A method for assembling large-span roof structures by segmented lifting

By adopting the segmented lifting assembly method and sliding structure in the long-span roof structure, the problem of unstable position of the patching rods during the lifting of the long-span grid structure is solved, safe and accurate welding and strength improvement are achieved, and the construction requirements are met. .

CN115898027BActive Publication Date: 2024-10-01ZHEJIANG ZHONGNAN CONSTR GRP STEEL STRUCTURE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310166870.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-02-13
Publication Date
2024-10-01
Estimated Expiration
2043-02-13

AI Technical Summary

Technical Problem

During the upgrading process of the long-span grid structure, the position of the patching rods between two adjacent grid structures was outside the assembly platform, which resulted in the welding joint not being fully welded, affecting the welding quality, and the strength of the patching poles could not meet the design requirements, posing safety risks. Hidden danger.

Method used

Using the segmented lifting and assembly method of large-span roof structures, the grid structure is divided into multiple sections, which are assembled and fixed on assembly platforms at different elevations. Hydraulic lifters and sliding structures are used to realize the movement and positioning of the grid structure. , ensure that the repair rod is completed and fully welded on the assembly platform.

Benefits of technology

It shortens the lifting distance of the entire long-span grid structure, improves the welding quality and rod strength, ensures the safety of the lifting process and welding accuracy, and meets the construction requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115898027B_ABST
    Figure CN115898027B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for assembling a large-span roof structure by segmented lifting, comprising the following steps: A, dividing the area by assembly elevation; B, assembling a single grid structure; C, installing a hydraulic lifter on the top of the structural column; D, installing a hydraulic lifter on the top of the support frame; E, installing a sliding structure on the assembly platforms of area two and area three; F, making the first grid structure reach the outside of the assembly platform of area two; G, fixing the first grid structure and the second grid structure with additional rods; H, controlling the first grid structure and the second grid structure that are fixedly connected to reach the outside of the assembly platform of area three; I, repeating step G, fixing the third grid structure and the second grid structure with additional rods. The present invention ensures full welding between the grid structure and the rods, improves the welding strength between the grid structure and the rods, ensures the accuracy of the welding position of the rods, improves the welding quality, and makes the entire large-span grid structure meet the construction requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of steel structure construction, and in particular relates to a segmented lifting and assembling method for a large-span roof structure. Background Art

[0002] With the development of steel structures, spatial structures are pursuing larger spans, higher spaces, and more complex structures. The roof of this structure usually adopts steel trusses and grid structures. When installing such structures, the overall lifting method is usually used. The overall lifting method is a construction method in which the structure is assembled as a whole at the projection position on the ground, and then the structure is lifted to the designed position through a temporary tire frame or a lifting platform on the structural column, using hydraulic jacks, steel strands and other lifting equipment.

[0003] When lifting the large-span grid structure to the designed position, the lifting height is high, which poses a safety hazard. In order to solve this technical problem, the technicians in this field lift the large-span roof structure in sections at different elevations, assemble the grid structure on assembly platforms at different elevations, and lift the grid structure from low to high. First, lift the first grid structure. When the first grid structure and the second grid structure correspond to each other, add rods between the first grid structure and the second grid structure, and then lift the overall structure of the first grid structure and the second grid structure. When the second grid structure and the third grid structure correspond to each other, add rods between the second grid structure and the third grid structure, and then lift the fixed overall structure of the first grid structure, the second grid structure and the third grid structure to the set position, shorten the lifting distance of the entire large-span grid structure, and ensure the safety of the lifting process.

[0004] However, the position of the supplementary rods between two adjacent truss structures is on the outside of the assembly platform. At this time, the welding point of the rod is in a suspended state, which makes it impossible to fully weld the welding point. It is also easy to cause deviations in the welding position, affecting the welding quality and causing the strength of the supplementary rods between the truss structures to fail to meet the design requirements. Summary of the invention

[0005] The purpose of the present invention is to solve the above-mentioned technical problems existing in the prior art and to provide a method for lifting and assembling a large-span roof structure in sections, which can divide a large-span grid structure into multiple sections, assemble the grid structure in sections on assembly platforms at different elevations, and then lift and fix the segmented grid structure with additional rods, thereby shortening the lifting distance of the entire large-span grid structure and ensuring the safety of the lifting process.

