A storage method for preparing Liushenqu

By designing an automatically moving placement rack, the automatic movement of the drive motor and conductive roller on the conductive rails is solved, and the storage efficiency and cleanliness are improved.

CN115848863BActive Publication Date: 2025-03-11ANHUI SHENGANTANG PHARM CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211109556.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-13
Publication Date
2025-03-11
Estimated Expiration
2042-09-13

AI Technical Summary

Technical Problem

During the storage of Liushenqu raw materials, staff need to frequently enter the storage bin, resulting in increased workload, reduced efficiency and decreased cleanliness of the storage bin.

Method used

A storage method including a moving mechanism and an auxiliary mechanism is designed. By driving the motor and the conductive roller to automatically move the placement rack on the conductive rail, the automatic storage of Liushenqu raw materials is realized, and manual push and frequent entry into the storage bin is avoided.

Benefits of technology

The efficiency of Liushenqu raw materials storage has been improved, the number of times staff enter the storage bin is reduced, and the tidyness of the storage bin is maintained.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115848863B_ABST
    Figure CN115848863B_ABST
Patent Text Reader

Abstract

The present invention discloses a storage method for preparing Liushenqu, which relates to the technical field of Chinese medicine preparation, including a storage bin, wherein a placement rack, a support box, and a moving mechanism are provided inside the storage bin for placing Liushenqu raw materials. The present invention sets a moving mechanism, and the output end of the driving motor rotates to drive the first conductive roller and the second conductive roller to automatically roll on the top of the first conductive rail and the second conductive rail through mechanical transmission. When the first conductive roller moves to one side of the limiting slider, the first conductive roller is separated from the top of the first conductive rail, and the limiting slider is reset and limits one side of the first conductive roller. This structure is conducive to automatically storing the Liushenqu raw materials placed in the placement rack inside the storage bin. Compared with traditional manual pushing, the efficiency during storage is improved, and it also avoids the staff from entering the inside of the storage bin, thereby ensuring the cleanliness inside the storage bin.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of traditional Chinese medicine preparation, in particular to a storage method for preparing Liushenqu. Background Art

[0002] Liu Shen Qu, the name of a Chinese patent medicine, is composed of Polygonum hydropiper, Artemisia annua, Xanthium sibiricum, Adzuki bean, bitter almond, wheat bran and flour. It has the functions of strengthening the spleen and stomach, digesting food and regulating the middle, and is used for weak spleen and stomach, food stagnation, chest distension and abdominal distension, and food accumulation in children. When processing the raw materials of Liu Shen Qu, the raw materials need to be cleaned and impurities removed first, and then dried. After drying, the raw materials need to be stored, and then crushed and screened to obtain irregular small blocks or coarse granules, and then processed by corresponding machines to form Liu Shen Qu cakes of different shapes.

[0003] At present, when storing Liu Shen Qu raw materials, it is necessary to push the dried Liu Shen Qu raw materials into the storage bin for storage, and ventilate the storage bin through the ventilation holes of the storage bin to achieve the effect of ventilation and drying inside the storage bin, and avoid the Liu Shen Qu raw materials from getting damp and moldy. However, at present, when storing Liu Shen Qu raw materials, the staff needs to push the placement rack with Liu Shen Qu raw materials into the storage bin, and then walk out of the storage bin and push the next placement rack into the storage bin. In this way, the staff needs to walk back and forth in the storage bin, which increases the workload of the staff and reduces the efficiency of the storage of Liu Shen Qu raw materials. On the other hand, the frequent movement of the staff in the storage bin will reduce the cleanliness of the storage bin, thereby affecting the subsequent storage effect of Liu Shen Qu raw materials. Summary of the invention

[0004] The object of the present invention is to provide a storage method for the preparation of Liushenqu to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] A storage method for preparing Liushenqu, comprising a storage bin, wherein a placement rack for placing Liushenqu raw materials is arranged inside the storage bin, a support box for moving the placement rack is fixed to the bottom end of the placement rack by welding, and a moving mechanism, wherein the moving mechanism comprises a first conductive rail and a second conductive rail for conducting electricity arranged at the bottom end of the inner wall of the storage bin, a first conductive roller for conducting electricity is arranged at the top end of the first conductive rail, a second conductive roller for conducting electricity is arranged at the top end of the second conductive rail, a battery for providing power is fixed inside the support box by bolts, one end of the battery is electrically connected to a first conductive L-rod extending to the outside of the support box, the other end of the battery is electrically connected to a conductive cross bar, one end of the conductive cross bar is provided with a conductive block, and one end of the conductive block is provided with a second conductive L-rod extending to the outside of the support box;

