A test system for energy storage system
By designing a test system that utilizes an energy controller and a backup power supply, and uses multiple energy storage systems to be grouped for mutual discharge and charging testing, the existing technology problems of high energy storage system test equipment and diverse power grid frequency requirements are solved. , achieving efficient and accurate energy storage system testing.
Patent Information
- Application Number
- CN202110990112.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-08-26
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-08-26
AI Technical Summary
Existing energy storage system testing solutions are difficult to test multiple grid formats and frequencies, and the test equipment requirements are high and expensive, and cannot meet the diverse voltage levels and frequency requirements of high-power energy storage systems.
A test system is designed. Through the energy controller and backup power supply, multiple energy storage systems are grouped for mutual discharge and charging tests. The commutation controller replenishes energy according to the energy provided by the backup power supply to realize the optimization of the energy storage system. Charge or discharge test to ensure the accuracy and reliability of test results.
It reduces the requirements and costs of test equipment, enables energy storage system testing of different power grid formats and frequencies, improves the accuracy and reliability of testing, and is suitable for the diverse voltage levels and frequency requirements of high-power energy storage systems.
Smart Images

Figure CN115728648B_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present disclosure relate to the field of circuit design technology, and more specifically, to a testing system for an energy storage system. Background Art
[0002] Existing energy storage systems usually include a battery system, a converter controller and a step-up transformer, wherein the DC side of the converter controller is connected to the battery system, and the AC side of the converter controller is connected to the low-voltage side of the step-up transformer. Before the energy storage system leaves the factory, it is necessary to perform charging and discharging tests on the energy storage system to improve the reliability of the energy storage system leaving the factory.
[0003] In the existing discharge test scheme, the grid is usually connected on the high-voltage side of the step-up transformer. However, the trend of energy storage systems is high-power integration, which will include step-up transformers to cope with different application scenarios. Different voltage level interfaces have multiple voltage level requirements for the grid, such as 380V, 480V, 33kV, 110kV, etc. It is difficult to implement multiple grid standards on a single test platform. Moreover, the high-power charging and discharging operation of the energy storage system requires the capacity of the grid to be large enough. Small capacity operation will cause fluctuations that affect the stability of the grid. The capacity of the connected grid must be higher than the capacity of the energy storage system to meet the normal operation of the energy storage system. Therefore, this test scheme has high requirements for the capacity of the grid. In addition, since the frequency of the grid is fixed and cannot be adjusted, the grid cannot test energy storage systems of different frequencies. For example, the domestic 50Hz grid cannot test a 60Hz energy storage system.
[0004] In existing charging test schemes, a generator is usually connected to the high-voltage side of the step-up transformer. However, the generator power is generally required to be at least 1.5 times greater than the output power of the energy storage system, that is, the higher the working power of the energy storage system, the higher the power of the generator set, and the higher the cost. Moreover, the generator generally exhibits high impedance and weak grid characteristics, and matching with the energy storage system requires debugging, which makes it difficult to realize the function. Summary of the invention
[0005] An objective of the embodiments of the present disclosure is to provide a technical solution for testing an energy storage system.
[0006] According to a first aspect of an embodiment of the present disclosure, a test system for an energy storage system is provided, comprising an energy controller, a backup power supply, a first energy storage system group to be tested, and a second energy storage system group, each energy storage system group comprising at least one energy storage system with the same specification, the energy storage system comprising a battery, a first converter controller, and a step-up transformer, the DC side of the first converter controller being connected to the battery, the AC side of the first converter controller being connected to the low-voltage side of the step-up transformer; the high-voltage sides of the step-up transformers in the first energy storage system group and the second energy storage system group being connected to each other;
[0007] The test system further includes second converter controllers corresponding one to one with the energy storage systems in the first energy storage system group; the DC side of each of the second converter controllers is connected to the DC side of the corresponding energy storage system in the first energy storage system group, and the AC side of each of the second converter controllers is connected to the backup power supply;
[0008] The energy controller is configured to control the discharge of the energy storage system in the first energy storage system group and control the charging of the energy storage system in the second energy storage system group; the energy controller is also used to obtain a first discharge parameter of the first energy storage system group and a first charging parameter of the second energy storage system group; according to the first discharge parameter and the first charging parameter, the second converter controller is controlled to supplement the loss energy of the first energy storage system group according to the energy provided by the backup power supply; the energy controller is also used to perform a charging test on the second energy storage system group when the second converter controller supplements the loss energy of the first energy storage system group according to the energy provided by the backup power supply;
[0009] And / or, the energy controller is configured to control the charging of the energy storage system in the first energy storage system group and to control the discharging of the energy storage system in the second energy storage system group; the energy controller is also used to obtain a second charging parameter of the first energy storage system group and a second discharging parameter of the second energy storage system group; according to the second discharging parameter and the second charging parameter, the second converter controller is controlled to supplement the lost energy of the first energy storage system group according to the energy provided by the backup power supply; the energy controller is also used to perform a discharge test on the second energy storage system group when the second converter controller supplements the lost energy of the first energy storage system group according to the energy provided by the backup power supply.
[0010] Optionally, controlling the second converter controller to supplement the lost energy of the first energy storage system group according to the energy provided by the backup power supply according to the first discharging parameter and the first charging parameter includes:
[0011] Determining a first target power of the second converter controller according to the first discharging parameter and the first charging parameter;
[0012] The second converter controller is controlled to use the energy provided by the backup power supply to supplement the lost energy of the first energy storage system group according to the first target power, and the energy storage system in the first energy storage system group is fully discharged when the energy storage system in the second energy storage system group is fully charged.
[0013] Optionally, the first discharge parameter includes: a first charging power on the DC side of the first converter controller in the energy storage system of the second energy storage system group, and a charge capacity of a battery in the energy storage system of the second energy storage system group; the first charging parameter includes: a charge capacity of a battery in the energy storage system of the first energy storage system group, and a first discharge power on the DC side of the first converter controller in the energy storage system of the first energy storage system group;
[0014] The first target power is determined by the following formula:
[0015]
[0016] Among them, P3' represents the first target power, P11 represents the first charging power on the DC side of the first converter controller in the energy storage system of the second energy storage system group, P21 represents the first discharging power on the DC side of the first converter controller in the energy storage system of the first energy storage system group, X11 represents the charge capacity of the battery in the energy storage system of the second energy storage system group, X21 represents the charge capacity of the battery in the energy storage system of the first energy storage system group, n represents the number of energy storage systems in the second energy storage system group, and m represents the number of energy storage systems in the first energy storage system group.
[0017] Optionally, the performing a charging test on the second energy storage system group includes:
[0018] Acquire a second charging test parameter of the second energy storage system group during the charging process;
[0019] A charging test is performed on the second energy storage system group according to the second charging test parameters.
[0020] Optionally, controlling the second converter controller to supplement the lost energy of the first energy storage system group according to the energy provided by the backup power supply according to the second discharging parameter and the second charging parameter includes:
[0021] Determining a second target power of the second converter controller according to the first discharging parameter and the first charging parameter;
[0022] The second converter controller is controlled to use the energy provided by the backup power supply to supplement the lost energy of the first energy storage system group according to the second target power, and the energy storage system in the first energy storage system group is fully charged when the energy storage system in the second energy storage system group is fully discharged.