[0006] Moreover, the grid structure can be moved during the lifting process, and the rod replacement between the grid structure being lifted and the assembled grid structure can be completed on the assembly platform. At the same time, the two grid structures with the rod replacement can be positioned to ensure full welding between the grid structure and the rods, improve the welding strength between the grid structure and the rods, ensure the accuracy of the rod replacement welding position, improve the welding quality, and make the entire large-span grid structure meet the construction requirements.

[0007] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0008] A method for assembling a large-span roof structure by sectional lifting, characterized in that it comprises the following steps:

[0009] A. Divide the area by assembling elevations, and divide it into Area 1, Area 2 and Area 3 from low to high elevations.

[0010] B. Assemble a single grid structure on the assembly platforms in Area 1, Area 2 and Area 3, and tie a fixing rope to each grid structure.

[0011] C. Install a hydraulic lifter on the top of the structural column.

[0012] D. Install a support frame between the two structural columns in Area 1 and Area 2, and then install a hydraulic lifter on the top of the support frame.

[0013] E. Install a sliding structure on the assembly platform of area 2 and area 3. The sliding structure includes a sleeve 1, a sleeve 2, a moving assembly, an assembly plate, a hydraulic cylinder and a positioning assembly; wherein the moving assembly includes a mounting plate and a roller, the mounting plate is provided with a mounting end, the mounting plate is provided with a notch, the roller is arranged in the notch, the roller rotates on the mounting plate through a rotating shaft, and both the sleeve 1 and the sleeve 2 are provided with a penetrating mounting hole; the positioning assembly includes two symmetrically arranged positioning plates, and clamping plates are provided on both sides of the positioning plates. The specific steps are as follows:

[0014] (1) According to the construction drawings, fix the casing and the hydraulic cylinder at the set positions of the assembly platform.

[0015] (2) According to the construction drawings, the second sleeve is fixed at the set position of the assembly platform, and the second sleeve and the first sleeve are set corresponding to each other.

[0016] (3) The moving components are installed one by one in the mounting hole of the sleeve 1 and the mounting hole of the sleeve 2, the outer wall of the mounting plate and the inner wall of the mounting hole are in close contact, and the roller rolls on the inner wall of the mounting hole.

[0017] (4) Adjust the position of the moving assembly, and then fix the assembly plate to the mounting end of the mounting plate by bolts. Ear plates are welded on both sides of the assembly plate.

[0018] (5) Move the assembly plate toward the hydraulic cylinder, and then weld the piston rod end and the ear plate on the hydraulic cylinder to fix them.

[0019] (6) Place the positioning plate vertically on the assembly plate, and then install the clamping plate on the fixing rod on the side of the positioning plate. The positioning plate is provided with a fixing hole. Then screw the nut into the fixing rod, adjust the installation position of the positioning plate, and then tighten the nut.

[0020] F. Fix the steel wire rope on the hydraulic lifter at the top of the structural column and the first grid structure in area one, and then start the hydraulic lifter to control the first grid structure to move upward a set distance so that it reaches the outside of the assembly platform in area two.

[0021] G. Fix the first and second grid structures with additional rods:

[0022] (1) Pull the fixing rope on the first grid structure toward the second grid structure by a set distance, and then fix the fixing rope to the fixing hole.

[0023] (2) Turn on the hydraulic cylinder, which controls the assembly plate to move a set distance toward the second grid structure, so that the first grid structure moves a set distance toward the second grid structure, so that the outer end of the first grid structure is located in the area between the two positioning plates.

