Electric self-climbing indoor construction elevator and use method thereof

By installing slide rails and sliding load-bearing connecting beams on both sides of the elevator shaft, combined with the automatic climbing technology of the traction machine and the electric climber, the safety hazards and cumbersome operation problems caused by the reserved opening of the existing construction elevator are solved, and the safety hazards and cumbersome operation problems are achieved. Efficient and safe construction elevator lift lift.

CN115744550BActive Publication Date: 2025-02-07CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211292215.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-21
Publication Date
2025-02-07
Estimated Expiration
2042-10-21

AI Technical Summary

Technical Problem

The existing indoor construction elevators need to reserve large holes during the lifting process, resulting in structural safety hazards and cumbersome later sealing operations.

Method used

Using electric self-climbing indoor construction elevator, by installing slide rails on both sides of the elevator shaft, the two ends of the load-bearing connecting beam can be slidably installed on the slide rails, and can be detachably connected to the side walls of the elevator shaft, traction machine and electric The climber automatically climbs through wire ropes and synchronous control switches.

Benefits of technology

There is no need to reserve large holes, which reduces the safety hazards of the structure, simplifies the later sealing operation, improves construction efficiency, and meets the requirements of safe construction and civilized construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115744550B_ABST
    Figure CN115744550B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of building construction, and is an electric self-climbing indoor construction elevator and a method for using the same. The elevator is arranged in the elevator shaft of a building, and includes an elevator car and a load-bearing connecting beam located above the elevator car. Slide rails arranged along the height direction of the elevator shaft are fixed on both side walls of the elevator shaft, and both ends of the load-bearing connecting beam are slidably mounted on the slide rails, and both ends of the load-bearing connecting beam are detachably connected to both side walls of the elevator shaft; a traction machine is fixed on the upper surface of the middle part of the load-bearing connecting beam, and the traction machine is connected to the elevator car through a connecting rope, and the elevator car is lifted and lowered in the elevator shaft under the drive of the traction machine; electric climbing machines are fixed at the same height of both side walls above the load-bearing connecting beam and at the top of the elevator shaft, and both electric climbing machines are connected to the load-bearing connecting beam, and the load-bearing connecting beam is lifted and lowered in the elevator shaft under the synchronous drive of the two electric climbing machines. The requirements of safe construction and civilized construction are met, and construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction, and in particular to an electric self-climbing indoor construction elevator and a use method thereof. Background Art

[0002] At present, the construction elevators of domestic residential projects have begun to use indoor shaft type construction elevators. This type of indoor construction elevator is mainly lifted by reserving holes in the shear wall of the shaft, setting steel beams, and installing electric hoists on the beams to lift the steel beams and traction machine supporting devices of the next floor to achieve the purpose of lifting the elevator car. Usually, the steel beams need to pass through the side walls of the elevator shaft, and the reserved holes are large. The longitudinal steel bars in the shear wall need to be cut off before the steel beams can be passed through and placed. Not only does it pose a safety and quality risk to the structure, but it is also cumbersome to seal the holes in the later stage, and there are safety risks during operation.

[0003] In order to improve construction efficiency, an electric self-climbing indoor construction elevator is urgently needed to solve the above technical problems. Summary of the invention

[0004] The present invention aims to solve the above-mentioned problem, and thus provides an electric self-climbing indoor construction elevator and a method for using the same. During the construction of the main structure, the traction machine and other equipment above the elevator car can automatically climb at any time according to the construction schedule. There is no need to reserve holes in the side walls of the elevator shaft or to break and drill holes in the walls at a later stage and then set up load-bearing connecting beams. Only holes for bolts need to be reserved. This not only ensures the safety and quality of the structure, but also reduces potential safety hazards during construction, meets the requirements of safe and civilized construction, and improves construction efficiency.

[0005] The present invention solves the above-mentioned problem by adopting the following technical solution:

[0006] An electric self-climbing indoor construction elevator is installed in an elevator shaft of a building, and comprises an elevator car and a load-bearing connecting beam located above the elevator car. Slide rails arranged along the height direction of the elevator shaft are fixed on both side walls of the elevator shaft, and both ends of the load-bearing connecting beam are slidably mounted on the slide rails up and down, and both ends of the load-bearing connecting beam are detachably connected to the two side walls of the elevator shaft; a traction machine is fixed on the upper surface of the middle part of the load-bearing connecting beam, and the traction machine is connected to the elevator car through a connecting rope, and the elevator car is raised and lowered in the elevator shaft under the drive of the traction machine; electric climbing machines are fixed at the same height of both side walls above the load-bearing connecting beam and at the top of the elevator shaft, and two electric climbing machines are connected to the load-bearing connecting beam, and the load-bearing connecting beam is raised and lowered in the elevator shaft under the synchronous drive of the two electric climbing machines.