[0023] Optionally, the second charging parameter includes: the charge capacity of the battery in the energy storage system of the first energy storage system group, and the second charging power of the DC side of the first converter controller in the energy storage system of the first energy storage system group; the second discharging parameter includes: the second discharging power of the DC side of the first converter controller in the energy storage system of the second energy storage system group, and the charge capacity of the battery in the energy storage system of the second energy storage system group;
[0024] The second target power is determined by the following formula:
[0025]
[0026] Among them, P4' represents the second target power, P22 represents the second charging power on the DC side of the first converter controller in the energy storage system of the first energy storage system group, P12 represents the second discharging power on the DC side of the first converter controller in the energy storage system of the second energy storage system group, X12 represents the charge capacity of the battery in the energy storage system of the second energy storage system group, X22 represents the charge capacity of the battery in the energy storage system of the first energy storage system group, n represents the number of energy storage systems in the second energy storage system group, and m represents the number of energy storage systems in the first energy storage system group.
[0027] Optionally, the performing a discharge test on the first energy storage system group includes:
[0028] Acquire a second discharge test parameter of the second energy storage system group during the discharge process;
[0029] A discharge test is performed on the second energy storage system group according to the second discharge test parameters.
[0030] Optionally, the energy controller is further configured to, before controlling the first energy storage system group to discharge or charge, obtain a first average charge capacity of the energy storage systems in the first energy storage system group, and perform energy balancing processing on the energy storage systems in the first energy storage system group according to the first average charge capacity; and / or,
[0031] The energy controller is also configured to obtain a second average charge capacity of the energy storage systems in the second energy storage system group before controlling the first energy storage system group to discharge or charge, and perform energy balancing processing on the energy storage systems in the second energy storage system group based on the second average charge capacity.
[0032] Optionally, performing energy balancing processing on the energy storage systems in the first energy storage system group according to the first average charge capacity includes:
[0033] controlling the discharging of the energy storage systems in the second energy storage system group;
[0034] Controlling the energy storage systems in the first energy storage system group to discharge or charge so that the charge capacities of the energy storage systems in the first energy storage system group all reach the first average charge capacity;
[0035] The performing energy balancing processing on the energy storage systems in the second energy storage system group according to the second average charge capacity comprises:
[0036] Controlling the discharging of energy storage systems in the first energy storage system group;
[0037] The energy storage systems in the second energy storage system group are controlled to discharge or charge so that the charge capacities of the energy storage systems in the second energy storage system group all reach the second average charge capacity.
[0038] Optionally, the test system further includes a third converter controller corresponding one-to-one to the energy storage system in the second energy storage system group; the DC side of each of the third converter controllers is connected to the DC side of the corresponding energy storage system in the second energy storage system group, and the AC side of each of the third converter controllers is connected to the backup power supply;
[0039] The energy controller is configured to control the discharge of the energy storage system in the first energy storage system group and control the charging of the energy storage system in the second energy storage system group; obtain a third discharge parameter of the first energy storage system group and a third charging parameter of the second energy storage system group; according to the third discharge parameter and the third charging parameter, control the third converter controller to supplement the loss energy of the second energy storage system group according to the energy provided by the backup power supply; the energy controller is also used to perform a discharge test on the first energy storage system group when the third converter controller supplements the loss energy of the second energy storage system group according to the energy provided by the backup power supply;
[0040] And / or, the energy controller is configured to control the charging of the energy storage system in the first energy storage system group and the discharging of the energy storage system in the second energy storage system group; obtain a fourth charging parameter of the first energy storage system group and a fourth discharging parameter of the second energy storage system group; and control the third converter controller to supplement the lost energy of the second energy storage system group according to the energy provided by the backup power supply based on the fourth discharging parameter and the fourth charging parameter; the energy controller is also used to perform a charging test on the first energy storage system group when the third converter controller supplements the lost energy of the second energy storage system group according to the energy provided by the backup power supply.
[0041] Through the embodiments of the present disclosure, during the process of discharging the energy storage systems in the first energy storage system group and charging the energy storage systems in the second energy storage system group, the energy controller controls the corresponding second converter controller to supplement the lost energy of the first energy storage system group according to the energy provided by the backup power supply, and performs a charging test on the second energy storage system group; or, during the process of charging the energy storage systems in the first energy storage system group and discharging the energy storage systems in the second energy storage system group, the energy controller controls the second converter controller to supplement the lost energy of the first energy storage system group according to the energy provided by the backup power supply, and performs a discharge test on the second energy storage system group. In this way, the charging or discharging test results of the energy storage system in the second energy storage system group can be made more accurate and reliable. In addition, the equipment required for the test system is not demanding and is easy to implement, and the cost of the test system can also be reduced.
[0042] Further features and advantages of the present invention will become apparent from the following detailed description of exemplary embodiments of the present invention with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the invention and, together with the description, serve to explain the principles of the invention.
[0044] Figure 1 is a block diagram of a testing system for an energy storage system according to an embodiment of the present disclosure;
[0045] Figure 2 is a block diagram of a testing system for an energy storage system according to another embodiment of the present disclosure;
[0046] Figure 3 is a schematic diagram of the current direction in the test system according to the first example of the present disclosure;
[0047] Figure 4 is a schematic diagram of the direction of current in a test system according to a second example of the present disclosure;
[0048] Figure 5 is a schematic diagram of the direction of current in a test system according to a third example of the present disclosure;
[0049] Figure 6 is a schematic diagram of the current direction in the test system according to the fourth example of the present disclosure. DETAILED DESCRIPTION
[0050] Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that the relative arrangement of components and steps, numerical expressions and numerical values set forth in these embodiments do not limit the scope of the present invention unless otherwise specifically stated.
[0051] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.
[0052] Technologies, methods and equipment known to persons of ordinary skill in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods and equipment should be considered part of the specification.
[0053] In all examples shown and discussed herein, any specific values should be interpreted as merely exemplary and not limiting. Therefore, other examples of the exemplary embodiments may have different values.
[0054] It should be noted that like reference numerals and letters refer to similar items in the following figures, and therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.
[0055] The voltage standards of power grids in different regions of the world are different. Taking major countries or regions as an example, the voltage levels of China's power grid are generally 380V, 10KV, 35KV, 110KV and above, Europe is generally 400V, 33KV, 132KV and above, and the United States is 480V, 13.2KV, etc. In terms of power grid frequency, the power grids in China and Europe are 50Hz, North America is 60Hz, and Japan has both 50Hz and 60Hz. Energy storage systems are all connected to the grid. The grid-connected voltage of energy storage systems shipped to different regions must match the local grid voltage. The diversification of the power grid has led to the diversification of the AC side working voltage of the energy storage system. With the development of energy storage technology, the power of energy storage systems is getting bigger and bigger, and the voltage level of the grid is getting higher and higher, and the requirements for test conditions are getting higher and higher. Many medium- and high-voltage, large-capacity energy storage systems do not have test conditions or the test cost is too high, so they cannot be tested as a whole before shipment or cannot be tested according to their designed voltage and capacity levels. Problems are often discovered when the energy storage system is installed and put into operation.