[0007] An auxiliary mechanism includes a T-block bonded to one side of the conductive block, one side of the support box is fixedly connected by bolts with an extrusion rod for pushing the T-block to move upward, a plastic guide rail is arranged inside the storage bin, the plastic guide rail is located on one side of the first conductive rail, and a limiting slider is arranged at the top end of the plastic guide rail and extends to the inside of the plastic guide rail for limiting the first conductive roller.

[0008] As a further scheme of the present invention: the moving mechanism also includes a first conductive column fixed to one end of the first conductive roller by welding, one side of the first conductive L-rod is sleeved on the outer wall of the first conductive column, one end of the first conductive column is connected to a rotating roller that penetrates to the other end of the support box by bolts, one end of the rotating roller is fixedly connected to the second conductive column by bolts, one side of the second conductive L-rod is sleeved on the outer wall of the second conductive column, the second conductive column is fixedly connected to one end of the second conductive roller by welding, one side of the battery is connected to a driving motor for providing driving force by a wire, the driving motor is fixedly connected to the inner wall of the support box by bolts, the output shaft of the driving motor is connected to a connecting rod by a coupling, a first bevel gear is fixed to one side of the connecting rod by welding, one end of the first bevel gear is meshed with a second bevel gear, and the second bevel gear is fixedly connected to the outer wall of the rotating roller.

[0009] As a further solution of the present invention: the rotating roller is rotatably connected to the inner wall of the support box through a bearing, and the outer wall of the rotating roller is provided with two auxiliary wheels, the first conductive roller and the second conductive roller are of the same specification, and the top end of the first conductive rail is formed with a groove matching the first conductive roller, and the top end of the second conductive rail is formed with a groove matching the second conductive roller.

[0010] As a further solution of the present invention: the first conductive rail is connected to the second conductive rail via a conductive rod, and the horizontal height of the first conductive L-rod and the second conductive L-rod is higher than the height of the top of the first conductive rail and the second conductive rail.

[0011] As a further solution of the present invention: rolling wheels for assisting the support box in rolling are connected to both ends of the support box through bearings, and the rolling wheels are located on one side of the second conductive roller and the first conductive roller.

[0012] As a further solution of the present invention: the auxiliary mechanism also includes a vertical rod sleeved on the outer wall of the T-block, the top of the T-block is provided with a first spring connected to the inner wall of the vertical rod, and the bottom end of the limit slider is provided with a second spring connected to the inner wall of the plastic guide rail.

[0013] As a further solution of the present invention: one side of the limit slider is set to be inclined, and the horizontal position of the top of the limit slider is higher than the horizontal position of the top of the first conductive roller, and the interior of the plastic guide rail is provided with a sliding groove matching the limit slider.

[0014] As a further solution of the present invention: the bottom end of the T-block is arranged to be inclined, one side of the extrusion rod is arranged to be curved, and the extrusion rod and the inclined bottom end of the T-block are at the same horizontal height, the interior of the support box is provided with a moving through groove matching the moving trajectory of the extrusion rod, the interior of the vertical rod is provided with a limiting sliding groove matching the moving trajectory of the T-block, and fixing rods are provided at both ends of the vertical rod, and the fixing rods are fixedly connected to the inner wall of the support box.

[0015] A storage method for preparing Liushenqu comprises the following steps:

[0016] S1. Storage: Place the Liushenqu raw materials to be stored on the placement rack, push the placement rack to the first conductive rail and the second conductive rail inside the storage bin, connect the circuit of the driving motor and the battery and start working, the output end of the driving motor rotates to drive the rotating roller to rotate, the rotating roller rotates to drive the first conductive roller and the second conductive roller to rotate, the first conductive roller and the second conductive roller rotate at the top of the first conductive rail and the second conductive rail to drive the support box and the placement rack to move horizontally;

[0017] S2, locking: when the first conductive roller rotates to the inclined surface on one side of the limit slider, the first conductive roller rolls and squeezes the limit slider to move downward, and the second spring is squeezed by force. When the limit slider moves to the inside of the plastic guide rail, the first conductive roller moves to one side of the limit slider, and the first conductive roller moves to the top of the plastic guide rail. At the same time, the second spring resets to drive the limit slider to reset. At this time, the first conductive roller is separated from the first conductive rail, and the limit slider limits the first conductive roller;

[0018] S3. Retrieval: Open the door on the other side of the storage bin, pull the placement rack to take out the placement rack, the movement of the placement rack drives the support box to move, the movement of the support box drives the extrusion rod to move, the extrusion rod moves and separates from the adjacent support box, at this time the next placement rack moves to one side of the limit slider under the working state of the drive motor, and the staff can take the placement rack on one side of the limit slider in turn.