[0007] Preferably, the load-bearing connecting beam includes a first I-beam and a second I-beam, and the first I-beam and the second I-beam are arranged in parallel and at a certain interval.

[0008] Preferably, a connecting plate body is fixed at the middle of the upper surfaces of the first I-beam and the second I-beam, the connecting plate body connects the first I-beam and the second I-beam together, and the traction machine and the connecting plate body are bolted.

[0009] Preferably, a fixed plate body is connected to the same end of the first I-beam and the second I-beam, and the two fixed plate bodies and the two side walls of the elevator shaft are connected by high-strength bolts.

[0010] Preferably, the slide rails on both sides are placed between the two ends of the first I-beam and the second I-beam, and pulleys slidably connected to the slide rails are fixedly connected to the upper surfaces of the two ends of the first I-beam and the second I-beam.

[0011] Preferably, the electric climbing machine includes a conical rotor brake motor, a wire rope and a wire rope drum. An anchor plate is fixed to the side wall of the elevator shaft by high-strength bolts. The conical rotor brake motor is fixed on the anchor plate. The wire rope drum is connected to the conical rotor brake motor. One end of the wire rope is wound and fixed on the wire rope drum. A hook is connected to the other end of the wire rope. The wire rope is connected to the load-bearing connecting beam through the hook.

[0012] Preferably, a lifting ring plate body is fixedly connected to the load-bearing connecting beam and both sides of the traction machine, and a lifting ring connected to the hook of the electric climbing machine is fixed to the lifting ring plate body.

[0013] Preferably, a first guide rope pulley plate is fixedly connected to the load-bearing connecting beam and both sides of the traction machine, a first guide rope pulley is fixed to the first guide rope pulley plate, and a second guide rope pulley is fixedly connected to the anchor plate, and the hook on the wire rope is connected in sequence via the first guide rope pulley, the second guide rope pulley and the load-bearing connecting beam.

[0014] Preferably, the two conical rotor brake motors are electrically connected to a control switch for controlling the synchronous retraction and extension of the steel wire rope.

[0015] A method for using an electric self-climbing indoor construction elevator.

[0016] S1. First, assemble the elevator car;

[0017] S2. Install slide rails on both side walls of the elevator shaft;

[0018] S3. According to the main construction progress of the main building, when the elevator car is needed on the Nth floor, the load-bearing connecting beam and traction machine are installed on the N+1th floor;

[0019] S4, wherein the load-bearing connecting beam is installed on the slide rail through a pulley, and the traction machine is fixed on the load-bearing connecting beam with high-strength bolts;

[0020] S5. Fixed plates are welded at both ends of the load-bearing coupling beams, and the fixed plates are fixed to the side wall of the elevator shaft on the N+1 floor by high-strength bolts;

[0021] S6. Determine the installation positions of two electric climbers at the same height on the two side walls of the elevator shaft top and above the load-bearing connecting beam, and install the two electric climbers;

[0022] S7, the steel wire ropes of the two electric climbing machines are connected in sequence through the first guide rope wheel, the second guide rope wheel and the load-bearing connecting beam;

[0023] S8. The conical rotor brake motors of the two electric climbers are electrically connected to the control switch;

[0024] S9. The traction machine is connected to the elevator car through a connecting rope;

[0025] S10. According to the main construction progress of the main building, when the elevator car is needed on the N+1 floor, the load-bearing connecting beam and the elevator car are lifted upwards;

[0026] S11, separating the fixed plates at both ends of the load-bearing coupling beam and the side wall of the elevator shaft on the N+1 floor;

[0027] S12, start the control switch, and drive the two steel wire ropes to retract simultaneously through the synchronous operation of the two electric climbers;

[0028] S13, two steel wire ropes simultaneously drive the load-bearing connecting beam to move upward along the slide rail. When the load-bearing connecting beam is lifted to the N+2 floor and the elevator car is lifted to the N+1 floor, the control switch is closed;

[0029] S14. Then fix the fixed plates at both ends of the load-bearing coupling beam to the side walls of the elevator shaft on the N+2 floor by high-strength bolts;

[0030] S15. When the elevator car needs to be upgraded later along with the progress of the main structure, just repeat steps S10-S14.