[0056] Therefore, in order to improve the reliability of an energy storage system, the present disclosure provides a testing system for an energy storage system.
[0057] Figure 1 Schematic diagram of a testing system for an energy storage system according to an embodiment of the present disclosure.
[0058] like Figure 1 As shown, the energy storage system test system 1000 may include an energy controller 1100, a backup power supply 1200, a first energy storage system group 1310 to be tested, and a second energy storage system group 1320 to be tested, each energy storage system group including at least one energy storage system 1300 of the same specification.
[0059] Specifically, the energy storage system test system may include at least two energy storage systems 1300 of the same specification, and according to a preset rule, the at least two energy storage systems 1300 are respectively divided into a first energy storage system group 1310 and a second energy storage system group 1320 .
[0060] In one example, the absolute value of the difference between the first number and the second number may be less than or equal to one, wherein the first number is the number of energy storage systems included in the first energy storage system group, and the second number is the number of energy storage systems included in the second energy storage system group.
[0061] In this embodiment, the preset rule may be a random allocation according to the number of energy storage systems. For example, in the case where the test system includes N test systems, if N is an even number, then each energy storage system group may include N / 2 energy storage systems, that is, the first number and the second number are both N / 2; if N is an odd number, then the two energy storage system groups may include (N+1) / 2 and (N-1) / 2 energy storage systems, respectively. That is, the first number may be (N+1) / 2 and the second number may be (N-1) / 2; or, the first number may be (N-1) / 2 and the second number may be (N+1) / 2.
[0062] For each energy storage system 1300, it can include a battery 1301, a first converter controller 1302 and a boost transformer 1303, the DC side of the first converter controller 1302 is connected to the battery 1301, the AC side of the first converter controller 1302 is connected to the low-voltage side of the boost transformer 1303, and the high-voltage sides of the boost transformers 1303 in the first energy storage system group 1310 and the second energy storage system group 1320 are connected to each other.
[0063] For all energy storage systems in the first energy storage system group 1310 and the second energy storage system group 1320, the high voltage sides of their step-up transformers are connected together.
[0064] The test system 1000 may also include a second converter controller 1400 corresponding one-to-one to each energy storage system in the first energy storage system group 1310, the DC side of each second converter controller 1400 is connected to the DC side of the corresponding energy storage system in the first energy storage system group 1310, and the AC side of each second converter controller 1400 is connected to the backup power supply 1200.
[0065] In this embodiment, the backup power supply 1200 can provide an AC power signal.
[0066] The energy controller 1100 can be configured to control the discharge of the energy storage system in the first energy storage system group 1310 and the charging of the energy storage system in the second energy storage system group 1320; obtain the first discharge parameter of the first energy storage system group 1310 and the first charging parameter of the second energy storage system group 1320; and control the second converter controller 1400 to replenish the lost energy of the first energy storage system group 1310 according to the energy provided by the backup power supply 1200, and perform a charging test on the second energy storage system group 1320 according to the first discharge parameter of the first energy storage system group 1310 and the first charging parameter of the second energy storage system group 1320.
[0067] And / or, the energy controller 1100 can also be configured to control the charging of the energy storage system in the first energy storage system group 1310 and the discharging of the energy storage system in the second energy storage system group 1320; obtain the second charging parameter of the first energy storage system group 1310 and the second discharging parameter of the second energy storage system group 1320; and control the second converter controller 1400 to replenish the lost energy of the first energy storage system group 1310 according to the energy provided by the backup power supply 1200, and perform a discharge test on the second energy storage system group 1320 according to the second charging parameter of the first energy storage system group 1310 and the second discharging parameter of the second energy storage system group 1320.
[0068] In this embodiment, the energy controller 1100 can be connected to each energy storage system and each second converter controller for communication. Specifically, the energy controller 1100 uses Ethernet communication to connect each energy storage system and each second converter controller.
[0069] Through the test system of the embodiment of the present disclosure, during the process of discharging the energy storage system in the first energy storage system group and charging the energy storage system in the second energy storage system group, the energy controller controls the second converter controller to supplement the lost energy of the first energy storage system group according to the energy provided by the backup power supply, and performs a charging test on the second energy storage system group; or, during the process of charging the energy storage system in the first energy storage system group and discharging the energy storage system in the second energy storage system group, the energy controller controls the second converter controller to supplement the lost energy of the first energy storage system group according to the energy provided by the backup power supply, and performs a discharge test on the second energy storage system group. In this way, the charging or discharging test results of the energy storage system in the second energy storage system group can be made more accurate and reliable. In addition, the equipment required for the test system is not demanding and is easy to implement, which can also reduce the cost of the test system.
[0070] Furthermore, the test system 1000 may also include a third converter controller 1500 corresponding one-to-one to each energy storage system in the second energy storage system group 1320, the DC side of each third converter controller 1500 is connected to the DC side of the corresponding energy storage system in the second energy storage system group 1320, and the AC side of each third converter controller 1500 is connected to the backup power supply 1200.
[0071] In this embodiment, the energy controller 1100 can be connected to each third converter controller for communication. Specifically, the energy controller 1100 is connected to each third converter controller using Ethernet communication.
[0072] The test system 1000 can also be used to perform a charging or discharging test on the energy storage systems in the first energy storage system group 1310 .
[0073] Specifically, the energy controller 1100 can also be configured to control the charging of the energy storage system in the first energy storage system group 1310 and the discharging of the energy storage system in the second energy storage system group 1320; obtain a third charging parameter of the first energy storage system group 1310 and a third discharging parameter of the second energy storage system group 1320; and control the third converter controller 1500 to replenish the lost energy of the second energy storage system group 1320 according to the energy provided by the backup power supply 1200, and perform a charging test on the first energy storage system group 1310 according to the third charging parameter of the first energy storage system group 1310 and the third discharging parameter of the second energy storage system group 1320.
[0074] And / or, the energy controller 1100 can also be configured to control the discharge of the energy storage system in the first energy storage system group 1310 and control the charging of the energy storage system in the second energy storage system group 1320; obtain the fourth discharge parameter of the first energy storage system group 1310 and the fourth charging parameter of the second energy storage system group 1320; according to the fourth discharge parameter and the fourth charging parameter, control the third converter controller 1500 to supplement the lost energy of the second energy storage system group 1320 according to the energy provided by the backup power supply 1200, and perform a discharge test on the first energy storage system group 1310.
[0075] Through the test system of the embodiment of the present disclosure, during the process of charging the energy storage system in the first energy storage system group and discharging the energy storage system in the second energy storage system group, the energy controller controls the third converter controller to supplement the lost energy of the second energy storage system group according to the energy provided by the backup power supply, and perform a charging test on the first energy storage system group; or, during the process of discharging the energy storage system in the first energy storage system group and charging the energy storage system in the second energy storage system group, the energy controller controls the third converter controller to supplement the lost energy of the second energy storage system group according to the energy provided by the backup power supply, and perform a discharge test on the first energy storage system group. In this way, the charging or discharging test results of the energy storage system in the first energy storage system group can be made more accurate and reliable. In addition, the equipment required for the test system is not demanding and is easy to implement, which can also reduce the cost of the test system.
