A method of AGC speed-up control based on variable speed operation of coal mill

By using variable speed direct drive permanent magnet motor to drive the coal mill in the powder making system, combined with the real-time control logic of DCS, the problem of slow response speed of traditional powder making systems is solved, and faster coal powder output adjustment and boiler response are achieved. , improves the response capability of AGC instructions.

CN115421526BActive Publication Date: 2024-11-08ZHEJIANG ZHENENG TECHN RES INST CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202211050313.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-31
Publication Date
2024-11-08
Estimated Expiration
2042-08-31

AI Technical Summary

Technical Problem

In traditional powder making systems, the coal mill uses asynchronous motors that operate in power frequency, which leads to a slow response speed of the boiler during variable loading, and the change in the output of the powder making system lags, affecting the AGC operating performance of the unit.

Method used

The coal mill is driven by a variable speed direct drive permanent magnet motor, and the coal mill speed is adjusted in real time through the dispersion control system (DCS), and the variable speed powder making system instructions are generated to reasonably allocate coal volume changes, and reduce the response delay of the powder making process. Improve boiler response speed.

Benefits of technology

Through the application of variable speed coal mill, the response delay of the powder making system during variable load is significantly reduced, the response speed of the boiler and the unit's response ability to AGC instructions are improved, and the overall load change rate is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115421526B_ABST
    Figure CN115421526B_ABST
Patent Text Reader

Abstract

The present invention relates to a speed-up control method based on the variable speed operation AGC of a coal mill, comprising: a DCS calculates and generates a coal feeding quantity instruction of the unit according to the current unit load instruction and operation requirements, and performs variable speed control on the variable speed coal mill. The beneficial effects of the present invention are as follows: the present invention adopts a variable speed coal mill, uses a frequency converter to adjust the motor speed, realizes the variable speed control of the coal mill, and through the configuration method of the number of variable speed coal mills and the corresponding control logic, gives full play to the response speed advantage of the variable speed pulverizing system during operation, reasonably distributes the change of coal quantity and cooperates with the real-time adjustment of the coal mill speed, reduces the response delay of the pulverizing link during the variable load process, and improves the speed of boiler response and the response capability of the unit AGC instruction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of thermal power generation, and more specifically, to an AGC speed-up control method based on the variable speed operation of a coal mill. Background Art

[0002] As an important part of boiler equipment, the pulverizing system is mainly responsible for grinding coal powder and providing fuel for boiler combustion. The pulverizing system is mainly composed of raw coal bunker, coal feeder, coal mill, air duct and powder pipe for conveying coal powder, and other related auxiliary equipment. A thermal power unit is often equipped with multiple pulverizing systems. At present, coal mills are mostly driven by asynchronous motors running at industrial frequency. Their speed is obtained by checking the designed coal type during the capital construction stage of the power plant. After that, no matter how the coal type changes, the coal mill motor will run at a fixed frequency.

[0003] Under the existing technology, the output of the pulverizing system needs to be adjusted in real time during the load change process. The output of the pulverizing system needs to go through several links, such as the increase or decrease of coal supply, pulverizing, pulverizing, and combustion. The response speed of the boiler output is affected by the lag time of these links. Among them, when the coal amount changes, the pulverizing system is most affected by the lag of the actual pulverizing output change in the pulverizing link, which has a greater impact on the speed of boiler response.

[0004] In order to ensure the power supply quality requirements of the power grid, the power grid dispatching agency implements automatic generation control (AGC) on the thermal power turbine units connected to the grid, and at the same time puts forward control requirements for the AGC command response rate, response time and control accuracy of the thermal power units.

[0005] Each system of the unit is controlled in real time by the Distributed Control System (DCS). The DCS processes the received AGC load instruction by limiting the amplitude and speed, generates the unit load instruction and the main steam pressure set value, and then compares it with the unit's real-time power and real-time pressure, adjusts the boiler fuel quantity, air supply volume and feed water flow, thereby changing the boiler output to meet the turbine's work requirements; at the same time, the DCS controls the turbine speed regulating valve opening to change the turbine output and thus adjust the unit's power generation. The DCS coordinates the energy supply and demand balance between the boiler and the turbine, adjusts the unit output in real time, and responds to the AGC instruction.

