A fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster
By calculating the three-dimensional principal stress of the reservoir in unconventional tight oil and gas reservoirs and simulating the fracture scale, the sand-carrying liquid with a stepped sand extraction ratio is used to add sand between clusters, which solves the problem of uneven stimulation between volume fracturing clusters and achieves The uniform transformation between clusters reduces costs and improves economic benefits.
Patent Information
- Application Number
- CN202211385006.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-07
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-11-07
AI Technical Summary
In unconventional tight oil and gas reservoirs, uneven stimulation among volumetric fracturing clusters results in high costs and poor results.
Calculate the three-dimensional principal stress of the reservoir based on well logging data and rock mechanics test data, simulate the fracture scale, calculate the semi-main fracture sand spreading volume and ground pressure, and use a sand-carrying liquid with a stepped sand extraction ratio to add sand between clusters to ensure that the The critical pressure is applied, and residual sand-carrying fluid in the wellbore is eliminated through displacement fluid to achieve uniform transformation between clusters.
It effectively solves the problem of uneven transformation between clusters, saves costs, reduces equipment requirements, avoids the risk of sand blockage, achieves uniform transformation of clean water or slippery water with sand, and improves economic benefits.
Smart Images

Figure CN115653559B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hydraulic fracturing in the petroleum and natural gas industry, and in particular to a fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster. Background Art
[0002] At present, hydraulic fracturing technology has become a key technology that restricts the industrial exploitation of unconventional tight oil and gas reservoirs such as tight oil, shale oil and gas, and coalbed methane. In the exploitation of tight oil and gas, volume fracturing technology has developed rapidly in recent years, among which bridge-shot combined subdivision volume cutting fracturing technology has become the main technology to assist the development of shale oil in Jimusar, Xinjiang and Longdong, Changqing. In the process of subdivided cutting and segmented multi-cluster fracturing, mechanical separation between segments can achieve relatively uniform transformation. However, the transformation between clusters within a segment is often difficult, the liquid volume enters unevenly, and some clusters are difficult to mobilize.
[0003] At present, the main means of inter-cluster homogenization transformation is temporary plugging and diversion technology. A certain amount of temporary plugging materials such as knotted temporary plugging agents and temporary plugging balls are added in the middle of the sand-carrying fluid to achieve pressure boosting and diversion and inter-cluster transformation. However, volume fracturing often uses slick water or clean water fracturing, which has a large displacement. After the temporary plugging materials are added, the pressure boosting and diversion effect is not obvious, and the cost is high, which needs further improvement. Summary of the invention
[0004] In order to solve the above technical problems, the present invention proposes a fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster, which can effectively solve the problem of uneven transformation between clusters in large-displacement volume fracturing of unconventional tight oil and gas reservoirs, save the cost of inter-cluster steering fracturing, achieve uniform transformation between clusters with clean water or slick water plus sand, and improve economic benefits.
[0005] The present invention is achieved by adopting the following technical solutions:
[0006] A fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster, characterized by comprising the following steps:
[0007] S1. Calculate the three-dimensional principal stress of the reservoir based on the well logging data, rock mechanics test data and block ground stress test, then simulate the fracture under the corresponding displacement, calculate the semi-main fracture sand volume based on the simulated fracture scale, and calculate the ground pressure based on the construction parameters, and calculate the construction pressure limit through the ground pressure;
[0008] S2. Fracture creation by front-fluid of main fracturing displacement;
[0009] S3. Pump the sand-carrying fluid into the main fracturing displacement to add sand to the first half of the main seam between clusters, and step the sand ratio to ensure that the critical pressure of construction is reached when the sand addition to the first half of the main seam is completed;
[0010] S4. Sand displacement into the stratum;
[0011] S5. Repeat steps S2-S4 to transform the remaining half main seams.
[0012] The logging data specifically refers to logging data reflecting formation porosity, cementing quality or ground stress conditions, including conventional acoustic wave time difference, well diameter, resistivity, natural potential, density, natural gamma and acoustic wave variable density.
