Automatic battery replacement control method for rail vehicles, electronic equipment and storage medium
Through the automatic power swap control method of rail vehicles, the vehicle and power swap station information is obtained, and the target power swap station is planned, which solves the problem of power swap needs of multi-group rail vehicles and achieves efficient and reliable operation of the system and shortens the power swap time.
Patent Information
- Application Number
- CN202111017117.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-08-31
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-08-31
AI Technical Summary
Existing smart power swap solutions cannot meet the power swap needs of multi-group rail vehicles, resulting in long battery swap times and limiting the endurance and operating efficiency of rail vehicles.
An automatic power swap control method for rail vehicles is proposed. By obtaining vehicle information and power swap station information, the target power swap station is planned, and a power swap plan is formulated to achieve unified scheduling of rail vehicles and power swap stations, ensuring that power swap needs are met and the duration is shortened. .
It achieves efficient and reliable operation of the rail vehicle system, meets the needs of power swapping, shortens the power swapping time, and improves the power swapping efficiency.
Smart Images

Figure CN115723618B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field related to rail vehicles, and in particular to a rail vehicle automatic battery replacement control method, electronic equipment and storage medium. Background Art
[0002] At present, reducing carbon emissions has become a major issue. With the continuous breakthroughs in new energy technologies, electric vehicles are increasingly favored by national governments and consumers. However, problems such as the short battery life and long charging time of electric vehicles have become increasingly prominent, becoming a bottleneck restricting their large-scale development, especially for operating rail vehicles. In recent years, with the development of the smart battery swap station network, electric vehicles have changed from charging to battery swapping, which can solve the problem of long charging time to a certain extent. However, most of the existing smart battery swapping solutions are only applicable to electric vehicles and cannot meet the battery swapping needs of multi-unit rail vehicles. Summary of the invention
[0003] The purpose of this application is to solve the technical problem that the existing battery replacement scheme is not suitable for multi-unit rail vehicles to a certain extent. In view of this, this application proposes a rail vehicle automatic battery replacement control method, electronic equipment and storage medium, which plans a target battery replacement station that meets the battery replacement needs for rail vehicles, which can not only realize the efficient and reliable operation of the system, but also formulate a battery replacement plan for the rail vehicle based on the vehicle information of the rail vehicle and the battery replacement device information of the target battery replacement station, thereby shortening the battery replacement time while meeting the battery replacement needs.
[0004] A first aspect of the present application provides an automatic battery replacement control method for a rail vehicle, which is applied to a battery replacement management platform, and the method includes: obtaining vehicle information of a rail vehicle, wherein the rail vehicle includes a plurality of carriages and a battery pack for power supply, and the vehicle information includes current position information of the rail vehicle and current power information of the battery pack; judging whether the rail vehicle has a battery replacement demand based on the vehicle information of the rail vehicle; when it is determined that the rail vehicle has a battery replacement demand, planning a target battery replacement station for the rail vehicle that meets the battery replacement demand; obtaining battery replacement device information of the target battery replacement station, and formulating a battery replacement plan for the rail vehicle based on the vehicle information and the battery replacement device information; and sending a battery replacement request signal to the target battery replacement station to request the target battery replacement station to execute the battery replacement plan for the rail vehicle.
[0005] The automatic battery replacement control method for rail vehicles provided in the present application can accurately determine the battery replacement demand of rail vehicles by receiving the vehicle information of rail vehicles, thereby realizing unified scheduling planning for rail vehicles and battery replacement stations, and planning target battery replacement stations that meet the battery replacement demand for rail vehicles, so as to realize efficient and reliable operation of the system. In addition, a battery replacement plan is formulated for rail vehicles based on the vehicle information of rail vehicles and the battery replacement device information of the target battery replacement station, so as to shorten the battery replacement time while meeting the battery replacement demand, thereby improving the battery replacement efficiency.
[0006] The second aspect of the present application provides an electronic device, including a processor and a memory, wherein the memory stores instructions that can be executed by the processor, and when the instructions are executed by the processor, the processor executes the rail vehicle automatic battery replacement control method described in the first aspect above.
[0007] A third aspect of the present application provides a computer-readable storage medium for storing instructions, which, when executed, implement the rail vehicle automatic battery replacement control method described in the first aspect.
