A digital training system and simulation method for deepwater natural gas production technology
Through the digital training system of deep water natural gas mining process, flow coupling algorithms and VR technology are used to provide a virtual on-site operating environment, solving the problem that the existing system cannot meet the training needs of deep water natural gas mining, and improving the safety awareness and emergency response capabilities of practitioners Effect.
Patent Information
- Application Number
- CN202211610584.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-12
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-12-12
AI Technical Summary
The existing simulation training system cannot meet the training needs of deep water natural gas mining and cannot effectively improve the safety awareness and emergency response capabilities of practitioners.
A digital training system for deep water natural gas mining process was designed, including the teacher side, the student side and the server. The simulation module and management module were used to calculate the pressure and flow in the simulated pipeline in real time through the flow coupling algorithm, and combined with VR technology to provide a virtual on-site operating environment. Students are allowed to conduct multi-person collaborative operations and accident simulation training.
This system enables students to be familiar with the internal structure and principles of gas extraction equipment, improve accident handling capabilities, and provide more in line with the actual situation on site, reduce training time, and achieve collaborative operation of multiple people to improve training results.
Smart Images

Figure CN115830937B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to deepwater natural gas exploitation simulation training equipment, and in particular to a deepwater natural gas exploitation process digital training system and simulation method. Background Art
[0002] Deepwater natural gas extraction training is mainly aimed at regional oil and gas production companies. Its main function is to enhance the safety awareness, safety precautions, and emergency response capabilities of oil and gas operation-related personnel, fulfill social responsibilities, and play a supporting and guaranteeing role in the establishment and improvement of the national safety production emergency response system.
[0003] We will utilize existing training resources to further establish a training and drill system, build a first-class domestic deepwater natural gas extraction training base, provide safety production emergency drill training services for oil and gas production companies, and safeguard regional economic development.
[0004] 1) The goal is to improve the theoretical level, practical skills, and emergency response capabilities of operators;
[0005] 2) Based on deepwater natural gas extraction technology;
[0006] 3) Adhere to the construction principles of high starting point, high standards and high quality;
[0007] 4) Unified planning is carried out from five aspects: teaching, training, drills, assessment and management, to establish a complete training and drill system.
[0008] The current simulation training system is not suitable for deepwater natural gas extraction simulation training system and cannot meet the training needs. Summary of the invention
[0009] The purpose of the present invention is to overcome the deficiencies of the prior art and provide a digital training system and simulation method for deepwater natural gas production technology.
[0010] The objective of the present invention is achieved through the following technical solutions:
[0011] A digital training system for deepwater natural gas extraction technology, comprising a teacher terminal, a student terminal and a server;
[0012] The teacher end is used to set and publish training tasks, upload them to the server end, and monitor the trainee training process in real time;
[0013] The server is used to receive the training tasks sent by the teacher, simulate and control various gas production conditions according to the training tasks, and send the simulated conditions to the trainee;
[0014] The trainee terminal is used to receive simulated working conditions and provide human-computer interaction tools for trainee training operations;
[0015] The teacher terminal includes an accident selection module, which is used to introduce accidents or failures at any time during the training process for the system to judge and handle;
[0016] The server includes a simulation module and a management module. The simulation module uses a flow coupling algorithm to calculate the pressure and flow of the fluid in the simulated pipeline in real time to improve the simulation working condition parameters; the management module generates multiple operation windows and simulation modules corresponding to the windows to realize the connection between the windows and the simulation modules, and between the windows and the simulation modules;
[0017] The trainee terminal includes an internal operation post operation window module and an external operation post VR operation module.
[0018] The internal operation window simulates the operation of the on-site internal operation personnel, displays the training gas production conditions, and provides a training operation interface for trainees;
[0019] The external operation post VR operation module adopts VR technology, uses VR glasses and VR operating handles to operate the valves and equipment in the virtual scene, and the VR scene displays the virtual character of the operator, and displays the working conditions inside the equipment and the flow conditions in the pipeline in a transparent and cross-sectional manner. The internal operation post and the external operation post work together to complete the operation and management of the gas production station. Multiple internal operation post trainees and external operation post trainees can work together at the same time. The virtual characters of other operators will be displayed in the VR scene, and the working conditions inside the equipment and the flow conditions in the pipeline will be displayed in a transparent and cross-sectional manner. The operation window module is used to display the training gas production conditions and provide a training operation interface for trainees.