[0013] The rock mechanics test data are data reflecting the brittleness, strength and toughness of the rock obtained through conventional triaxial tests, splitting tests, acoustic emission geostress tests and reservoir grain size characteristic tests, including reservoir rock modulus, Poisson's ratio and fracture strength.
[0014] The calculation method of the volume of the semi-main joint sand paving is:
[0015]
[0016] Among them, V σ is the volume of sand paved in the half main joint, m 3 ; h is the simulated height of the crack, m; L is the simulated half length of the crack, m; is the average crack width, m.
[0017] The calculation method of the ground pressure is:
[0018] P B =P w +P g +P b +P j -P l ,
[0019] Among them, P B is the ground pressure, MPa; P w is the formation closure stress, MPa; P g is the string friction, MPa; P b is the estimated crack net pressure, MPa; P j is the near-wellbore friction, MPa; P l is the liquid column pressure, MPa.
[0020] The sand-carrying liquid refers to a clean water mixed liquid or low-viscosity slippery water added with basic chemical materials, and the viscosity of the sand-carrying liquid is less than 10mPa.s. The basic chemical materials include bactericides or active agents.
[0021] The step-by-step sand ratio specifically refers to: the sand ratio is determined according to the main construction displacement and is gradually increased in a step-by-step manner, and the highest sand ratio does not exceed 20%.
[0022] Completion of sanding the first half main seam specifically refers to: the amount of sand added reaches more than 80% of the volume of sanding the half main seam in step S1.
[0023] The construction critical pressure specifically refers to: under the condition of not exceeding the construction limit pressure, the slope of the ground pressure curve rapidly exceeds 1.0, the curve pressure increases, the pressure increases by more than 3MPa, and the pressure remains stable for more than 30S after the pressure increase.
[0024] The sand displacement into the formation specifically refers to: all the sand-carrying fluid is pumped into the formation by the displacement fluid, and no sand-carrying fluid remains in the wellbore.
[0025] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0026] 1. This method can solve the problem of uneven transformation among clusters in large-volume fracturing of unconventional tight oil and gas reservoirs, save the cost of inter-cluster diversion fracturing, achieve uniform transformation among clusters with clean water or slick water plus sand, and improve economic benefits.
[0027] This method collects and organizes geological data, simulates the expansion of inter-cluster cracks before construction, and determines the amount of sand added in the semi-main joint stage and the construction pressure limit. During the construction process, the sand increase ratio makes the ground pressure reach the construction critical pressure without causing overpressure problems.
[0028] 2. All the sand-carrying fluid is pumped into the formation through the displacement fluid, and there is no residual sand-carrying fluid in the wellbore, which can ensure that the risk of sand blockage is eliminated.
[0029] 3. In the present invention, the proppant can be pumped into the formation safely and smoothly through the step-by-step sand ratio. The highest sand ratio does not exceed 20%, which can avoid the phenomenon of sand losing suspension, sedimentation in the wellbore, sand plugging and overpressure.
[0030] 4. Conventional knot temporary plugging agents and mixed particle size temporary plugging agents require the use of plug valves, bell mouths, main pressure trucks and other addition construction equipment. This technology does not require additional equipment, reducing equipment costs and safety risks.
[0031] 5. Under large-displacement casing fracturing construction, the temporary plugging and pressure-increasing effect of temporary plugging agents between clusters is not obvious, and the temporary plugging and diversion effect is not good. This method can realize pulse temporary plugging and sanding, control the relatively uniform extension of the semi-main fracture, and achieve good inter-cluster uniformization transformation.
[0032] 6. This method uses strict simulation and construction methods for shallow coalbed methane and tight oil and gas horizontal wells, uses low-cost active water or slick water as fracturing fluid, and uses quartz sand of different particle sizes as temporary plugging material, saving the cost of temporary plugging materials and fracturing fluid, and reducing the cost of the entire well transformation.
