An LNG carrier converted from a container ship
By adding a convex deck structure to the midship cargo hold and converting it into a Type B hold, and connecting it to an LNG gas supply system, the problem of excess container ship capacity and insufficient LNG capacity was solved, achieving optimized capacity allocation and environmentally friendly transformation, and reducing construction costs and carbon dioxide emissions.
Patent Information
- Application Number
- CN202211331070.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-28
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-10-28
AI Technical Summary
How to convert container ships into LNG carriers to address the issues of excess capacity and insufficient LNG transport capacity, while simultaneously meeting environmental regulations.
A convex deck structure was added to the midship cargo hold of the container ship to convert it into a Type B hold, and the main and auxiliary engines were connected to the LNG gas supply system, including LNG fuel processing equipment and heat exchange units, thus converting the main and auxiliary engines to a dual-fuel mode.
This effectively releases excess container ship capacity, optimizes capacity allocation, reduces construction costs and time, reduces carbon dioxide emissions, improves energy efficiency indicators, and meets environmental protection requirements.
Smart Images

Figure CN115571275B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of container ship transformation, and more specifically, to an LNG transport ship transformed from a container ship. Background Art
[0002] Port congestion, container freight rates have risen sharply, and the profit levels of major liner companies have reached an unprecedented height. With sufficient funds in hand, liner companies have placed orders to build container ships. These orders will be put on the market one after another. Coupled with the effective capacity released by congestion relief, it is estimated that the new capacity in the next three years will account for about 33% of the current fleet size, which will inevitably increase the risk of serious overcapacity in the container shipping market. Once the world economy shows a downward trend, these excess capacities will have to face the fate of suspension and dismantling, resulting in a great waste of capacity and huge economic losses. On the other hand, with the continuous tightening of environmental protection regulations, LNG, as a very effective transitional energy, has become increasingly popular in the market. In the new shipbuilding market, there are more and more dual-fuel ships with LNG as the main fuel. Similarly, container ship owners and operators are also turning to LNG fuel. Correspondingly, LNG carriers are also emerging to meet the increasing demand for LNG fuel. With the growing demand and the limited number of shipyards that can build LNG ships, the LNG ship market may face a situation where there are no ships available in the future. How to transform container ships into LNG carriers is an urgent problem to be solved in the current shipbuilding industry. Summary of the invention
[0003] The purpose of the present invention is to solve the problem of how to transform a container ship into an LNG carrier. In order to achieve the above-mentioned purpose, the present invention provides an LNG carrier converted from a container ship, including a cargo hold located in the middle of the container ship, as well as main and auxiliary engines and generators. A type B tank is provided in the cargo hold, and a convex deck structure is installed on the hatch of the cargo hold. The convex deck structure includes a longitudinal compartment main deck frame combination, a transverse sealing bulkhead frame combination and a transverse strong frame frame structure. Among them, the longitudinal compartment main deck frame combination includes a first longitudinal compartment main deck frame horizontally arranged along the length of the ship, a second longitudinal compartment main deck frame connected to both sides of the first longitudinal compartment main deck frame and gradually extending downward to connect to the cargo hold hatch, and a longitudinal compartment main deck fixed on the first longitudinal compartment main deck frame and the second longitudinal compartment main deck frame.
[0004] The transverse sealing bulkhead plate frame assembly includes a plurality of first longitudinal plates installed at intervals and vertically at the lower part of the first longitudinal compartment main deck plate frame at the cargo hold hatch, a second longitudinal plate frame installed at the lower part of the second longitudinal compartment main deck plate frame adjacent to the first longitudinal plate frame, a third longitudinal plate frame installed at the lower part of the second longitudinal compartment main deck plate frame adjacent to the second longitudinal plate frame, and a transverse sealing bulkhead plate fixed on the plane formed by the first longitudinal plate frame, the second longitudinal plate frame and the third longitudinal plate frame. The transverse strong frame plate frame structure includes a first transverse strong frame arranged at the middle position of the lower part of the longitudinal compartment main deck plate frame assembly and parallel to the transverse sealing bulkhead plate frame assembly, and a plurality of second transverse strong frames arranged at intervals and parallel on both sides of the first transverse strong frame. The two ends of the first transverse strong frame are fixed to the hatch edge of the cargo hold through a transverse strong frame transition structure. The two ends of the second transverse strong frame are reinforced and fixed to the hatch edge of the cargo hold through a longitudinal partition frame.