[0024] (3) The outer end of the second grid structure is placed into the area between the two positioning plates. The positioning plates simultaneously position the first grid structure and the second grid structure. The operator welds the rods between the first grid structure and the second grid structure on the assembly plate.

[0025] H. Return the hydraulic cylinder to its initial position, so that the first grid structure and the second grid structure that are fixedly connected move outward by a set distance, then untie the fixing rope on the first grid structure from the fixing hole, and then fix the steel rope on the hydraulic lifter at the top of the other structural column and the second grid structure in area two, and then untie the steel rope on the hydraulic lifter at the top of the support frame and the first grid structure in area one, and then start the hydraulic lifter to control the first grid structure and the second grid structure that are fixedly connected to move upward by a set distance, so that they reach the outside of the assembly platform in area three.

[0026] I. Repeat step G to fix the third grid structure and the second grid structure with additional rods, and then return the hydraulic cylinder to the initial position, so that the first grid structure, the second grid structure and the third grid structure that are fixedly connected move outward by a set distance, and then start the hydraulic lifter to control the overall structure of the first grid structure, the second grid structure and the third grid structure that are fixedly connected to move upward by a set distance.

[0027] Furthermore, when installing the sleeve 1 and the hydraulic cylinder, a groove is cut at a set position on the side of the assembly platform to form an installation groove, and then concrete is filled in the installation groove, and a pre-embedded screw rod 1 is set in the concrete. When the concrete solidifies, the pre-embedded screw rod 1 can be fixed to the side of the assembly platform, and then the fixing seat 1 of the installation sleeve 1 is installed on the pre-embedded screw rod 1, and then a nut is screwed into the pre-embedded screw rod 1 and tightened, and then the fixing seat 2 of the hydraulic cylinder is installed on another pre-embedded screw rod 1, and then a nut is screwed into the pre-embedded screw rod 1 and tightened.

[0028] Furthermore, a reinforcing plate 1 is welded at the corner of the fixing seat 1.

[0029] Furthermore, when installing the second sleeve, a groove is cut at a set position on the top of the assembly platform to form an installation groove, and then concrete is filled in the installation groove, and a pre-embedded screw rod 2 is set in the concrete. When the concrete solidifies, the pre-embedded screw rod 2 can be fixed at the top of the assembly platform, and then the fixing seat 3 of the installation sleeve 2 is installed on the pre-embedded screw rod 2, and then a nut is screwed into the pre-embedded screw rod 2 and tightened.

[0030] Furthermore, a support rod is fixed at the assembly platform, the support rod is located below the second sleeve, the support rod is threadedly connected to a support head, and a locking nut is welded to the outside of the support head. When the second sleeve is installed, the locking nut is screwed so that the support head supports the bottom surface of the second sleeve.

[0031] Furthermore, when the sleeve 2 is fixed, a support assembly is installed on the top of the assembly platform. The support assembly includes a fixed seat 4 and a rolling roller. The rolling roller rotates on the fixed seat 4 through a rotating shaft. When the assembly plate is fixed, the support assembly is located below the assembly plate, and the assembly plate is supported on the rolling roller.

[0032] Furthermore, when installing the support component, a groove is cut at a set position on the top of the assembly platform to form an installation groove, and then concrete is filled in the installation groove, and a pre-embedded screw rod three is set in the concrete. When the concrete solidifies, the pre-embedded screw rod three can be fixed at the top of the assembly platform, and then the fixing seat four is installed on the pre-embedded screw rod three, and then a nut is screwed into the pre-embedded screw rod three and tightened.

[0033] Furthermore, a reinforcing plate 2 is welded at the corner of the fixing seat 4.

[0034] The present invention has the following beneficial effects due to the adoption of the above technical solution:

[0035] 1. The present invention can divide a large-span grid structure into multiple sections, assemble the grid structure in sections on assembly platforms at different elevations, and then lift and fix the segmented grid structure with additional rods, thereby shortening the lifting distance of the entire large-span grid structure and ensuring the safety of the lifting process.