[0019] Compared with the prior art, the present invention has the following beneficial effects:

[0020] By setting a moving mechanism, the output end of the driving motor rotates and drives the first conductive roller and the second conductive roller to automatically roll on the top of the first conductive rail and the second conductive rail through mechanical transmission. When the first conductive roller moves to one side of the limit slider, the first conductive roller is separated from the top of the first conductive rail, and the limit slider is reset and limits one side of the first conductive roller. This structure is conducive to automatically storing the Liu Shen Qu raw materials placed on the placement rack in the storage bin. Compared with traditional manual pushing, the storage efficiency is improved, and the staff is prevented from entering the storage bin, thereby ensuring the cleanliness of the storage bin. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A schematic diagram of a storage method for preparing Liushenqu;

[0022] Figure 2 A schematic diagram of the internal structure of a storage bin for a storage method for preparing Liushenqu;

[0023] Figure 3 A schematic diagram of a storage rack structure for the preparation of Liushenqu;

[0024] Figure 4 A schematic diagram of the contact structure of adjacent placement racks in a storage method for preparing Liushenqu;

[0025] Figure 5 A schematic diagram of the internal structure of a plastic guide rail for a storage method for preparing Liushenqu;

[0026] Figure 6 A schematic diagram of the structure of a first conductive rail, a second conductive rail and a conductive rod in a storage method for preparing Liushenqu;

[0027] Figure 7 A schematic diagram of the internal structure of a support box for a storage method for preparing Liushenqu;

[0028] Figure 8 A schematic diagram of the internal structure of a support box for a storage method for preparing Liu Shen Qu from another perspective.

[0029] In the figure: 1. storage bin; 2. support box; 3. placement rack; 4. moving mechanism; 401. first conductive rail; 402. second conductive rail; 403. first conductive roller; 404. first conductive column; 405. rotating roller; 406. first conductive L-rod; 407. battery; 408. conductive cross bar; 409. conductive block; 410. second conductive L-rod; 411. driving motor; 412. first bevel gear; 413. second bevel gear; 414. second conductive column; 415. second conductive roller; 5. auxiliary mechanism; 501. extrusion rod; 502. T-block; 503. vertical rod; 504. first spring; 505. limit slider; 506. second spring; 6. plastic guide rail. Implementation

[0030] See also Figures 1 to 8 In an embodiment of the present invention, a storage method for preparing Liu Shen Qu comprises a storage bin 1, a placement rack 3 for placing Liu Shen Qu raw materials is arranged inside the storage bin 1, a support box 2 for moving the placement rack 3 is fixed to the bottom end of the placement rack 3 by welding, and a moving mechanism 4, wherein the moving mechanism 4 comprises a first conductive rail 401 and a second conductive rail 402 for conducting electricity arranged at the bottom end of the inner wall of the storage bin 1, a first conductive roller 403 for conducting electricity is arranged at the top end of the first conductive rail 401, and a second conductive roller 415 for conducting electricity is arranged at the top end of the second conductive rail 402, a battery 407 for providing power is fixed inside the support box 2 by bolts, one end of the battery 407 is electrically connected to a first conductive L-rod 406 extending to the outside of the support box 2, and the other end of the battery 407 is electrically connected to a conductive cross bar 408, one end of the conductive cross bar 408 is provided with a conductive block 409, and one end of the conductive block 409 is provided with a second conductive L-rod 410 extending to the outside of the support box 2;

[0031] The auxiliary mechanism 5 includes a T-block 502 bonded to one side of the conductive block 409, and one side of the support box 2 is fixedly connected with an extrusion rod 501 for pushing the T-block 502 to move upward by bolts. A plastic guide rail 6 is arranged inside the storage bin 1. The plastic guide rail 6 is located on one side of the first conductive rail 401. The top of the plastic guide rail 6 is provided with a limiting slider 505 extending into the inside of the plastic guide rail 6 for limiting the first conductive roller 403.