[0031] Compared with the prior art, the present invention adopting the above technical solution has the following outstanding features:

[0032] Compared with the prior art, the present invention enables the traction machine and other equipment above the elevator car to automatically climb at any time according to the construction schedule during the main structure construction process, without the need to reserve holes in the side walls of the elevator shaft or to break holes in the wall at a later stage before setting the load-bearing connecting beam. It only needs to reserve holes for bolts; the traction machine is arranged above two I-beams arranged in parallel, and the two I-beams are fixed by steel plates to form a whole, thereby improving the bearing strength of the load-bearing connecting beam; the end of the load-bearing connecting beam is welded with a fixing plate body, and the fixing plate body is provided with bolt holes It is fixed to the side wall of the elevator shaft by high-strength bolts. There is no need to reserve holes or drill holes in the side wall of the elevator shaft in advance, which can avoid damage to the wall reinforcement and the trouble of later structural blocking operations. Two electric climbing machines are installed on the two side walls of the elevator shaft on the upper layer of the load-bearing connecting beam. The two climbing machines can achieve one-button synchronous lifting and lowering through connecting lines and synchronous control switches, which can make the traction machine and the load-bearing connecting beam automatically climb. This not only ensures the safety and quality of the structure, but also reduces safety hazards during construction, meets the requirements of safe and civilized construction, and improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 is a schematic diagram of the main view structure of an embodiment of the present invention;

[0034] Figure 2 It is a partial schematic diagram of the facade structure of an embodiment of the present invention;

[0035] In the figure: 1. load-bearing connecting beam; 2. traction machine; 3. high-strength bolt; 4. first guide rope pulley; 5. hook; 6. lifting ring; 7. conical rotor brake motor; 8. wire rope; 9. slide rail; 10. control switch; 11. pulley; 12. elevator car; 13. elevator shaft side wall; 14. connecting rope; 15. movable pulley; 16. hook; 17. fixing ring; 18. connecting plate; 19. fixing plate; 20. anchor plate; 21. lifting ring plate; 22. first guide rope pulley plate; 23. second guide rope pulley. DETAILED DESCRIPTION

[0036] The following description of the embodiments will help the public better understand the present invention, but the specific embodiments given by the applicant cannot and should not be regarded as limitations on the technical solutions of the present invention. Any changes to the definitions of components or technical features and / or formal but not substantial changes to the overall structure should be regarded as the scope of protection defined by the technical solutions of the present invention.

[0037] See also Figure 1 to Figure 2 As shown, the technical solution of the present invention is as follows:

[0038] An electric self-climbing indoor construction elevator is arranged in the elevator shaft of a building, comprising an elevator car 12 and a load-bearing connecting beam 1 located above the elevator car 12. Slide rails 9 arranged along the height direction of the elevator shaft are fixed on both side walls of the elevator shaft. The slide rails 9 are fixed to the two side walls of the elevator shaft by high-strength bolts 3. The height of the slide rails 9 is determined according to the construction requirements. Both ends of the load-bearing connecting beam 1 are slidably mounted on the slide rails 9 up and down. Both ends of the load-bearing connecting beam 1 are detachably connected to the two side walls of the elevator shaft. A traction machine 2 is fixed on the upper surface of the middle part of the load-bearing connecting beam 1. The traction machine 2 is connected to the elevator car 12 by a connecting rope 14. The connection One end of the rope 14 is wound and fixed on the traction machine 2, and the other end of the connecting rope 14 is fixed on the lower bottom surface of the load-bearing connecting beam 1. A movable pulley 15 is arranged on the connecting rope 14, and a hook 16 is connected to the movable pulley 15. A fixing ring 17 is fixedly welded on the top of the elevator car 12, and the hook 16 is connected to the fixing ring 17. The elevator car 12 is raised and lowered in the elevator shaft under the drive of the traction machine 2; electric climbers are fixed at the same height on both side walls above the load-bearing connecting beam 1 and at the top of the elevator shaft, and the two electric climbers are connected to the load-bearing connecting beam 1. The load-bearing connecting beam 1 is raised and lowered in the elevator shaft under the synchronous drive of the two electric climbers.