[0076] In addition, the second converter controller and the third converter controller in this embodiment are used to supplement the energy loss of the corresponding energy storage system according to the energy provided by the backup power supply. Therefore, the maximum power of the second converter controller and the third converter controller can be determined according to the energy loss of the corresponding energy storage system. Since the energy loss of the energy storage system is small, the low-power second converter controller and the third converter controller can meet the requirements, so that the cost of the test system can be further reduced.
[0077] In one embodiment of the present disclosure, the energy controller 1100 may also be configured to obtain a first average charge capacity of the energy storage systems in the first energy storage system group before controlling the first energy storage system group to discharge or charge, and perform energy balancing processing on the energy storage systems in the first energy storage system group according to the first average charge capacity. And / or, the energy controller 1100 may also be configured to obtain a second average charge capacity of the energy storage systems in the second energy storage system group before controlling the first energy storage system group to discharge or charge, and perform energy balancing processing on the energy storage systems in the second energy storage system group according to the second average charge capacity.
[0078] By performing energy balancing processing on the energy storage systems in the first energy storage system group, the charge capacity of each energy storage system in the first energy storage system group can be made to be the first charge capacity.
[0079] In this embodiment, the first average charge capacity may be an average value of the charge capacities of all energy storage systems in the first energy storage system group.
[0080] In one embodiment of the present disclosure, energy balancing processing of energy storage systems in a first energy storage system group according to a first average charge capacity may include: controlling the energy storage systems in a second energy storage system group to discharge; and controlling the energy storage systems in a first energy storage system group to discharge or charge so that the charge capacities of the energy storage systems in the first energy storage system group all reach the first average charge capacity.
[0081] By performing energy balancing processing on the energy storage systems in the second energy storage system group, the charge capacity of each energy storage system in the second energy storage system group can be made to be the second charge capacity.
[0082] In this embodiment, the second average charge capacity may be an average value of the charge capacities of all energy storage systems in the second energy storage system group.
[0083] In one embodiment of the present disclosure, energy balancing processing of the energy storage systems in the second energy storage system group according to the second average charge capacity may include: controlling the energy storage systems in the first energy storage system group to discharge; controlling the energy storage systems in the second energy storage system group to discharge or charge, so that the charge capacities of the energy storage systems in the second energy storage system group all reach the second average charge capacity.
[0084] In this embodiment, by performing energy balancing processing on the energy storage systems in the first energy storage system group, the charge capacity of the energy storage systems in the first energy storage system group can be made the same; by performing energy balancing processing on the energy storage systems in the second energy storage system group, the charge capacity of the energy storage systems in the second energy storage system group can be made the same.
[0085] In one embodiment of the present disclosure, on the basis of energy balancing processing of the energy storage systems in the first energy storage system group and the energy storage systems in the second energy storage system group, the energy controller can also be configured as follows: for the energy storage systems in the first energy storage system group, when the charge capacity thereof is less than the first capacity threshold, the corresponding second converter controller is controlled to supplement the energy of the energy storage systems in the energy storage system group according to the energy provided by the backup power supply, so that the charge capacity of the energy storage system is equal to the first capacity threshold; when the charge capacity thereof is greater than the first capacity threshold, the energy storage systems in the energy storage system group are controlled to discharge energy to the backup power supply through the corresponding second converter controller, so that the charge capacity of the energy storage system is equal to the first capacity threshold. The first capacity threshold may be set according to the second average charge capacity. For example, the first capacity threshold may be 1-the second average charge capacity.
[0086] Alternatively, the energy controller may also be configured as follows: for the energy storage system in the second energy storage system group, when its charge capacity is less than the second capacity threshold, the corresponding third converter controller is controlled to supplement the energy storage system in the energy storage system group according to the energy provided by the backup power supply, so that the charge capacity of the energy storage system is equal to the second capacity threshold; when its charge capacity is greater than the second capacity threshold, the energy storage system in the energy storage system group is controlled to discharge energy to the backup power supply through the corresponding third converter controller, so that the charge capacity of the energy storage system is equal to the second capacity threshold. The second capacity threshold may be set according to the first average charge capacity. For example, the second capacity threshold may be 1-the first average charge capacity.
[0087] By making the sum of the charge capacity of the energy storage systems in the first energy storage system group and the charge capacity of the energy storage systems in the second energy storage system group equal to 1, in the subsequent steps, when the energy storage systems in the second energy storage system group are fully charged, the energy storage systems in the first energy storage system group are just discharged.
[0088] In an embodiment in which the first energy storage system group includes only energy storage system 1 and the second energy storage system group includes only energy storage system 2, the structure of the test system may be as follows: Figure 2 shown.
[0089] In such Figure 2 In the illustrated embodiment, the second converter controller corresponding to the energy storage system 1 may be PCS1, and the third converter controller corresponding to the energy storage system 2 may be PCS2.
[0090] In the first embodiment of the present disclosure, the energy controller 1100 is configured to control the discharge of the energy storage system in the first energy storage system group 1310 and the charging of the energy storage system in the second energy storage system group 1320; obtain the first discharge parameter of the first energy storage system group 1310 and the first charging parameter of the second energy storage system group 1320; according to the first discharge parameter of the first energy storage system group 1310 and the first charging parameter of the second energy storage system group 1320, control the second converter controller 1400 to supplement the lost energy of the first energy storage system group 1310 according to the energy provided by the backup power supply 1200, and perform a charging test on the second energy storage system group 1320.
[0091] In this embodiment, the energy storage system in the first energy storage system group may be controlled to output the voltage required by the energy storage system in the second energy storage system group, and the amplitude and frequency of the voltage may be adjusted as required.
[0092] The first charging parameter may include a state of charge and a first charging power, and the first discharging parameter may include a state of charge and a first discharging power.
[0093] In one example, the first discharge parameter of the first energy storage system group may be an average discharge parameter of the energy storage systems in the first energy storage system group, or may include a discharge parameter of each energy storage system in the first energy storage system group. The first charge parameter of the second energy storage system group may be an average charge parameter of the energy storage systems in the second energy storage system group, or may include a charge parameter of each energy storage system in the second energy storage system group. This is not limited here.
[0094] In such Figure 2 In the embodiment shown, when the energy storage system in the first energy storage system group is discharged and the energy storage system in the second energy storage system group is charged, the current direction of the second converter controller in the process of supplementing the lost energy of the first energy storage system group according to the energy provided by the backup power supply can be as follows: Figure 3 Direction of arrow shown.
[0095] In one embodiment, according to the second charging parameter of the first energy storage system group 1310 and the second discharging parameter of the second energy storage system group 1320, controlling the second converter controller 1400 to supplement the lost energy of the first energy storage system group 1310 according to the energy provided by the backup power supply 1200 may include:
[0096] According to the first discharging parameter and the first charging parameter, the first target power of the second converter controller 1400 is determined; the second converter controller 1400 is controlled to use the energy provided by the backup power supply 1200 to supplement the lost energy of the first energy storage system group 1310 according to the first target power, and the energy storage system in the first energy storage system group 1320 is fully charged when the energy storage system in the second energy storage system group 1320 is fully charged.