[0036] 2. The present invention can move the grid structure during the lifting process, and the rod patching between the grid structure being lifted and the assembled grid structure is completed on the assembly platform. At the same time, the two grid structures for the rod patching are positioned to ensure full welding between the grid structure and the rods, improve the welding strength between the grid structure and the rods, ensure the accuracy of the rod patching position, improve the welding quality, and make the entire large-span grid structure meet the construction requirements.

[0037] 3. The present invention installs moving components one by one in the mounting holes of the first sleeve and the second sleeve, so that the grid structure can move directionally between the first sleeve and the second sleeve during the rod replenishment process, thereby ensuring the safety of the movement of the grid structure.

[0038] Taking into account that the grid structure has a large weight, when it is pressed on the assembly plate, it will apply a large pressure to the assembly, making it difficult to move the assembly plate. To address this technical problem, the present invention installs rollers in the grooves of the mounting plate, so that the assembly plate moves on the rollers, which turns into rolling friction, thereby improving the smoothness of the movement of the assembly plate and meeting the movement of a grid structure of a certain weight. The hoisting grid structure can be moved into the set position of the assembly platform for fixing with additional rods. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] The present invention will be further described below in conjunction with the accompanying drawings:

[0040] Figure 1 It is a structural schematic diagram of installing a support frame between two structural columns in area 1 and area 2 in the present invention;

[0041] Figure 2 It is a schematic structural diagram of the first grid structure and the second grid structure being fixed with supplementary rods in the present invention;

[0042] Figure 3 It is a structural schematic diagram of the embedded screw rod 1, the embedded screw rod 2 and the embedded screw rod 3 in the present invention;

[0043] Figure 4 It is a structural schematic diagram of the present invention when the sleeve pipe 1 and the hydraulic cylinder are fixed at the set position of the assembly platform;

[0044] Figure 5 for Figure 4 A schematic diagram of the structure enlarged at C in the middle;

[0045] Figure 6 It is a structural schematic diagram of the hydraulic cylinder in the present invention;

[0046] Figure 7 It is a structural schematic diagram of the sleeve 1 in the present invention;

[0047] Figure 8 It is a structural schematic diagram of the support assembly in the present invention;

[0048] Fig. 9 This is a schematic diagram of the structure of the supporting assembly of the present invention after installation;

[0049] Fig.10 It is a structural schematic diagram of the sleeve 2 in the present invention;

[0050] Fig.11 It is a structural schematic diagram of the present invention when the second sleeve is fixed on the set position of the assembly platform;

[0051] Fig.12 It is a structural schematic diagram of the mobile component in the present invention;

[0052] Fig.13 It is a structural schematic diagram of the assembly board in the present invention;

[0053] Fig.14 It is a structural schematic diagram of the present invention in which the assembly plate is fixed to the installation end of the installation plate by bolts;

[0054] Fig.15 It is a structural schematic diagram of the positioning component in the present invention;

[0055] Fig.16 This is a structural schematic diagram of the present invention after the positioning assembly is installed;

[0056] Fig.17 It is a structural schematic diagram of the positioning component in the present invention when positioning the grid structure.

[0057] In the figure, A-area one; B-area two; a-first grid structure; b-second grid structure; 1-structural column; 2-support frame; 3-assembly platform; 4-embedded screw one; 5-embedded screw two; 6-embedded screw three; 7-hydraulic cylinder; 8-casing one; 9-mounting hole; 10-fixing seat one; 11-reinforcement plate one; 12-fixing seat two; 13-support rod; 14-locking nut; 15-support head; 16-rolling roller; 17-fixing seat four; 18-reinforcement plate two; 19-casing two; 20-fixing seat three; 21-mounting plate; 22-slot; 23-roller; 24-assembly plate; 25-ear plate; 26-positioning plate; 27-fixing hole; 28-clamping plate; 29-fixing rod; 30-installation end. DETAILED DESCRIPTION

[0058] like Figures 1 to 17 As shown, a segmented lifting and assembling method of a large-span roof structure of the present invention is provided, in which the large-span roof structure is divided into three segments, and the number of segments is adjusted specifically according to the length of the large-span roof structure.