[0008] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 It is a structural schematic diagram of a rail vehicle automatic battery replacement control system provided in an embodiment of the present application.
[0010] Figure 2 It is an interaction flow chart between a rail vehicle, a battery replacement management platform and a target battery replacement station in a rail vehicle automatic battery replacement control system provided in an embodiment of the present application.
[0011] Figure 3 It is a step flow chart of a rail vehicle automatic battery replacement control method provided in an embodiment of the present application.
[0012] Figure 4 yes Figure 3 Detailed flowchart of step 602 in FIG.
[0013] Figure 5 yes Figure 3 Detailed flowchart of step 604 in FIG.
[0014] Figure 6 It is a structural schematic diagram of an electronic device provided in an embodiment of the present application.
[0015] Description of main component symbols:
[0016] Rail vehicle automatic battery replacement control system 10
[0017] Battery swap management platform 100
[0018] Battery swap station 300
[0019] Rail Vehicles 200
[0020] Vehicle controller 210
[0021] Carriage 201
[0022] Train Control and Management System 220
[0023] Battery Management System 230
[0024] Change potential 301
[0025] Battery swap server 310
[0026] Battery replacement device 320
[0027] Electronic equipment 400
[0028] Processor 410
[0029] Memory 420
[0030] Steps 601-605, 6021-6025, 6041-6045
[0031] The following specific implementation methods will further illustrate the present application in conjunction with the above-mentioned drawings. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0033] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, "several" and "multiple" mean one or more, unless otherwise clearly and specifically defined.
[0034] Figure 1 Schematic diagram of a rail vehicle automatic battery replacement control system provided by an embodiment of the present application. Figure 1As shown, the rail vehicle automatic battery replacement control system 10 includes a battery replacement management platform 100, a plurality of rail vehicles 200 and a plurality of battery replacement stations 300. For the sake of illustration, Figure 1 Only one rail vehicle 200 and one battery swap station 300 are shown.
[0035] In an embodiment of the present application, the battery exchange management platform 100 is used to compile an operation diagram for each rail vehicle 200 in the rail vehicle automatic battery exchange control system 10, and communicate with each rail vehicle through a vehicle-to-ground wireless communication method, for example, real-time or periodic receiving operation data of each rail vehicle 200, and sending a notification signal or a control signal to each rail vehicle, so as to ensure that the rail vehicle can travel as planned. Exemplarily, the wireless communication method may include an LTE-U communication method or other communication methods. Among them, the operation diagram is a technical document used to indicate the operation of rail vehicles in the track section and the arrival, departure or passing time at the station. It specifies the procedure for each train number of rail vehicles to occupy the section, the arrival and departure (or passing) time of the rail vehicle at each station, the operation time of the rail vehicle in the section and the stop time, which is the basis for organizing the operation of rail vehicles throughout the railway.
[0036] The battery swap management platform 100 is also used to communicate with each battery swap station 300, and when the rail vehicle has a battery swap demand, plan a target battery swap station for the rail vehicle 200, and request the target battery swap station to replenish power to the rail vehicle 200 to ensure that the rail vehicle 200 has sufficient power to complete the operation plan.
[0037] In the embodiment of the present application, the rail vehicle 200 includes a vehicle on-board controller (Vehicle On-board Controller, VOBC) 210, a train control and management system (Train Control and Management System, referred to as TCMS) 220 and a plurality of carriages 201. The train control and management system 220 is electrically connected to the vehicle on-board controller 210, and the vehicle on-board controller 210 is used to communicate with the battery exchange management platform 100 through vehicle-ground wireless communication, for example, in real time or periodically sending vehicle information from the train control and management system 220 of the vehicle to the battery exchange management platform 100, and receiving the battery exchange notification signal sent by the battery exchange management platform 100, so that the battery exchange management platform 100 can monitor the vehicle information of the rail vehicle 200 in real time, including the power status of the battery pack, etc., and make reasonable overall planning, thereby ensuring that the rail vehicle 200 has sufficient power to complete the operation plan.
