40 concrete, and a steel bar hole is reserved at the bottom of the stopper (7), and a reserved steel sleeve is provided in the steel bar hole.

6. The assembled track structure according to claim 5, characterized in that: A plurality of connecting pieces are also provided on the end surface of the filling layer for contacting and connecting with the leveling layer (9), and the plurality of connecting pieces are distributed in sequence along the extension direction of the steel rail (5).

7. The assembled track structure according to claim 6, characterized in that: A sleeve is also pre-buried in the track plate (1).