[0006] The traditional pulverizing system is driven by an asynchronous motor running at industrial frequency. The speed cannot be adjusted during operation. When the coal feed rate changes, the inertial characteristics of the pulverizing link will lead to a slow change in the actual output of the boiler, and the inertia time T of the system is relatively long. At the same time, in the initial stage of coal quantity change, since the pulverizer speed remains unchanged, the change in coal quantity will cause the change in the internal air duct resistance of the pulverizer, and the retention time τ of the coal powder in the pipeline is also relatively long. It may even happen that the actual pulverizing amount in the initial stage of coal quantity adjustment changes in the opposite direction to the instruction demand. The superposition of the above two factors will cause a lag in the actual pulverizing amount change of the pulverizing system, which will lead to a slow overall response speed on the boiler side and affect the overall AGC operation performance of the unit. Summary of the invention

[0007] The purpose of the present invention is to overcome the deficiencies in the prior art and to provide an AGC speed-up control method based on the variable speed operation of a coal mill.

[0008] In a first aspect, an AGC speed-up control method based on a coal mill variable speed operation is provided, comprising:

[0009] S1. The dispatching agency issues an AGC instruction, and the generator set instruction receiving device receives the automatic generation control AGC instruction issued by the dispatching agency;

[0010] S2. Send the AGC command to the DCS; the DCS calculates and generates the coal feeding quantity command of the unit according to the current unit load command and operation requirements; generates the fixed speed pulverizing system command and the variable speed pulverizing system command according to the coal feeding quantity command, and sends them to each coal feeder;

[0011] S3, after receiving the corresponding instruction, the coal feeder changes the coal feeding amount and sends the coal to the coal mill for coal powder grinding; wherein, the DCS controls the speed of the variable speed coal mill;

[0012] S4. After the load variation process is completed and the coal quantity is stable, the coal quantity is stabilized at the new load corresponding value, and the speed of the variable speed coal mill returns to the normal value.

[0013] Preferably, in S2, the DCS generates a boiler load reference coal quantity instruction according to the AGC instruction change and the adjustment amount of the boiler master control PID; and the boiler dynamic feedforward coal quantity instruction is generated from the AGC instruction through inertia differential calculation and feedforward correction.

[0014] Preferably, in S2, the variable speed pulverizing system is open-loop controlled, and the coal feed amount corresponding to the instruction is the sum of the reference coal amount and the dynamic feedforward coal amount. The reference coal amount is generated by a step control curve with a dead zone, and the dynamic feedforward coal amount is generated by dividing the boiler dynamic feedforward coal amount instruction by the number of variable speed pulverizing systems in operation.

[0015] Preferably, in S2, a manual bias function is provided on the generation loop of the variable speed milling system instruction.

[0016] Preferably, in S2, the constant speed pulverizing system is in closed loop control, and the instruction is a total coal quantity instruction synthesized from the boiler load reference coal quantity instruction and the boiler dynamic feedforward coal quantity instruction.

[0017] Preferably, the method for selecting the number of variable speed pulverizing systems includes: obtaining the boiler response speed improvement A% that can be achieved by using a single variable speed coal mill in a certain type of unit, and taking the load change rate that can be achieved when all units are operated with fixed speed coal mills as a benchmark. The calculation formula for the number of variable speed pulverizing systems is as follows:

[0018] The number of variable speed pulverizing systems configured = (load change rate expected to be achieved by the unit - reference load change rate) / (reference load change rate × A%).

[0019] Preferably, in S3, the DCS performs variable speed control on the variable speed coal mill, including:

[0020] S301, when the AGC instruction is stable and the unit load is not changed, the DCS controls the variable speed coal mill according to the load instruction requirements, and the speed of the variable speed coal mill is maintained at the normal speed;

[0021] S302. When the AGC instruction changes, the DCS limits the instruction change and the speed, and then determines the AGC instruction state as a load increase instruction or a load reduction instruction; for the load increase instruction, the DCS controls the speed of the variable speed coal mill to run at a high speed gear; for the load reduction instruction, the DCS controls the speed of the variable speed coal mill to run at a low speed gear.