[0059] The assembly method specifically includes the following steps:

[0060] A. The area is divided by assembling elevations, from low to high, into Area 1A, Area 2B and Area 3.

[0061] B. Assemble a single grid structure on the assembly platform 3 in area 1A, area 2B and area 3, and tie a fixing rope to each grid structure.

[0062] C. A hydraulic lifter is installed at the top of the structural column 1. The hydraulic lifter is a prior art. Specifically, reference is made to the utility model patent named through-type hydraulic lifter (authorization announcement number: CN2866450Y) in the comparative document. The present invention will not elaborate on its structure.

[0063] D. Install support frame 2 between two structural columns 1 in area 1 A and area 2 B, and then install a hydraulic lifter on the top of support frame 2.

[0064] E. Install a sliding structure on the assembly platform 3 of area 2B and area 3. The sliding structure includes a sleeve 1 8, a sleeve 2 19, a moving assembly, an assembly plate 24, a hydraulic cylinder 7 and a positioning assembly. The moving assembly includes a mounting plate 21 and a roller 23. The mounting plate 21 is provided with a mounting end 30. The mounting plate 21 is provided with a notch 22. Six rollers 23 are arranged in the notch 22. The rollers 23 rotate on the mounting plate 21 through a rotating shaft. Both the sleeve 1 8 and the sleeve 2 19 are provided with a through mounting hole 9. The positioning assembly includes two symmetrically arranged positioning plates 26. Both sides of the positioning plate 26 are provided with a clamping plate 28. The specific steps are as follows:

[0065] (1) According to the construction drawings, the sleeve 8 and the hydraulic cylinder 7 are fixed at the set position of the assembly platform 3. Specifically, when installing the sleeve 8 and the hydraulic cylinder 7, a groove is cut at the set position on the side of the assembly platform 3 to form an installation groove, and then concrete is filled in the installation groove, and a pre-embedded screw 4 is set in the concrete. When the concrete solidifies, the pre-embedded screw 4 can be fixed at the side of the assembly platform 3 to improve the firmness of the pre-embedded screw 4 on the assembly platform 3. Then, the fixing seat 10 of the installation sleeve 8 is installed on the pre-embedded screw 4, and the reinforcing plate 11 is welded at the corner of the fixing seat 10. Then, a nut is screwed into the pre-embedded screw 4 and tightened, and then the fixing seat 2 12 of the hydraulic cylinder 7 is installed on another pre-embedded screw 4, and then a nut is screwed into the pre-embedded screw 4 and tightened.

[0066] (2) According to the construction drawings, the second sleeve 19 is fixed at the set position of the assembly platform 3. The second sleeve 19 and the first sleeve 8 are arranged corresponding to each other. Specifically, when installing the second sleeve 19, a groove is cut at the set position on the top of the assembly platform 3 to form an installation groove, and then concrete is filled in the installation groove, and a pre-embedded screw 2 5 is arranged in the concrete. When the concrete solidifies, the pre-embedded screw 2 5 can be fixed at the top of the assembly platform 3, thereby improving the firmness of the pre-embedded screw 2 5 on the assembly platform 3. Then, the fixing seat 3 20 of the second sleeve 19 is installed on the pre-embedded screw 2 5, and then a nut is screwed into the pre-embedded screw 2 5 and tightened.

[0067] The support rod 13 is fixed at the assembly platform 3. The support rod 13 is below the sleeve 19. The support rod 13 is threadedly connected with a support head 15. A locking nut 14 is welded to the outside of the support head 15. When the sleeve 19 is installed, the locking nut 14 is screwed to make it easier to lift the support head 15. The support head 15 supports the sleeve 19 so that the support head 15 supports the bottom surface of the sleeve 19, thereby improving the bearing capacity of the sleeve 19 and making the moving assembly move smoothly to meet the needs of the later rod replenishment operation.