[0038] In an embodiment of the present application, each carriage 201 includes a battery pack (not shown) and a battery management system (BMS) 230. Each carriage 201 is driven independently by its own battery pack. Among them, for the same carriage, the battery management system 230 is electrically connected to the train control and management system 220 and the battery pack, respectively, and the battery management system 230 is used to monitor the battery information of the corresponding battery pack in real time and transmit it to the train control and management system 220. The train control and management system 220 can at least obtain the vehicle information of the rail vehicle 200 based on the battery information of the corresponding battery pack provided by each battery management system 230.
[0039] During battery replacement, each battery management system 230 communicates with the target battery replacement station 300 to achieve battery replacement information exchange.
[0040] In the embodiment of the present application, the battery swap station 300 includes a battery swap server 310 and a plurality of battery swap points 301. The battery swap server 310 is electrically connected to the battery swap management platform 100 (for example, connected via an Internet network connection), and the battery swap server 310 is used to communicate with the battery swap management platform 100, for example, to receive a battery swap request signal sent by the battery swap management platform 100 or to send a usage status signal of its battery swap point 301 to the battery swap management platform 100. Each battery swap point 301 is configured with a battery swap device 320, and each battery swap device 320 is electrically connected to the battery swap server 310, respectively, and each battery swap device 320 is used to receive and respond to the battery swap control signal sent by the battery swap server 310, and execute a corresponding battery swap plan for the corresponding carriage 201.
[0041] For details, please refer to Figure 1 and Figure 2 , during the operation of the rail vehicle 200, the vehicle information of the vehicle is sent to the battery exchange management platform 100 through the train control and management system 220. The vehicle information at least includes the current location information and current power information of the rail vehicle 200. The vehicle information is used for the battery exchange management platform 100 to determine whether the rail vehicle 200 has a battery exchange demand. It should be noted that in this embodiment of the present application, the communication between the train control and management system 220 and the battery exchange management platform 100 is achieved through the on-board controller 210. For example, the train control and management system 220 sends the vehicle information of the vehicle to the on-board controller 210, and the on-board controller 210 sends the vehicle information to the battery exchange management platform 100 in a wireless communication manner. In order to simplify the interaction flow chart, Figure 2 The onboard controller 210 is not shown.
[0042] When the battery replacement management platform 100 receives the vehicle information sent by the rail vehicle 200 , it determines whether the rail vehicle 200 has a battery replacement demand based on the vehicle information of the rail vehicle 200 .
[0043] When the battery swap management platform 100 determines that the rail vehicle 200 has a battery swap demand, it plans a target battery swap station 300 that meets the battery swap demand for the rail vehicle 200 from the several battery swap stations 300, obtains the battery swap device information of the target battery swap station 300, and then formulates a battery swap plan for the rail vehicle 200 based on the vehicle information and the battery swap device information, and sends a battery swap request signal to the target battery swap station 300 to request the target battery swap station 300 to execute the battery swap plan for the rail vehicle 200. The battery swap request signal contains at least the identification information and the battery swap plan information of the rail vehicle 200, and the battery swap request signal is used to request the target battery swap station 300 to execute the battery swap plan for the rail vehicle 200. Exemplarily, the battery swap management platform 100 can obtain and store the battery swap device information of all battery swap stations 300 in the rail vehicle automatic battery swap control system 10 before the rail vehicle automatic battery swap control system 10 is put into operation, and can also continuously update the battery swap device information of each battery swap station 300 during operation. For example, the battery exchange device information includes the number of battery exchange devices 320 of each battery exchange station 300. In this embodiment, the battery exchange management platform 100 is also used to send a battery exchange notification signal and a vehicle control signal to the rail vehicle 200 after the battery exchange plan is formulated. The battery exchange notification signal at least includes the location information of the target battery exchange station 300, and the vehicle control signal is used to control the rail vehicle 200 to travel to the target battery exchange station 300 for battery pack replacement.
[0044] When the train control and management system 220 of the rail vehicle 200 receives the battery swap notification signal and the vehicle control signal sent by the battery swap management platform 100, it controls the rail vehicle 200 to travel to the target battery swap station 300. The rail vehicle 200 stops at the target battery swap location of the target battery swap station 300. Exemplarily, after the rail vehicle 200 stops at the target battery swap location and disconnects the positive and negative contactors of the battery packs of each carriage, it sends a battery swap readiness signal to the target battery swap station 300.