[0022] In a second aspect, a variable speed pulverizing system is provided, which is applied to any of the equipment selection and AGC speed-up control methods based on the variable speed operation of the coal mill described in the first aspect, comprising: a raw coal hopper, a coal feeder, a coal mill, a motor, a frequency converter, a DCS, a command receiving device and a dispatching mechanism;

[0023] Among them, the raw coal hopper, coal feeder, coal mill, motor and frequency converter are connected in sequence, the coal mill is also connected to the furnace through a pipeline, and the frequency converter is also connected to the dispatching agency through DCS and command receiving device in sequence.

[0024] Preferably, the motor is a variable speed direct drive permanent magnet motor.

[0025] The beneficial effects of the present invention are as follows: the present invention adopts a variable speed coal mill, uses a frequency converter to adjust the motor speed, realizes variable speed control of the coal mill, and through a variable speed coal mill number configuration method and corresponding control logic, fully utilizes the response speed advantage of the variable speed pulverizing system during operation, reasonably distributes the change in coal quantity and coordinates the real-time adjustment of the coal mill speed, reduces the response delay of the pulverizing link during the load change process, and improves the boiler response speed and the response capability of the unit AGC command. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 A schematic diagram of the variable speed milling system structure provided for this application;

[0027] Figure 2 Schematic diagram of the unit configuration provided for this application;

[0028] Figure 3 Schematic diagram of the unit variable load coal quantity control process provided for this application;

[0029] Figure 4 AGC instruction processing and variable load state judgment logic diagram provided for this application;

[0030] Figure 5 Coal mill speed control logic diagram provided for this application;

[0031] Figure 6 A logic diagram for generating boiler coal quantity instructions provided for this application;

[0032] Figure 7 A schematic diagram of a benchmark coal quantity generation curve for a variable speed pulverizing system provided in this application;

[0033] Figure 8 Generate logic diagram for variable speed milling system instructions provided by this application;

[0034] Fig. 9 A logic diagram for generating instructions for a constant speed milling system provided in this application;

[0035] Fig.10 A schematic diagram of the curve of changes in command and coal quantity during the load change process provided for this application;

[0036] Explanation of the reference numerals: raw coal hopper 1, coal feeder 2, coal mill 3, motor 4, frequency converter 5, DCS 6, instruction receiving device 7, dispatching mechanism 8, furnace 9. DETAILED DESCRIPTION

[0037] The present invention is further described below in conjunction with embodiments. The description of the following embodiments is only used to help understand the present invention. It should be noted that for ordinary persons in the art, without departing from the principle of the present invention, the present invention can also be modified in some ways, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

[0038] Embodiment 1:

[0039] A variable speed milling system, such as Figure 1 As shown, it includes: a raw coal hopper 1, a coal feeder 2, a coal mill 3, a motor 4, a frequency converter 5, a DCS 6, a command receiving device 7 and a dispatching mechanism 8;

[0040] Among them, the raw coal hopper 1, the coal feeder 2, the coal mill 3, the motor 4 and the frequency converter 5 are connected in sequence, the coal mill 3 is also connected to the furnace 9 through a pipeline, the frequency converter 5 is also connected to the dispatching mechanism 8 through the DCS 6 and the instruction receiving device 7 in sequence, and the motor 4 is a variable speed direct drive permanent magnet motor. In addition, the variable speed pulverizing system also includes an air duct and a powder pipe for conveying coal powder.

[0041] The coal mill 3 is driven by a variable speed direct drive permanent magnet motor. The DCS 6 can control the motor speed through the inverter 5, thereby achieving real-time adjustment of the coal mill speed. The coal feed rate of the pulverizing system is adjusted by the DCS according to the dispatching AGC instructions and the unit status.

