A safe and fast construction method for direct conversion from step normal to CRD method
Through the direct conversion method of step normal to CRD method, the advanced pre-reinforcement and gradient expansion technology are adopted to solve the problems of conservatism and slow construction progress in shallow buried and hidden excavation tunnel construction, and the rapid and safe construction is achieved The conversion reduces surrounding rock disturbances and idle work, and improves construction efficiency.
Patent Information
- Application Number
- CN202211070619.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-02
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2042-09-02
AI Technical Summary
The existing shallow buried and hidden tunnel construction method conversion method is too conservative and difficult to quickly convert construction, especially when small sections are converted to large sections or super large sections, it is impossible to effectively ensure the stability of surrounding rock and construction safety, and the construction progress is slow. , lack of engineering cases that can be learned from.
The direct conversion method of the step-to-step CRD method is adopted, including advance pre-reinforcement, gradual expansion of the upper and lower step-to-step method, safety step control and upward arch follow-up construction, gradually completing the construction method conversion, reducing surrounding rock disturbances and speeding up construction progress.
The direct conversion of step normal CRD method sections is realized, the process conversion time is shortened, surrounding rock disturbance is reduced, excavation efficiency is improved, multiple working surfaces are formed in advance, significantly speeding up the construction progress and reducing idle work.
Smart Images

Figure CN115387798B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shallow buried dark excavation tunnel construction, and in particular to a safe and fast construction method for direct conversion from a step normal method to a CRD method. Background Art
[0002] With the rapid development of my country's economy, more and more shallow-buried tunnels are involved in transportation engineering and urban construction, and more and more construction method conversions are involved. At present, most of the shallow-buried tunnel construction method conversion methods in China are too conservative, which is not conducive to rapid conversion of construction, and there is little research on the conversion of excavation methods from small sections to large sections or even super-large sections. At the same time, in response to increasingly complex hydrogeological and environmental conditions, the limitations of traditional method conversions have gradually become apparent. For example, the conversion of construction methods from small sections to large sections and super-large sections in shallow-buried tunnel construction must not only ensure the stability of the surrounding rock and construction safety, but also appropriately speed up the construction progress. There are currently no engineering cases for reference. Summary of the invention
[0003] In order to overcome the deficiencies of the above-mentioned prior art, the purpose of the present invention is to provide a safe and fast construction method for direct conversion from the step method to the CRD method. The present invention avoids the time interval between the conversion of the construction method, reduces the disturbance of the surrounding rock by the step method excavation, ensures the construction safety, and also speeds up the construction progress and reduces the idle work, which has very important reference value and practical significance for the construction of similar projects.
[0004] In order to achieve the above object, the technical solution adopted by the present invention is:
[0005] A safe and fast construction method for direct conversion of step normal to CRD method, characterized by comprising the following steps:
[0006] 1) Advance pre-reinforcement: When the step reaches the transition section of the expansion on the step method section, the excavation is stopped and the horizontal and oblique advance pre-reinforcement in the tunnel is carried out by forward or backward grouting;
[0007] 2) Upper step section conversion: When it is determined that the front reinforcement effect is good, the upper step method is used to continue excavating the upper step, and the gradual excavation angle is maintained within 30°. The excavation construction is carried out frame by frame. When the upper step is excavated to the central mileage position of the gradual excavation transition section, the upper step is directly converted to the upper left cavern and upper right cavern of the CRD method section in advance;
[0008] 3) Continue excavation of the left and right upper caverns: After the left upper cavern continues to be excavated forward for 15 to 20 meters using the up-and-down step method, the right upper cavern will follow up with construction for 6 to 10 meters. The left and right caverns maintain a safe step distance of more than 10 meters to create conditions for the step excavation and section conversion of the step method section.