[0033] 7. The implementation of this method requires a high level of pressure monitoring and command response capabilities, which will help construction personnel improve their technical level, deepen their understanding of the stress sensitivity of the formation in this block, and improve subsequent development strategies. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments, wherein:
[0035] Figure 1 This is a schematic diagram of the temporary blocking uniform transformation between clusters in the bridge-radiation connection in the present invention, wherein ①-④ are four semi-main seams;
[0036] Figure 2 This is a result diagram of the interpretation of the ground stress of the transformed coal seam in the present invention;
[0037] Figure 3 It is a schematic diagram of the construction curve of pulse-type temporary plugging and sand addition to achieve uniform transformation between clusters in the present invention. DETAILED DESCRIPTION
[0038] Example 1
[0039] As a basic embodiment of the present invention, the present invention includes a fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster, including the following steps:
[0040] S1. Calculate the three-dimensional principal stress of the reservoir based on the well logging data, rock mechanics test data and block ground stress test, and use the three-dimensional principal stress of the reservoir to simulate the fractures under the corresponding displacement. Calculate the semi-main seam sand paving volume based on the simulated fracture scale, and calculate the ground pressure based on the construction parameters, and calculate the construction pressure limit through the ground pressure.
[0041] S2. Fracture creation with the main displacement pre-fluid.
[0042] S3. The main displacement of fracturing pumps in sand-carrying fluid to add sand to the first half of the main seam between clusters, with a step-by-step sand increase ratio to ensure that the critical construction pressure is reached when the first half of the main seam is filled with sand.
[0043] S4. Displace sand into the stratum with appropriate displacement.
[0044] S5. Repeat steps S2-S4 to transform the remaining half main seams to achieve uniform transformation among clusters.
[0045] Example 2
[0046] As a preferred embodiment of the present invention, the present invention includes a fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster, comprising the following steps:
[0047] S1. Calculate the three-dimensional principal stress of the reservoir based on well logging data, rock mechanics test data and block ground stress test, and then perform fracture simulation under corresponding displacement. Calculate the semi-main seam sand paving volume based on the simulated fracture scale, and calculate the ground pressure based on the construction parameters, and calculate the construction pressure limit through the ground pressure.
[0048] Wherein, the calculation method of the volume of the semi-main joint sand paving is:
[0049]
[0050] Among them, V σ is the volume of sand paved in the half main joint, m 3 ; h is the simulated height of the crack, m; L is the simulated half length of the crack, m; is the average crack width, m.
[0051] The calculation method of the ground pressure is:
[0052] P B =P w +P g +P b +P j -P l ,
[0053] Among them, P B is the ground pressure, MPa; P w is the formation closure stress, MPa; P g is the string friction, MPa; P b is the estimated crack net pressure, MPa; P j is the near-wellbore friction, MPa; P l is the liquid column pressure, MPa.
[0054] S2. Fracture creation with the main displacement pre-fluid.
[0055] S3. The sand-carrying fluid is pumped into the main fracturing displacement to add sand to the first half of the main seam between clusters. The sand ratio is gradually increased in a step-by-step manner according to the main construction displacement to ensure that the critical construction pressure is reached when the first half of the main seam is filled with sand.
[0056] S4. Sand is displaced into the stratum.
[0057] S5. Repeat steps S2-S4 to transform the remaining half main seams to achieve uniform transformation among clusters.
[0058] Example 3
[0059] As another preferred embodiment of the present invention, the present invention includes a fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster, comprising the following steps:
[0060] S1. Calculate the three-dimensional principal stress of the reservoir based on the well logging data, rock mechanics test data and block ground stress test, and then use the software to simulate the fractures under the corresponding displacement.
