A pole assembly welding device and method for a power battery cover
By designing the pole assembly and welding equipment for the power battery cover, and using the cooperation of the carrier platform and the jacking module, the precise positioning and assembly of the poles and top cover sheets are achieved, and the offset and material removal during the pole assembly process are solved. This improves the assembly accuracy and yield rate of power battery covers.
Patent Information
- Application Number
- CN202210973433.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-15
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-08-15
AI Technical Summary
During the assembly process of the poles of the existing power battery cover, there are problems such as pole offset or incorrect material taking, resulting in poor assembly accuracy and affecting the yield of the power battery cover.
A pole assembly and welding equipment for power battery covers is designed, including a conveying mechanism, a top cover sheet loading mechanism, a sealing ring assembly mechanism and a pole assembly mechanism. Through the movement of the carrier platform and the action of the jacking module, the The precise positioning and assembly of the pole and top cover ensure that the pole falls accurately into the discharge chute.
It improves the assembly accuracy of pole posts and top cover sheets, improves the product yield of power battery covers, and the equipment has a compact structure and takes up less space.
Smart Images

Figure CN115415692B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power battery manufacturing, and in particular to a pole assembly welding device and method for a power battery cover plate. Background Art
[0002] Lithium batteries are widely used in various industries, such as 3C electronics and new energy vehicles. However, due to their own characteristics, lithium batteries have major safety issues, such as fire and explosion. Especially in the field of electric vehicles, batteries, as key components of power output, are related to the safety of vehicles and the safety of people's lives. As the core component of the battery assembly, the reliability of the power battery cover has a huge impact on the normal use of the car.
[0003] The battery cover mainly includes the top cover, pole, sealing ring, insulating plastic parts, explosion-proof valve and other components. During the assembly process of the battery cover, it is necessary to first weld the top cover and the explosion-proof valve, and then assemble and weld the sealing ring, pole and other structural parts. Before welding, the pole assembly is required. However, during the transportation and feeding process of the pole, the current automatic assembly equipment may cause the pole to be offset or the material to be taken incorrectly, and there is a problem of poor assembly accuracy of the pole and the top cover, resulting in a low yield of the assembled power battery cover. Summary of the invention
[0004] In view of the above problems, the purpose of the present invention is to provide a pole assembly welding device and a pole assembly welding method for a power battery cover plate, which can realize accurate assembly of the pole and the top cover plate, have high automated assembly accuracy, and improve the yield rate of power battery cover plate products.
[0005] According to one aspect of the present invention, a pole assembly welding device for a power battery cover plate comprises a conveying mechanism and a top cover sheet feeding mechanism, a sealing ring assembly mechanism, a pole assembly mechanism, and a welding mechanism sequentially arranged along the conveying mechanism, wherein the conveying mechanism comprises a carrier platform that can move along the x-axis through the pole assembly mechanism and a carrier carrying a top cover sheet, wherein the carrier can be placed on the carrier platform so as to be movable along the z-axis;
[0006] The pole assembly mechanism comprises:
[0007] First bracket;
[0008] A first assembly plate, which is arranged on the first bracket, and the first assembly plate is provided with a discharge groove for the pole to pass through, and the discharge groove passes through the first assembly plate along the z-axis;
[0009] Assembling a suction cup, which is used to place the pole into the discharge trough; and
[0010] A first lifting module, which is used to lift the carrier from the carrier platform, and the first lifting module is located below the first assembly plate;
[0011] Wherein, the first assembly plate has a first positioning portion extending downward, the carrier has a second positioning portion extending upward, the first positioning portion and the second positioning portion can be engaged with each other and at least one of them has a positioning guide slope;
[0012] The pole assembly mechanism has a first working state and a second working state. In the first working state, the carrier is located on the carrier platform, and the carrier is located a distance below the first assembly plate; in the second working state, the carrier is detached from the carrier platform, and the first positioning portion and the second positioning portion are engaged with each other so that the discharge trough is opposite to the pole installation part of the top cover plate on the carrier.
[0013] In a preferred embodiment, the first assembly plate is also provided with a positioning sleeve for positioning the pole, the positioning sleeve and the discharge trough are spaced apart along the x-axis, the assembly suction cup can be movably arranged on the first bracket along the y-axis to transfer the pole from the positioning sleeve to the discharge trough, and the assembly suction cup has an adsorption surface that matches the pole; the pole assembly mechanism also includes a material picking suction cup, which can be movably arranged on the first bracket along the y-axis to transfer the pole on the pole feeding belt into the positioning sleeve.
[0014] In a more preferred embodiment, the material discharge trough, the positioning sleeve, the assembly suction cup and the material picking suction cup are respectively arranged in pairs, each of the assembly suction cups can be synchronously movably arranged on the first bracket along the y-axis and the z-axis, and each of the material picking suction cups can be independently movably arranged on the first bracket along the y-axis and the z-axis.