[0097] In such Figure 2 In the embodiment shown, the energy controller obtains the first charging power P11 of the DC side of the first converter controller in the energy storage system 2, the charge capacity X11 of the battery in the energy storage system 2, and the battery capacity Q. Then, the time T1 required for the energy storage system 2 to be fully charged can be expressed as:
[0098]
[0099] The energy controller obtains the first discharge power P21 of the DC side of the first converter controller in the energy storage system 1. The discharge capacity requirement Q11 of the energy storage system 1 can be expressed as:
[0100] Q11=P21*T1
[0101] According to the charge capacity X21 and battery capacity Q of the energy storage system 1 battery, the discharge capacity requirement Q11 of the energy storage system 1, and the time T1 required for the energy storage system 2 to be fully charged, the first target power P3 of the DC side of the second converter controller PCS1 can be determined. The first target power P3 can be expressed as:
[0102]
[0103] Specifically, the first target power P3 on the DC side of the second converter controller PCS1 may be the difference between the discharge capacity requirement Q11 of the energy storage system 1 and the power state X21*Q of the battery in the energy storage system 2, relative to the time T1 required for the energy storage system 2 to be fully charged.
[0104] When the first energy storage system group includes m energy storage systems and the second energy storage system group includes n energy storage systems, since the charge capacity of the energy storage systems in each energy storage system group is equal, the time required to fully charge the n energy storage systems in the second energy storage system group is T1, and the first target power P3' of the DC side of each second converter controller can be expressed as:
[0105]
[0106] In such Figure 3In the illustrated embodiment, the energy controller may control the second converter controller PCS1 to operate according to the first target power, so as to supplement the lost energy of the energy storage system 1 according to the energy provided by the backup power supply.
[0107] Furthermore, the energy controller may update the first target power on the DC side of the second converter controller PCS1 according to a set frequency, and control the second converter controller PCS1 to operate according to the latest first target power.
[0108] In one embodiment of the present disclosure, performing a charging test on the second energy storage system group may include: obtaining a second charging test parameter of the second energy storage system group during the charging process; and performing a charging test on the second energy storage system group according to the second charging test parameter.
[0109] In this embodiment, the second charging test parameter may include any one or more of the rated operating capacity, charging power, output voltage, cycle efficiency, and operating temperature of each device of the second energy storage system group.
[0110] The cycle efficiency can be expressed as the ratio of the discharged electrical energy to the charged electrical energy.
[0111] In this embodiment, it can be determined whether the second charging test parameter is within the corresponding qualified range. When all the second charging test parameters are within the corresponding qualified range, the charging test result of the second energy storage system group is determined to be qualified; when any second charging test parameter is not within the corresponding qualified range, the charging test result of the second energy storage system group is determined to be failed.
[0112] Through the test system of this embodiment, the second energy storage system group can be charged and tested, and the test result can be made more accurate and reliable by controlling the corresponding second converter controller to supplement the lost energy of the first energy storage system group according to the energy provided by the backup power supply. In addition, the equipment required by the test system is not demanding and is easy to implement, which can also reduce the cost of the test system.
[0113] In a second embodiment of the present disclosure, it is configured to control the charging of the energy storage system in the first energy storage system group 1310 and the discharging of the energy storage system in the second energy storage system group 1320; obtain the second charging parameter of the first energy storage system group 1310 and the second discharging parameter of the second energy storage system group 1320; and control the second converter controller 1400 to supplement the lost energy of the first energy storage system group 1310 according to the energy provided by the backup power supply 1200, and perform a discharge test on the second energy storage system group 1320 according to the second charging parameter of the first energy storage system group 1310 and the second discharging parameter of the second energy storage system group 1320.
[0114] In this embodiment, the energy controller may control the energy storage system in the second energy storage system group, and output the voltage required by the energy storage system in the first energy storage system group. The amplitude and frequency of the voltage may be adjusted as needed.
[0115] The second charging parameter may include a charge state and a second charging power, and the second discharging parameter may include a charge state and a second discharging power.
[0116] In one example, the second charging parameter of the first energy storage system group may be an average charging parameter of the energy storage systems in the first energy storage system group, or may include a charging parameter of each energy storage system in the first energy storage system group. The second discharging parameter of the second energy storage system group may be an average discharging parameter of the energy storage systems in the second energy storage system group, or may include a discharging parameter of each energy storage system in the second energy storage system group. This is not limited here.
[0117] In one embodiment, when the second energy storage system group needs to discharge, the energy controller may first control the energy storage system in the second energy storage system group to start, output the voltage required for the first energy storage system group to work, start the second converter controller, monitor the charge capacity and the second charging power of the first energy storage system group, and the charge capacity and the second discharging power of the second energy storage system group through communication, and adjust the power of the second converter controller according to the charge capacity and the second charging power of the first energy storage system group, and the charge capacity and the second discharging power of the second energy storage system group, so as to replenish the lost energy of the first energy storage system group.
[0118] In such Figure 2 In the embodiment shown, when the energy storage system in the first energy storage system group is charged and the energy storage system in the second energy storage system group is discharged, the current direction of the second converter controller in the process of supplementing the lost energy of the first energy storage system group according to the energy provided by the backup power supply can be as follows: Figure 4 Direction of arrow shown.
[0119] In one embodiment of the present disclosure, according to the second discharge parameter of the first energy storage system group and the second charging parameter of the second energy storage system group, controlling the second converter controller to supplement the loss energy of the first energy storage system group according to the energy provided by the backup power supply may include:
[0120] The second target power of the second converter controller is determined according to the second charging parameter of the first energy storage system group and the second discharging parameter of the second energy storage system group; the second converter controller is controlled to use the energy provided by the backup power supply to supplement the lost energy of the first energy storage system according to the corresponding second target power, so that the energy storage systems in the first energy storage system group are fully charged when the energy storage systems in the second energy storage system group are fully discharged.
[0121] In such Figure 2 In the embodiment shown, the energy controller obtains the second discharge power P12 of the DC side of the first converter controller in the energy storage system 2, the charge capacity X12 of the battery in the energy storage system 2, and the battery capacity Q. Then, the time T2 required for the energy storage system 2 to discharge electricity can be expressed as:
[0122]
[0123] The energy controller obtains the second discharge power P22 of the DC side of the first converter controller in the energy storage system 1. The charging capacity requirement Q12 of the energy storage system 1 can be expressed as:
[0124] Q12=P22*T2
[0125] According to the charge capacity X22 and battery capacity Q of the energy storage system 1 battery, the discharge capacity requirement Q12 of the energy storage system 1, and the time T2 required for the energy storage system 2 to discharge electricity, the second target power P4 of the DC side of the second converter controller PCS1 can be determined. The second target power P4 can be expressed as:
[0126]
[0127] Specifically, the second target power P4 on the DC side of the second converter controller PCS1 may be the difference between the battery power state (1-X22)*Q in the energy storage system 2 and the charging capacity requirement Q12 of the energy storage system 1, relative to the time T2 required for the energy storage system 2 to discharge electricity.