[0005] The main and auxiliary machines are connected to the LNG gas supply system, and the structure of the LNG gas supply system includes: an LNG tank for storing liquid LNG, an LNG submersible pump located below the liquid surface of the LNG tank, a BOG compressor connected to the gas phase of the LNG tank, and the outlet of the LNG submersible pump is connected to the LNG gasification device, and the outlet of the LNG gasification device and the outlet of the BOG compressor are both connected to the LNG fuel processing equipment;
[0006] One of the LNG fuel processing equipment leads to the main engine gas valve group, and the other leads to the generator gas valve group;
[0007] The LNG gas supply system structure also includes: a heat exchange unit connected to the LNG fuel processing equipment, and a nitrogen generator that supplies gas to the main engine gas valve group and the generator gas valve group.
[0008] Preferably, the cross-sections of the first longitudinal compartment main deck frame and the second longitudinal compartment main deck frame are T-shaped or L-shaped.
[0009] Preferably, the cross-sections of the first longitudinal frame, the second longitudinal frame and the third longitudinal frame are T-shaped or L-shaped.
[0010] Preferably, the cross-sections of the first transverse strong frame and the second transverse strong frame are T-shaped or L-shaped.
[0011] Preferably, the transverse strong frame transition structure includes a transverse bracket and a transverse strong frame transition structure.
[0012] Preferably, the longitudinal partition frame is a rectangular plate structure with an elongated hole in the middle.
[0013] Preferably, a third transverse strong frame is fixedly connected between the longitudinal bulkhead frame and the upper edge of the cargo hold hatch.
[0014] Preferably, the medium of the heat exchange unit is water and ethylene glycol.
[0015] The present invention ensures the structural integrity to the maximum extent on the basis of removing the special outfitting parts for container loading, and performs reasonable modification at a lower cost and a shorter construction period. On the one hand, it effectively releases the excess capacity of container ships and avoids a huge waste of resources; on the other hand, the modified LNG transport ship can effectively solve the problem of insufficient LNG transport capacity and achieve optimal configuration of transport capacity, thus bringing huge economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of a half cross section of the middle cabin of a container after transformation in an embodiment of the present invention.
[0017] Figure 2 It is a side structural schematic diagram of the convex deck structure on the top of any LNG tank in an embodiment of the present invention.
[0018] Figure 3 It is a schematic diagram of the cross-sectional structure of the convex deck structure on the top of any LNG tank in an embodiment of the present invention.
[0019] Figure 4 It is a schematic diagram of the top view of the convex deck structure on the top of any LNG tank in the embodiments of the present invention.
[0020] Figure 5 It is a structural schematic diagram of a transverse sealing bulkhead panel assembly between the convex deck structures of any two adjacent LNG tanks in an embodiment of the present invention.
[0021] Figure 6 yes Figure 5 Schematic diagram of the structure of the middle section B-1.
[0022] Figure 7 yes Figure 5 Schematic diagram of the structure of the middle section B-2.
[0023] Figure 8 yes Figure 5 Schematic diagram of the structure of the middle section B-3.
[0024] Fig. 9 It is a schematic diagram of a half cross-sectional structure of the convex deck structure at the first transverse strong frame of the convex deck structure on the top of any LNG tank in an embodiment of the present invention.
[0025] Fig.10 yes Fig. 9Schematic diagram of the structure of the middle section A-1.
[0026] Fig.11 It is a schematic diagram of installing the first transverse strong frame of the convex deck structure on the top of any LNG tank in an embodiment of the present invention on an existing transverse strong frame transition structure.
[0027] Fig.12 yes Fig.11 Schematic diagram of the enlarged structure at a.
[0028] Fig.13 It is a structural schematic diagram of the second transverse strong frame of the convex deck structure on the top of any LNG tank in the embodiments of the present invention being connected to the third transverse strong frame through a longitudinal bulkhead frame and then fixed to the cargo hold hatch.
[0029] Fig.14 yes Fig.13 Schematic diagram of the structure with the middle longitudinal partition frame in direction A.
[0030] Fig.15 yes Fig.13 Schematic diagram of the cross section of the second transverse strong frame.
[0031] Fig.16 yes Fig.13 Enlarged structural diagram of the third transverse strong frame.
[0032] Fig.17 It is a schematic diagram of the structure of the LNG gas supply system in an embodiment of the present invention.