[0020] A digital simulation method for deepwater natural gas production process, based on a digital training system for deepwater natural gas production process, includes the following specific steps:
[0021] S1: The server restores the window through the on-site picture and adds a simulation module corresponding to the operation window to realize the jump relationship between each window;
[0022] S2: Each operation window uses the flow coupling algorithm to calculate the pressure and flow of the fluid in the simulated pipeline;
[0023] S3: Then connect the relevant parameters calculated by the flow coupling algorithm of each window, compare them with the on-site data, and adjust the parameters.
[0024] Furthermore, the step S1: realizing the connection between the windows specifically includes:
[0025] S101: The management module monitors the operation of the window and transmits the corresponding switch and analog quantity to the simulation module of the window;
[0026] S102: The value changed by the window operation is transmitted to the simulation module, and the parameter is returned through calculation of the simulation module;
[0027] S103: The window receives and displays the data from the simulation module.
[0028] Further, the step S2: calculating the flow rate of the fluid in the simulated pipeline by the flow coupling algorithm specifically includes: for node A, there are three pipelines connected to it: pipeline A, pipeline B, and pipeline C, and the fluid flows from pipeline A into pipeline B and pipeline C,
[0029] S201: Calculate the flow rate Q out of pipe A A-out , the flow rate Q flowing into pipe B B-in , the flow rate Q flowing into pipe C C-in ;
[0030] S202: Calculate the total flow ∑Q of node A according to the result of S201;
[0031] S203: Determine whether the total flow ∑Q at node A satisfies the mass conservation law.
[0032] Furthermore, the step S201 is specifically as follows:
[0033] The flow out of pipe A includes the flow Q from pipe A into pipe B. AB , the flow rate Q from pipeline A to pipeline C AC :
[0034] Q A_out =Q AB +Q AC ;
[0035] The flow rate flowing into pipe B includes the flow rate Q flowing from pipe A into pipe B AB , the flow rate Q from pipe C to pipe B CB :
[0036] Q B _in=Q AB +QC B ;
[0037] The flow rate flowing into pipe C includes the flow rate Q flowing from pipe A into pipe C. AB , the flow rate Q from pipe B to pipe C BC :
[0038] Q C_in =Q AC +Q BC .
[0039] Furthermore, the step S202 is specifically as follows:
[0040] For node A, the outflow flow of pipe A is the flow into node A, so it is positive flow.
[0041] The inflow flow of pipes B and C is the flow out of node A, so it is negative flow.
[0042] For node A, the total traffic here is:
[0043]
[0044] ∑Q=Q AB +Q AC -Q AB -Q AC =0.
[0045] Beneficial effects of the present invention:
[0046] The gas extraction comprehensive simulation training system of the present invention is a product of the integration of petroleum engineering, oil and gas storage and transportation, and computer technology. It allows trainees to understand the internal structure and principles of various gas extraction equipment and become familiar with the typical stations and processes of the gas field block. The training is divided into multiple levels and can be used for the training of junior workers, intermediate workers, senior workers, technicians, and senior technicians. Through the training of this system, trainees can master the principles and usage methods of various gas extraction equipment and be able to handle common accidents on site.