[0015] Further, the first positioning portion is a positioning guide pin, the positioning guide pin has an inclined conical surface, the second positioning portion is a positioning guide hole for the positioning guide pin to be inserted, the positioning guide hole has an inclined hole wall, and the positioning guide slope includes the conical surface and the hole wall.
[0016] In a preferred embodiment, the positioning guide pin is disposed on the first assembly plate so as to be movable up and down, and a buffer spring is disposed between the first assembly plate and the positioning guide pin.
[0017] In a preferred embodiment, the conveying mechanism includes a slide that can move along the x-axis, the carrier platform has an inner part fixedly connected to the slide and an outer part suspended, and the carrier is placed on the outer part; a through hole is provided on the outer part, and the carrier has a downwardly extending boss that can pass through the through hole to the bottom of the carrier platform; the first lifting module includes a first lifting cylinder and a first push block driven by the first lifting cylinder to move up and down along the z-axis, and when the pole assembly mechanism is in the second working state, the first push block is pressed against the boss.
[0018] In a preferred embodiment, the carrier platform has a connecting pin extending upward, and the carrier has a connecting slot, and the connecting pin is detachably inserted into the connecting slot.
[0019] In a preferred embodiment, the conveying mechanism includes a plurality of carrier platforms, each of which is provided with at least one carrier; the sealing ring assembly mechanism includes:
[0020] Second bracket;
[0021] A second assembly plate, which is disposed on the second bracket, and a sealing ring groove is provided on the second assembly plate for the sealing ring to pass through, and the sealing ring groove passes through the second assembly plate along the z-axis;
[0022] A discharge suction cup, used to place the sealing ring into the discharge trough; and
[0023] A second lifting module, used for lifting the carrier from the carrier platform, the second lifting module is located below the second assembly plate;
[0024] Wherein, the second assembly plate has a third positioning portion extending downward, the third positioning portion and the second positioning portion can be engaged with each other and at least one of them has a positioning guide slope;
[0025] The sealing ring assembly mechanism has a third working state and a fourth working state. In the third working state, the carrier is located on the carrier platform, and the carrier is located a distance below the second assembly plate. In the fourth working state, the carrier is detached from the carrier platform, and the third positioning portion and the second positioning portion are engaged with each other so that the sealing ring groove is opposite to the pole mounting portion of the top cover plate on the carrier.
[0026] In a preferred embodiment, the third positioning portion is a positioning cone pin, and the positioning cone pin has an inclined cone surface; the second positioning portion is a positioning guide hole for the positioning cone pin to be inserted, and the positioning guide hole has an inclined hole wall, and the positioning guide inclined surface includes the cone surface and the hole wall; the positioning cone pin is movably arranged on the second assembly plate, and a buffer spring is arranged between the second assembly plate and the positioning cone pin; a through hole is provided on the carrier platform, and the carrier has a boss extending downward and capable of passing from the through hole to the bottom of the carrier platform; the second lifting module includes a second lifting cylinder and a second push block driven by the second lifting cylinder to move up and down along the z-axis, and when the pole assembly mechanism is in the fourth working state, the second push block is pressed against the boss.
[0027] According to another aspect of the present invention, a pole assembly welding method for a power battery cover plate adopts the pole assembly welding device mentioned above, and the pole assembly welding method includes a pole assembly step, and the pole assembly step specifically includes:
[0028] S101, the carrier platform moves, so that the carrier carries the top cover sheet and enters under the first assembly plate;
[0029] S102, when it is detected that the carrier enters below the first assembly plate, the first lifting module is actuated to lift the carrier from the carrier platform, and under the action of the guiding slope, the first positioning part and the second positioning part are engaged to accurately position the carrier, so that the pole assembly part of the top cover sheet on the carrier is aligned with the discharge groove of the first assembly plate;
[0030] S103, assembling the suction cup to place the pole into the discharge trough, and the pole falls from the discharge trough into the pole assembly position of the top cover piece.
[0031] In a preferred embodiment, a positioning sleeve for positioning the pole is further provided on the first assembly plate, and the pole assembly mechanism also includes a material picking suction cup. In step S103, the material picking suction cup moves downward to pick up the pole on the pole feeding belt and puts it into the positioning sleeve to position the pole, and the assembly suction cup puts the positioned pole in the positioning sleeve into the discharge trough.
[0032] In a preferred embodiment, two carriers are placed on each carrier platform, and a top cover plate is placed on each carrier, and each top cover plate has two mounting positions for positive and negative poles; in step S103, after the first pair of material picking suction cups move down a pair of positive and negative poles, the second pair of material picking suction cups move down another pair of positive and negative poles, and then move synchronously to above the two pairs of positioning sleeves; the two pairs of assembly suction cups move synchronously to above the two pairs of material discharge troughs.