[0042] also, Figure 1 A in it represents an AGC instruction, and the instruction receiving device 7 sends the AGC instruction to DCS6; B represents a coal feeding amount instruction, and DCS6 calculates and generates the coal feeding amount instruction; C represents a coal mill speed instruction, which is generated by DCS6 and sent to the inverter 5; D represents other pulverizing system control instructions, which are used to control other devices in the pulverizing system; E represents an air volume instruction, which is used to control the air volume supplied to the coal mill 3 (such as cold primary air G and hot primary air H); F represents a unit operating parameter measurement signal, which is generated by the unit operating parameter measurement equipment, and the unit operating parameter measurement equipment is connected to DCS6.

[0043] Embodiment 2:

[0044] In order to reduce the impact of the lag in the pulverizing process on the variable load capacity of the boiler and improve the responsiveness of the thermal power generating set to the AGC command of the power grid, the present invention provides an equipment selection and AGC speed-up control method based on the variable speed operation of the coal mill, adopts a variable speed coal mill, uses a frequency converter to adjust the motor speed, and realizes the variable speed control of the coal mill. Through the configuration method of the number of variable speed coal mills and the corresponding control logic, the response speed advantage of the variable speed pulverizing system is fully utilized during the operation process, the change of coal quantity is reasonably allocated and the speed of the coal mill is adjusted in real time, the response delay of the pulverizing process in the variable load process is reduced, and the response speed of the boiler and the responsiveness of the unit AGC command are improved. Figure 3 As shown, including:

[0045] S1. The dispatching agency issues an AGC instruction, and the generator set instruction receiving device receives the automatic generation control AGC instruction issued by the dispatching agency;

[0046] S2, send the AGC command to the distributed control system DCS; DCS calculates and generates the unit's coal feeding command based on the current unit load command and operation requirements; generates the fixed speed pulverizing system command and the variable speed pulverizing system command based on the coal feeding command, and sends them to each coal feeder;

[0047] S3. After receiving the corresponding instructions, each coal feeder changes the coal feeding amount and sends the coal to the coal mill for coal powder grinding. Among them, DCS performs variable speed control on the variable speed coal mill. In other words, the speed control of the coal mill is changed at the same time during the process of changing the coal amount to speed up the response speed of the coal powder production output. The speed of the variable speed coal mill has a normal gear, a low speed gear and a high speed gear.

[0048] S4. After the load variation process is completed and the coal quantity is stable, the coal quantity is stabilized at the new load corresponding value, and the speed of the variable speed coal mill returns to the normal value.

[0049] In S3, DCS controls the speed of the variable speed coal mill, including:

[0050] S301, when the AGC instruction is stable and the unit load is not changed, the DCS controls the variable speed coal mill according to the load instruction requirements, and the speed of the variable speed coal mill is maintained at the normal speed;

[0051] S302: When the AGC command changes, the DCS performs amplitude and speed limiting on the command change and then determines the AGC command state as a load increase command or a load decrease command. For example, the logic diagram of command processing and judgment is as follows: Figure 4As shown, the ACG instruction is obtained through the subtraction function and the upper limit judgment to obtain the load increase instruction; the ACG instruction is obtained through the subtraction function and the lower limit judgment to obtain the load reduction instruction; the AGC instruction is obtained through the limit function and the speed limit function to obtain the processed AGC instruction. For the load increase instruction, the DCS controls the speed of the variable speed coal mill to run at the high speed gear (maximum speed); for the load reduction instruction, the DCS controls the speed of the variable speed coal mill to run at the low speed gear (minimum speed). Since the speed change of the coal mill will affect the maximum output of the pulverizing system, a minimum speed curve f(x) of the coal mill generated according to the coal amount of the coal feeder is set to prevent the pulverizing system from having insufficient output. The specific speed control logic is as follows Figure 5 As shown, > represents the lower limit function, M / A represents the manual operator station, a represents the coal feed rate of this pulverizing system, b represents the speed control signal of the coal mill, and T in the figure is the switching function mark, that is, when the switch signal represented by the dotted line is 1, the switching function module output is the YES terminal input, otherwise when the switch signal is 0, the switching function module output is the NO terminal input.