[0045] When the target battery swap station 300 receives the battery swap request signal sent by the battery swap management platform 100, it exchanges battery swap information with the rail vehicle 200 according to the identification information of the rail vehicle 200 contained in the battery swap request signal, and after completing the information exchange, executes the battery swap plan on the rail vehicle 200 according to the battery swap request signal sent by the battery swap management platform 100. Exemplarily, the battery swap server 310 is also used to establish a communication connection with the rail vehicle 200 according to the identification information of the rail vehicle 200, so as to realize the battery swap information exchange.
[0046] The rail vehicle automatic battery replacement control system 10 provided in the present application uses a battery replacement management platform 100 to perform unified scheduling and planning for rail vehicles 200 and battery replacement stations 300. The battery replacement management platform 100 obtains the vehicle information of the rail vehicle 200 to monitor whether each rail vehicle 200 has a battery replacement demand, and promptly meets the battery replacement demand of the rail vehicle 200 through the coordinated scheduling of the rail vehicle 200 and the battery replacement station 300, which can ensure that the rail vehicle can complete the operation plan reliably and efficiently. In addition, during the battery replacement process, the rail vehicle 200 and the battery replacement station 300 automatically match and exchange information according to the signal sent by the battery replacement management platform 100, which improves the automation level of battery replacement.
[0047] See also Figure 3 , the embodiment of the present application provides a rail vehicle automatic battery replacement control method, and the rail vehicle automatic battery replacement control method is applied to the battery replacement management platform 100. Specifically, the rail vehicle automatic battery replacement control method includes the following steps:
[0048] Step 601, obtaining vehicle information of the rail vehicle 200. The rail vehicle 200 includes a plurality of carriages 201 and a battery pack for power supply, and the vehicle information includes the current position information of the rail vehicle 200 and the current power information of the battery pack. For example, in an embodiment of the present application, the rail vehicle 200 can send its vehicle information to the battery exchange management platform 100 in real time or periodically.
[0049] Step 602, judging whether the rail vehicle 200 has a need for battery replacement according to the vehicle information of the rail vehicle 200. If the rail vehicle has a need for battery replacement, executing step 603; if the rail vehicle does not have a need for battery replacement, returning to step 601, and continuing to obtain the vehicle information of the rail vehicle 200.
[0050] Step 603, planning a target battery swap station 300 that meets the battery swap demand for the rail vehicle 200. It is understandable that the battery swap management platform 100 can plan a target battery swap station 300 that meets the battery swap demand for the rail vehicle 200 in advance, in combination with the current location information and operation diagram information of the rail vehicle 200. Among them, the target battery swap station 300 that meets the battery swap demand refers to the battery swap station that the rail vehicle 200 can reach if it continues to operate according to the operation diagram with the current power.
[0051] Step 604, obtaining the battery swap device information of the target battery swap station 300, and formulating a battery swap plan for the rail vehicle 200 based on the vehicle information and the battery swap device information.
[0052] Step 605, sending a battery replacement request signal to the target battery replacement station 300 to request the target battery replacement station 300 to execute the battery replacement plan for the rail vehicle 200, and sending a battery replacement notification signal and a vehicle control signal to the rail vehicle 200 to control the rail vehicle 200 to travel to the target battery replacement station 300 to replace the battery pack. The battery replacement notification signal includes the location information of the target battery replacement station 300.
[0053] In an embodiment of the present application, the battery replacement scheme may include controlling the battery replacement device 320 to replace the battery pack for the corresponding battery replacement car 201, and controlling the charging device (not shown in the figure, such as a charging bow) to charge the corresponding charging car 201. Specifically, the battery replacement scheme of the rail vehicle 200 includes a battery replacement strategy for several of its cars, for example, replacing the battery packs for cars 1 and 2, and charging cars 3 and 4. Exemplarily, before the target battery replacement station 300 executes the battery replacement scheme for the rail vehicle 200, the battery replacement server 310 sends a corresponding battery replacement control signal to several battery replacement devices 320 according to the battery replacement request signal, and the several battery replacement devices 320 communicate with the corresponding car 201 according to the battery replacement control signal and then replace the battery pack for the corresponding car 201. In this embodiment, the battery replacement server 310 can control the movement of the battery replacement device 320 according to the position of the battery replacement car 201 to achieve the replacement of the battery pack for the corresponding battery replacement car 201. Similarly, the battery exchange server 310 can control the movement of the charging device according to the position of the battery exchange carriage 201 to charge the corresponding charging carriage 201.