[0033] In a preferred embodiment, the pole assembly welding method includes a sealing ring assembly step, and each top cover sheet is subjected to the sealing ring assembly step before the pole assembly step, and the sealing ring assembly step specifically includes:
[0034] S201, the carrier platform moves, so that the carrier carries the top cover sheet and enters under the second assembly plate;
[0035] S202, when it is detected that the carrier enters under the second assembly plate, the second lifting module is actuated to lift the carrier from the carrier platform, and under the action of the guiding slope, the third positioning part and the second positioning part are engaged to accurately position the carrier, so that the pole assembly part of the top cover sheet on the carrier is aligned with the sealing ring groove of the second assembly plate;
[0036] S203, the discharge suction cup puts the sealing ring into the sealing ring groove, and the sealing ring falls from the sealing ring groove into the pole assembly position of the top cover plate.
[0037] The present invention adopts the above solution, which has the following advantages compared with the prior art:
[0038] The pole assembly welding equipment and pole assembly welding method of the power battery cover plate of the present invention, during the process of the pole assembly mechanism converting from the first working state to the second working state, the first lifting module lifts the carrier from the carrier platform until the carrier is detached from the carrier platform, and the second positioning portion of the carrier and the first positioning portion of the first assembly plate are engaged with each other. At this time, the pole assembly mechanism is in the second working state, and the assembly suction cup puts the positioned pole into the discharge trough, and the pole can accurately fall into the pole assembly position of the top cover plate, thereby realizing accurate assembly of the pole and the top cover plate, improving the assembly accuracy and the yield rate of the power battery cover plate product after assembly, and the equipment structure is compact and occupies less space. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the technical solution of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0040] Figure 1 It is a structural schematic diagram of a pole assembly welding device for a power battery cover plate according to an embodiment of the present invention;
[0041] Figure 2 for Figure 1 A partial enlarged view of the middle A;
[0042] Figure 3 is a structural schematic diagram of a pole assembly mechanism according to an embodiment of the present invention;
[0043] Figure 4 is a front view of a pole assembly mechanism according to an embodiment of the present invention;
[0044] Figure 5 for Figure 4 A partial enlarged view of point B in the middle;
[0045] Figure 6 is a side view of a pole assembly mechanism according to an embodiment of the present invention;
[0046] Figure 7 is a structural schematic diagram of a sealing ring assembly mechanism according to an embodiment of the present invention;
[0047] Figure 8 is a front view of a sealing ring assembly mechanism according to an embodiment of the present invention;
[0048] Fig. 9 for Figure 8 A partial enlarged view of point C in the middle;
[0049] Fig.10 is a top view of a sealing ring assembly mechanism according to an embodiment of the present invention;
[0050] Fig.11 A schematic diagram of a partial structure of a conveying mechanism according to an embodiment of the present invention;
[0051] Fig.12 A flowchart of pole assembly according to an embodiment of the present invention;
[0052] Fig.13 The figure is a flow chart of assembling a sealing ring according to an embodiment of the present invention.
[0053] in,
[0054] 100, top cover piece;
[0055] 200, pole;
[0056] 1. Pole assembly welding equipment; 12. Feeding mechanism; 15. Welding mechanism;
[0057] 11. conveying mechanism; 111. carrier platform; 112. carrier; 1121. boss; 1122. connecting groove; 113. slide; 114. inner part; 115. outer part; 116. connecting pin; 117. gear; 118. rack; 119. slide rail;
[0058] 14. Pole assembly mechanism; 2. First bracket; 3. First assembly plate; 31. Material discharge trough; 32. First positioning part; 321. Conical surface; 33. Sleeve; 4. Assembly suction cup; 41. Adsorption surface; 5. First lifting module; 51. First lifting cylinder; 52. First push block; 6. Second positioning part; 61. Hole wall; 7. Material taking suction cup;
[0059] 13. Sealing ring assembly mechanism; 131. Second bracket; 132. Second assembly plate; 1321. Sealing ring groove; 1322. Third positioning portion; 133. Discharging suction cup; 134. Second lifting module; 1341. Second lifting cylinder; 1342. Second push block. DETAILED DESCRIPTION
[0060] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings so that the advantages and features of the present invention can be more easily understood by those skilled in the art. It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention.
[0061] Figures 1 to 11 The pole assembly welding device 1 provided in this embodiment is shown, which is used to assemble the sealing ring and the positive and negative poles to the positive and negative pole assembly parts of the top cover of the power battery in sequence, and then put the protective cap on the pole, weld the positive and negative poles to the top cover, and compress the sealing ring to a set compression amount to seal the pole and the top cover. Figure 1 As shown, the pole assembly welding device 1 includes a conveying mechanism 11 and a top cover sheet feeding mechanism 12, a sealing ring assembly mechanism 13, a pole assembly mechanism 14, and a welding mechanism 15 which are sequentially arranged along the conveying mechanism 11. Figures 1 to 11 As shown, the conveying mechanism 11 includes a carrier platform 111 and a carrier 112. The carrier platform 111 can move along the x-axis through the pole assembly mechanism 14. The carrier 112 is used to carry the top cover sheet 100. The carrier 112 can be placed on the carrier platform 111 movably along the z-axis.