[0052] In S2, DCS generates the boiler load reference coal quantity instruction according to the AGC instruction change and the adjustment amount of the boiler main control PID; the boiler dynamic feedforward coal quantity instruction is generated by the AGC instruction through inertial differential calculation and feedforward correction. The coal quantity instruction generation logic is as follows: Figure 6 As shown, f(x) represents the coal quantity curve, c is the boiler main control PID adjustment amount, d is the AGC instruction after limiting the amplitude and speed, e is the variable load correction coefficient, f is the boiler load reference coal quantity instruction, g is the boiler dynamic feedforward coal quantity instruction, and LAG is the inertia lag link.

[0053] In S2, the coal feeding amount corresponding to the variable speed pulverizing system instruction is the sum of the reference coal amount and the dynamic feedforward coal amount. Its control strategy is designed as an open loop, and the reference coal amount is determined by a step control curve with a dead zone (such as Figure 7 The function is: variable speed pulverizing system base coal quantity = F((boiler load base coal quantity instruction - manual pulverizing system coal quantity) / number of automatic pulverizing systems in operation), and the dynamic feedforward coal quantity is generated by dividing the boiler dynamic feedforward coal quantity instruction by the number of variable speed pulverizing systems in operation. In addition, Figure 8 As shown, a manual bias function M / A (the M / A can be a hand controller for controlling the coal feed rate of the pulverizing system) can be set on the generation loop of the variable speed pulverizing system command, so that the operating personnel can adjust the output of the pulverizing system according to the actual working conditions. Figure 8In the formula, A represents the coal quantity bias, f1 represents the reference coal quantity instruction of the fixed speed pulverizing system, g represents the dynamic feedforward coal quantity instruction of the boiler, m represents the number of variable speed pulverizing systems in operation, ≯≮ represents the coal quantity limit, f(x) represents the coal quantity-coal feeder curve, and h represents the variable speed pulverizing system instruction. It should be noted that the variable speed pulverizing system instruction h in this method is obtained by adding the fixed speed pulverizing system instruction f1 to the dynamic feedforward coal quantity instruction.

[0054] In S2, the constant speed milling system command generation logic is as follows Fig. 9 As shown, for the constant speed pulverizing system, its main control goal is to gradually adjust its own output as the load changes, and at the same time compensate for the adjustment deviation caused by the open-loop regulation of the variable speed pulverizing system, and finally ensure that the actual total coal feedback is equal to the total coal instruction. Therefore, its control strategy is closed-loop control, and the instruction is the total coal instruction synthesized by the "boiler load benchmark coal instruction" and the "boiler dynamic feedforward coal instruction", and the feedback is the actual coal feed of each pulverizing system. PID control is used to adjust the output of each constant speed pulverizing system. For example, Fig. 9 In the formula, f is the boiler load reference coal quantity instruction, g is the boiler dynamic feedforward coal quantity instruction, and the two are combined into the boiler total coal quantity instruction, and combined with the total coal quantity feedback, the constant speed pulverizing system instruction i is formed through the PID controller and the fuel master hand operator M / A in sequence. In addition, Fig. 9 The total coal quantity feedback is the sum of the coal supply n1 of the A pulverizing system, the coal supply n2 of the B pulverizing system...the coal supply n6 of the F pulverizing system. The constant speed pulverizing system instruction i includes the instructions i1, i2...i6 corresponding to each constant speed pulverizing system.

[0055] The selection method of the number of variable speed coal milling systems includes: first, by conducting a variable speed coal mill boiler response characteristic test, the boiler response speed improvement range A% that can be achieved by using a single variable speed coal mill in a certain type of unit is obtained, and the load change rate that can be achieved when all units are operated with fixed speed coal mills is used as a benchmark, or the variable load rate specified in the power industry standard DL / T657-2015 "Acceptance Test Procedure for Analog Control Systems of Thermal Power Plants" and the regional power grid connection management regulations is used as a benchmark to calculate the number of variable speed coal mills that need to be configured. The calculation formula for the number of variable speed coal milling systems is as follows:

[0056] The number of variable speed pulverizing systems configured = (load change rate expected to be achieved by the unit - reference load change rate) / (reference load change rate × A%). For example, the unit configuration is as follows Figure 2 As shown, among them, the powder making system C and the powder making system D are variable speed powder making systems, and the rest are fixed speed powder making systems.