[0068] After the second sleeve 19 is fixed, a support assembly is installed on the top of the assembly platform 3. The support assembly includes a fixed seat 4 17 and a rolling roller 16. A reinforcing plate 2 18 is welded at the corner of the fixed seat 4 17. The rolling roller 16 rotates on the fixed seat 4 17 through a rotating shaft. When the assembly plate 24 is fixed, the support assembly is located below the assembly plate 24, and the assembly plate 24 is supported on the rolling roller 16, which improves the bearing capacity of the assembly plate 24, so that the assembly plate 24 meets the rod-replenishing operation of the grid structure.

[0069] When installing the support assembly, a groove is cut at a set position on the top of the assembly platform 3 to form an installation groove, and then concrete is filled in the installation groove, and a pre-embedded screw rod 3 6 is arranged in the concrete. When the concrete solidifies, the pre-embedded screw rod 3 6 can be fixed at the top of the assembly platform 3, thereby improving the firmness of the pre-embedded screw rod 3 6 on the assembly platform 3. Then, the fixing seat 4 17 is installed on the pre-embedded screw rod 3 6, and then a nut is screwed into the pre-embedded screw rod 3 6 and tightened.

[0070] (3) The moving components are installed one by one in the mounting hole 9 of the sleeve 1 8 and the mounting hole 9 of the sleeve 2 19 , the outer wall of the mounting plate 21 and the inner wall of the mounting hole 9 are in close contact, and the roller 23 rolls on the inner wall of the mounting hole 9 .

[0071] (4) Adjust the position of the moving assembly, and then fix the assembly plate 24 to the mounting end 30 of the mounting plate 21 by bolts. Ear plates 25 are welded on both sides of the assembly plate 24.

[0072] (5) Move the assembly plate 24 toward the hydraulic cylinder 7, and then weld the piston rod end of the hydraulic cylinder 7 and the ear plate 25 to fix them.

[0073] (6) Place the positioning plate 26 vertically on the assembly plate 24, and then install the clamping plate 28 on the fixing rod 29 on the side of the positioning plate 26. The positioning plate 26 is provided with a fixing hole 27. Then, screw a nut onto the fixing rod 29, adjust the installation position of the positioning plate 26, and then tighten the nut.

[0074] F. Fix the steel wire rope on the hydraulic lifter at the top of the structural column 1 and the first grid structure in area 1A, and fix them with the steel wire rope on the hydraulic lifter at the top of the support frame 2 and the first grid structure in area 1A, then start the hydraulic lifter to control the first grid structure to move upward a set distance so that it reaches the outside of the assembly platform 3 in area 2B.

[0075] G. Fix the first grid structure a and the second grid structure b with additional rods:

[0076] (1) Pull the fixing rope on the first grid structure a toward the second grid structure b by a set distance, which is L1, and then fix the fixing rope to the fixing hole 27.

[0077] (2) The hydraulic cylinder 7 is turned on. The hydraulic cylinder 7 controls the assembly plate 24 to move a set distance in the direction of the second grid structure b. The distance is L2, 0.5m<L1+L2<1m, and the total length of L1+L2 shall not be too long, so that the first grid structure a moves a set distance in the direction of the second grid structure b, so that the outer end of the first grid structure a is located in the area between the two positioning plates 26.

[0078] (3) The outer end of the second grid structure b is placed into the area between the two positioning plates 26. The positioning plates 26 simultaneously position the first grid structure a and the second grid structure b. The operator welds the rods between the first grid structure a and the second grid structure b on the assembly plate 24.