[0062] Furthermore, the pole assembly mechanism 14 includes: a first bracket 2; a first assembly plate 3; an assembly suction cup 4; and a first lifting module 5. Furthermore, the first assembly plate 3 is arranged on the first bracket 2, and a plurality of discharge slots 31 are provided on the first assembly plate 3 for the poles 200 to pass through, and the discharge slots 31 pass through the first assembly plate 3 along the z-axis; the assembly suction cup 4 is used to place a plurality of poles 200 into the corresponding discharge slots 31; and the first lifting module 5 is used to lift the carrier 112 from the carrier platform 111, and is located below the first assembly plate 3. More specifically, referring to Figure 4 As shown, the first lifting module 5 includes a first lifting cylinder 51 and a first push block 52 driven by the first lifting cylinder 51 to move up and down along the z-axis.
[0063] Reference Figure 2 and Figure 5As shown, the first assembly plate 3 has a first positioning portion 32 extending downward, and the carrier 112 has a second positioning portion 6 extending upward, and the first positioning portion 32 and the second positioning portion 6 can be engaged with each other and at least one of them has a positioning guide inclined surface. Specifically, the first positioning portion 32 is a positioning guide pin, and the positioning guide pin has an inclined conical surface 321, and the second positioning portion 6 is a positioning guide hole for the positioning guide pin to be inserted, and the positioning guide hole has an inclined hole wall 61. The above-mentioned positioning guide inclined surface is the conical surface 321 and the hole wall 61. Since the first positioning portion 32 and the second positioning portion 6 both have a conical structure, under the guidance of the conical surface, as the carrier 112 is lifted, the positioning guide pin is gradually inserted into the positioning guide hole to achieve positioning, and the top cover sheet on the carrier 112 is accurately positioned so that its pole assembly part is directly opposite to the discharge trough 31 above. The positioning guide pin is arranged on the first assembly plate 3 so that it can move up and down, and a buffer spring (not shown in the figure) is arranged between the first assembly plate 3 and the positioning guide pin. The buffer spring can prevent the carrier 112 or the top cover sheet 100 from being damaged when the thrust of the first lifting cylinder 51 is large, thereby providing buffering.
[0064] The carrier platform 111 has a connecting pin 116 extending upward (eg Figure 5 As shown), the carrier 112 has a matching connection slot 1122 (as shown Figure 2 As shown), the connecting pin 116 can be detachably inserted into the connecting groove 1122. When the carrier 112 is placed on the carrier platform 111, the connecting pin 116 is inserted into the connecting groove 1122 to position the carrier 112 and limit the carrier 112 so that it cannot be offset in the horizontal direction; when the carrier 112 is lifted up until the connecting pin 116 is detached from the connecting groove 1122, the carrier 112 can be fine-tuned in the horizontal direction under the action of the positioning guide pins of the first assembly plate 3, and the alignment accuracy of the top cover sheet 100 on the carrier 112 and the pole 200 to be assembled is adjusted. After precise alignment is achieved, the pole is discharged. Specifically, the number of positioning guide holes and connecting grooves 1122 on the carrier 112 is multiple, at least two positioning guide holes are located at opposite corners, and at least two connecting grooves 1122 are located at opposite corners.
[0065] Combination Figure 3 , Figure 4 and Fig.11As shown, the conveying mechanism 11 includes a slide 113 and a slide rail 119 that can move along the x-axis. The slide 113 can be movably arranged on the slide rail 119 along the x-axis. The slide 113 is provided with a rack 118 and a gear 117 extending along the x-axis. The rack 118 and the gear 117 are meshed with each other. The gear 117 is driven to rotate by the conveying motor, so that the slide 113 moves along the x-axis under the cooperation of the gear 117 and the rack 118. The carrier platform 111 has an inner side 114 and an outer side 115. The inner side 114 is fixedly connected to the slide 113 by bolts, and the outer side 115 is suspended and the carrier 112 is placed on the outer side 115. The outer side 115 is provided with a through hole, and the carrier 112 has a boss 1121 extending downward and capable of passing through the through hole to the bottom of the carrier platform 111. The conveying mechanism also includes a turntable located at two ends, and a part of the slide rail is located on the turntable. When the carrier platform moves along the slide rail to the turntable, the turntable rotates 180 degrees to achieve rotation, and the carrier platform moves in the opposite direction along the x-axis along the other slide rail.