[0033] Fig.18 It is a schematic diagram of the cargo hold structure of an existing container ship.
[0034] Fig.19 It is a schematic diagram of the internal structure of the cargo hold of an existing container ship.
[0035] Fig. 20 It is a schematic diagram of the overall structure of an existing container ship.
[0036] Fig.21 It is a schematic diagram of the cabin modification structure near the bow and stern of an existing container ship.
[0037] Among them: 1. Lashing bridge; 2. Side column; 3. Cargo hatch cover; 4. Guide rail; 5. Lashing platform; 6. Longitudinal compartment main deck frame combination; 60. First longitudinal compartment main deck frame; 61. Second longitudinal compartment main deck frame; 7. Transverse sealing bulkhead frame combination; 71. First longitudinal frame; 72. Second longitudinal frame; 73. Third longitudinal frame; 8. Transverse strong frame frame structure; 80. First transverse strong frame; 81. Second transverse strong frame Frame; 82. Transverse strong frame transition structure; 83. Transverse bracket; 84. Transverse strong frame transition structure; 85. Longitudinal partition frame; 86. Third transverse strong frame; 9. Type B cabin; 10. Inner shell of container cabin; 18. LNG submersible pump; 19. LNG gasification device; 20. BOG compressor; 21. LNG fuel processing equipment; 22. Generator gas valve group; 23. Main engine gas valve group; 24. Nitrogen generator; 25. Heat exchange unit. DETAILED DESCRIPTION
[0038] Example:
[0039] like Figure 1 As shown, an LNG carrier converted from a container ship includes a cargo hold located in the middle of the container ship, as well as main and auxiliary engines and generators. The cargo hold is provided with a B-type tank 9, and a convex deck structure A is installed on the hatch of the cargo hold. The convex deck structure A includes a longitudinal compartment main deck frame assembly 6, a transverse sealing bulkhead frame assembly 7 and a transverse strong frame frame structure 8.
[0040] like Figure 3 As shown, the longitudinal compartment main deck frame assembly 6 includes a first longitudinal compartment main deck frame 60 horizontally arranged along the length direction of the ship, a second longitudinal compartment main deck frame 61 connected to both sides of the first longitudinal compartment main deck frame 60 and gradually extending downward to connect to the cargo hold hatch, and a longitudinal compartment main deck fixed to the first longitudinal compartment main deck frame 60 and the second longitudinal compartment main deck frame 61. The cross-sections of the first longitudinal compartment main deck frame 60 and the second longitudinal compartment main deck frame 61 are T-shaped or L-shaped.
[0041] like Figure 5 As shown, the transverse sealing bulkhead plate frame assembly 7 includes a plurality of first longitudinal plates 71 which are spaced apart and vertically installed at the lower part of the first longitudinal compartment main deck plate frame 60 at the cargo hold hatch, a second longitudinal plate frame 72 which is installed at the lower part of the second longitudinal compartment main deck plate frame 61 adjacent to the first longitudinal plate frame 71, a third longitudinal plate frame 73 which is installed at the lower part of the second longitudinal compartment main deck plate frame 61 adjacent to the second longitudinal plate frame 72, and a transverse sealing bulkhead plate fixed on the plane formed by the first longitudinal plate frame 71, the second longitudinal plate frame 72 and the third longitudinal plate frame 73. Figures 6 to 8 , which are the cross-sectional shapes of the first longitudinal plate frame 71, the second longitudinal plate frame 72 and the third longitudinal plate frame 73. The cross-sections of the first longitudinal plate frame 71, the second longitudinal plate frame 72 and the third longitudinal plate frame 73 are T-shaped or L-shaped.
[0042] like Figure 2 , Figure 4 and Figure 9-10 As shown, the transverse strong frame plate frame structure 8 includes a first transverse strong frame 80 arranged at the middle position of the lower part of the longitudinal compartment main deck plate frame assembly 6 and parallel to the transverse sealing bulkhead plate frame assembly 7, and a plurality of second transverse strong frames 81 arranged at intervals and in parallel on both sides of the first transverse strong frame 80. The cross-sections of the first transverse strong frame 80 and the second transverse strong frame 81 are T-shaped or L-shaped. The two ends of the first transverse strong frame 80 are fixed to the hatch edge of the cargo hold through a transverse strong frame transition structure 84. Figure 13 to Figure 16 As shown, both ends of the second transverse strong frame 81 are reinforced and fixed at the hatch edge of the cargo hold by longitudinal partition frames 85. The longitudinal partition frame 85 is a rectangular plate structure with a long hole in the middle. A third transverse strong frame 86 is fixedly connected between the longitudinal partition frame 85 and the upper edge of the cargo hold hatch.