[0039] The load-bearing connecting beam 1 includes a first I-beam and a second I-beam, which are arranged in parallel and at a certain distance. The above-mentioned structural arrangement is conducive to installing a pulley 11 on the load-bearing connecting beam 1, thereby enabling the load-bearing connecting beam 1 and the slide rail 9 to slide up and down.

[0040] A connecting plate 18 is welded in the middle of the upper surface of the first I-beam and the second I-beam. The connecting plate 18 is a steel plate. The connecting plate 18 connects the first I-beam and the second I-beam together, and the traction machine 2 and the connecting plate 18 are bolted. The above-mentioned structural arrangement is not only conducive to increasing the load of the load-bearing connecting beam 1, avoiding bending and deformation of the load-bearing connecting beam 1 during use, and ensuring safe use, but also can centrally and firmly install the traction machine 2 on the load-bearing connecting beam 1, preventing the traction machine 2 from tilting and deviating due to the influence of the elevator car 12 after the connection between the traction machine 2 and the elevator car 12.

[0041] A fixing plate 19 is welded to the same end of the first I-beam and the second I-beam. The fixing plate 19 is a steel plate. The two fixing plates 19 and the two side walls of the elevator shaft are connected by high-strength bolts 3. The above-mentioned structural setting can solve the problem of reserving holes in the shear wall part on the side wall 13 of the elevator shaft, ensure the quality and safety of the overall building structure, and reduce the damaged area of ​​the shear wall part.

[0042] The slide rails 9 on both sides are placed between the two ends of the first I-beam and the second I-beam, and pulleys 11 slidably connected to the slide rails 9 are fixedly connected to the upper surfaces of the two ends of the first I-beam and the second I-beam; the above-mentioned structural setting is conducive to the load-bearing connecting beam 1 sliding up and down along the slide rails 9, reducing the friction resistance when the load-bearing connecting beam 1 is lifted upward.

[0043] The electric climbing machine includes a conical rotor brake motor 7, a wire rope 8 and a wire rope drum. An anchor plate body 20 is fixed on the side wall of the elevator shaft by high-strength bolts 3. The anchor plate body 20 is a steel plate. The conical rotor brake motor 7 is fixed on the anchor plate body 20. The wire rope drum is connected to the conical rotor brake motor 7. One end of the wire rope 8 is wound and fixed on the wire rope drum. A hook 5 is connected to the other end of the wire rope 8. The wire rope 8 is connected to the load-bearing connecting beam 1 through the hook 5.

[0044] A lifting ring plate 21 is welded to the load-bearing connecting beam 1 and both sides of the traction machine 2. The lifting ring plate 21 is a steel plate, and a lifting ring 6 connected to the hook 5 of the electric climber is welded to the lifting ring plate 21. The above-mentioned structural arrangement can enable the traction machine 2 and the load-bearing connecting beam 1 to move synchronously during the lifting process, preventing the load-bearing connecting beam 1 from getting stuck during the rising process along the slide rail 9, while ensuring the stability of the connection between the load-bearing connecting beam 1 and the electric climber.

[0045] A first guide rope pulley plate 22 is welded on the load-bearing connecting beam 1 and on both sides of the traction machine 2, a first guide rope pulley 4 is fixed on the first guide rope pulley plate 22, a second guide rope pulley 23 is fixed on the anchor plate 20, and the hook 5 on the wire rope 8 is connected to the load-bearing connecting beam 1 via the first guide rope pulley 4, the second guide rope pulley 23 in sequence; the above-mentioned structural arrangement can ensure that the wire rope 8 is more stable during the lifting process to prevent shaking.

[0046] The two conical rotor brake motors 7 are electrically connected to a control switch 10 for controlling the synchronous retraction and extension of the wire rope 8; the above-mentioned structural arrangement controls the retraction and extension of the wire rope 8 through the control switch 10 to achieve the purpose of lifting the load-bearing connecting beam 1, and the two climbing machines can achieve one-button synchronous lifting and lowering through the connection and synchronous control switch 10.

[0047] A method for using an electric self-climbing indoor construction elevator.