[0066] The pole assembly mechanism 14 has a first working state and a second working state. In the first working state, the carrier 112 is located on the carrier platform 111, and the carrier 112 is located at a distance below the first assembly plate 3; in the second working state, under the action of the first lifting cylinder 51, the first push block 52 pushes the boss 1121 to move upward, and the carrier 112 is separated from the carrier platform 111, and the first positioning portion 32 and the second positioning portion 6 are engaged with each other so that the discharge trough 31 is opposite to the pole installation part of the top cover plate 100 on the carrier 112. At this time, the above-mentioned spring is in a compressed state.
[0067] Reference Figure 3 As shown, the first assembly plate 3 is also provided with a plurality of positioning sleeves 33 for positioning the pole 200, and the positioning sleeves 33 and the discharge trough 31 are arranged at intervals along the x-axis. The pole assembly mechanism 14 also includes a plurality of material picking suction cups 7, and the discharge trough 31, the positioning sleeves 33, the assembly suction cups 4 and the material picking suction cups 7 are arranged in pairs. The material picking suction cups 7 can be independently movably arranged along the y-axis and the z-axis on the first bracket 2 to transfer the pole 200 on the pole feeding belt to the positioning sleeves 33. Each assembly suction cup 4 can be synchronously movably arranged on the first bracket 2 along the y-axis and the z-axis to transfer the pole 200 from the positioning sleeve 33 to the discharge groove 31. The assembly suction cup 4 has an adsorption surface 41. The shape and size of the adsorption surface 41 match the pole 200. When the suction cup 4 sucks the pole 200 out of the sleeve 33, the pole can be directly released to pass through the discharge groove 31 and fall into the pole installation part of the top cover sheet 100 without the need to re-position the pole 200.
[0068] The conveying mechanism 11 includes a plurality of carrier platforms 111, and at least one carrier 112 is placed on each carrier platform 111. In this embodiment, two carriers 112 are placed on each carrier platform 111. The pole assembly welding device can synchronously realize the pole assembly welding of two top cover sheets, thereby improving production efficiency.
[0069] The sealing ring assembly mechanism 13 includes: a second bracket 131 ; a second assembly plate 132 ; a material discharge suction cup 133 ; and a second lifting module 134 .
[0070] Furthermore, the second assembly plate 132 is disposed on the second bracket 131, and a sealing ring groove 1321 is provided on the second assembly plate 132 for the sealing ring to pass through, and the sealing ring groove 1321 passes through the second assembly plate 132 along the z-axis; the discharge suction cup 133 is used to put the sealing ring into the discharge groove 31; the second lifting module 134 is used to lift the carrier 112 from the carrier platform 111, and the second lifting module 134 is located below the second assembly plate 132. Among them, the second assembly plate 132 has a third positioning portion 1322 extending downward, and the third positioning portion 1322 and the second positioning portion 6 can be engaged with each other and at least one of them has a positioning guide inclined surface. Specifically in this embodiment, refer to Figure 2 and Fig. 9 As shown, the third positioning portion 1322 is a positioning cone pin, and the positioning cone pin has an inclined cone surface 321. The second positioning portion 6 is a positioning guide hole for the positioning cone pin to be inserted, and the positioning guide hole has an inclined hole wall 61. The positioning guide inclined surface includes the cone surface 321 and the hole wall 61. The positioning cone pin is arranged on the second assembly plate 132 so as to be movable up and down. A buffer spring (not shown in the figure) is arranged between the second assembly plate 132 and the positioning cone pin. The function of the buffer spring is the same as that described above, and will not be repeated here.
[0071] The second lifting module 134 includes a second lifting cylinder 1341 and a second push block 1342 driven by the second lifting cylinder 1341 to move up and down along the z-axis. The sealing ring assembly mechanism 13 has a third working state and a fourth working state. In the third working state, the carrier 112 is located on the carrier platform 111, and the carrier 112 is located a distance below the second assembly plate 132; in the fourth working state, the second lifting cylinder 1341 drives the second push block 1342 to push the boss 1121 to move upward, and the carrier 112 is separated from the carrier platform 111. The third positioning portion 1322 and the second positioning portion 6 are engaged with each other so that the sealing ring groove 1321 is directly opposite to the pole mounting position of the top cover plate on the carrier 112.
[0072] Reference Fig.12 As shown, this embodiment also provides a pole assembly welding method for a power battery cover plate, using the pole assembly welding device 1 mentioned above, the pole assembly welding method includes a pole assembly step, and the pole assembly step specifically includes:
[0073] S101, the carrier platform 111 moves, so that the carrier 112 carries the top cover sheet 100 and enters below the first assembly plate 3;
[0074] S102, when it is detected that the carrier 112 enters below the first assembly plate 3, the first lifting module 5 is actuated to lift the carrier 112 from the carrier platform 111, and under the action of the guiding slope, the first positioning portion 32 and the second positioning portion 6 are engaged to accurately position the carrier 112, so that the pole assembly part of the top cover sheet 100 on the carrier 112 is facing the discharge groove 31 of the first assembly plate 3;
[0075] S103 , the assembly suction cup 4 puts the pole 200 into the discharge trough 31 , and the pole 200 falls from the discharge trough 31 into the pole assembly position of the top cover sheet 100 .