[0043] like Figures 9 to 12 As shown, the transverse strong frame transition structure 84 includes a transverse bracket 83 and a transverse strong frame transition structure 82 . Fig.11 The strong frame transition structure is installed on existing ships. Compared with the existing strong frame transition structure, the lower structure of the transverse strong frame transition structure 84 in the present invention is changed accordingly according to the upper port structure of the container cabin, and the other structures remain unchanged.
[0044] like Fig.17 As shown in the figure, the main and auxiliary machines are connected to the LNG gas supply system, and the structure of the LNG gas supply system includes: an LNG tank for storing liquid LNG, an LNG submersible pump 18 located below the liquid surface of the LNG tank, a BOG compressor 20 connected to the gas phase of the LNG tank, and the outlet of the LNG submersible pump 18 is connected to the LNG gasification device 19, and the outlet of the LNG gasification device 19 and the outlet of the BOG compressor 20 are both connected to the LNG fuel processing equipment 21;
[0045] One path of the LNG fuel processing equipment 21 is connected to the main engine gas valve group 23, and the other path is connected to the generator gas valve group 22.
[0046] The LNG gas supply system structure further includes: a heat exchange unit 25 connected to the LNG fuel processing equipment 21, and a nitrogen generator 24 for supplying gas to the main engine gas valve group 23 and the generator gas valve group 22. The medium of the heat exchange unit 25 is water and ethylene glycol.
[0047] The present invention converts a container ship into an LNG transport ship to achieve optimal configuration of transport capacity. On the basis of removing special outfitting parts for container loading, the structural integrity is guaranteed to the maximum extent, and reasonable conversion is carried out at a lower cost and a shorter construction period.
[0048] The technical solution adopted by this patent is as follows:
[0049] Step 1. Remove the original container outfitting on the deck, mainly including the lashing bridge, side pillars and cargo hold hatch covers;
[0050] Step 2. Dismantle the outfitting in the cargo hold, mainly including the guide rail frame and the lashing platform in the middle of each cargo hold;
[0051] Step 3. The cargo hold is converted into a Type B tank suitable for loading LNG;
[0052] Step 4. Mechanical and electrical equipment modification: conventional power host and generator are modified into dual-fuel host and generator
[0053] The technical solution adopted by this patent is: an LNG carrier converted from a medium-sized fuel-powered container ship, wherein an engine room and a superstructure are provided in the stern half of the LNG carrier; a cargo hold area is provided in the main part, and the cargo hold area is divided into a plurality of relatively independent B-type LNG liquid cargo tanks, and watertight transverse bulkheads and isolated void spaces are provided between adjacent cargo holds; the top of the cargo hold is convex in shape, and an air dome is installed on the top of each cargo hold to connect the equipment and piping inside and outside the B-type hold; the original subdivision of the double hull and double bottom of the cargo hold area remains unchanged, a pipe passage is provided in the middle of the bottom, and two-side passages are provided on the top of the double hull, and the rest of the double hull and double bottom are ballast tanks for adjusting the buoyancy of the ship.
[0054] To achieve the above modification plan, the specific steps include:
[0055] Step 1. Remove the original container outfitting on the deck, mainly including the lashing bridge, side columns and cargo hold hatch covers.
[0056] The deck lashing bridge 1 and side column 2 are used for stacking and lashing containers on the original container ship deck, which are not suitable for LNG carriers and need to be removed. The cargo hold hatch cover 3 is also a unique form of container ships and needs to be removed. The outfitting parts that need to be removed on the deck are shown in Fig.18 .
[0057] Step 2. Dismantle the outfitting in the cargo hold, mainly including the guide rail frame and the lashing platform in the middle of each cargo hold.
[0058] The guide rail frame 4 is a special outfitting part in the cargo hold of the container ship. It is distributed on the bulkheads around the cargo hold and on the lashing platform in the cargo hold, and is arranged vertically. When loading containers, they are placed along the guide rail frame, which can easily make them stacked in the specified position. The lashing platform is mainly for the convenience of lashing containers in the cargo hold. Three lashing platforms are arranged at the front, middle and rear positions of each cargo hold. When refitting, the front and rear can be retained, and the middle lashing platform 5 needs to be removed. See the removal items in the cargo hold for details. Fig.19 shown.