[0009] 4) Follow-up construction of the lower step and section conversion: Follow up the excavation of the lower step, and maintain the gradual excavation angle within 30° when reaching the transition section. When the lower step is excavated to the central mileage position of the gradual excavation transition section, complete the early direct conversion of the lower step to the lower left cavern and lower right cavern of the CRD section;
[0010] 5) Continue excavation of the lower left cavern: After the lower left cavern continues to be excavated forward for 10 to 15 meters using the up-and-down step method, a safe step distance of 3 to 5 meters is maintained with the upper left cavern and a safe step distance of 3 to 5 meters with the upper right cavern, creating conditions for the conversion of the construction method of the lower right cavern;
[0011] 6) Continue excavation of the lower right cavern: After the lower right cavern continues to be excavated forward for 3 to 5 meters using the up-and-down step method, a safe step distance of 3 to 5 meters is maintained with the upper right cavern to create conditions for the subsequent step method section invert follow-up construction and the full section construction method conversion construction;
[0012] 7) Follow-up construction of the invert: After the synchronous follow-up construction of the lower right cavern is completed, the follow-up construction of the invert is carried out to the central mileage position of the gradual expansion transition section to complete the excavation construction of the entire step method section;
[0013] 8) Completion of construction method conversion: Construction of each cavern is carried out simultaneously according to the safe step distance to complete the construction method conversion from the entire step method section to the CRD method section.
[0014] Furthermore, the upper step (I) of the step method section is gradually changed and expanded, and the arch and side wall (1) of the upper step (I) are brought closer to the arch and side walls ① and ⑥ of the upper left cavern 1 and the upper right cavern 3 of the CRD method design section, and a temporary middle partition wall ② and temporary inverts ③ and ⑦ are added simultaneously at the central mileage position of the transition section to complete the early direct conversion of the upper step (I) to the upper left cavern 1 and the upper right cavern 3 of the CRD method section.
[0015] Furthermore, the lower step (II) of the step method section is gradually changed and expanded by the upper and lower step method, and the side wall (2) of the lower step is brought closer to the side walls ④ and ⑧ of the lower left cavern 2 and the lower right cavern 4 of the CRD method design section. A temporary middle partition wall ⑤ is added simultaneously at the central mileage position of the transition section to complete the early direct conversion of the lower step (II) to the lower left cavern 2 and the lower right cavern 4 of the CRD method section.
[0016] Furthermore, the step 1) advance pre-reinforcement: focuses on reinforcing the soil in front of the upper and lower cavern faces, the grouting range is from the face to 3m outside the corresponding contour, the reinforced stratum is grade V and VI surrounding rock with poor self-stability, and the one-time reinforcement depth is comprehensively considered in combination with the cavern excavation sequence and its safe step distance.
[0017] Furthermore, the step 8) completes the construction method conversion: the safe step distance of each cavern can be considered according to the surrounding rock and pre-reinforcement conditions and the actual conditions on site. Generally, when a single cavern is excavated using the up and down step method, the safe step distance of the upper and lower caverns is maintained at 3 to 5 meters, and the step distance between the left and right caverns is maintained at more than 10 meters.
[0018] The beneficial effects of the present invention are:
[0019] 1) Realize direct conversion from step normal to CRD method section, shortening the time interval between section conversions;
[0020] 2) Realize the early conversion of the step method to the CRD method section, reducing the disturbance of the step method excavation to the surrounding rock;
[0021] 3) The efficiency of excavation method conversion is improved, multiple working surfaces are formed in advance, the construction progress is accelerated and idle work is reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the construction process of the present invention;
[0023] Figure 2 It is a schematic diagram of the excavation section and construction method conversion of the present invention.
[0024] Among them, in the figure: (1) - the upper step arch and side wall of the step method section; (2) - the lower step arch and side wall of the step method section; (3) - the inverted arch of the step method section; ① - the upper left cave chamber arch and side wall; ② - the temporary middle partition wall of the upper left cave chamber; ③ - the temporary inverted arch of the upper left cave chamber; ④ - the side wall and inverted arch of the lower left cave chamber; ⑤ - the temporary middle partition wall of the lower left cave chamber; ⑥ - the upper right cave chamber arch and side wall; ⑦ - the temporary inverted arch of the upper right cave chamber; ⑧ - the side wall and inverted arch of the lower right cave chamber. DETAILED DESCRIPTION
[0025] The present invention is further described below in conjunction with the accompanying drawings.