[0061] Among them, the logging data include conventional acoustic wave time difference, well diameter, resistivity, natural potential, density, natural gamma, acoustic variable density and other logging data reflecting the formation porosity, cementing quality, and ground stress. The rock mechanics test data include reservoir rock modulus, Poisson's ratio, fracture strength and other data reflecting the brittleness, strength and toughness of the rock obtained from conventional triaxial tests, splitting tests, acoustic emission ground stress tests, reservoir grain characteristics tests and other tests. Calculating the three-dimensional principal stress of the reservoir can be used to determine the direction of crack expansion. Its size affects the crack expansion morphology and can be input into the software as a formation stress parameter. It can itself be calculated through rock mechanics tests and logging data.
[0062] The simulation of fractures requires a three-dimensional simulation under a certain large displacement under the condition of well logging and rock mechanics data input in large commercial software. Here, the certain large displacement refers to the casing volume fracturing construction displacement under the bridge-shot joint operation process, and the displacement is greater than 8m3 / min. The software can use general fracturing software, such as FracproPT, Meyer, GOHFER, etc. Through commercial software simulation, it is intended to predict the ideal fracturing main fracture scale under a certain construction and transformation scale based on the preliminary geological logging and rock testing.
[0063] The volume of sand paving in the semi-main joint is calculated according to the simulated crack scale, and the ground pressure is calculated according to the construction parameters, and the construction limit pressure is calculated through the ground pressure.
[0064] Wherein, the calculation method of the volume of the semi-main joint sand paving is:
[0065]
[0066] Among them, V σ is the volume of sand paved in the half main joint, m 3 ; h is the simulated height of the crack, m; L is the simulated half length of the crack, m; is the average crack width, m.
[0067] Under ideal conditions, multiple cluster perforations are performed in the perforation section. Each cluster perforation section generally adopts full circumferential perforation of the wellbore. The main fractures of the fracturing are similarly symmetrically distributed relative to the wellbore, and one side of the main fracture is called the semi-main fracture. Due to the actual fracturing, one side of the fracture may be easier to advance, so this method takes the semi-main fracture as the research object.
[0068] The calculation method of the ground pressure is:
[0069] P B =P w +P g +P b +P j -P l ,
[0070] Among them, PB is the ground pressure, MPa; P w is the formation closure stress, MPa; P g is the string friction, MPa; P b is the estimated crack net pressure, MPa; P j is the near-wellbore friction, MPa; P l is the liquid column pressure, MPa.
[0071] The construction pressure limit is predicted by engineering technicians based on transformation parameters, ground pressure and related formulas when compiling engineering designs, and is an important parameter for guiding on-site construction.
[0072] S2. The main displacement of fracturing is the main displacement of the fracturing section, and the displacement is greater than 8m 3 / min.
[0073] S3. The main displacement of fracturing pumps in sand-carrying fluid to add sand to the first half of the main seam between clusters, with a step-by-step sand increase ratio to ensure that the critical construction pressure is reached when the first half of the main seam is filled with sand.
[0074] The clusters are separated mechanically due to economic and technical conditions. It is generally believed that a cluster produces a symmetrical main fracture, one side of which is a half-main fracture. Here, the first half-main fracture refers to the side of the main fracture that first starts to form fractures in the segment. Which segment starts to expand first is determined by the stratum.
[0075] The sand-carrying liquid refers to a clean water mixed liquid or low-viscosity slippery water with basic chemical materials such as bactericides and surfactants added, and the viscosity of the sand-carrying liquid is <10mPa.s.
[0076] The sand ratio is determined according to the main displacement of the construction and gradually increased in a step-by-step manner, such as 8%, 10%, 12%, etc. The highest sand ratio does not exceed 20%. Generally, when adding sand at a sand ratio, the pressure stabilizes or slightly decreases, or rises slightly and then stabilizes, the sand ratio can be increased again, in order to pump the proppant into the formation under safe and smooth conditions.
[0077] The completion of sanding the first half main seam specifically refers to the amount of sand added reaching more than 80% of the volume of sanding the half main seam in step S1. The construction critical pressure refers to the condition that the slope of the ground pressure curve is rapidly greater than 1.0 under the condition that the construction does not exceed the construction limit pressure, the curve pressure increases, the pressure increases by more than 3MPa, and the pressure is stable for more than 30S after the pressure increase.