[0059] Step 3: Convert the cargo hold into a Type B tank suitable for loading LNG.
[0060] The container has a large opening cargo hold. Except for the bow and stern cargo holds which have some steps due to the obvious contraction of the line, the shape of the middle cargo hold is relatively regular. There are not many equipments in the hold. When converted into a Type B LNG cargo hold, the modification amount is relatively small, which can significantly shorten the construction period and reduce the modification cost.
[0061] The following is a detailed description of the cargo hold modification process using a mid-sized container ship as an example.
[0062] Step 3-1, Modify cargo hold selection:
[0063] This type of container ship has 7 cargo holds, 6 in front of the engine room and 1 behind the engine room, a total of 7 cargo holds. There are many steps in the 1 cargo hold at the front and 7 cargo holds at the rear, and the cross-sectional shapes at different longitudinal positions vary greatly, which are not suitable for conversion into LNG cargo holds. Therefore, the 5 cargo holds in the middle are selected to be converted into LNG tanks.
[0064] Step 3-2, LNG tank type selection:
[0065] Commonly used LNG tank types are mainly divided into membrane tanks, type B tanks and type C tanks. The membrane tank has a high capacity utilization rate, but it needs to be modified on the basis of the original cargo hold structure, which takes a long time to complete; the membrane tank is a GTT patent, and a considerable patent fee needs to be paid for the selection of this tank type. The capacity utilization rate of the type B tank is slightly lower than that of the membrane tank, but it is a self-owned patent and does not require the payment of patent fees (the patent name is "A new type of type B independent storage tank", patent number CN202010765072.0), which can be carried out separately from the modification of the cargo hold structure. After the construction of the type B tank is completed, it can be hoisted into the cargo hold as a whole; although the type C tank can also be hoisted as a whole, the cost is lower, but the capacity utilization rate is low, which is not suitable for this ship. After comprehensive consideration, the type B LNG cargo tank was finally selected.
[0066] Step 3-3, modification of cargo hold main hull structure:
[0067] For the B-type cargo holds near the midship (3rd and 4th cargo holds), the bilge steps of the cargo holds do not need to be modified. It is only necessary to install a convex deck structure A above the uppermost hatch coaming. The convex deck structure A is mainly composed of the longitudinal main deck frame assembly 6 (see Figure 3 60 and 61), transverse sealing bulkhead plate frame assembly 7 ( Figure 5 71 to 73) transverse strong frame structure 8 ( Figures 9 to 13 80 to 86 in the plate frame diagram, the shape of this series of plate frames can be fine-tuned according to production needs); the plate frame structure in this article is designed according to the relevant requirements of the classification society rules of the same ship, that is, all the plate frame structures in this article are welded by plates and or frames, the plates used in all plate frames are marine plates, and the cross-sectional shapes of the longitudinal bones of all plate frames can be: T-type and L-type, bulb flat steel, flat iron and other marine profiles. The plates and frames used in the plate frame structure can be cut into small pieces and then welded into a whole according to the needs of engineering production and transportation; because all the structures of this ship are symmetrically designed for both port and starboard, all the figures in this article except Figure 3 The transverse view in the figure is the full width of the ship, while other schematic diagrams only show one side. The figure only shows the length of a single cargo hold. The newly added convex deck structure of other holds is similar to the figure.
[0068] The independent B-type cabin 9 and the container cabin inner shell 10, the transverse strong frame plate frame structure 8 and the transverse sealing bulkhead plate frame combination 7 structure are kept at an appropriate distance according to the requirements of the IGF specification. After the modification, the capacity of the third cargo hold and the fourth cargo hold can reach about 21,000 cubic meters respectively. For the modification diagram, please refer to Figure 1 .
[0069] For other cargo holds closer to the bow and stern, the bilge step 13 needs to be removed and a new structure 14 needs to be added to ensure the watertight separation of the B-type tank 9 and other external compartments. This can maximize the LNG tank capacity without making major modifications to the original cargo holds. Like the middle cargo ship, the deck also needs to add a convex longitudinal main deck frame assembly 6, a transverse sealing bulkhead frame assembly 7 and a transverse strong frame frame structure 8 series. The corresponding B-type tank capacity is 19,000 cubic meters. See the modification diagram for details. Fig.21 .