[0054] For details, please refer to Figure 4-Figure 5 , Figure 4 is a detailed flow chart of step 602, Figure 5 is a detailed flow chart of step 604. Figure 4 As shown, step 602 specifically includes the following steps:
[0055] Step 6021 : Obtain the remaining planned mileage of the rail vehicle 200 . In this embodiment, the remaining planned mileage can be obtained through the operation diagram and the current position information of the rail vehicle 200 .
[0056] Step 6022, calculate the required power of each car 201 according to the remaining planned mileage and the average energy consumption of each car 201. Among them, the ratio of the remaining planned mileage to the average energy consumption of each car 201 is the required power of the corresponding car 201. Exemplarily, the average energy consumption may be the average energy consumption in a preset operation record, for example, the average energy consumption of car 1 in the last 50 km is 10% of the total power of the battery pack consumed per 1 km traveled, or the average energy consumption of car 1 in the last 50 km is 10kWh / 100km. In an embodiment of the present application, the vehicle information also includes the current remaining power information of the battery pack of each car 201 and the average energy consumption information of each car 201 in the preset operation record.
[0057] Step 6023 , judging whether the remaining power value of the battery pack of each carriage 201 is less than the corresponding required power value according to the current remaining power information of the battery pack of each carriage 201 and the required power value of each carriage 201 .
[0058] Step 6024, if the remaining power value of the battery pack of the car 201 is less than the corresponding required power value, the car 201 is determined as the target car 201 that needs to be supplemented with electricity. It is understandable that when the remaining power value of the battery pack of the car 201 is less than the corresponding required power value, the car 201 will not be able to complete the remaining planned mileage, and therefore needs to be charged or replaced. In another embodiment, it is also possible to determine whether each car is a target car based on the SOC (State of Charge) of the battery pack. For example, when the SOC of the battery pack is less than a preset value, such as 20%, the car 201 is determined to be a target car. The present application does not specifically limit the judgment rules for the target car.
[0059] Step 6025: If there is at least one target carriage 201, it is determined that the rail vehicle 200 needs to be replaced with a battery.
[0060] like Figure 5 As shown, step 604 specifically includes the following steps:
[0061] Step 6041 , counting the number N of the target carriages 201 .
[0062] Step 6042, determine whether the number N of the target carriages 201 is greater than the number A of the battery swapping devices 320 of the target battery swapping station 300. If the number N of the target carriages 201 is less than or equal to the number A of the battery swapping devices 320 of the target battery swapping station 300, execute step 6043. If the number N of the target carriages 201 is greater than the number A of the battery swapping devices 320 of the target battery swapping station 300, execute step 6044. In an embodiment of the present application, the battery swapping device information includes the number A of the battery swapping devices 320 of the target battery swapping station 300.
[0063] Step 6043, all target carriages 201 are determined as battery replacement carriages 201. The battery replacement carriage 201 is a carriage 201 where the battery pack is planned to be replaced.
[0064] In some embodiments, the vehicle information also includes the number M of carriages 201 of the rail vehicle 200. The rail vehicle automatic battery replacement control method further includes the following steps:
[0065] Step A1, if the number N of the target carriages 201 is less than the number A of the battery swap devices 320 of the target battery swap station 300, and the number M of the carriages 201 of the rail vehicle 200 is greater than the number A of the battery swap devices 320 of the target battery swap station 300, then the cruising range of each non-target carriage 201 is calculated based on the average energy consumption of each non-target carriage 201 and the current remaining power of its battery pack.
[0066] Step A2, sort the cruising range of each non-target carriage 201 from small to large, and determine the carriage 201 with the first Y cruising ranges as the battery-exchange carriage 201, where Y=AN.
[0067] It can be understood that if the number N of the target carriages 201 is less than the number A of the battery swapping devices 320 of the target battery swapping station 300, and the number M of the carriages 201 of the rail vehicle 200 is greater than the number A of the battery swapping devices 320 of the target battery swapping station 300, it means that on the basis of meeting the battery swapping needs of each target carriage 201, the target battery swapping station 300 still has idle battery swapping devices 320. This embodiment selects carriages with shorter cruising range from each non-target carriage 201 for battery pack replacement, which can maximize the utilization of the battery swapping device 320 and increase the overall cruising range of the rail vehicle 200.