[0078] S4. Displacement at an appropriate displacement, and the sand is displaced into the formation. The appropriate displacement in the displacement stage is generally the main displacement of fracturing, which can be adjusted appropriately according to the pressure after boosting. Displacement of sand into the formation specifically means that all the sand-carrying fluid is pumped into the formation through the displacement fluid, and there is no residual sand-carrying fluid in the wellbore.
[0079] S5. Repeat steps S2-S4 to transform the remaining half main seams to achieve uniform transformation among clusters.
[0080] Example 4
[0081] As another preferred embodiment of the present invention, refer to the attached specification Figure 1 And the instruction manual Figure 3 The present invention includes a fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster, specifically taking a coalbed methane horizontal well as an example. The coalbed methane horizontal well has a vertical depth of 771.28m and an oblique depth of 2150m. The horizontal section of the well is 1219 meters long and is designed to be divided into 15 sections for perforation and fracturing, of which the 12th section (1233.0-1235.0m, 1202.0-1204.0m) is subjected to a multi-cluster perforation steering fracturing construction test. The light casing large-displacement injection + bridge plug segmented fracturing technology is used to perform segmented fracturing construction on the horizontal section of the coal seam roof, and a quartz sand support fracture with high conductivity is established in the coal seam to increase the coal seam drainage area.
[0082] The rock mechanics parameters of the transformed coal seam and coal roof were calculated through cross-dipole acoustic logging in adjacent wells. According to the logging interpretation results, the anisotropic orientation of the coal seam and the top and bottom strata is NE-SWW, and the direction of the fracturing crack is NE-SWW, which is oblique to the horizontal wellbore. The interpretation results of the reservoir and roof rock mechanics parameters can be seen in the table below, and the interpretation results of the transformed coal seam ground stress can be seen in the attached manual. Figure 2 :
[0083]
[0084] The interval between the staged fracturing sections of the well is 70-90m. The fracturing fluid is active water fracturing fluid, and the fracturing fluid ratio is: clean water + 1.0% KCl + 0.05% fungicide. The main proppant uses quartz sand with two particle sizes of 20 / 40 mesh and 16 / 20 mesh, which is suitable for the stress condition of the coal seam of this well group. The spare 40 / 70 mesh fine sand is used for pre-fluid polishing holes to reduce resistance and prevent filtration loss. The average sand ratio is controlled at 12%, the pre-fluid ratio is 30% to 40%, and 70-90m3 of sand is designed to be added in each section. According to the designed displacement, the sand addition amount is predetermined to design the corresponding pumping program, and a three-dimensional fracture simulation is performed. The fracture parameters can be seen in the following table:
[0085]
[0086] Ideal seam volume for a single half main seam:
[0087]
[0088] In actual situations, it is difficult to completely fill the joint volume. The effective sand-laying characteristic length of the dense layer is calculated as 1 / 2, and the sand-laying volume of the half main joint is:
[0089] V σ =1 / 8V
[0090] The sand volume of the semi-main seam of this section is calculated to be 35m 3 The amount of sand added in the set stage is 28m 3 , actually adjust according to the construction situation to ensure the effect of pulse sand adding temporary plugging and diverting.
[0091] Construction pressure limit calculation: Calculate the ground pressure based on formation stress, construction displacement, perforation parameters, and reservoir rock mechanics parameters. See the table below for details:
[0092]
[0093] It is estimated that the ground pressure of this well will be between 21-30MPa. The pressure increase in the final stage of sand addition is in the reasonable range of 3-10MPa. The critical construction pressure of sand addition is 24-40MPa. To ensure safety, the maximum pressure limit during the entire construction stage is 45MPa.