[0032] In the storage method for preparing Liu Shen Qu, a storage bin 1 is used for storing Liu Shen Qu raw materials, vents are provided at both ends of the storage bin, and dust-proof nets are provided at the vents, a placement rack 3 is used for placing the Liu Shen Qu raw materials that have been washed and dried, and a moving mechanism 4 is provided to facilitate automatic storage of the Liu Shen Qu raw materials placed on the placement rack 3 in the storage bin 1, which improves the efficiency of storage compared to traditional manual pushing, and also avoids the staff from entering the storage bin 1, thereby ensuring the cleanliness of the storage bin 1, and an auxiliary mechanism 5 is provided to facilitate the quick removal of the placement rack 3, thereby improving the convenience of the device as a whole.

[0033] exist Figure 2 , 3 , 4, 6, 7, and 8: the moving mechanism 4 also includes a first conductive column 404 fixed to one end of the first conductive roller 403 by welding, one side of the first conductive L-rod 406 is sleeved on the outer wall of the first conductive column 404, one end of the first conductive column 404 is connected to a rotating roller 405 that penetrates to the other end of the support box 2 by bolts, one end of the rotating roller 405 is fixedly connected to a second conductive column 414 by bolts, one side of the second conductive L-rod 410 is sleeved on the outer wall of the second conductive column 414, the second conductive column 414 is fixedly connected to one end of the second conductive roller 415 by welding, one side of the battery 407 is connected to a driving motor 411 for providing driving force by a wire, the driving motor 411 is fixedly connected to the inner wall of the support box 2 by bolts, the output shaft of the driving motor 411 is connected to a connecting rod by a coupling, one side of the connecting rod is fixed with a first bevel gear 412 by welding, and the first bevel gear 412 One end of the gear 413 is meshed with a second bevel gear 413, and the second bevel gear 413 is fixedly connected to the outer wall of the rotating roller 405; the rotating roller 405 is rotatably connected to the inner wall of the support box 2 through a bearing, and the outer wall of the rotating roller 405 is provided with two auxiliary wheels, the first conductive roller 403 and the second conductive roller 415 are of the same specification, and the top end of the first conductive rail 401 is formed with a groove matching the first conductive roller 403, and the top end of the second conductive rail 402 is formed with a groove matching the second conductive roller 415; the first conductive rail 401 and the second conductive rail 402 are connected by a conductive rod, and the horizontal height of the first conductive L rod 406 and the second conductive L rod 410 is higher than the height of the top end of the first conductive rail 401 and the second conductive rail 402; both ends of the support box 2 are connected with rolling wheels for assisting the rolling of the support box 2 through bearings, and the rolling wheels are located on one side of the second conductive roller 415 and the first conductive roller 403.

[0034] The storage method for preparing the six divine songs, the battery 407 is turned on and the drive motor 411 is working, the output end of the drive motor 411 rotates to drive the connecting rod to rotate, the connecting rod rotates to drive the first bevel gear 412 to rotate, the first bevel gear 412 rotates to drive the second bevel gear 413 to rotate, the second bevel gear 413 rotates to drive the rotating roller 405 to rotate, the rotating roller 405 rotates to drive the first conductive column 404 and the second conductive column 414 to rotate, that is, the first conductive roller 403 and the second conductive roller 415 rotate on the first conductive column 404 and the second conductive column 414. The top of the electric rail 401 and the second conductive rail 402 roll automatically. When the first conductive roller 403 moves to the inclined surface on one side of the limit slider 505, the first conductive roller 403 continues to roll and squeezes the limit slider 505 to move downward. The second spring 506 is squeezed by force. When the first conductive roller 403 is separated from the top of the first conductive rail 401, the closed circuit is disconnected, the battery 407 is turned off, and the second spring 506 is reset and drives the limit slider 505 to reset and move. The limit slider 505 is reset and the first conductive roller 403 is pressed. One side of the electric roller 403 is limited, and when the next placement rack 3 automatically moves to the side of the previous placement rack 3, the extrusion rod 501 on the side of the previous support box 2 is inserted into the interior of the next support box 2, and the extrusion rod 501 contacts the T-block 502 and pushes the T-block 502 to move upward, and the first spring 504 is squeezed by force, and the T-block 502 moves and drives the conductive block 409 to move upward at the same time. When the previous extrusion rod 501 is completely inserted into the interior of the next support box 2, the conductive block 409 moves and is disconnected from the conductive cross bar 408 and the second conductive L rod 410. At this time, the closed loop inside the next support box 2 is closed, that is, the placement rack 3 stops at one side of the previous placement rack 3, so that the placement rack 3 can be placed in the interior of the storage bin 1 in sequence. This structure is conducive to automatically storing the Liushenqu raw materials placed on the placement rack 3 in the interior of the storage bin 1. Compared with traditional manual pushing, the efficiency during storage is improved, and at the same time, it also avoids the staff from entering the interior of the storage bin 1, thereby ensuring the cleanliness of the interior of the storage bin 1.