[0047] The system uses the "flow coupling" method to calculate the pressure, flow, and temperature of the fluid in the pipeline in real time. Advanced mathematical models make the training more in line with the actual situation on site. The system uses accident pre-embedded technology to simulate common accidents and equipment failures in gas production operations. Instructors can introduce these accidents or failures at any time. Trainees can judge and deal with them correctly based on the phenomena, improving their ability to judge and deal with accidents. Displaying the working status of the equipment on a large screen makes the entire process clear and easy to understand, which can reduce the training time of trainees and give them a deeper understanding. Customizable accident simulation can make training easier. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0049] Figure 1 It is a schematic diagram of the system structure of the present invention;
[0050] Figure 2 is a flow chart of the method of the present invention;
[0051] Figure 3 It is a window jump flow chart of the present invention;
[0052] Figure 4 It is a schematic diagram of window generation of the present invention;
[0053] Figure 5 It is a node traffic schematic diagram of the present invention. DETAILED DESCRIPTION
[0054] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0055] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0056] In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the fact that ordinary technicians in the field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0057] like Figure 1 As shown, a digital training system for deepwater natural gas extraction technology includes a teacher terminal, a student terminal and a server;
[0058] The teacher end is used to set and publish training tasks, upload them to the server end, and monitor the trainee training process in real time;
[0059] The server is used to receive the training tasks sent by the teacher, simulate and control various gas production conditions according to the training tasks, and send the simulated conditions to the trainee;
[0060] The trainee terminal is used to receive simulated working conditions and provide human-computer interaction tools for trainee training operations;
[0061] The teacher terminal includes an accident selection module, which is used to introduce accidents or failures at any time during the training process for the system to judge and handle;
[0062] The server includes a simulation module and a management module. The simulation module uses a flow coupling algorithm to calculate the pressure and flow of the fluid in the simulated pipeline in real time and improve the simulation working condition parameters; the management module generates multiple operation windows and simulation modules corresponding to the windows (such as Figure 4 As shown), realize the connection between window and simulation module, and between simulation modules between windows;
[0063] The trainee terminal includes an internal operation post operation window module and an external operation post VR operation module.
[0064] The external operation post VR operation module adopts VR technology, uses VR glasses or helmet-type displays, and VR operating handles to operate the valves and equipment in the virtual field. The VR scene displays the virtual characters of the operators, and displays the working conditions inside the equipment and the flow conditions in the pipeline in a transparent and cross-sectional manner. The internal operation post and the external operation post work together to complete the operation and management of the gas production station. Multiple internal operation post trainees and external operation post trainees can work together to operate at the same time. The virtual characters of other operators will be displayed in the VR scene, and the working conditions inside the equipment and the flow conditions in the pipeline will be displayed in a transparent and cross-sectional manner. The operation window module is used to display the training gas production conditions and provide the trainee training operation interface. Multi-person collaborative operation is realized in an immersive virtual reality environment. The personnel operation in the real environment can be synchronously fed back to the VR three-dimensional well site environment, so that the trainees in the virtual environment can be visible to each other; the position information of the handle positioning is used to determine the personnel action, and the action recognition and determination of the real personnel action in the VR environment are realized. Provide a vivid and intuitive operation mode for multiple people to complete the disposal process in collaboration, and improve the training effect.
[0065] The student side supports the integration of VR and desktop interaction, as well as multi-person collaboration during the operation process, to meet project training needs.
[0066] (1) Convenient mode switching
[0067] Use the prefabricated Player component in the Steam VR plugin, use SteamVRObjects and NoSteamVRFallbackObjects objects, and switch the modes of these two objects to achieve mode recognition between the VR camera and the desktop camera, thereby achieving the fusion of the desktop interactive perspective and the VR interactive perspective, and showing the same drill scene elements and corresponding information.
[0068] (2) Fast interactive response
[0069] By writing the core classes of the interaction system Player, Hand and Interactable, setting up the Player prefab, implementing the player object in the scene and the SteamVR camera setup. The interaction system works by sending messages to any object that interacts with it. These objects then react quickly to the messages and can attach themselves to the hand as needed.
[0070] (3) Realization of general interactive functions between VR and desktop
[0071] By adding Interactable components to objects that need to be interacted with, the VR handle interaction and desktop mouse click interaction functions are integrated to assimilate the interaction functions between various positions and virtual scenes and equipment during the drill;
[0072] After the Player component is added to the scene, the camera can be adapted according to the scene position without the need to re-personalize the camera parameters;
[0073] At the same time, the parameters for switching between the two drill modes are set using an external panel, allowing various settings to be quickly implemented and updated.
[0074] Helmet-mounted display system: HTC Cosmos, an immersive virtual reality system based on a helmet-mounted display, uses a helmet-mounted display to block the user's vision and hearing to produce virtual vision. Users can use a voice recognizer to allow participants to issue operating commands to the system host. At the same time, the head, hands, and eyes are tracked by corresponding head trackers, hand trackers, and eye tracking trackers, so that the system can achieve the most interactive real-time performance. The immersive virtual reality system is an ideal model for replacing the real environment. The immersive three-dimensional display has the characteristics of strong realism, flexible interaction, and real-time feedback.