[0094] During the construction process, first 10m 3 / min displacement to create seams, and add 40-70 mesh sand to grind the seams, the pre-liquid volume is 300m 3 Then start adding sand in steps. When the sand ratio reaches 12%, the amount of sand added reaches 25m 3 , basically meet the stage sand addition amount, continue to increase the sand ratio, the pressure rises from 27MPa to 36MPa, and then at 10m 3 / min displacement replaces 15m 3 Then, the above steps of adding sand are repeated until the fracturing construction of the two clusters in the entire section is completed. On the whole, 4 and a half main seams are added with sand, and the purpose of temporary plugging and diversion by adding clean water and sand is completed twice, and the two clusters of cracks are evenly transformed.
[0095] In summary, after reading the present invention document, ordinary technicians in this field can make various other corresponding transformation schemes based on the technical scheme and technical concept of the present invention without creative mental labor, which all fall within the scope of protection of the present invention.
Claims
1. A fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster, characterized in that: The following steps are involved: S1. Calculate the three-dimensional principal stress of the reservoir based on well logging data, rock mechanics test data and block ground stress test, then simulate the fractures under the corresponding displacement, calculate the semi-main fracture sand volume based on the simulated fracture scale, calculate the ground pressure based on the construction parameters, and calculate the construction pressure limit through the ground pressure; S2. Fracture creation with pre-fluid of main fracturing displacement; S3. Pump the sand-carrying fluid into the first half of the main seam between the clusters with the main displacement of the fracturing, and step the sand-raising ratio to ensure that the construction critical pressure is reached when the sand-adding of the first half of the main seam is completed; wherein, the completion of the sand-adding of the first half of the main seam specifically refers to: the amount of sand added reaches more than 80% of the volume of the sand-paved half of the main seam in step S1; the construction critical pressure specifically refers to: under the condition of not exceeding the construction limit pressure, the slope of the ground pressure curve is rapidly greater than 1.0, the curve is increased, the pressure is increased by more than 3MPa, and the pressure is stable for more than 30S after the pressure is increased; S4. Sand displacement into the stratum; S5. Repeat steps S2-S4 to transform the remaining half main seam; Wherein, the calculation method of the volume of the semi-main joint sand paving is: in, is the volume of sand paved in the half main joint, m 3 ; h is the simulated height of the crack, m; L is the simulated half length of the crack, m; is the average crack width, m.
2. A fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster according to claim 1, characterized in that: The logging data specifically refers to logging data reflecting formation porosity, cementing quality or ground stress conditions, including conventional acoustic wave time difference, well diameter, resistivity, natural potential, density, natural gamma and acoustic wave variable density.
3. A fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster according to claim 2, characterized in that: The rock mechanics test data are data reflecting the brittleness, strength and toughness of the rock obtained through conventional triaxial tests, splitting tests, acoustic emission geostress tests and reservoir grain size characteristic tests, including reservoir rock modulus, Poisson's ratio and fracture strength.
4. A fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster according to claim 1, characterized in that: The calculation method of the ground pressure is: in, is the ground pressure, MPa; is the formation closure stress, MPa; is the string friction, MPa; is the estimated fracture net pressure, MPa; is the near-wellbore friction, MPa; is the liquid column pressure, MPa.
5. A fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster according to claim 1, characterized in that: The sand-carrying liquid refers to a liquid mixture of clean water and basic chemical materials, the viscosity of the sand-carrying liquid is less than 10mPa.s, and the basic chemical materials include bactericides or active agents.
6. A fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster according to claim 1, characterized in that: The stepped sand ratio specifically refers to: the sand ratio is determined according to the main construction displacement and gradually increased in a stepped manner, and the highest sand ratio does not exceed 20%.
7. A fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster according to claim 1, characterized in that: The sand displacement into the formation specifically refers to: all the sand-carrying fluid is pumped into the formation by the displacement fluid, and no sand-carrying fluid remains in the wellbore.
8. The fracturing method for temporarily plugging horizontal well clusters to achieve uniform transformation of each cluster according to claim 1, characterized in that: The main displacement in step S2 refers to the main displacement of this fracturing stage, and the displacement is greater than 8m 3 / min.