[0035] exist Figure 5 , 78: The auxiliary mechanism 5 also includes a vertical rod 503 sleeved on the outer wall of the T-block 502, the top of the T-block 502 is provided with a first spring 504 connected to the inner wall of the vertical rod 503, and the bottom of the limit slider 505 is provided with a second spring 506 connected to the inner wall of the plastic guide rail 6; one side of the limit slider 505 is set in an inclined shape, and the horizontal position of the top of the limit slider 505 is higher than the horizontal position of the top of the first conductive roller 403, and the inside of the plastic guide rail 6 is provided with a second spring 506 connected to the inner wall of the limit slider 505. 5; the bottom end of the T-block 502 is set to be inclined, one side of the extrusion rod 501 is set to be cambered, and the extrusion rod 501 and the inclined bottom end of the T-block 502 are at the same horizontal height, the interior of the support box 2 is provided with a moving through groove matching the moving trajectory of the extrusion rod 501, the interior of the vertical rod 503 is provided with a limiting sliding groove matching the moving trajectory of the T-block 502, and both ends of the vertical rod 503 are provided with fixing rods, which are fixedly connected to the inner wall of the support box 2.

[0036] The storage method for preparing the six divine songs is as follows: when it is necessary to take the placement rack 3 stored in the storage bin 1, the door on the other side of the storage bin 1 is opened, and the placement rack 3 near the door is pulled toward the outside of the storage bin 1, the placement rack 3 moves and drives the support box 2 to move, the support box 2 moves and drives the extrusion rod 501 to move, the extrusion rod 501 moves and separates from the adjacent support box 2, at this time the first spring 504 resets and drives the T-block 502 to move downward, the T-block 502 moves downward and drives the conductive block 409 to move downward, the conductive block 409 moves and contacts the conductive cross bar 408 and the second conductive L-bar 410, that is, the closed loop is opened at this time, and the output end of the drive motor 411 is The rotation drives the first conductive roller 403 and the second conductive roller 415 to rotate through mechanical transmission. The first conductive roller 403 and the second conductive roller 415 rotate and drive the placement rack 3 to move horizontally. When the first conductive roller 403 moves to one side of the limit slider 505, the first conductive roller 403 is separated from the first conductive rail 401, that is, the closed loop is disconnected. At this time, the placement rack 3 stays at the top of the plastic guide rail 6. The staff can then take out the next placement rack 3. In this way, the placement racks 3 stored in the storage bin 1 are taken out one by one. This structure is conducive to the quick removal of the placement rack 3, thereby improving the overall convenience of the device.

[0037] A storage method for preparing Liushenqu comprises the following steps:

[0038] S1, storage: the Liushenqu raw materials to be stored are placed on the placement rack 3, and the placement rack 3 is pushed to the first conductive rail 401 and the second conductive rail 402 inside the storage bin 1, the driving motor 411 and the battery 407 are connected and start working, the output end of the driving motor 411 rotates to drive the rotating roller 405 to rotate, the rotating roller 405 rotates to drive the first conductive roller 403 and the second conductive roller 415 to rotate, the first conductive roller 403 and the second conductive roller 415 rotate at the top of the first conductive rail 401 and the second conductive rail 402 to drive the support box 2 and the placement rack 3 to move horizontally;

[0039] S2, locking: when the first conductive roller 403 rotates to the inclined surface on one side of the limiting slider 505, the first conductive roller 403 rolls and squeezes the limiting slider 505 to move downward, and the second spring 506 is squeezed by force. When the limiting slider 505 moves to the inside of the plastic guide rail 6, the first conductive roller 403 moves to one side of the limiting slider 505, and the first conductive roller 403 moves to the top of the plastic guide rail 6. At the same time, the second spring 506 resets to drive the limiting slider 505 to reset. At this time, the first conductive roller 403 is separated from the first conductive rail 401, and the limiting slider 505 limits the first conductive roller 403;