[0057] Embodiment 3:

[0058] When the unit receives the dispatching AGC instruction, the boiler needs to change the output according to the demand. The DCS adjusts the output of the pulverizing system after instruction processing and calculation. The change of the pulverizing system output can only be realized after a series of processes such as coal feed adjustment, coal mill pulverizing, coal pulverizing transportation and combustion. According to the modeling analysis of the mechanism model, the dynamic process of the pulverizing system can be described as a first-order inertia link with pure lag, as shown in the following formula:

[0059]

[0060] In the formula, τ is the pure lag time of the system, T is the inertia time of the system, and K is the gain coefficient of the system. The pure lag time τ of the system mainly includes the pure lag time of the adjustment of the coal feeder and the time that the coal powder stays in the pipeline, while the system inertia time T is the inertia time of the coal mill grinding, and the gain coefficient K represents the ratio of the change in coal volume to the change in the final boiler output.

[0061] According to the mathematical model of the pulverizing system, if the amount of coal in the pulverizing system changes, adjusting the pulverizer speed by using the characteristics of the variable speed pulverizer will have a favorable effect on the pure lag time τ and inertia time T of the system. In the early stage of increasing the output, due to the lag of the coal feeder, the amount of coal in the pulverizer did not change in the initial stage. At this time, by increasing the speed of the pulverizer, the stored coal in the pulverizer is quickly ground into coal powder, and the increase in the primary air volume is simultaneously used to quickly convert the stored coal into coal powder and blow it into the furnace, reducing the pure lag time τ of the system; after the actual amount of coal entering the pulverizer increases, the pulverizer speed will increase after the speed adjustment, and its efficiency in grinding coal powder will be improved, so the overall inertia time T of the pulverizing system will also be shortened. Using the same means in the process of reducing output will have a similar effect. The test results on a 660MW unit show that when the coal feed rate is increased by 5t / h, the synchronous speed adjustment of the coal mill increases from 24r / min to 31r / min, which reduces the pure lag time by 60s, about 50%; the system inertia time is reduced by about 40s, about 20%; and the overall response time can be reduced by about 30%. This shows that it is feasible to use this solution to improve the load response rate of the unit.

[0062] Embodiment 4:

[0063] The overall structure diagram of the flour making system is as follows: Figure 1As shown in the figure, the device is mainly composed of a frequency converter, a direct-drive permanent magnet motor, a coal mill, a raw coal hopper, a coal feeder, an air duct and a powder pipe for conveying coal powder, a distributed control system (DCS), equipment for receiving dispatching AGC instructions, and related regulating valves and measuring equipment. Among them, the fixed-speed coal mill is transformed into an adjustable-speed coal mill. The DCS controls the speed of the permanent magnet motor through the frequency converter, thereby realizing the dynamic adjustment of the coal mill speed. The coal feeding amount of the pulverizing system is adjusted by the DCS according to the dispatching AGC instructions, the unit status, and the different characteristics of the pulverizing system.

[0064] The implemented unit is a 660MW supercritical thermal power unit, equipped with six pulverizing systems, and pre-achieved AGC speed-up. Before the transformation, the unit's load change rate was about 8MW / min. After the transformation, it is hoped that the unit's load change rate will reach 12MW / min. The application of a single variable-speed coal mill on this type of unit can improve the boiler response capacity by about 25%. According to the equipment selection method in the present invention, the required number of variable-speed pulverizing systems can be calculated as follows: (12MW / min-8MW / min) / (8MW / min×25%)=2. Therefore, 2 pulverizing systems were finally selected to be transformed into variable-speed coal mills, as shown in the schematic diagram. Figure 2 As shown in the figure (variable speed coal mills are used for C and D pulverizing systems). During the load change process, the speed of these two coal mills will be adjusted in accordance with the change in coal quantity to speed up the response speed of the pulverizing system and the boiler. At the same time, in order to utilize the rapid response characteristics of the variable speed coal mill, the coal quantity between the conventional pulverizing system and the variable speed pulverizing system is reasonably allocated during load change to achieve an overall improvement in the load response capability of the coal mill.