[0048] S1, first assembling the elevator car 12;

[0049] S2. Install slide rails 9 on both side walls of the elevator shaft;

[0050] S3. According to the main construction progress of the main building, when the elevator car 12 is needed on the Nth floor, the load-bearing connecting beam 1 and the traction machine 2 are installed on the N+1th floor;

[0051] S4, wherein the load-bearing connecting beam 1 is slidably mounted on the slide rail 9 via the pulley 11, and the traction machine 2 is fixed to the load-bearing connecting beam 1 by high-strength bolts 3;

[0052] S5. A fixing plate 19 is welded to both ends of the load-bearing coupling beam 1. The fixing plate 19 is fixed to the side wall 13 of the elevator shaft on the N+1 floor by high-strength bolts 3;

[0053] S6. Determine the installation positions of two electric climbers at the same height on the two side walls of the top of the elevator shaft above the load-bearing connecting beam 1 and install the two electric climbers;

[0054] S7, the steel wire ropes 8 of the two electric climbing machines are connected in sequence through the first guide rope wheel 4, the second guide rope wheel 23 and the load-bearing connecting beam 1;

[0055] S8, the conical rotor brake motors 7 of the two electric climbers are electrically connected to the control switch 10;

[0056] S9, the traction machine 2 is connected to the elevator car 12 through the connecting rope 14;

[0057] S10. According to the main construction progress of the main building, when the elevator car 12 is needed on the N+1 floor, the load-bearing connecting beam 1 and the elevator car 12 are lifted upwards;

[0058] S11, separate the fixed plates 19 at both ends of the load-bearing connecting beam 1 and the elevator shaft side wall 13 of the N+1 floor;

[0059] S12, start the control switch 10, and drive the two steel ropes 8 to retract simultaneously through the synchronous operation of the two electric climbing machines;

[0060] S13, the two steel wire ropes 8 simultaneously drive the load-bearing connecting beam 1 to move upward along the slide rail 9. When the load-bearing connecting beam 1 is lifted to the N+2 floor and the elevator car 12 is lifted to the N+1 floor, the control switch 10 is closed;

[0061] S14, then fix the fixing plates 19 at both ends of the load-bearing connecting beam 1 to the side wall 13 of the elevator shaft on the N+2 floor by means of high-strength bolts 3;

[0062] S15. When the elevator car 12 needs to be upgraded later along with the progress of the main structure, steps S10-S14 can be repeated.

[0063] Compared with the prior art, during the construction of the main structure, the present invention enables the traction machine 2 and other equipment above the elevator car 12 to automatically climb at any time according to the construction schedule, without the need to reserve holes in the side walls of the elevator shaft or to break holes in the wall at a later stage before setting the load-bearing connecting beam 1. Only bolt holes need to be reserved; the traction machine 2 is arranged above two I-beams arranged in parallel, and the two I-beams are fixed by steel plates to form a whole, thereby improving the bearing strength of the load-bearing connecting beam 1; the end of the load-bearing connecting beam 1 is welded with a fixing plate body, and the fixing plate body is provided with bolts Holes are fixed to the side walls of the elevator shaft by high-strength bolts 3. There is no need to reserve holes or drill holes in the side walls of the elevator shaft in advance, which can avoid damage to the wall reinforcement and the trouble of later structural blocking operations. Two electric climbing machines are installed on the two side walls of the elevator shaft on the upper layer of the load-bearing connecting beam 1. The two climbing machines can achieve one-button synchronous lifting and lowering through the connection line and the synchronous control switch 10, so that the traction machine 2 can automatically climb with the load-bearing connecting beam 1. This not only ensures the safety and quality of the structure, but also reduces the potential safety hazards during construction, meets the requirements of safe and civilized construction, and improves construction efficiency.

[0064] The above description is only a preferred feasible embodiment of the present invention, and does not limit the scope of rights of the present invention. All equivalent changes made using the contents of the present specification and its drawings are included in the scope of rights of the present invention.