[0026] like Figure 1 , 2 As shown, the purpose of the present invention is to provide a safe and fast construction method for direct conversion from the step normal method to the CRD method, which can realize the direct conversion of the step method section to the CRD method section and the early conversion of the corresponding construction method, reduce the disturbance of the surrounding rock caused by the gradual expansion of the step method, and form multiple working surfaces in advance, thereby accelerating the construction progress.
[0027] The upper step (I) of the step method section is gradually changed and expanded, and the arch and side wall (1) of the upper step (I) are brought closer to the arch and side walls ① and ⑥ of the upper left cavern 1 and the upper right cavern 3 of the CRD method design section, and a temporary middle partition wall ② and temporary inverts ③ and ⑦ are added simultaneously at the central mileage position of the transition section to complete the early direct conversion of the upper step (I) to the upper left cavern 1 and the upper right cavern 3 of the CRD method section.
[0028] The lower step (II) of the step method section is also gradually changed and expanded by the upper and lower step method, and the side wall (2) of the lower step is brought closer to the side walls ④ and ⑧ of the lower left cavern 2 and the lower right cavern 4 of the CRD method design section. A temporary middle partition wall ⑤ is added simultaneously at the central mileage position of the transition section to complete the early direct conversion of the lower step (II) to the lower left cavern 2 and the lower right cavern 4 of the CRD method section.
[0029] A safe and fast construction method for direct conversion of step normal to CRD method, characterized by comprising the following steps:
[0030] 1) Advance pre-reinforcement: When the step (I) reaches the transition section of the expansion on the step method section, stop excavation and use forward or backward grouting to carry out horizontal and oblique advance pre-reinforcement in the tunnel;
[0031] 2) Conversion of upper step section: When it is determined that the reinforcement effect in the front is good, the upper and lower step method is used to continue excavating the upper step (I). The gradual excavation angle is maintained within 30°, and the excavation construction is carried out one by one. When the upper step (I) is excavated to the central mileage position of the gradual excavation transition section, the upper step (I) is directly converted to the upper left cavern 1 and the upper right cavern 3 of the CRD method section in advance.
[0032] 3) Continue excavation of the left and right upper caverns: After the upper left cavern 1 continues to be excavated forward for 15 to 20 meters using the up and down step method, the upper right cavern 3 follows up with construction for 6 to 10 meters. The upper left cavern 1 and the upper right cavern 3 maintain a safe step distance of more than 10 meters to create conditions for the excavation of the lower step (II) of the step method section and the section conversion.
[0033] 4) Follow-up construction of the lower step and section conversion: Follow up the excavation of the lower step, and maintain the gradual excavation angle within 30° when reaching the transition section. When the lower step (II) is excavated to the central mileage position of the gradual excavation transition section, complete the early direct conversion of the lower step (II) to the lower left cavern 2 and lower right cavern 4 of the CRD method section.
[0034] 5) Continue excavation of the lower left cavern: After the lower left cavern 2 continues to be excavated forward for 10 to 15 meters using the up and down step method, it maintains a safe step distance of 3 to 5 meters with the upper left cavern 1 and a safe step distance of 3 to 5 meters with the upper right cavern 3, creating conditions for the conversion of the construction method of the lower right cavern 4.
[0035] 6) Continue excavation of the lower right cavern: After the lower right cavern 4 continues to be excavated forward for 3 to 5 meters using the up and down step method, a safe step distance of 3 to 5 meters is maintained with the upper right cavern 3 to create conditions for the subsequent step method invert follow-up construction and the full-section construction method conversion construction.
[0036] 7) Follow-up construction of the invert: After the synchronous follow-up construction of the lower right cavern is completed, the follow-up construction of the invert (III) is carried out to the central mileage position of the gradual expansion transition section to complete the excavation construction of the entire step method section.
[0037] 8) Completion of construction method conversion: Construction of each cavern is carried out simultaneously according to the safe step distance to complete the construction method conversion from the entire step method section to the CRD method section.
[0038] The described safe and fast construction method of direct conversion of the step normal CRD method is characterized in that the step 1) advance pre-reinforcement: focus on reinforcing the soil in front of the upper and lower cavern faces, the grouting range is from the face to 3m outside the corresponding contour, the reinforced stratum is grade V and VI surrounding rock with poor self-stability, and the single reinforcement depth is comprehensively considered in combination with the cavern excavation sequence and its safe step distance.