[0065] Combine the following Fig.10 The working principle of the present invention is explained. The above-mentioned unit converted the C and D pulverizing systems into variable-speed coal mills, and the other 4 pulverizing systems were fixed-speed coal mills. On a certain day, the unit was operating at a load of 500MW, and a total of 5 pulverizing systems A, B, C, D, and E were in operation. The total coal feed of the unit was 196t / h, and the output of each pulverizing system was 39.4t / h. The normal speed of the variable-speed coal mill was 24r / min, the maximum speed was 31r / min, and the minimum speed was 18r / min; the upper limit of the output of each pulverizing system was 52t / h. At a certain moment, the unit received an AGC instruction from 500MW to 550MW, and the load change rate was 12MW / min. DCS uses the control strategy proposed in the present invention to control the coal quantity and coal mill speed. During the load change process, the unit load instruction, the total coal quantity instruction, and the coal quantity instruction of each pulverizing system change as follows Fig.10 shown.

[0066] like Fig.10As shown in the figure, after the unit receives the AGC command at time T0 (curve 1), the DCS processes the command according to the relevant logic, generates the AGC command after limiting the amplitude and speed (curve 2), and at the same time determines the load increase signal to adjust the speed of the variable speed coal mill (curve 8), from the conventional 24r / min to the maximum speed of 31r / min; in the process of load command increase, according to the amplitude, rate and unit operating parameters of the load change, the dynamic feedforward coal quantity command (curve 5, the peak value is about 19.5t / h) and the load reference coal quantity command (curve 4, from 196t / h to 216.6t / h) are calculated and generated, and the two are combined to form the total coal quantity command in the process of variable load (curve 3). After the variable speed pulverizing system is superimposed with the basic coal quantity and the feedforward dynamic coal quantity, it is no longer adjusted (curve 6). With the increase of the coal mill speed, the actual pulverizing amount of the system can be adjusted faster, which speeds up the boiler response. The change of static coal quantity and closed-loop control of fuel quantity during the load change process are completely undertaken by the constant speed pulverizing system, which gradually increases with the load base coal quantity instruction (curve 7). At T1, with the increase of the base coal quantity instruction, the base coal quantity instruction of the variable speed pulverizing system reaches the next step value, so its coal quantity increases at a certain rate to the new coal quantity value and remains unchanged. In order to ensure the error-free regulation of coal quantity, the output of the constant speed pulverizing system has decreased. Subsequent coal quantity adjustments continue to be based on the constant speed pulverizing system. The constant speed pulverizing system ensures that the total coal quantity feedback and instruction of all pulverizing systems remain unchanged based on the calculation results of the coal quantity control PID. At T2, the unit load instruction reaches the target AGC instruction, the unit load change process ends, the load base coal quantity remains unchanged at the new stable value, and the dynamic feedforward coal quantity instruction gradually returns to 0. After the load change ended, the speed of the variable-speed coal mill should have quickly returned to normal. However, since the dynamic feedforward dropped to 0 at a certain rate according to the calculation results, the coal quantity in the variable-speed pulverizing system decreased relatively slowly, and the speed drop of the coal mill was limited by the change in coal quantity. It gradually returned to normal speed only after the coal quantity decreased.

[0067] In summary, the present invention utilizes a variable speed direct-drive permanent magnet motor to drive a coal mill instead of a traditional industrial frequency asynchronous motor to drive a coal mill, thereby breaking through the speed limit of the existing coal mill system, and designs relevant control logic to take advantage of the fast response of the variable speed pulverizing system, reasonably allocate the amount of coal in the AGC load change process, and coordinately adjust the speed of the coal mill, thereby reducing the lag time of the pulverizing link in the output change process and improving the overall response rate of the unit.