[0040] S3, taking out: open the door on the other side of the storage bin 1, pull the placement rack 3 to take out the placement rack 3, the movement of the placement rack 3 drives the support box 2 to move, the movement of the support box 2 drives the squeezing rod 501 to move, the squeezing rod 501 moves and separates from the adjacent support box 2, at this time, the next placement rack 3 moves to one side of the limit slider 505 under the working state of the drive motor 411, and the staff can take the placement rack 3 on one side of the limit slider 505 in turn.

[0041] This storage method for preparing Liu Shen Qu is beneficial for automatically storing the Liu Shen Qu raw materials placed on the placement rack 3 inside the storage bin 1 through this structure. Compared with the traditional manual pushing, the efficiency of storage is improved, and it also avoids the staff from entering the interior of the storage bin 1, thereby ensuring the cleanliness of the interior of the storage bin 1.

[0042] The working principle of the present invention is: when it is necessary to store the raw materials of Liu Shen Qu, the raw materials of Liu Shen Qu are cleaned and impurities removed, and then placed in the storage bin 1 for storage after drying. First, the raw materials to be stored are placed on the placement rack 3, and the door on one side of the storage bin 1 is opened, and then the placement rack 3 is pushed. The movement of the placement rack 3 drives the support box 2 to move, and the movement of the support box 2 drives the extrusion rod 501 to move. At the same time, the first conductive roller 403 rolls with the second conductive roller 415. When the first conductive roller 403 contacts the first conductive rail 401 and the second conductive roller 415 contacts the second conductive rail 402, the staff can loosen the placement rack 3, and the first conductive rail 401, the second conductive rail 402, the second conductive roller 415, and the second conductive column 501 are moved. 414, the second conductive L-rod 410, the conductive block 409, the conductive cross bar 408, the storage battery 407, the first conductive L-rod 406 and the first conductive column 404 form a closed loop. At this time, the storage battery 407 is turned on and the drive motor 411 is working. The output end of the drive motor 411 rotates to drive the connecting rod to rotate. The connecting rod rotates to drive the first bevel gear 412 to rotate. The first bevel gear 412 rotates to drive the second bevel gear 413 to rotate. The second bevel gear 413 rotates to drive the rotating roller 405 to rotate. The rotating roller 405 rotates to drive the first conductive column 404 and the second conductive column 414 to rotate. That is, the first conductive roller 403 and the second conductive roller 415 automatically roll on the top of the first conductive rail 401 and the second conductive rail 402. When the first conductive roller 415 rotates, the first conductive roller 403 and the second conductive roller 415 automatically roll on the top of the first conductive rail 401 and the second conductive rail 402. 03 moves to the inclined surface on one side of the limit slider 505, the first conductive roller 403 continues to roll and squeezes the limit slider 505 to move downward, and the second spring 506 is squeezed. When the first conductive roller 403 is separated from the top of the first conductive rail 401, the closed circuit is disconnected, the battery 407 is turned off, and the second spring 506 is reset and drives the limit slider 505 to reset and move. The limit slider 505 is reset and limits one side of the first conductive roller 403. When the next placement rack 3 automatically moves to the side of the previous placement rack 3, the squeezing rod 501 on the side of the previous support box 2 is inserted into the inside of the next support box 2, and the squeezing rod 501 contacts the T-block 502 and pushes the T-block 502 to move upward. The first spring 504 is squeezed, and the T-block The movement of block 502 drives the conductive block 409 to move upward. When the previous extrusion rod 501 is fully inserted into the interior of the subsequent support box 2, the conductive block 409 moves and is disconnected from the conductive cross bar 408 and the second conductive L rod 410. At this time, the closed circuit inside the subsequent support box 2 is closed, that is, the placement rack 3 stops on one side of the previous placement rack 3, so that the placement rack 3 can be placed in the interior of the storage bin 1 in turn. This structure is conducive to automatically storing the Liushenqu raw materials placed on the placement rack 3 in the interior of the storage bin 1. Compared with traditional manual pushing, the efficiency of storage is improved, and the staff is prevented from entering the interior of the storage bin 1, thereby ensuring the cleanliness of the interior of the storage bin 1. When the placement rack 3 stored in the storage bin 1 needs to be taken,Open the door on the other side of the storage bin 1, pull the placement rack 3 near the door toward the outside of the storage bin 1, the placement rack 3 moves and drives the support box 2 to move, the support box 2 moves and drives the extrusion rod 501 to move, the extrusion rod 501 moves and separates from the adjacent support box 2, at this time the first spring 504 resets and drives the T-block 502 to move downward, the T-block 502 moves downward and drives the conductive block 409 to move downward, the conductive block 409 moves and contacts the conductive cross bar 408 and the second conductive L rod 410, that is, at this time the closed loop is opened, the output end of the drive motor 411 rotates and drives the first conductive roller 403 and the second conductive roller 415 to rotate through mechanical transmission, the first The conductive roller 403 and the second conductive roller 415 rotate and drive the placement rack 3 to move horizontally. When the first conductive roller 403 moves to one side of the limit slider 505, the first conductive roller 403 separates from the first conductive rail 401, that is, the closed loop is disconnected. At this time, the placement rack 3 stays at the top of the plastic guide rail 6. The staff can then take out the next placement rack 3, and thus the placement racks 3 stored in the storage bin 1 are taken out in turn. This structure is conducive to the rapid removal of the placement rack 3, which improves the convenience of the entire device. It should be noted that the support box 2, the placement rack 3 and the rotating roller 405 are all made of non-conductive materials.