[0079] H. Return the hydraulic cylinder 7 to its initial position, so that the first grid structure a and the second grid structure b that are fixedly connected move outward by a set distance, then untie the fixing rope on the first grid structure a from the fixing hole 27, and then fix the steel rope on the hydraulic lifter at the top of the other structural column 1 and the second grid structure b in area two B, and then untie the steel rope on the hydraulic lifter at the top of the support frame 2 and the first grid structure a in area one A, and then start the hydraulic lifter to control the first grid structure a and the second grid structure b that are fixedly connected to move upward by a set distance, so that they reach the outside of the assembly platform 3 in area three.

[0080] I. Repeat step G to fix the third grid structure and the second grid structure b with additional rods, and then return the hydraulic cylinder 7 to the initial position, so that the first grid structure a, the second grid structure b and the third grid structure that are fixedly connected move outward by a set distance, and then start the hydraulic lifter to control the overall structure of the first grid structure a, the second grid structure b and the third grid structure that are fixedly connected to move upward by a set distance.

[0081] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to solve basically the same technical problems and achieve basically the same technical effects are all included in the protection scope of the present invention.

Claims

1. A method for assembling a large-span roof structure in sections, characterized in that: The steps include: A. Divide the area by assembling the elevation, and divide it into Area 1, Area 2 and Area 3 from low to high elevation; B. Assemble a single grid structure on the assembly platforms of Area 1, Area 2 and Area 3, and tie a fixing rope to each grid structure; C. Install a hydraulic lifter on the top of the structural column; D. Install a support frame between two structural columns in Area 1 and Area 2, and then install a hydraulic lifter on the top of the support frame; E. Install a sliding structure on the assembly platforms of area 2 and area 3, wherein the sliding structure includes a sleeve 1, a sleeve 2, a moving assembly, an assembly plate, a hydraulic cylinder and a positioning assembly; wherein the moving assembly includes a mounting plate and a roller, wherein the mounting plate is provided with a mounting end, the mounting plate is provided with a notch, the roller is arranged in the notch, the roller rotates on the mounting plate through a rotating shaft, and the sleeve 1 and the sleeve 2 are both provided with a penetrating mounting hole; the positioning assembly includes two symmetrically arranged positioning plates, and clamping plates are provided on both sides of the positioning plates. The specific steps are as follows: (1) According to the construction drawings, fix the casing and the hydraulic cylinder at the set position of the assembly platform; (2) According to the construction drawings, the second sleeve is fixed at the set position of the assembly platform, and the second sleeve and the first sleeve are arranged corresponding to each other; (3) The moving components are installed one by one in the mounting hole of the first sleeve and the mounting hole of the second sleeve, the outer wall of the mounting plate and the inner wall of the mounting hole are in close contact, and the roller rolls on the inner wall of the mounting hole; (4) Adjust the position of the moving assembly, and then fix the assembly plate to the mounting end of the mounting plate by bolts, with ear plates welded on both sides of the assembly plate; (5) Move the assembly plate toward the hydraulic cylinder, and then weld the piston rod end and the ear plate on the hydraulic cylinder to fix them; (6) Place the positioning plate vertically on the assembly plate, and then install the clamping plate on the fixing rod on the side of the positioning plate. The positioning plate is provided with a fixing hole, and then screw the nut into the fixing rod, adjust the installation position of the positioning plate, and then tighten the nut; F. Fix the steel rope on the hydraulic lifter at the top of the structural column and the first grid structure in area one, and fix the steel rope on the hydraulic lifter at the top of the support frame and the first grid structure in area one, then start the hydraulic lifter to control the first grid structure to move upward a set distance, so that it reaches the outside of the assembly platform of area two; G. Fix the first and second grid structures with additional rods: (1) Pull the fixing rope on the first grid structure toward the second grid structure by a set distance, and then fix the fixing rope to the fixing hole; (2) Turning on the hydraulic cylinder, the hydraulic cylinder controls the assembly plate to move a set distance in the direction of the second grid structure, so that the first grid structure moves a set distance in the direction of the second grid structure, so that the outer end of the first grid structure is located in the area between the two positioning plates; (3) The outer end of the second grid structure is placed in the area between the two positioning plates. The positioning plates simultaneously position the first grid structure and the second grid structure. The operator welds the rods between the first grid structure and the second grid structure on the assembly plate; H. Return the hydraulic cylinder to the initial position, so that the first grid structure and the second grid structure that are fixedly connected move outward by a set distance, then untie the fixing rope on the first grid structure from the fixing hole, and then fix the steel rope on the hydraulic lifter at the top of another structural column and the second grid structure in area two, and then untie the steel rope on the hydraulic lifter at the top of the support frame and the first grid structure in area one, and then start the hydraulic lifter to control the first grid structure and the second grid structure that are fixedly connected to move upward by a set distance, so that they reach the outside of the assembly platform of area three; I. Repeat step G to fix the third grid structure and the second grid structure with additional rods, and then return the hydraulic cylinder to the initial position, so that the first grid structure, the second grid structure and the third grid structure that are fixedly connected move outward by a set distance, and then start the hydraulic lifter to control the overall structure of the first grid structure, the second grid structure and the third grid structure that are fixedly connected to move upward by a set distance.