[0076] More specifically, in step S102, the first lifting cylinder 51 drives the first pushing block 52 to push the boss 1121, and lifts the carrier 112 from the carrier platform 111. The positioning guide slope includes the conical surface 321 of the first positioning portion 32 and the inclined hole wall 61 of the second positioning portion 6. Under the action of the positioning guide slope, the first positioning portion 32 and the second positioning portion 6 are engaged to accurately position the carrier 112. After the assembly suction cup 4 puts the pole into the discharge trough 31, the pole will accurately fall into the pole assembly position of the top cover sheet; in step S103, the material picking suction cup 7 moves down to pick up the pole 200 on the pole feeding belt and puts it into the positioning sleeve 33 to position the pole 200. The assembly suction cup 4 puts the positioned pole 200 in the positioning sleeve 33 into the discharge trough 31.
[0077] Reference Figure 2 and Figure 3 As shown, two carriers 112 are placed on each carrier platform 111, and a top cover sheet 100 is placed on each carrier 112. Each top cover sheet 100 has two mounting positions for positive and negative poles. In step S103, after the first pair of material taking suction cups 7 remove a pair of positive and negative poles, the second pair of material taking suction cups 7 remove another pair of positive and negative poles, and then move synchronously to the top of the two pairs of positioning sleeves 33, and the two pairs of assembly suction cups 4 move synchronously to the top of the two pairs of material discharging troughs 31.
[0078] Reference Fig.13 As shown, the pole assembly welding method includes a sealing ring assembly step. Each top cover sheet 100 performs the sealing ring assembly step and then performs the pole assembly step. The sealing ring assembly step specifically includes:
[0079] S201, the carrier platform 111 moves, so that the carrier 112 carrying the top cover sheet 100 enters below the second assembly plate 132;
[0080] S202, when it is detected that the carrier 112 enters below the second assembly plate 132, the second lifting module 134 is actuated to lift the carrier 112 from the carrier platform 111. Under the action of the guiding slope, the third positioning portion 1322 and the second positioning portion 6 are engaged to accurately position the carrier 112, so that the pole assembly portion of the top cover sheet on the carrier 112 is aligned with the sealing ring groove 1321 of the second assembly plate 132;
[0081] S203 , the discharge suction cup 133 puts the sealing ring into the sealing ring groove 1321 , and the sealing ring falls into the pole assembly position of the top cover plate 100 from the sealing ring groove 1321 .
[0082] More specifically, in step S202, when it is detected that the carrier 112 enters under the second assembly plate 132, the second lifting cylinder 1341 drives the second push block 1342 to push the boss 1121 to move upward, thereby lifting the carrier 112 from the carrier platform 111, and the conical surface 321 on the third positioning portion 1322 and the inclined hole wall 61 engage to accurately position the carrier 112. After the discharge suction cup 133 puts the sealing ring into the sealing ring groove 1321, the sealing ring can accurately fall into the pole assembly position of the top cover plate.
[0083] The pole assembly welding device 1 in this embodiment comprises a pole assembly mechanism 14 and a sealing ring assembly mechanism 13 . The pole assembly is performed after the sealing ring assembly of each top cover sheet 100 . During the conversion of the pole assembly mechanism 14 from the first working state to the second working state, the first lifting cylinder 51 drives the first pushing block 52, and the first pushing block 52 pushes the boss 1121 to lift the carrier 112 from the carrier platform 111, and the conical surface 321 and the hole wall 61 cooperate to accurately position the carrier 112, which ensures that the assembly suction cup 4 can accurately drop the positioned pole 200 into the pole assembly part of the top cover sheet after placing it into the discharge groove 31; during the conversion of the sealing assembly mechanism 13 from the third working state to the fourth working state, the second lifting cylinder 1341 drives the second pushing block 1342, and the second pushing block 1342 pushes the boss 1121 to move upward, and the carrier 112 is lifted from the carrier platform 111, and the third positioning portion 1322 and the second positioning portion 6 cooperate to accurately position the carrier 112, which ensures that the discharge suction cup 133 can accurately drop the sealing ring into the sealing ring groove 1321 and fall into the pole assembly part of the top cover sheet. Therefore, the pole assembly welding equipment and method of this embodiment can improve the assembly accuracy and the yield rate of the power battery cover product after assembly.
