A novel semi-submersible lifting platform and offshore wind power hoisting method
By installing the propeller on the semi-submersible lifting platform and using its rotation function, the problem of low construction efficiency of the mobile conversion position of the lifting ship is solved, and rapid lifting of facilities in all directions of the wind power foundation is achieved, and installation efficiency is improved.
Patent Information
- Application Number
- CN202211643735.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-20
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-12-20
AI Technical Summary
When installing floating multi-neck fans in the deep sea, the lifting ship needs to frequently move and change positions, resulting in low construction efficiency and unable to effectively improve the lifting efficiency of all aspects of the wind power foundation.
The new semi-submersible lifting platform is adopted to achieve overall rotation by installing a thruster on the platform. The fixed semi-submersible lifting platform descends to the depth of the water surface and lifts up the floating wind power foundation, so that the spacing distribution of the lifting ships is stable, and the overall rotation is driven by the thruster. Carry out quick lifting.
It has achieved rapid lifting of facilities in all directions of wind power foundation, improved installation efficiency, reduced workload, and solved the problem of low construction efficiency of mobile conversion positions of lifting ships.
Smart Images

Figure CN115771595B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a novel semi-submersible lifting platform and an offshore wind power hoisting method, belonging to the technical field of offshore wind power construction. Background Art
[0002] When installing floating multi-head wind turbines in the deep sea, sometimes due to the restrictions of the nearshore dock, it is necessary to hoist the wind turbines on the sea surface. When the wind turbine is hoisted, the hoisting ships for different hoisting steps are distributed around the floating wind power foundation at intervals. Although the hoisting ships distributed around the floating wind power foundation can carry out different hoisting steps around, the floating wind power foundation is moored on the sea surface, and the hoisting ships need to move and change positions before the next hoisting step can be carried out. The preparation time period required for the hoisting ships before and after the hoisting is long, and there is a problem of low construction efficiency of the hoisting ship moving and changing positions. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides a novel semi-submersible lifting platform.
[0004] The invention also provides an offshore wind power hoisting method.
[0005] The present invention is achieved through the following technical solutions.
[0006] The present invention provides an offshore wind power hoisting method, comprising: a floating wind power foundation is moved to the top of a semi-submersible lifting platform and fixed, hoisting ships are distributed around the floating wind power foundation at intervals, and a propeller drives the entire foundation to rotate to realize a construction process of rapid hoisting of the wind power foundation in all directions.
[0007] When the floating wind power foundation is moved to the top of the semi-submersible lifting platform for fixing, the semi-submersible lifting platform is lowered to a certain depth above the water surface before fixing. After fixing, the semi-submersible lifting platform lifts the floating wind power foundation so that part of it remains in the water and the other part is above the water surface.
[0008] A new type of semi-submersible lifting platform, comprising:
[0009] Three-pronged pontoon;
[0010] The propeller is installed at the bottom of the three-pronged pontoon. The propeller can be rotatably installed at the bottom of the three-pronged pontoon and can drive the three-pronged pontoon to rotate around the center.
[0011] Support columns are fixedly installed on the three ends of the three-pronged buoyancy box, and the support columns can be raised, lowered, slidable and retracted;
[0012] The central column is fixed in the middle of the three-pronged pontoon. The central column is composed of a fixed support and a sleeve. There is a cavity at the bottom of the fixed support to install a drive motor. The drive motor is meshed with an adjusting screw through a bevel gear. The adjusting screw is rotatably connected to the bottom of the fixed support through a ball bearing. The sleeve is threadedly connected to the center block, and the center block is fixed in the middle of the three-pronged pontoon.
[0013] The supporting columns are composed of an upper column and a lower column slidably matched with the upper column, and the upper column and the lower column can slide relatively; a supporting truss is installed between the upper columns of the supporting columns.
[0014] The fixed support column of the central column is connected to the supporting truss through a connecting bracket for reinforcement, and cross-distributed reinforcement rods are installed between the connecting brackets.
[0015] It also includes floating wind power foundations used in conjunction with new semi-submersible lifting platforms.
[0016] The floating wind power foundation comprises a floating body foundation which can float or sink by water injection, and the floating body foundation is multiple;
[0017] A horizontal truss connected to the floating foundation, with both ends of the horizontal truss connected between the floating foundations, so that the multiple floating foundations and the multiple horizontal trusses form a regular polygon; a triangular rod is installed on the inner surface of the horizontal truss;
[0018] A diverter tower is provided at the center of the plurality of buoyancy foundations, and is connected to the inner side of the buoyancy foundations through a connecting truss. A diverter plate is installed on the diverter tower, and the end of the diverter plate is located between the connecting trusses and fixed with a triangular cone plate, and a through hole is provided on the surface of the triangular cone plate.