[0128] When the first energy storage system group includes m energy storage systems and the second energy storage system group includes n energy storage systems, since the charge capacity of the energy storage systems in each energy storage system group is equal, the time required to fully charge the n energy storage systems in the second energy storage system group is T2, and the second target power P4' of the DC side of each second converter controller can be expressed as:
[0129]
[0130] In such Figure 4In the illustrated embodiment, the energy controller may control the second converter controller PCS1 to operate according to the second target power, so as to supplement the lost energy of the energy storage system 1 according to the energy provided by the backup power supply.
[0131] Furthermore, the energy controller may update the second target power on the DC side of the second converter controller PCS1 according to a set frequency, and control the second converter controller PCS1 to operate according to the latest second target power.
[0132] In one embodiment of the present disclosure, performing a discharge test on the second energy storage system group may include:
[0133] Acquire a second discharge test parameter of the second energy storage system group during the charging process; and perform a charging test on the second energy storage system group according to the second discharge test parameter.
[0134] In this embodiment, the second discharge test parameter may include any one or more of the rated operating capacity, charging power, output voltage, cycle efficiency, and operating temperature of each device of the second energy storage system group.
[0135] In this embodiment, it can be determined whether the second discharge test parameter is within the corresponding qualified range. When all the second discharge test parameters are within the corresponding qualified range, the charging test result of the second energy storage system group is determined to be qualified; when any second discharge test parameter is not within the corresponding qualified range, the charging test result of the second energy storage system group is determined to be failed.
[0136] Through the test system of this embodiment, the discharge test can be performed on the second energy storage system group, and by controlling the second converter controller to supplement the loss energy of the first energy storage system group according to the energy provided by the backup power supply, the test result can be made more accurate and reliable. In addition, the equipment required by the test system is not demanding and is easy to implement, which can also reduce the cost of the test system.
[0137] In a third embodiment of the present disclosure, the energy controller 1100 is configured to control the charging of the energy storage system in the first energy storage system group 1310 and the discharging of the energy storage system in the second energy storage system group 1320; obtain a third charging parameter of the first energy storage system group 1310 and a third discharging parameter of the second energy storage system group 1320; and control the third converter controller 1500 to supplement the lost energy of the second energy storage system group 1320 according to the energy provided by the backup power supply 1200, and perform a charging test on the first energy storage system group 1310, based on the third charging parameter of the first energy storage system group 1310 and the third discharging parameter of the second energy storage system group 1320.
[0138] In this embodiment, the energy controller may control the energy storage system in the second energy storage system group, and output the voltage required by the energy storage system in the first energy storage system group. The amplitude and frequency of the voltage may be adjusted as needed.
[0139] The third charging parameter may include a charge state and a third charging power, and the third discharging parameter may include a charge state and a third discharging power.
[0140] In one example, the third charging parameter of the first energy storage system group may be an average charging parameter of the energy storage systems in the first energy storage system group, or may include a charging parameter of each energy storage system in the first energy storage system group. The third discharging parameter of the second energy storage system group may be an average discharging parameter of the energy storage systems in the second energy storage system group, or may include a discharging parameter of each energy storage system in the second energy storage system group. This is not limited here.
[0141] In this embodiment, when the first energy storage system group needs to be charged, the energy controller may first control the energy storage system in the second energy storage system group to start, output the voltage required for the first energy storage system group to work, start the third converter controller, monitor the charge capacity and the third charging power of the first energy storage system group, and the charge capacity and the third discharging power of the second energy storage system group through communication, and adjust the power of the third converter controller corresponding to the energy storage system in the second energy storage system group according to the charge capacity and the third charging power of the first energy storage system group, and the charge capacity and the third discharging power of the second energy storage system group, so as to replenish the loss energy of the second energy storage system group.
[0142] In such Figure 2 In the embodiment shown, when the energy storage system in the first energy storage system group is charged and the energy storage system in the second energy storage system group is discharged, the current direction of the third converter controller in the process of supplementing the lost energy of the second energy storage system group according to the energy provided by the backup power supply can be as follows: Figure 5 Direction of arrow shown.
[0143] In one embodiment of the present disclosure, controlling the third converter controller according to the third discharging parameter and the third charging parameter to supplement the lost energy of the second energy storage system group according to the energy provided by the backup power supply may include:
[0144] The third target power of the third converter controller is determined according to the third charging parameter and the third discharging parameter; the third converter controller is controlled to supplement the lost energy of the second energy storage system with the energy provided by the backup power supply according to the third target power, so that the energy storage systems in the first energy storage system group are fully charged when the energy storage systems in the second energy storage system group are fully discharged.
[0145] In such Figure 2 In the embodiment shown, the energy controller obtains the third discharge power P13 of the DC side of the first converter controller in the energy storage system 2, the charge capacity X13 of the battery in the energy storage system 2, and the battery capacity Q. Then, the time T3 required for the energy storage system 2 to be discharged can be expressed as:
[0146]
[0147] The energy controller obtains the third discharge power P23 of the DC side of the first converter controller in the energy storage system 1. The charging capacity requirement Q13 of the energy storage system 1 can be expressed as:
[0148] Q13=P23*T3
[0149] According to the charge capacity X23 and battery capacity Q of the battery of energy storage system 2, the discharge capacity requirement Q13 of energy storage system 1, and the time T3 required for energy storage system 2 to discharge electricity, the third target power P5 of the DC side of the third controller PCS2 can be determined. The third target power P5 can be expressed as:
[0150]
[0151] Specifically, the third target power P5 on the DC side of the third converter controller PCS2 may be the difference between the battery power state (1-X23)*Q in the energy storage system 2 and the charging capacity requirement Q13 of the energy storage system 1, relative to the time T3 required for the energy storage system 2 to discharge electricity.
[0152] When the first energy storage system group includes m energy storage systems and the second energy storage system group includes n energy storage systems, since the charge capacity of the energy storage systems in each energy storage system group is equal, the time required to fully charge the n energy storage systems in the second energy storage system group is T3, and the third target power P5' on the DC side of each third converter controller can be expressed as:
[0153]
[0154] In such Figure 5In the illustrated embodiment, the energy controller may control the third converter controller PCS2 to operate according to the third target power, so as to supplement the lost energy of the energy storage system 2 according to the energy provided by the backup power supply.
[0155] Furthermore, the energy controller may update the third target power of the DC side of the third converter controller PCS2 according to a set frequency, and control the third converter controller PCS2 to operate according to the latest third target power.
[0156] In one embodiment of the present disclosure, performing a charging test on the second energy storage system group may include:
[0157] Acquire a first charging test parameter of the first energy storage system group during the charging process; and perform a charging test on the first energy storage system group according to the first charging test parameter.
[0158] In this embodiment, the first charging test parameter may include any one or more of the rated operating capacity, charging power, output voltage, cycle efficiency, and operating temperature of each device of the first energy storage system group.
[0159] In this embodiment, it can be determined whether the first charging test parameter is within the corresponding qualified range. When all the first charging test parameters are within the corresponding qualified range, the charging test result of the first energy storage system group is determined to be qualified; when any first charging test parameter is not within the corresponding qualified range, the charging test result of the first energy storage system group is determined to be failed.