[0084] As shown in this specification and claims, the terms "comprises" and "include" only indicate the inclusion of the steps and elements that have been clearly identified, and these steps and elements do not constitute an exclusive list, and the method or device may also include other steps or elements. The term "and / or" as used herein includes any combination of one or more of the relevant listed items.
[0085] It should be noted that, unless otherwise specified, when a feature is referred to as being "fixed" or "connected" to another feature, it can be directly fixed or connected to the other feature, or it can be indirectly fixed or connected to the other feature. In addition, the descriptions of up, down, left, right, etc. used in the present invention are only relative to the relative positional relationship of the components of the present invention in the accompanying drawings. Figure 1 .
[0086] It is further understood that in the present disclosure, "plurality" refers to two or more than two, and other quantifiers are similar. "And / or" describes the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone.
[0087] It is further understood that the terms "first", "second", etc. are used to describe various information, but such information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other, and do not indicate a specific order or degree of importance. In fact, the expressions "first", "second", etc. can be used interchangeably. For example, without departing from the scope of the present disclosure, the first information can also be referred to as the second information, and similarly, the second information can also be referred to as the first information.
[0088] The above embodiment is only for illustrating the technical concept and features of the present invention, and is a preferred embodiment. Its purpose is to enable people familiar with the technology to understand the content of the present invention and implement it accordingly, and it cannot be used to limit the protection scope of the present invention. Any equivalent transformation or modification made according to the principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A pole assembly welding device for a power battery cover plate, comprising a conveying mechanism and a top cover sheet feeding mechanism, a sealing ring assembly mechanism, a pole assembly mechanism, and a welding mechanism sequentially arranged along the conveying mechanism, characterized in that: The conveying mechanism includes a carrier platform that can move along the x-axis through the pole assembly mechanism and a carrier carrying a top cover sheet, and the carrier can be placed on the carrier platform so as to be movable along the z-axis; The pole assembly mechanism comprises: First bracket; A first assembly plate, which is arranged on the first bracket, and the first assembly plate is provided with a discharge groove for the pole to pass through, and the discharge groove passes through the first assembly plate along the z-axis; Assembling a suction cup, which is used to place the pole into the discharge trough; and A first lifting module, which is used to lift the carrier from the carrier platform, and the first lifting module is located below the first assembly plate; Wherein, the first assembly plate has a first positioning portion extending downward, the carrier has a second positioning portion extending upward, the first positioning portion and the second positioning portion can be engaged with each other and at least one of them has a positioning guide slope; The pole assembly mechanism has a first working state and a second working state. In the first working state, the carrier is located on the carrier platform, and the carrier is located a distance below the first assembly plate; in the second working state, the carrier is separated from the carrier platform, and the first positioning portion and the second positioning portion are engaged with each other so that the discharge groove is directly opposite to the pole installation part of the top cover sheet on the carrier; The first assembly plate is also provided with a positioning sleeve for positioning the pole, the positioning sleeve and the discharge trough are arranged at intervals along the x-axis, the assembly suction cup can be movably arranged on the first bracket along the y-axis to transfer the pole from the positioning sleeve to the discharge trough, and the assembly suction cup has an adsorption surface that matches the pole; the pole assembly mechanism also includes a material taking suction cup, which can be movably arranged on the first bracket along the y-axis to transfer the pole on the pole feeding belt into the positioning sleeve; During assembly, the pole is transferred by the material taking suction cup to the positioning sleeve for positioning. The material taking suction cup takes out the positioned pole in the positioning sleeve and directly releases it to pass through the discharge trough and fall into the pole installation part of the top cover sheet on the carrier.
2. The pole assembly welding equipment according to claim 1, characterized in that: The material discharge trough, the positioning sleeve, the assembly suction cup and the material picking suction cup are arranged in pairs, each of the assembly suction cups can be synchronously movably arranged on the first bracket along the y-axis and the z-axis, and each of the material picking suction cups can be independently movably arranged on the first bracket along the y-axis and the z-axis.
3. The pole assembly welding equipment according to claim 1, characterized in that: The first positioning portion is a positioning guide pin having an inclined conical surface, the second positioning portion is a positioning guide hole for inserting the positioning guide pin, the positioning guide hole having an inclined hole wall, and the positioning guide slope includes the conical surface and the hole wall.
4. The pole assembly welding equipment according to claim 3, characterized in that: The positioning guide pin is arranged on the first assembly plate so as to be movable up and down, and a buffer spring is arranged between the first assembly plate and the positioning guide pin.
5. The pole assembly welding equipment according to claim 1, characterized in that: The conveying mechanism includes a slide that can move along the x-axis, the carrier platform has an inner part fixedly connected to the slide and an outer part suspended, and the carrier is placed on the outer part; a through hole is provided on the outer part, and the carrier has a downwardly extending boss that can pass through the through hole to the bottom of the carrier platform; the first lifting module includes a first lifting cylinder and a first push block driven by the first lifting cylinder to move up and down along the z-axis, and when the pole assembly mechanism is in the second working state, the first push block is pressed against the boss.