[0075] In order to avoid mutual interference among personnel operations in the real space, a physical operation area is set for personnel, and equipment cables are hung to avoid entanglement and interference, so that each operator has an independent operating space.
[0076] You can use the handles worn on the virtual reality glasses to interact with the virtual reality world, or you can interact in the air through gestures, such as grabbing, moving, clicking, etc.
[0077] like Figure 2 As shown, a digital simulation method for deepwater natural gas production process is based on a digital training system for deepwater natural gas production process, and includes the following specific steps:
[0078] S1: The server restores the window through the on-site picture, and adds a simulation module corresponding to the operation window, and realizes the jump relationship between each window through the simulation module;
[0079] S2: Each operation window uses the flow coupling algorithm to calculate the pressure, flow rate, and temperature of the fluid in the simulated pipeline;
[0080] S3: Then connect the relevant parameters calculated by the flow coupling algorithm of each window, compare them with the on-site data, and adjust the parameters.
[0081] like Figure 3 As shown, the step S1: realizing the connection between each window specifically includes:
[0082] S101: The management module monitors the operation of the window and transmits the corresponding switch and analog quantity to the simulation module of the window;
[0083] S102: The value changed by the window operation is transmitted to the simulation module, and the parameter is returned through calculation of the simulation module;
[0084] S103: The window receives the data from the simulation module and displays it. Figure 5 As shown, the flow diagram of pipeline node A. For node A, there are three pipelines connected to it: pipeline A, pipeline B, and pipeline C. Assume that the flow direction is pipeline A flowing into pipeline B and pipeline C. The flow out of pipeline A includes the flow Q of pipeline A flowing into pipeline B. AB , the flow rate Q from pipeline A to pipeline C AC ,
[0085] Q A_out =Q AB +Q AC ,
[0086] The flow rate flowing into pipe B includes the flow rate Q flowing from pipe A into pipe B AB , the flow rate Q from pipe C to pipe B CB ,
[0087] Q Bi n=Q AB +Qc B ,
[0088] The flow rate flowing into pipe C includes the flow rate Q flowing from pipe A into pipe C. AB , the flow rate Q from pipe B to pipe C BC ,
[0089] Q C_in =Q AC +Q BC ,
[0090] For node A, the outflow flow of pipe A is the flow into node A, so it is positive flow.
[0091] The inflow flow of pipes B and C is the flow out of node A, so it is negative flow.
[0092] For node A, the total traffic volume is
[0093]
[0094] ∑Q=Q AB +Q AC -Q AB -Q AC =0,
[0095] At node A, the calculation process satisfies ∑Q=0, which satisfies the conservation of mass. Using this method, the problem to be solved can be expanded into a large system, and by comparing with the actual on-site data, the parameters of the entire system can be adjusted to make the training more in line with the actual on-site situation.
[0096] The above is only a preferred embodiment of the present invention. It should be understood that the present invention is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art shall not deviate from the spirit and scope of the present invention, and shall be within the scope of protection of the claims attached to the present invention.