[0070] After the cargo hold structure modification and B-type tank design were carried out in a similar manner, the original forward cargo hold 15 and the rear cargo hold 16 were not suitable for modification due to their thin bottoms. The original five cargo holds 17 in front of the superstructure were converted into B-type LNG cargo holds, and the total capacity could reach 95,000 cubic meters. Fig. 20 .
[0071] Step 4. Mechanical and electrical modification:
[0072] When a conventional powered container ship is converted into an LNG carrier, a certain amount of boil-off gas will be generated in the LNG cargo tank. Although the proportion is small, the total boil-off gas volume is still considerable due to the large total tank capacity. If conventional powered main and auxiliary engines are still used, on the one hand, a reliquefaction system has to be used to treat the boil-off gas. On the other hand, it is extremely unfavorable for the operational carbon intensity index CII, which is about to take effect, and may not meet the rating requirements. If the conventional powered main and auxiliary engines are converted into dual-fuel main and auxiliary engines, the boil-off gas can be completely consumed. More importantly, after the conversion, under the same heat generation conditions, the use of LNG can reduce carbon dioxide emissions by nearly 20% and reduce nitrogen oxide and particulate matter emissions by 90% compared to the use of fuel oil, which is of great significance for improving carbon intensity indicators and energy conservation and environmental protection.
[0073] During the modification, it is not necessary to remove the main and auxiliary engines of conventional power as a whole and replace them with dual-fuel main and auxiliary engines. Some functional modules need to be added or updated on the main engine and generator body to adapt to LNG fuel, including gas injectors, gas control modules, gas supply double-wall pipes, sealing oil modules, and nitrogen purge modules. When the functional modules and equipment are modified, they are packaged as a whole and sent to the main engine manufacturer, who will replace them as a whole.
[0074] At the same time, it is necessary to add LNG gas supply system equipment, the schematic diagram is as follows ( Fig. 9 ):
[0075] When the BOG volume in the LNG tank can meet the fuel demand of the main engine and generator,
[0076] The gaseous BOG in the LNG tank passes through 20-BOG compressor 21-LNG fuel processing equipment, and then enters the generator and the main engine through the generator gas valve group 22 and the main engine gas valve group 23 for combustion.
[0077] When the amount of BOG in the LNG tank cannot meet the combustion requirements of the main engine and the generator, the liquid LNG in the LNG tank is transferred to the LNG gasification device 19 through the LNG submersible pump 18, and after passing through the LNG fuel processing equipment 21, it enters the generator and the main engine for combustion through the generator gas valve group 22 and the main engine gas valve group 23. The equipment nitrogen generator 24 generates nitrogen for pipeline blowing and inerting during LNG operation, and the equipment water-ethylene glycol heat exchange unit 25 is used for heating and cooling of LNG fuel.
[0078] The present invention can effectively release the excess capacity of container ships through modification, and on the other hand, the modified LNG transport ship can effectively solve the problem of insufficient LNG transport capacity and achieve optimal configuration of transport capacity, thereby bringing huge economic benefits. The cargo hold of the LNG transport ship can make full use of the structural characteristics of the container ship, and realize the rapid modification of the cargo ship without making many modifications to the hull structure, thereby reducing the construction cost. Modified into a B-type cabin LNG cargo ship, the hull structure modification and the B-type cabin can be synchronously constructed. After the two constructions are completed, the complete B-type cabin is directly hoisted into the modified cargo hold structure, which significantly improves work efficiency and shortens the construction period. The main and auxiliary engines are converted into dual-fuel mode, which can reduce carbon dioxide emissions by nearly 20%, reduce nitrogen oxides and particulate matter emissions by 90%, and significantly improve energy efficiency indicators. The main scale characteristics and stability characteristics of the container ship are similar to those of the LNG transport ship, so the main strength components of the hull, the cargo hold and the ballast tank cabin type and capacity are not significantly modified, which provides the possibility and convenience for modification.