[0160] Through the test system of this embodiment, the first energy storage system group can be charged and tested, and the energy loss of the second energy storage system group can be supplemented according to the energy provided by the backup power supply by controlling the corresponding third converter controller, so that the test result can be more accurate and reliable. In addition, the equipment required by the test system is not demanding and is easy to implement, which can also reduce the cost of the test system.
[0161] In a fourth embodiment of the present disclosure, the energy controller 1100 is configured to control the discharge of the energy storage system in the first energy storage system group 1310 and the charging of the energy storage system in the second energy storage system group 1320; obtain a fourth discharge parameter of the first energy storage system group 1310 and a fourth charging parameter of the second energy storage system group 1320; and control the third converter controller 1500 to supplement the lost energy of the second energy storage system group 1320 according to the energy provided by the backup power supply 1200, and perform a discharge test on the first energy storage system group 1310 according to the fourth discharge parameter and the fourth charging parameter.
[0162] In this embodiment, the energy storage system in the first energy storage system group may be controlled to output the voltage required by the energy storage system in the second energy storage system group, and the amplitude and frequency of the voltage may be adjusted as required.
[0163] In this embodiment, the fourth charging parameter may include a fourth state of charge and a fourth charging power, and the fourth discharging parameter may include a state of charge and a fourth discharging power.
[0164] In one example, the fourth discharge parameter of the first energy storage system group may be an average discharge parameter of the energy storage systems in the first energy storage system group, or may include a discharge parameter of each energy storage system in the first energy storage system group. The fourth charge parameter of the second energy storage system group may be an average charge parameter of the energy storage systems in the second energy storage system group, or may include a charge parameter of each energy storage system in the second energy storage system group. This is not limited here.
[0165] In this embodiment, when the first energy storage system group needs to discharge, the energy controller may first control the energy storage system in the first energy storage system group to start, output the voltage required for the second energy storage system group to work, start the third converter controller, monitor the charge capacity and the fourth discharge power of the first energy storage system group, and the charge capacity and the fourth charging power of the second energy storage system group through communication, and adjust the power of the third converter controller according to the charge capacity and the fourth discharge power of the first energy storage system group, and the charge capacity and the fourth charging power of the second energy storage system group, so as to replenish the lost energy of the second energy storage system group.
[0166] In such Figure 2 In the embodiment shown, when the energy storage system in the first energy storage system group is discharged and the energy storage system in the second energy storage system group is charged, the current direction of the third converter controller in the process of supplementing the lost energy of the second energy storage system group according to the energy provided by the backup power supply can be as follows: Figure 6 Direction of arrow shown.
[0167] In one embodiment of the present disclosure, according to the fourth discharge parameter of the first energy storage system group and the fourth charging parameter of the second energy storage system group, controlling the third converter controller to supplement the lost energy of the second energy storage system group according to the energy provided by the backup power supply may include:
[0168] The fourth target power of the third converter controller is determined according to the fourth discharge parameter of the first energy storage system group and the fourth charging parameter of the second energy storage system group; the third converter controller is controlled to use the energy provided by the backup power supply to supplement the lost energy of the second energy storage system according to the corresponding fourth target power, so that the energy storage systems in the second energy storage system group are fully charged when the energy storage systems in the first energy storage system group are fully discharged.
[0169] In such Figure 2 In the embodiment shown, the energy controller obtains the fourth charging power P14 of the DC side of the first converter controller in the energy storage system 2, the charge capacity X14 of the battery in the energy storage system 2, and the battery capacity Q. Then, the time T4 required for the energy storage system 2 to be fully charged can be expressed as:
[0170]
[0171] The energy controller obtains the fourth discharge power P24 of the DC side of the first converter controller in the energy storage system 1. The discharge capacity requirement Q14 of the energy storage system 1 can be expressed as:
[0172] Q14=P24*T4
[0173] According to the charge capacity X24 and battery capacity Q of the battery of energy storage system 1, the discharge capacity requirement Q14 of energy storage system 1, and the time T4 required for full charging of energy storage system 2, the fourth target power P6 of the DC side of the third converter controller PCS2 can be determined. The fourth target power P6 can be expressed as:
[0174]
[0175] Specifically, the fourth target power P4 on the DC side of the third converter controller PCS2 may be the difference between the discharge capacity requirement Q14 of the energy storage system 1 and the power state X24*Q of the battery in the energy storage system 2, relative to the time T4 required for the energy storage system 2 to be fully charged.
[0176] In the case where the first energy storage system group includes m energy storage systems and the second energy storage system group includes n energy storage systems, since the charge capacity of the energy storage systems in each energy storage system group is equal, the time required to fully charge the n energy storage systems in the second energy storage system group is T4. The fourth target power P6' of the DC side of each third converter controller can be expressed as:
[0177]
[0178] In such Figure 6In the illustrated embodiment, the energy controller may control the third converter controller PCS2 to operate according to the fourth target power, so as to supplement the lost energy of the energy storage system 2 according to the energy provided by the backup power supply.
[0179] Furthermore, the energy controller may update the fourth target power of the DC side of the third converter controller PCS2 according to a set frequency, and control the third converter controller PCS2 to operate according to the latest fourth target power.
[0180] In one embodiment of the present disclosure, performing a discharge test on the first energy storage system group may include:
[0181] A first discharge test parameter of the first energy storage system group during the discharge process is obtained; and a discharge test is performed on the first energy storage system group according to the first discharge test parameter.
[0182] In this embodiment, the first discharge test parameter may include any one or more of the rated operating capacity, charging power, output voltage, cycle efficiency, and operating temperature of each device of the first energy storage system group.
[0183] In this embodiment, it can be determined whether the first discharge test parameter is within the corresponding qualified range. When all the first discharge test parameters are within the corresponding qualified range, the discharge test result of the first energy storage system group is determined to be qualified; when any first discharge test parameter is not within the corresponding qualified range, the charging test result of the first energy storage system group is determined to be failed.
[0184] Through the test system of this embodiment, the first energy storage system group can be charged and tested, and the energy loss of the second energy storage system group can be supplemented according to the energy provided by the backup power supply by controlling the corresponding third converter controller, so that the test result can be more accurate and reliable. In addition, the equipment required by the test system is not demanding and is easy to implement, which can also reduce the cost of the test system.
[0185] Embodiments of the present invention have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The terms used herein are selected to best explain the principles of the embodiments, practical applications, or technical improvements in the marketplace, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein. The scope of the present invention is defined by the appended claims.