[0043] What has been described above are only preferred specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field of Chinese medicine preparation technology within the technical scope disclosed by the present invention, who makes equivalent replacements or changes according to the technical scheme and inventive concept of the present invention, should be covered by the protection scope of the present invention.

Claims

1. A storage method for preparing Liu Shen Qu, comprising a storage bin (1), wherein a placement rack (3) for placing Liu Shen Qu raw materials is arranged inside the storage bin (1), and a support box (2) for moving the placement rack (3) is fixed to the bottom end of the placement rack (3) by welding, characterized in that: A moving mechanism (4), the moving mechanism (4) comprising a first conductive rail (401) and a second conductive rail (402) for conducting electricity, the top of the first conductive rail (401) being provided with a first conductive roller (403) for conducting electricity, the top of the second conductive rail (402) being provided with a second conductive roller (415) for conducting electricity, a battery (407) for providing power being fixed inside the support box (2) by bolts, one end of the battery (407) being electrically connected to a first conductive L-rod (406) extending to the outside of the support box (2), the other end of the battery (407) being electrically connected to a conductive cross bar (408), one end of the conductive cross bar (408) being provided with a conductive block (409), and one end of the conductive block (409) being provided with a second conductive L-rod (410) extending to the outside of the support box (2); An auxiliary mechanism (5), the auxiliary mechanism (5) comprising a T-shaped block (502) bonded to one side of the conductive block (409), an extrusion rod (501) for pushing the T-shaped block (502) to move upwards being fixedly connected to one side of the support box (2) by means of bolts, a plastic guide rail (6) being arranged inside the storage bin (1), the plastic guide rail (6) being located on one side of the first conductive rail (401), a limiting slider (505) extending into the inside of the plastic guide rail (6) for limiting the first conductive roller (403) being arranged at the top end of the plastic guide rail (6); The moving mechanism (4) further comprises a first conductive column (404) fixed to one end of the first conductive roller (403) by welding, one side of the first conductive L-rod (406) being sleeved on the outer wall of the first conductive column (404), one end of the first conductive column (404) being connected to a rotating roller (405) penetrating to the other end of the support box (2) by bolts, one end of the rotating roller (405) being fixedly connected to a second conductive column (414) by bolts, one side of the second conductive L-rod (410) being sleeved on the outer wall of the second conductive column (414), and the second conductive column (414) being fixedly connected to the second conductive column (414) by bolts. The battery (407) is fixedly connected to one end of the second conductive roller (415) by welding, one side of the battery (407) is connected to a driving motor (411) for providing driving force by means of a wire, the driving motor (411) is fixedly connected to the inner wall of the support box (2) by means of bolts, the output shaft of the driving motor (411) is connected to a connecting rod by means of a coupling, one side of the connecting rod is fixedly connected to a first bevel gear (412) by means of welding, one end of the first bevel gear (412) is meshed with a second bevel gear (413), and the second bevel gear (413) is fixedly connected to the outer wall of the rotating roller (405); The rotating roller (405) is rotatably connected to the inner wall of the support box (2) via a bearing, and the outer wall of the rotating roller (405) is provided with two auxiliary wheels, the first conductive roller (403) and the second conductive roller (415) are of the same specification, and the top end of the first conductive rail (401) is formed with a groove matching the first conductive roller (403), and the top end of the second conductive rail (402) is formed with a groove matching the second conductive roller (415); The first conductive rail (401) and the second conductive rail (402) are connected via a conductive rod, and the horizontal height of the first conductive L-rod (406) and the second conductive L-rod (410) is higher than the height of the top ends of the first conductive rail (401) and the second conductive rail (402); Both ends of the support box (2) are connected to rolling wheels for assisting the support box (2) in rolling via bearings, and the rolling wheels are located on one side of the second conductive roller (415) and the first conductive roller (403).