[0039] The safe and fast construction method for direct conversion from the step method to the CRD method is characterized in that the step 8) completes the construction method conversion: the safe step distance of each cavern can be considered based on the surrounding rock and pre-reinforcement conditions and the actual conditions on site. Generally, when a single cavern is excavated using the up and down step method, the safe step distance of the upper and lower caverns is maintained at 3 to 5 meters, and the step distance between the left and right caverns is maintained at more than 10 meters.
Claims
1. A safe and fast construction method for direct conversion of step normal CRD method, characterized in that: The following steps are involved: 1) Advance pre-reinforcement: When the step (I) reaches the transition section of the expansion on the step method section, stop excavation and use forward or backward grouting to carry out horizontal and oblique advance pre-reinforcement in the tunnel; 2) Conversion of upper step section: When it is confirmed that the reinforcement effect in front is good, the upper step (I) is continued to be excavated by the upper and lower step method, and the gradual excavation angle is maintained within 30°. The excavation construction is carried out frame by frame. When the upper step (I) is excavated to the central mileage position of the gradual excavation transition section, the upper step (I) is directly converted to the upper left cavern and the upper right cavern of the CRD method section in advance; 3) Continue excavation of the left and right upper caverns: After the left upper cavern continues to be excavated forward for 15 to 20 meters using the up-and-down step method, the right upper cavern will follow up with construction for 6 to 10 meters. The left upper cavern and the right upper cavern maintain a safe step distance of more than 10 meters to create conditions for the excavation of the lower step (II) of the step method section and section conversion; 4) Follow-up construction and section conversion of the lower step of the step method: follow up the excavation of the lower step, and maintain the gradual excavation angle within 30° when reaching the transition section. When the lower step (II) is excavated to the central mileage position of the gradual excavation transition section, complete the early direct conversion of the lower step (II) to the lower left cavern and the lower right cavern of the CRD method section; 5) Continue excavation of the lower left cavern: After the lower left cavern continues to be excavated forward for 10 to 15 meters using the up-and-down step method, a safe step distance of 3 to 5 meters is maintained with the upper left cavern and a safe step distance of 3 to 5 meters with the upper right cavern, creating conditions for the conversion of the construction method of the lower right cavern; 6) Continue excavation of the lower right cavern: After the lower right cavern continues to be excavated 3 to 5 meters forward using the up-and-down step method, a safe step distance of 3 to 5 meters is maintained with the upper right cavern to create conditions for the subsequent step method invert follow-up construction and the full-section construction method conversion construction; 7) Follow-up construction of the invert: After the synchronous follow-up construction of the lower right cavern is completed, the follow-up construction of the invert (III) is carried out to the central mileage position of the gradual expansion transition section to complete the excavation construction of the entire step method section; 8) Complete the construction method conversion: Each cavern is constructed synchronously according to the safe step distance to complete the construction method conversion from the step method section to the CRD method section; Through the step method, using gradual change and expansion, the arch and side walls of the upper step (I) are moved closer to the arch and side walls ① and ⑥ of the upper left and upper right caverns of the CRD method design section, and temporary middle partition walls ② and temporary inverts ③ and ⑦ are added at the center mileage position of the transition section. The side walls of the lower step are moved closer to the side walls ④ and ⑧ of the lower left and lower right caverns of the CRD method section, and temporary middle partition walls ⑤ are added at the center mileage position of the transition section to complete the early direct conversion of the step method to the CRD method section; The step 1) advance pre-reinforcement: focus on reinforcing the soil in front of the upper and lower cavern faces, the grouting range is from the face to 3m outside the corresponding contour, the reinforced stratum is the self-stability poor V and VI grade surrounding rock, and the one-time reinforcement depth is combined with the excavation sequence and its safe step distance during the conversion of the excavation method; The step 8) completes the construction method conversion: the safe step distance of each cavern can be considered according to the surrounding rock and pre-reinforcement conditions and the actual conditions on site. When the upper and lower step method is used for excavation of a single cavern, the safe step distance of the upper and lower caverns is maintained at 3 to 5 meters, and the step distance between the left and right caverns is maintained at more than 10 meters.