2. The method for assembling a large-span roof structure in sections according to claim 1 is characterized in that: When installing the sleeve 1 and the hydraulic cylinder, a groove is cut at a set position on the side of the assembly platform to form an installation groove, and then concrete is filled in the installation groove, and a pre-embedded screw rod 1 is arranged in the concrete. When the concrete solidifies, the pre-embedded screw rod 1 can be fixed to the side of the assembly platform, and then the fixing seat 1 of the installation sleeve 1 is installed on the pre-embedded screw rod 1, and then a nut is screwed into the pre-embedded screw rod 1 and tightened, and then the fixing seat 2 of the hydraulic cylinder is installed on another pre-embedded screw rod 1, and then a nut is screwed into the pre-embedded screw rod 1 and tightened.

3. The method for assembling a large-span roof structure in sections according to claim 2 is characterized in that: A reinforcing plate 1 is welded at the corner of the fixing seat 1.

4. The method for assembling a large-span roof structure in sections according to claim 1 is characterized in that: When installing the second sleeve, a groove is cut at a set position on the top of the assembly platform to form an installation groove, and then concrete is filled in the installation groove, and a pre-embedded screw rod 2 is arranged in the concrete. When the concrete solidifies, the pre-embedded screw rod 2 can be fixed at the top of the assembly platform, and then the fixing seat 3 of the second sleeve is installed on the pre-embedded screw rod 2, and then a nut is screwed into the pre-embedded screw rod 2 and tightened.

5. The method for assembling a large-span roof structure in sections according to claim 1 is characterized in that: A support rod is fixed at the assembly platform. The support rod is located below the second sleeve. The support rod is threadedly connected to a support head. A locking nut is welded to the outside of the support head. When the second sleeve is installed, the locking nut is screwed to allow the support head to support the bottom surface of the second sleeve.

6. The method for assembling a large-span roof structure in sections according to claim 1 is characterized in that: When the sleeve two is fixed, a support assembly is installed on the top of the assembly platform. The support assembly includes a fixed seat four and a rolling roller. The rolling roller rotates on the fixed seat four through a rotating shaft. When the assembly plate is fixed, the support assembly is located below the assembly plate, and the assembly plate is supported on the rolling roller.

7. The method for assembling a large-span roof structure in sections according to claim 6 is characterized in that: When installing the support component, a groove is cut at a set position on the top of the assembly platform to form an installation groove, and then concrete is filled in the installation groove, and a pre-embedded screw rod three is set in the concrete. When the concrete solidifies, the pre-embedded screw rod three can be fixed at the top of the assembly platform, and then the fixing seat four is installed on the pre-embedded screw rod three, and then a nut is screwed into the pre-embedded screw rod three and tightened.

8. The method for assembling a large-span roof structure in sections according to claim 6 is characterized in that: Weld reinforcement plate 2 at the corner of fixing seat 4.