Claims

1. A speed-up control method based on the variable speed operation of a coal mill, characterized in that: include: S1. The dispatching agency issues an AGC instruction, and the generator set instruction receiving device receives the automatic generation control AGC instruction issued by the dispatching agency; S2. Send the AGC command to the distributed control system DCS; the DCS calculates and generates the coal feeding amount command of the unit according to the current unit load command and operation requirements; generates a fixed speed pulverizing system command and a variable speed pulverizing system command according to the coal feeding amount command, and sends them to the coal feeder; In S2, the DCS generates the boiler load reference coal quantity instruction according to the AGC instruction change and the adjustment amount of the boiler master control PID; the boiler dynamic feedforward coal quantity instruction is generated from the AGC instruction through inertia differential calculation and feedforward correction; In S2, the variable speed pulverizing system is open-loop controlled, and the coal feeding amount corresponding to the instruction is the sum of the reference coal amount and the dynamic feedforward coal amount. The reference coal amount is generated by a step control curve with a dead zone, and the dynamic feedforward coal amount is generated by dividing the boiler dynamic feedforward coal amount instruction by the number of variable speed pulverizing systems in operation; In S2, the constant speed pulverizing system is in closed loop control, and the command is the total coal quantity command synthesized by the boiler load reference coal quantity command and the boiler dynamic feedforward coal quantity command; The selection method of the number of variable speed pulverizing systems includes: obtaining the boiler response speed improvement A% that can be achieved by using a single variable speed coal mill in a certain type of unit, and taking the load change rate that can be achieved when all units are operated with fixed speed coal mills as a benchmark. The calculation formula of the number of variable speed pulverizing systems is as follows: The number of variable speed pulverizing systems configured = (load change rate expected to be achieved by the unit - reference load change rate) / (reference load change rate × A%); S3, after receiving the corresponding instruction, the coal feeder changes the coal feeding amount and sends the coal to the coal mill for coal powder grinding; wherein, the DCS controls the speed of the variable speed coal mill; S4. After the load variation process is completed and the coal quantity is stable, the coal quantity is stabilized at the new load corresponding value, and the speed of the variable speed coal mill returns to the normal value.

2. The AGC speed-up control method based on the variable speed operation of the coal mill according to claim 1 is characterized in that: In S2, a manual bias function is provided on the generation circuit of the variable speed milling system instruction.

3. The AGC speed-up control method based on the variable speed operation of the coal mill according to claim 1 is characterized in that: In S3, the DCS performs variable speed control on the variable speed coal mill, including: S301, when the AGC instruction is stable and the unit load is not changed, the DCS controls the variable speed coal mill according to the load instruction requirements, and the speed of the variable speed coal mill is maintained at the normal speed; S302. When the AGC instruction changes, the DCS limits the instruction change and the speed, and then determines the AGC instruction state as a load increase instruction or a load reduction instruction; for the load increase instruction, the DCS controls the speed of the variable speed coal mill to run at a high speed gear; for the load reduction instruction, the DCS controls the speed of the variable speed coal mill to run at a low speed gear.

4. A variable speed milling system, characterized in that: The variable speed operation AGC speed-up control method based on a coal mill as claimed in any one of claims 1 to 3 comprises: a raw coal hopper (1), a coal feeder (2), a coal mill (3), a motor (4), a frequency converter (5), a DCS (6), a command receiving device (7) and a dispatching mechanism (8); The raw coal hopper (1), the coal feeder (2), the coal mill (3), the motor (4) and the frequency converter (5) are connected in sequence. The coal mill (3) is also connected to the furnace (9) through a pipeline. The frequency converter (5) is also connected to the dispatching mechanism (8) through a DCS (6) and a command receiving device (7).

Citation Information

Patent Citations

  • Motor-small steam turbine variable-speed dual-drive system

    CN108386238A

  • Rapid frequency modulation method and device for coal-fired boiler unit

    CN110345506A

  • Adjusting method capable of improving boiler load response rate

    CN110848727A

  • Coal-fired unit variable-rate load control method and device based on AGC instruction state change judgment

    CN114609902A

  • Thermal power generation coal mill

    CN216125835U