[0068] It can be understood that when the number N of the target carriages 201 and the number M of the carriages 201 of the rail vehicle 200 are both less than the number A of the battery swapping devices 320 of the target battery swapping station 300, the target battery swapping station 300, on the basis of meeting the battery swapping needs of each target carriage 201, also has idle battery swapping devices 320. In this case, in addition to determining all target carriages 201 as battery swapping carriages 201, the remaining carriages can also be determined as battery swapping carriages 201. In this way, the utilization of the battery swapping device 320 can be maximized and the vehicle range of the rail vehicle 200 can be increased.
[0069] Step 6044, determine A battery-changing carriages 201 from N target carriages 201 according to a preset rule, and determine the remaining X target carriages 201 as charging carriages 201. Where X=NA, the charging carriage 201 is the carriage 201 where the battery pack is planned to be charged.
[0070] Specifically, step 6044 includes the following steps:
[0071] Step B1, combining the power demand of each carriage 201 and the current remaining power and charging characteristic curve of the battery pack of each carriage 201, determining the shortest charging time required for the battery pack of each carriage 201 to complete the remaining planned mileage of each carriage 201. The vehicle information also includes the charging characteristic curve information of the battery pack of each carriage 201.
[0072] Step B2, sort the shortest charging time of the battery packs of each carriage 201 from large to small, and determine the carriage 201 with the shortest charging time in the top A positions as the battery replacement carriage 201.
[0073] Step B3 , determining the maximum value among the shortest charging times of the battery packs of all the charging carriages 201 as the planned charging time of each charging carriage 201 .
[0074] It is understandable that priority is given to replacing the battery in the carriage 201 with a relatively long shortest charging time, while charging the carriage 201 with a relatively short short charging time. This can shorten the charging time while ensuring that the rail vehicle 200 can complete the remaining planned mileage, thereby improving the efficiency of battery replacement.
[0075] It is understandable that when the number N of the target carriages 201 is greater than the number A of the battery swapping devices 320 of the target battery swapping station 300, the number M of the carriages 201 of the rail vehicle 200 must also be greater than the number A of the battery swapping devices 320 of the target battery swapping station 300. In this case, since some of the target battery swapping carriages 201 need to be charged, the remaining non-target battery swapping carriages can also be charged at the same time. Similarly, the maximum value of the shortest charging time of the battery packs of all charging carriages 201 is determined as the planned charging time of each charging carriage 201. In this way, the non-target battery swapping carriages can also be replenished with electricity, further increasing the vehicle range of the rail vehicle 200.
[0076] Step 6045, determine the parameters of the new battery packs that need to be replaced in each battery replacement carriage 201. The vehicle information also includes the rated electrical parameters of the battery packs of each carriage 201 and the average energy consumption information of each carriage 201 in the preset operation record.
[0077] Specifically, step 6045 includes the following steps:
[0078] Step C1, determining the minimum power value of the new battery pack required for each battery-exchange carriage 201 based on the remaining planned mileage and the average energy consumption of each battery-exchange carriage 201.
[0079] Step C2, determine the parameters of the new battery pack of each battery-exchanging car 201 based on the rated electrical parameters of the battery pack of each battery-exchanging car 201 and the minimum power value of the new battery pack required by each battery-exchanging car 201, wherein the parameters of the new battery pack at least include the corresponding rated electrical parameters and the minimum power value.
[0080] Furthermore, the rated electrical parameters of the new battery pack of each battery-exchange carriage 201 include a rated voltage. It should be noted that the difference between the rated voltage of the new battery pack of each battery-exchange carriage 201 and the rated voltage of the battery pack before replacement cannot exceed a preset difference range.
[0081] It is understandable that since the power load of each battery exchange car 201 may be different, when determining the parameters of the new battery pack that needs to be replaced in each battery exchange car 201, the minimum required power is calculated based on the average energy consumption value of each battery exchange car 201 and the remaining planned mileage, which can ensure that each battery exchange car 201 can complete the remaining planned mileage.