[0019] The beneficial effects of the present invention are as follows: the rotatable and adjustable propeller drives the overall rotation, so as to keep the position of the lifting ship tooling around the floating wind power foundation unchanged, and realize the rapid lifting of facilities such as wind power towers in all directions of the wind power foundation, which greatly improves the installation efficiency, reduces the workload, and solves the problem of low construction efficiency of the lifting ship moving and changing positions. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 is a top view schematic diagram of the floating wind power foundation of the present invention;
[0021] Figure 2 It is a schematic diagram of the main view of the novel semi-submersible lifting platform of the present invention;
[0022] Figure 3 It is a partial cross-sectional schematic diagram of the novel semi-submersible lifting platform of the present invention;
[0023] Figure 4 It is a top view schematic diagram of the novel semi-submersible lifting platform of the present invention;
[0024] In the figure: 1- floating wind power foundation; 11- floating body foundation; 12- diverter tower; 13- horizontal truss; 14- connecting truss; 15- triangular rod; 16- diverter plate;
[0025] 2-new type semi-submersible lifting platform; 21-support column; 211-upper column; 212-lower column; 22-center column; 221-fixed support column; 222-sleeve; 23-three-pronged pontoon; 231-center block; 24-support truss; 25-connecting bracket; 26-driving motor; 3-adjusting screw rod; 4-thruster. DETAILED DESCRIPTION
[0026] The technical solution of the present invention is further described below, but the scope of protection claimed is not limited to the description.
[0027] like Figure 1 to Figure 2 shown.
[0028] A novel semi-submersible lifting platform 2 of the present invention comprises:
[0029] A three-pronged buoyancy box 23 capable of floating or sinking by filling water;
[0030] A propeller 4 is installed at the bottom of the three-pronged pontoon 23. The propeller 4 is rotatably installed at the bottom of the three-pronged pontoon 23. The propeller 4 can drive the three-pronged pontoon 23 to rotate around the center;
[0031] The support columns 21 are fixedly mounted on the three ends of the three-pronged pontoon 23, and the support columns 21 can be lifted, slidably and telescopically. The support columns 21 are composed of an upper column 211 and a lower column 212 slidably matched with the upper column 211, and the upper column 211 and the lower column 212 can slide relative to each other. A support truss 24 is installed between the upper columns 211 of the support columns 21;
[0032] The center column 22 is fixed in the middle of the three-pronged pontoon 23. The center column 22 is composed of a fixed support 221 and a sleeve 222. The bottom of the fixed support 221 has a cavity to install a drive motor 26. The drive motor 26 is engaged with the adjusting screw 3 through a bevel gear. The adjusting screw 3 is rotatably connected to the bottom of the fixed support 221 through a ball bearing. The sleeve 222 is threadedly connected to the center block 231, and the center block 231 is fixed in the middle of the three-pronged pontoon 23.
[0033] The driving motor 26 drives the adjusting screw 3 to make the fixed support 221 and the sleeve 222 move relative to each other, and to make the upper column 211 and the lower column 212 slide relative to each other.
[0034] The fixed support column 221 of the central column 22 is connected to the supporting truss 24 through the connecting bracket 25 for reinforcement, and cross-distributed reinforcement rods are installed between the connecting brackets 25.
[0035] The input end of the propeller 4 is rotationally connected to the output end of the stepper motor placed inside the pontoon unit, the input end of the stepper motor is connected to the output end of the controller, and the input end of the controller is connected to the input end of the direction sensor placed at the bottom of the pontoon.
[0036] It also includes a floating wind power foundation 1 used in conjunction with a new semi-submersible lifting platform 2. The floating wind power foundation 1 includes a floating body foundation 11 that can float or sink by filling water, and the floating body foundation 11 is multiple;
[0037] The horizontal trusses 13 are connected to the floating foundations 11, and the two ends of the horizontal trusses 13 are connected between the floating foundations 11, so that the multiple floating foundations 11 and the multiple horizontal trusses 13 form a regular polygon, such as a regular octagon; the inner surface of the horizontal trusses 13 is installed with triangular rods 15.
[0038] A diverter tower 12 is provided at the center of the plurality of floating foundations 11, and is connected to the inner side of the floating foundation 11 via a connecting truss 14. A diverter plate 16 is installed on the diverter tower 12, and the end of the diverter plate 16 is located between the connecting trusses 14 and is fixed with a triangular cone plate, and a through hole is provided on the surface of the triangular cone plate.
[0039] The present invention also provides an offshore wind power hoisting method, comprising four steps of fixing a tooling platform, installing a wind turbine foundation, performing wind power hoisting operations and disassembling the tooling platform in sequence.