2. The storage method for preparing Liushenqu according to claim 1, characterized in that: The auxiliary mechanism (5) further comprises a vertical rod (503) sleeved on the outer wall of the T-shaped block (502); a first spring (504) connected to the inner wall of the vertical rod (503) is arranged at the top end of the T-shaped block (502); and a second spring (506) connected to the inner wall of the plastic guide rail (6) is arranged at the bottom end of the limit slide block (505).

3. The storage method for preparing Liushenqu according to claim 1, characterized in that: One side of the limiting slider (505) is arranged in an inclined plane shape, and the horizontal position of the top end of the limiting slider (505) is higher than the horizontal position of the top end of the first conductive roller (403), and a sliding groove matching the limiting slider (505) is arranged inside the plastic guide rail (6).

4. The storage method for preparing Liushenqu according to claim 2, characterized in that: The bottom end of the T-block (502) is arranged in an inclined plane shape, one side of the extrusion rod (501) is arranged in an arcuate plane shape, and the extrusion rod (501) and the inclined plane bottom end of the T-block (502) are at the same horizontal height, a moving through groove matching the moving track of the extrusion rod (501) is arranged inside the support box (2), a limiting sliding groove matching the moving track of the T-block (502) is arranged inside the vertical rod (503), and fixing rods are arranged at both ends of the vertical rod (503), and the fixing rods are fixedly connected to the inner wall of the support box (2).

5. The storage method for preparing Liushenqu according to claim 1, characterized in that: The steps include: S1, storage: the Liushenqu raw materials to be stored are placed on the placement rack (3), and the placement rack (3) is pushed onto the first conductive rail (401) and the second conductive rail (402) inside the storage bin (1). The circuits of the drive motor (411) and the storage battery (407) are connected and start working. The output end of the drive motor (411) rotates to drive the rotating roller (405) to rotate. The rotating roller (405) rotates to drive the first conductive roller (403) and the second conductive roller (415) to rotate. The first conductive roller (403) and the second conductive roller (415) rotate at the top of the first conductive rail (401) and the second conductive rail (402) to drive the support box (2) and the placement rack (3) to move horizontally. S2, locking: when the first conductive roller (403) rotates to the inclined surface on one side of the limiting slider (505), the first conductive roller (403) rolls and squeezes the limiting slider (505) to move downward, and the second spring (506) is squeezed by force. When the limiting slider (505) moves to the inside of the plastic guide rail (6), the first conductive roller (403) moves to one side of the limiting slider (505), and the first conductive roller (403) moves to the top of the plastic guide rail (6). At the same time, the second spring (506) resets to drive the limiting slider (505) to reset. At this time, the first conductive roller (403) is separated from the first conductive rail (401), and the limiting slider (505) limits the first conductive roller (403); S3, taking out: open the door on the other side of the storage bin (1), pull the placement rack (3) to take out the placement rack (3), the placement rack (3) moves to drive the support box (2), the support box (2) moves to drive the extrusion rod (501), the extrusion rod (501) moves and separates from the adjacent support box (2), at this time, the next placement rack (3) moves to one side of the limit slider (505) under the working state of the drive motor (411), and the staff can take out the placement rack (3) on one side of the limit slider (505) in turn.

Citation Information

Patent Citations

  • Traditional Chinese medicinal material intelligent warehousing system

    CN107032032A

  • Power taking device of sorting trolley of logistics sorting machine

    CN212571633U