[0082] It should be noted that the battery packs in the same carriage 201 may include several battery packs of the same model connected in parallel to meet the corresponding power requirements. The number of battery packs in a single carriage 201 is not limited here. Since the minimum power requirements of each battery-swapping carriage 201 may be different, each battery-swapping carriage 201 can replace standard battery packs of different models. For example, carriage 1 replaces 2 battery packs A, and carriage 2 replaces 3 battery packs B, where the rated voltages of battery packs A and battery packs B are similar but the capacity values are different.
[0083] The automatic battery replacement control method for rail vehicles provided in the present application can accurately determine the battery replacement demand of rail vehicles by receiving the vehicle information of rail vehicles, thereby realizing unified scheduling planning for rail vehicles and battery replacement stations, and planning target battery replacement stations that meet the battery replacement demand for rail vehicles, so as to realize efficient and reliable operation of the system. In addition, a battery replacement plan is formulated for rail vehicles based on the vehicle information of rail vehicles and the battery replacement device information of the target battery replacement station, so as to shorten the battery replacement time while meeting the battery replacement demand, thereby improving the battery replacement efficiency.
[0084] See also Figure 6 An embodiment of the present application provides an automatic battery replacement control electronic device 400 for a rail vehicle, wherein the electronic device 400 includes a processor 410 and a memory 420, wherein the memory 420 stores instructions that can be executed by the processor 410, and when the instructions are executed by the processor 410, the steps of the automatic battery replacement control method for a rail vehicle described in the above-mentioned embodiments are executed.
[0085] Exemplarily, in one embodiment, when the instruction is executed by the processor 410, the execution Figure 3 The steps of the rail vehicle automatic battery replacement control method in the illustrated embodiment.
[0086] The present application also provides a computer-readable storage medium having instructions stored thereon, and when the instructions are executed by a processor, the steps of the rail vehicle automatic battery replacement control method described in the above-mentioned embodiments are executed.
[0087] Exemplarily, in one embodiment, when the instruction is executed by the processor, Figure 3 The steps of the rail vehicle automatic battery replacement control method in the illustrated embodiment.
[0088] A person of ordinary skill in the art can understand that the present application implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, ReNd-Only Memory), random access memory (RNM, RNndom NccessMemory), electric carrier signal, telecommunication signal and software distribution medium, etc. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.
[0089] It is obvious to those skilled in the art that the present application is not limited to the details of the above exemplary embodiments, and that the present application can be implemented in other specific forms without departing from the spirit or basic features of the present application. Therefore, from any point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present application is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present application. Any figure mark in the claims should not be regarded as limiting the claims involved. In addition, it is obvious that the word "comprising" does not exclude other units or steps, and the singular does not exclude the plural. Multiple units or devices stated in the device claim can also be implemented by the same unit or device through software or hardware.
[0090] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.
Claims
1. A rail vehicle automatic battery replacement control method, applied to a battery replacement management platform, characterized in that: The method comprises: Acquire vehicle information of a rail vehicle, wherein the rail vehicle includes a plurality of carriages and a battery pack for power supply, and the vehicle information includes current position information of the rail vehicle and current power information of the battery pack; Determining whether the rail vehicle needs to be replaced according to the vehicle information of the rail vehicle; When it is determined that the rail vehicle has a battery replacement demand, planning a target battery replacement station that meets the battery replacement demand for the rail vehicle; Acquire the battery swap device information of the target battery swap station, and formulate a battery swap plan for the rail vehicle according to the vehicle information and the battery swap device information; and Sending a battery swap request signal to the target battery swap station to request the target battery swap station to execute the battery swap plan for the rail vehicle; The battery swap device information includes the number A of battery swap devices of the target battery swap station; The formulating a battery replacement plan for the rail vehicle according to the vehicle information and the battery replacement device information specifically includes: Counting the number N of target carriages; wherein the target carriage is a carriage among the plurality of carriages that needs to be supplemented with electric power; Determine whether the number N of the target carriages is greater than the number A of the battery swapping devices of the target battery swapping station; If the number N of the target carriages is less than or equal to the number A of the battery swapping devices of the target battery swapping station, all the target carriages are determined as battery swapping carriages; wherein the battery swapping carriage is a carriage where the battery pack is planned to be replaced; If the number of target carriages N is greater than the number of battery swapping devices A of the target battery swapping station, then A battery swapping carriages are determined from the N target carriages according to a preset rule, and the remaining X target carriages are determined as charging carriages; wherein X=NA, and the charging carriage is a carriage where the battery pack is planned to be charged; Determine the parameters of the new battery pack that needs to be replaced in each battery-swapping carriage.