[0079] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. An LNG carrier converted from a container ship, comprising a cargo hold located in the middle of the container ship, as well as main and auxiliary engines and generators, characterized in that: A B-type hold (9) is provided in the cargo hold, and a convex deck structure (A) is installed on the hatch coaming of the cargo hold; The convex deck structure (A) comprises a longitudinal compartment main deck plate frame assembly (6), a transverse sealing bulkhead plate frame assembly (7) and a transverse strong frame plate frame structure (8); The longitudinal compartment main deck frame assembly (6) comprises a first longitudinal compartment main deck frame (60) horizontally arranged along the length direction of the ship, a second longitudinal compartment main deck frame (61) connected to both sides of the first longitudinal compartment main deck frame (60) and gradually extending downward to connect to the cargo hold hatch, and a longitudinal compartment main deck fixed to the first longitudinal compartment main deck frame (60) and the second longitudinal compartment main deck frame (61); The transverse sealing bulkhead plate assembly (7) comprises a plurality of first longitudinal plates (71) which are spaced apart and vertically installed at the lower part of the first longitudinal compartment main deck plate frame (60) at the cargo hold hatch, a second longitudinal plate frame (72) which is installed at the lower part of the second longitudinal compartment main deck plate frame (61) adjacent to the first longitudinal plate frame (71), a third longitudinal plate frame (73) which is installed at the lower part of the second longitudinal compartment main deck plate frame (61) adjacent to the second longitudinal plate frame (72), and a transverse sealing bulkhead plate fixed on the plane formed by the first longitudinal plate frame (71), the second longitudinal plate frame (72) and the third longitudinal plate frame (73); The transverse strong frame plate frame structure (8) comprises a first transverse strong frame (80) arranged at the middle position of the lower part of the longitudinal cabin main deck plate frame assembly (6) and parallel to the transverse sealing bulkhead plate frame assembly (7), and a plurality of second transverse strong frames (81) arranged at intervals and in parallel on both sides of the first transverse strong frame (80); Both ends of the first transverse strong frame (80) are fixed to the hatch edge of the cargo hold via a transverse strong frame transition structure (84); Both ends of the second transverse strong frame (81) are reinforced and fixed at the hatch edge of the cargo hold by longitudinal bulkhead frames (85); The main and auxiliary machines are connected to an LNG gas supply system, and the structure of the LNG gas supply system includes: an LNG tank storing liquid LNG, an LNG submersible pump (18) located below the liquid surface of the LNG tank, a BOG compressor (20) connected to the gas phase of the LNG tank, the outlet of the LNG submersible pump (18) being connected to an LNG gasification device (19), and the outlet of the LNG gasification device (19) and the outlet of the BOG compressor (20) being both connected to an LNG fuel processing device (21); One of the paths of the LNG fuel processing equipment (21) is connected to the main engine gas valve group (23), and the other path is connected to the generator gas valve group (22); The LNG gas supply system structure further includes: a heat exchange unit (25) connected to the LNG fuel processing equipment (21), and a nitrogen generator (24) for supplying gas to the main engine gas valve group (23) and the generator gas valve group (22).
2. The LNG carrier converted from a container ship according to claim 1, characterized in that: The cross-sections of the first longitudinal compartment main deck frame (60) and the second longitudinal compartment main deck frame (61) are T-shaped or L-shaped.
3. The LNG carrier converted from a container ship according to claim 1, characterized in that: The cross sections of the first longitudinal plate frame (71), the second longitudinal plate frame (72) and the third longitudinal plate frame (73) are T-shaped or L-shaped.
4. The LNG carrier converted from a container ship according to claim 1, characterized in that: The cross sections of the first transverse strong frame (80) and the second transverse strong frame (81) are T-shaped or L-shaped.
5. The LNG carrier converted from a container ship according to claim 1, characterized in that: The transverse strong frame transition structure (84) includes a transverse bracket (83) and a transverse strong frame transition structure (82).
6. The LNG carrier converted from a container ship according to claim 1, characterized in that: The longitudinal partition frame (85) is a rectangular plate structure with a long hole in the middle.
7. The LNG carrier converted from a container ship according to claim 1, characterized in that: A third transverse strong frame (86) is fixedly connected between the longitudinal partition frame (85) and the upper edge of the cargo hold hatch.
8. The LNG carrier converted from a container ship according to claim 1, characterized in that: The medium of the heat exchange unit (25) is water and ethylene glycol.
Citation Information
Patent Citations
Novel B-type independent storage cabin
CN111924040A
Dual-fuel container transport ship
CN111469981A
Dual-fuel container transport ship
CN212447954U
Method and system for heading control during ship-to-ship transfer of LNG
US20190233058A1
Cited By
LNG ship modification and dynamic allocation method considering carbon strength compliance
CN122529269A