[0040] The tooling platform fixing step is: using towing, the semi-submersible lifting platform 2 is moved to the tooling position, usually a deep water area of 20 to 30 meters, and the adjusting screw 3 is rotated by the driving motor 26 to drive the fixed support 221 and the sleeve 2222 to move and the upper column 211 and the lower column 212 to slide, so as to realize the height lifting of the semi-submersible lifting platform 2. After adjusting to the appropriate position, the semi-submersible lifting platform 2 is fixed to realize batch tooling operations.
[0041] The wind turbine foundation installation steps are as follows: lower the semi-submersible lifting platform 2 to a certain depth on the water surface, move the floating wind power foundation 1 to the top of the semi-submersible lifting platform 2 by towing, and then tie it up and fix it.
[0042] The wind turbine hoisting operation steps are as follows: lift the floating wind turbine foundation 1 by the semi-submersible lifting platform 2 so that part of it stays in the water and the other part is exposed to the water surface, and the buoyancy of the floating foundation 11 itself is used to reduce the load-bearing capacity of the semi-submersible platform. The hoisting ships are distributed around the floating wind turbine foundation 1 at intervals, and then the tower, nacelle, hub, blades and other components are hoisted in place by the hoisting ship to form a multi-head wind turbine on the floating foundation 11. During the hoisting process, due to the symmetrical polygonal structure of the floating wind turbine foundation 1, the side ends of the wind turbine foundation can be limited by the supporting columns 21, and then the rotatable and adjustable propeller 4 drives the overall rotation, so that the tooling positions of the hoisting ships around the floating wind turbine foundation 1 can be kept unchanged, so as to realize the rapid hoisting of wind turbine towers and other facilities in all directions of the wind turbine foundation, greatly improve the installation efficiency, and reduce the workload; and solve the problem of low construction efficiency of the hoisting ship moving and changing positions.
[0043] The tooling platform disassembly steps are as follows: after the lifting is completed, the semi-submersible lifting platform 2 continues to descend in depth until the semi-submersible lifting platform 2 is disconnected from the floating wind power foundation 1, and then it can be towed away freely.
Claims
1. A novel semi-submersible lifting platform (2), characterized in that: include: Three-pronged pontoon (23); A propeller (4) is installed at the bottom of the three-pronged pontoon (23). The propeller (4) is rotatably installed at the bottom of the three-pronged pontoon (23). The propeller (4) can drive the three-pronged pontoon (23) to rotate around the center. Support columns (21) are fixedly installed on the three ends of the three-pronged buoy (23), and the support columns (21) can be raised, lowered, slidable, and retracted; A center column (22) fixed in the middle of the three-pronged buoyancy box (23), the center column (22) is composed of a fixed support column (221) and a sleeve (222), the bottom of the fixed support column (221) has a cavity for installing a drive motor (26), the drive motor (26) is meshed with an adjustment screw rod (3) through a bevel gear, the adjustment screw rod (3) is rotatably connected to the bottom of the fixed support column (221) through a ball bearing, the sleeve (222) is threadedly connected to the center block (231), and the center block (231) is fixed in the middle of the three-pronged buoyancy box (23); It also includes a floating wind power foundation (1) used in conjunction with a new semi-submersible lifting platform (2); The floating wind power foundation (1) comprises a floating foundation (11) capable of floating up or sinking by water injection, and the floating foundation (11) is multiple; A horizontal truss (13) connected to the floating foundation (11), wherein both ends of the horizontal truss (13) are connected between the floating foundations (11), so that the plurality of floating foundations (11) and the plurality of horizontal trusses (13) form a regular polygon; a triangular rod (15) is installed on the inner surface of the horizontal truss (13); A flow diversion tower (12) is provided at the center of a plurality of floating foundations (11). The flow diversion tower (12) is connected to the inner side of the floating foundation (11) via a connecting truss (14). A flow diversion plate (16) is installed on the flow diversion tower (12). The end of the flow diversion plate (16) is located between the connecting trusses (14) and is fixed with a triangular cone plate. A through hole is provided on the surface of the triangular cone plate.
2. The novel semi-submersible lifting platform as claimed in claim 1, characterized in that: The supporting column (21) is composed of an upper column (211) and a lower column (212) slidably matched with the upper column (211), and the upper column (211) and the lower column (212) can slide relative to each other; a supporting truss (24) is installed between the upper columns (211) of the supporting column (21).
3. The novel semi-submersible lifting platform as claimed in claim 2, characterized in that: The fixed support column (221) of the central column (22) is connected to the supporting truss (24) through a connecting bracket (25) for reinforcement, and cross-distributed reinforcement rods are installed between the connecting brackets (25).