2. The rail vehicle automatic battery replacement control method according to claim 1, characterized in that: Each carriage of the rail vehicle is driven independently by its own battery pack; the vehicle information also includes the current remaining power information of the battery pack of each carriage and the average energy consumption information of each carriage in the preset operation record; The determining, based on the vehicle information of the rail vehicle, whether the rail vehicle has a need for battery replacement specifically includes: Obtaining the remaining planned mileage of the rail vehicle; Calculate the required power of each carriage according to the remaining planned mileage and the average energy consumption of each carriage; According to the current remaining power information of the battery pack of each carriage and the required power of each carriage, it is determined whether the remaining power value of the battery pack of each carriage is less than the corresponding required power value; If the remaining power value of the battery pack of the compartment is less than the corresponding required power value, the compartment is determined as a target compartment that needs to be supplemented with power; If there is at least one target carriage, it is determined that the rail vehicle needs to be replaced with a battery.
3. The rail vehicle automatic battery replacement control method according to claim 2, characterized in that: The vehicle information also includes the battery pack charging characteristic curve information of each carriage; The step of determining A battery-swapping carriage from N target carriages according to a preset rule specifically includes: Combined with the power demand of each carriage, the current remaining power of the battery pack of each carriage and the charging characteristic curve, determine the shortest charging time required for the battery pack of each carriage to complete the remaining planned mileage of each carriage; The shortest charging time of the battery packs in each carriage is sorted from large to small, and the carriage with the shortest charging time ranked in the top A positions is determined as the battery replacement carriage.
4. The rail vehicle automatic battery replacement control method according to claim 2, characterized in that: The vehicle information also includes the rated power parameters of the battery pack of each carriage and the average energy consumption information of each carriage in the preset operation record; Determining the parameters of the new battery packs to be replaced in each battery-swapping carriage specifically includes: Determine the minimum power value of the new battery pack required for each battery-swapping carriage based on the remaining planned mileage and the average energy consumption of each battery-swapping carriage; The parameters of the new battery pack of each battery-swapping car are determined based on the rated electrical parameters of the battery pack of each battery-swapping car and the minimum power value of the new battery pack required by each battery-swapping car, wherein the parameters of the new battery pack at least include the corresponding rated electrical parameters and the minimum power value.
5. The rail vehicle automatic battery replacement control method according to claim 2, characterized in that: The vehicle information also includes the number M of carriages of the rail vehicle; the method further includes: If the number N of the target carriages is less than the number A of the battery swapping devices of the target battery swapping station, and the number M of the rail vehicle carriages is greater than the number A of the battery swapping devices of the target battery swapping station, the cruising range of each non-target carriage is calculated based on the average energy consumption of each non-target carriage and the current remaining power of its battery pack; The cruising range of each non-target carriage is sorted from small to large, and the carriages with the first Y cruising ranges are determined as battery-swapping carriages, where Y = AN.
6. The rail vehicle automatic battery replacement control method according to claim 3, characterized in that: The formulating a battery replacement plan for the rail vehicle according to the vehicle information and the battery replacement device information also includes: If the number N of the target carriages is greater than the number A of the battery swap devices of the target battery swap station, the maximum value of the shortest charging times of the battery packs of all the charging carriages is determined as the planned charging time of each charging carriage.
7. The rail vehicle automatic battery replacement control method according to claim 1, characterized in that: The method further comprises: A battery replacement notification signal and a vehicle control signal are sent to the rail vehicle to control the rail vehicle to travel to the target battery replacement station to replace the battery pack, wherein the battery replacement notification signal includes the location information of the target battery replacement station.
8. An electronic device for controlling automatic battery replacement of a rail vehicle, comprising a processor and a memory, wherein: The memory stores instructions that can be executed by the processor, and is characterized in that when the instructions are executed by the processor, the processor executes the rail vehicle automatic battery replacement control method according to any one of claims 1-7.
9. A computer-readable storage medium for storing instructions, characterized in that: When the instruction is executed, the rail vehicle automatic battery replacement control method as described in any one of claims 1-7 is implemented.