Claims
1. A testing system for an energy storage system, characterized in that: It includes an energy controller, a backup power supply, a first energy storage system group to be tested and a second energy storage system group, each energy storage system group includes at least one energy storage system with the same specifications, the energy storage system includes a battery, a first converter controller and a step-up transformer, the DC side of the first converter controller is connected to the battery, and the AC side of the first converter controller is connected to the low-voltage side of the step-up transformer; the high-voltage sides of the step-up transformers in the first energy storage system group and the second energy storage system group are connected to each other; The test system further includes second converter controllers corresponding one to one with the energy storage systems in the first energy storage system group; the DC side of each of the second converter controllers is connected to the DC side of the corresponding energy storage system in the first energy storage system group, and the AC side of each of the second converter controllers is connected to the backup power supply; The energy controller is configured to control the discharge of the energy storage system in the first energy storage system group and control the charging of the energy storage system in the second energy storage system group; the energy controller is also used to obtain a first discharge parameter of the first energy storage system group and a first charging parameter of the second energy storage system group; according to the first discharge parameter and the first charging parameter, the second converter controller is controlled to supplement the loss energy of the first energy storage system group according to the energy provided by the backup power supply; the energy controller is also used to perform a charging test on the second energy storage system group when the second converter controller supplements the loss energy of the first energy storage system group according to the energy provided by the backup power supply; And / or, the energy controller is configured to control the charging of the energy storage system in the first energy storage system group and to control the discharging of the energy storage system in the second energy storage system group; the energy controller is also used to obtain a second charging parameter of the first energy storage system group and a second discharging parameter of the second energy storage system group; according to the second discharging parameter and the second charging parameter, the second converter controller is controlled to supplement the lost energy of the first energy storage system group according to the energy provided by the backup power supply; the energy controller is also used to perform a discharge test on the second energy storage system group when the second converter controller supplements the lost energy of the first energy storage system group according to the energy provided by the backup power supply.
2. The test system according to claim 1, characterized in that: The controlling the second converter controller to supplement the lost energy of the first energy storage system group according to the energy provided by the backup power supply according to the first discharging parameter and the first charging parameter comprises: Determining a first target power of the second converter controller according to the first discharging parameter and the first charging parameter; The second converter controller is controlled to use the energy provided by the backup power supply to supplement the lost energy of the first energy storage system group according to the first target power, and the energy storage system in the first energy storage system group is fully discharged when the energy storage system in the second energy storage system group is fully charged.
3. The test system according to claim 2, characterized in that: The first discharge parameter includes: the first charging power of the DC side of the first converter controller in the energy storage system of the second energy storage system group, and the charge capacity of the battery in the energy storage system of the second energy storage system group; the first charging parameter includes: the charge capacity of the battery in the energy storage system of the first energy storage system group, and the first discharge power of the DC side of the first converter controller in the energy storage system of the first energy storage system group; The first target power is determined by the following formula: Among them, P3' represents the first target power, P11 represents the first charging power on the DC side of the first converter controller in the energy storage system of the second energy storage system group, P21 represents the first discharging power on the DC side of the first converter controller in the energy storage system of the first energy storage system group, X11 represents the charge capacity of the battery in the energy storage system of the second energy storage system group, X21 represents the charge capacity of the battery in the energy storage system of the first energy storage system group, n represents the number of energy storage systems in the second energy storage system group, and m represents the number of energy storage systems in the first energy storage system group.
4. The test system according to claim 1, characterized in that: The charging test of the second energy storage system group includes: Acquire a second charging test parameter of the second energy storage system group during the charging process; A charging test is performed on the second energy storage system group according to the second charging test parameters.
5. The test system according to claim 1, characterized in that: The controlling the second converter controller to supplement the lost energy of the first energy storage system group according to the energy provided by the backup power supply according to the second discharging parameter and the second charging parameter comprises: Determining a second target power of the second converter controller according to the second discharging parameter and the second charging parameter; The second converter controller is controlled to use the energy provided by the backup power supply to supplement the lost energy of the first energy storage system group according to the second target power, and the energy storage system in the first energy storage system group is fully charged when the energy storage system in the second energy storage system group is fully discharged.
6. The test system according to claim 5, characterized in that: The second charging parameter includes: the charge capacity of the battery in the energy storage system of the first energy storage system group, and the second charging power of the DC side of the first converter controller in the energy storage system of the first energy storage system group; the second discharging parameter includes: the second discharging power of the DC side of the first converter controller in the energy storage system of the second energy storage system group, and the charge capacity of the battery in the energy storage system of the second energy storage system group; The second target power is determined by the following formula: Among them, P4' represents the second target power, P22 represents the second charging power on the DC side of the first converter controller in the energy storage system of the first energy storage system group, P12 represents the second discharging power on the DC side of the first converter controller in the energy storage system of the second energy storage system group, X12 represents the charge capacity of the battery in the energy storage system of the second energy storage system group, X22 represents the charge capacity of the battery in the energy storage system of the first energy storage system group, n represents the number of energy storage systems in the second energy storage system group, and m represents the number of energy storage systems in the first energy storage system group.
7. The test system according to claim 1, characterized in that: The discharging test on the second energy storage system group includes: Acquire a second discharge test parameter of the second energy storage system group during the discharge process; A discharge test is performed on the second energy storage system group according to the second discharge test parameters.
8. The test system according to claim 3, characterized in that: The energy controller is further configured to, before controlling the first energy storage system group to discharge or charge, obtain a first average charge capacity of the energy storage systems in the first energy storage system group, and perform energy balancing processing on the energy storage systems in the first energy storage system group according to the first average charge capacity; and / or, The energy controller is also configured to obtain a second average charge capacity of the energy storage systems in the second energy storage system group before controlling the second energy storage system group to discharge or charge, and perform energy balancing processing on the energy storage systems in the second energy storage system group based on the second average charge capacity.
9. The test system according to claim 8, characterized in that: The performing energy balancing processing on the energy storage systems in the first energy storage system group according to the first average charge capacity comprises: controlling the discharging of the energy storage systems in the second energy storage system group; Controlling the energy storage systems in the first energy storage system group to discharge or charge so that the charge capacities of the energy storage systems in the first energy storage system group all reach the first average charge capacity; The performing energy balancing processing on the energy storage systems in the second energy storage system group according to the second average charge capacity comprises: Controlling the discharging of energy storage systems in the first energy storage system group; The energy storage systems in the second energy storage system group are controlled to discharge or charge so that the charge capacities of the energy storage systems in the second energy storage system group all reach the second average charge capacity.
10. The test system according to claim 1, characterized in that: The test system further includes a third converter controller corresponding one-to-one to the energy storage system in the second energy storage system group; the DC side of each of the third converter controllers is connected to the DC side of the corresponding energy storage system in the second energy storage system group, and the AC side of each of the third converter controllers is connected to the backup power supply; The energy controller is configured to control the discharge of the energy storage system in the first energy storage system group and control the charging of the energy storage system in the second energy storage system group; obtain a third discharge parameter of the first energy storage system group and a third charging parameter of the second energy storage system group; according to the third discharge parameter and the third charging parameter, control the third converter controller to supplement the loss energy of the second energy storage system group according to the energy provided by the backup power supply; the energy controller is also used to perform a discharge test on the first energy storage system group when the third converter controller supplements the loss energy of the second energy storage system group according to the energy provided by the backup power supply; And / or, the energy controller is configured to control the charging of the energy storage system in the first energy storage system group and the discharging of the energy storage system in the second energy storage system group; obtain the fourth charging parameter of the first energy storage system group and the fourth discharging parameter of the second energy storage system group; control the third converter controller to supplement the lost energy of the second energy storage system group according to the energy provided by the backup power supply based on the fourth discharging parameter and the fourth charging parameter; the energy controller is also used to perform a charging test on the first energy storage system group when the third converter controller supplements the lost energy of the second energy storage system group according to the energy provided by the backup power supply.