Claims

1. An electric self-climbing indoor construction elevator, installed in the elevator shaft of a building, characterized in that: The invention comprises an elevator car and a load-bearing connecting beam located above the elevator car. Slide rails arranged along the height direction of the elevator shaft are fixed on both side walls of the elevator shaft. Both ends of the load-bearing connecting beam are slidably mounted on the slide rails, and both ends of the load-bearing connecting beam are detachably connected to both side walls of the elevator shaft. A traction machine is fixed on the upper surface of the middle part of the load-bearing connecting beam. The traction machine is connected to the elevator car through a connecting rope. The elevator car is raised and lowered in the elevator shaft under the drive of the traction machine. Electric climbing devices are fixed at the same height on both side walls above the load-bearing connecting beam and at the top of the elevator shaft. The two electric climbing machines are connected to the load-bearing connecting beam, and the load-bearing connecting beam is raised and lowered in the elevator shaft under the synchronous drive of the two electric climbing machines; the load-bearing connecting beam includes a first I-beam and a second I-beam, and the first I-beam and the second I-beam are arranged in parallel and at a certain interval; a connecting plate body is fixed in the middle of the upper surface of the first I-beam and the second I-beam, and the connecting plate body connects the first I-beam and the second I-beam together, and the traction machine and the connecting plate body are bolted; a fixing plate body is connected to the same end of the first I-beam and the second I-beam, and the two fixing plates are connected to the same end of the first I-beam and the second I-beam. The plate body and the two side walls of the elevator shaft are connected by high-strength bolts; the slide rails on both sides are placed between the two ends of the first I-beam and the second I-beam, and the upper surfaces of the two ends of the first I-beam and the second I-beam are fixedly connected with pulleys slidably connected to the slide rails; the electric climbing machine includes a conical rotor brake motor, a steel wire rope and a steel wire rope drum, and an anchor plate body is fixed on the side wall of the elevator shaft by high-strength bolts, the conical rotor brake motor is fixed on the anchor plate body, the steel wire rope drum is connected to the conical rotor brake motor, and one end of the steel wire rope is wound and fixed on On the wire rope drum, a hook is connected to the other end of the wire rope, and the wire rope is connected to the load-bearing connecting beam through the hook; on the load-bearing connecting beam and on both sides of the traction machine, a lifting ring plate is fixedly connected, and a lifting ring connected to the hook of the electric climbing machine is fixed on the lifting ring plate; on the load-bearing connecting beam and on both sides of the traction machine, a first guide rope pulley plate is fixedly connected, a first guide rope pulley is fixed on the first guide rope pulley plate, and a second guide rope pulley is fixedly connected to the anchor plate, and the hook on the wire rope is connected to the first guide rope pulley, the second guide rope pulley and the load-bearing connecting beam in sequence.

2. The electric self-climbing indoor construction elevator according to claim 1 is characterized in that: The two conical rotor brake motors are electrically connected to a control switch for controlling the synchronous retraction and extension of the steel wire rope.

3. The method for using an electric self-climbing indoor construction elevator according to claim 1 or 2, characterized in that: S1. First, assemble the elevator car; S2. Install slide rails on both side walls of the elevator shaft; S3. According to the main construction progress of the main building, when the elevator car is needed on the Nth floor, the load-bearing connecting beam and traction machine are installed on the N+1th floor; S4, wherein the load-bearing connecting beam is installed on the slide rail through a pulley, and the traction machine is fixed on the load-bearing connecting beam with high-strength bolts; S5. Fixed plates are welded at both ends of the load-bearing coupling beams, and the fixed plates are fixed to the side wall of the elevator shaft on the N+1 floor by high-strength bolts; S6. Determine the installation positions of two electric climbers at the same height on the two side walls of the elevator shaft top and above the load-bearing connecting beam, and install the two electric climbers; S7, the steel wire ropes of the two electric climbing machines are connected in sequence through the first guide rope wheel, the second guide rope wheel and the load-bearing connecting beam; S8. The conical rotor brake motors of the two electric climbers are electrically connected to the control switch; S9. The traction machine is connected to the elevator car through a connecting rope; S10. According to the main construction progress of the main building, when the elevator car is needed on the N+1 floor, the load-bearing connecting beam and the elevator car are lifted upwards; S11, separating the fixed plates at both ends of the load-bearing coupling beam and the side wall of the elevator shaft on the N+1 floor; S12, start the control switch, and drive the two steel wire ropes to retract simultaneously through the synchronous operation of the two electric climbers; S13, two steel wire ropes simultaneously drive the load-bearing connecting beam to move upward along the slide rail. When the load-bearing connecting beam is lifted to the N+2 floor and the elevator car is lifted to the N+1 floor, the control switch is closed; S14. Then fix the fixed plates at both ends of the load-bearing coupling beam to the side walls of the elevator shaft on the N+2 floor by high-strength bolts; S15. When the elevator car needs to be upgraded later along with the progress of the main structure, just repeat steps S10-S14.

Citation Information

Patent Citations

  • Hydraulic climbing type elevator shaft finalization operation platform and construction method

    CN106013776A

  • Formwork for lifting elevator and construction method thereof

    CN109436985A