6. The pole assembly welding equipment according to claim 5, characterized in that: The carrier platform has a connecting pin extending upward, and the carrier has a connecting slot, and the connecting pin is detachably inserted into the connecting slot.
7. The pole assembly welding equipment according to claim 1, characterized in that: The conveying mechanism includes a plurality of carrier platforms, each of which is provided with at least one carrier; the sealing ring assembly mechanism includes: Second bracket; A second assembly plate, which is disposed on the second bracket, and a sealing ring groove is provided on the second assembly plate for the sealing ring to pass through, and the sealing ring groove passes through the second assembly plate along the z-axis; A discharge suction cup, which is used to place the sealing ring into the discharge trough; and A second lifting module, which is used to lift the carrier from the carrier platform, and the second lifting module is located below the second assembly plate; Wherein, the second assembly plate has a third positioning portion extending downward, the third positioning portion and the second positioning portion can be engaged with each other and at least one of them has a positioning guide slope; The sealing ring assembly mechanism has a third working state and a fourth working state. In the third working state, the carrier is located on the carrier platform, and the carrier is located a distance below the second assembly plate. In the fourth working state, the carrier is detached from the carrier platform, and the third positioning portion and the second positioning portion are engaged with each other so that the sealing ring groove is opposite to the pole mounting portion of the top cover plate on the carrier.
8. The pole assembly welding equipment according to claim 7, characterized in that: The third positioning portion is a positioning cone pin, and the positioning cone pin has an inclined cone surface. The second positioning portion is a positioning guide hole for the positioning cone pin to be inserted, and the positioning guide hole has an inclined hole wall, and the positioning guide inclined surface includes the cone surface and the hole wall; the positioning cone pin is movably arranged on the second assembly plate, and a buffer spring is arranged between the second assembly plate and the positioning cone pin; a through hole is arranged on the carrier platform, and the carrier has a boss extending downward and can pass from the through hole to the bottom of the carrier platform. The second lifting module includes a second lifting cylinder and a second push block driven by the second lifting cylinder to move up and down along the z-axis, and when the pole assembly mechanism is in the fourth working state, the second push block is pressed against the boss.
9. A method for assembling and welding a pole of a power battery cover, characterized in that: Using the pole assembly welding equipment according to claim 1, the pole assembly welding method includes a pole assembly step, and the pole assembly step specifically includes: S101, the carrier platform moves, so that the carrier carries the top cover sheet and enters under the first assembly plate; S102, when it is detected that the carrier enters below the first assembly plate, the first lifting module is actuated to lift the carrier from the carrier platform, and under the action of the guiding slope, the first positioning part and the second positioning part are engaged to accurately position the carrier, so that the pole assembly part of the top cover sheet on the carrier is aligned with the discharge groove of the first assembly plate; S103, assembling the suction cup to place the pole into the discharge trough, and the pole falls from the discharge trough into the pole assembly position of the top cover piece.
10. The pole assembly welding method according to claim 9, characterized in that: The first assembly plate is also provided with a positioning sleeve for positioning the pole, and the pole assembly mechanism also includes a material picking suction cup. In step S103, the material picking suction cup moves downward to pick up the pole on the pole feeding belt and puts it into the positioning sleeve to position the pole, and the assembly suction cup puts the positioned pole in the positioning sleeve into the discharge trough.
11. The pole assembly welding method according to claim 9, characterized in that: Two carriers are placed on each carrier platform, and a top cover plate is placed on each carrier, and each top cover plate has two mounting positions for positive and negative poles; in step S103, after the first pair of material picking suction cups move down to pick up a pair of positive and negative poles, the second pair of material picking suction cups move down to pick up another pair of positive and negative poles, and then move synchronously to above the two pairs of positioning sleeves; the two pairs of assembly suction cups move synchronously to above the two pairs of material discharge troughs.
12. The pole assembly welding method according to claim 9, characterized in that: The pole assembly welding method includes a sealing ring assembly step, and each top cover sheet is subjected to the sealing ring assembly step before the pole assembly step, and the sealing ring assembly step specifically includes: S201, the carrier platform moves, so that the carrier carries the top cover sheet and enters under the second assembly plate; S202, when it is detected that the carrier enters under the second assembly plate, the second lifting module is actuated to lift the carrier from the carrier platform, and under the action of the guiding slope, the third positioning part and the second positioning part are engaged to accurately position the carrier, so that the pole assembly part of the top cover sheet on the carrier is aligned with the sealing ring groove of the second assembly plate; S203, the discharge suction cup puts the sealing ring into the sealing ring groove, and the sealing ring falls from the sealing ring groove into the pole assembly position of the top cover plate.