Claims
1. A digital training system for deepwater natural gas extraction technology, including a teacher terminal, a student terminal and a server; The teacher end is used to set and publish training tasks, upload them to the server end, and monitor the trainee training process in real time; The server is used to receive the training tasks sent by the teacher, simulate and control various gas production conditions according to the training tasks, and send the simulated conditions to the trainee; The trainee terminal is used to receive simulated working conditions and provide human-computer interaction tools for trainee training operations; It is characterized in that The teacher terminal includes an accident selection module, which is used to introduce accidents or failures at any time during the training process for the system to judge and handle; The server includes a simulation module and a management module. The simulation module uses a flow coupling algorithm to calculate the pressure and flow of the fluid in the simulated pipeline in real time to improve the simulation working condition parameters; the management module generates multiple operation windows and simulation modules corresponding to the windows to realize the connection between the windows and the simulation modules, and between the windows and the simulation modules; The trainee terminal includes an internal operation post operation window module and an external operation post VR operation module. The internal operation post operation window simulates the operation of the on-site internal operation post personnel, displays the training gas production conditions, and provides a training operation interface for trainees; The VR operation module for the external operation post adopts VR technology, uses VR glasses and VR operating handles to operate the valves and equipment in the virtual scene, and the VR scene displays the virtual character of the operator, and shows the working conditions inside the equipment and the flow conditions in the pipeline in a transparent and cross-sectional manner; The flow coupling algorithm specifically includes the following steps: For node A, there are three pipes connected to it: pipe A, pipe B, and pipe C. The fluid flows from pipe A into pipe B and pipe C. S201: Calculate the flow rate Q out of pipe A A-out , the flow rate Q flowing into pipe B B -in, flow rate Q flowing into pipe C C-i n; S202: Calculate the total flow ∑Q of node A according to the result of S201; S203: Determine whether the total flow ∑Q at node A satisfies the mass conservation law; The step S201 is specifically as follows: The flow out of pipe A includes the flow Q from pipe A into pipe B. AB , the flow rate Q from pipeline A to pipeline C AC :Q A_out =Q AB +Q AC ; The flow rate flowing into pipe B includes the flow rate Q flowing from pipe A into pipe B AB , the flow rate Q from pipe C to pipe B CB Q B_in =Q AB +Q CB ; The flow rate flowing into pipe C includes the flow rate Q flowing from pipe A into pipe C. AB , the flow rate Q from pipe B to pipe C BC Q c _ in =Q AC +Q BC ; The step S202 is specifically as follows: For node A, the outflow flow of pipe A is the flow into node A, so it is positive flow. The inflow flow of pipes B and C is the flow out of node A, so it is negative flow. For node A, the total traffic here is: ∑Q=Q AB +Q AC -Q AB -Q AC =0。 2. A digital simulation method for deepwater natural gas production process, based on a digital training system for deepwater natural gas production process according to claim 1, characterized in that: The specific steps include: S1: The server restores the window through the on-site picture and adds a simulation module corresponding to the operation window to realize the jump relationship between each window; S2: Each operation window uses the flow coupling algorithm to calculate the pressure, flow rate, and temperature of the fluid in the simulated pipeline; S3: Then connect the relevant parameters calculated by the flow coupling algorithm of each window, compare them with the on-site data, and adjust the parameters.
3. A digital simulation method for deepwater natural gas production process according to claim 2, characterized in that: The step S1: realizing the connection between each window, specifically includes: S101: The management module monitors the operation of the window and transmits the corresponding switch and analog quantity to the simulation module of the window; S102: The value changed by the window operation is transmitted to the simulation module, and the parameter is returned through calculation of the simulation module; S103: The window receives and displays the data from the simulation module.
4. A digital simulation method for deepwater natural gas production process according to claim 2, characterized in that: The step S2: Calculate the flow rate of the fluid in the simulated pipeline by using the flow coupling algorithm, specifically including: for node A, there are three pipelines connected to it: pipeline A, pipeline B, and pipeline C, and the fluid flows from pipeline A into pipelines B and C, S201: Calculate the flow rate Q out of pipe A A-out , the flow rate Q flowing into pipe B B -in, flow rate Q flowing into pipe C C-i n; S202: Calculate the total flow ∑Q of node A according to the result of S201; S203: Determine whether the total flow ∑Q at node A satisfies the mass conservation law.
5. A digital simulation method for deepwater natural gas production process according to claim 4, characterized in that: The step S201 is specifically as follows: The flow out of pipe A includes the flow Q from pipe A into pipe B. AB , the flow rate Q from pipeline A to pipeline C AC :Q Aout =Q AB +Q AC ; The flow rate flowing into pipe B includes the flow rate Q flowing from pipe A into pipe B AB , the flow rate Q from pipe C to pipe B CB Q B_in =Q AB +Q CB ; The flow rate flowing into pipe C includes the flow rate Q flowing from pipe A into pipe C. AB , the flow rate Q from pipe B to pipe C BC Q C _in=Q AC +Q BC .
6. A digital simulation method for deepwater natural gas production process according to claim 4, characterized in that: The step S202 is specifically as follows: For node A, the outflow flow of pipe A is the flow into node A, so it is positive flow. The inflow flow of pipes B and C is the flow out of node A, so it is negative flow. For node A, the total traffic here is: ∑Q=Q AB +Q Ac -Q AB -Q Ac =0。