An electrostatic precipitator and dust removal method for coal-fired boiler smoke control

By installing circulation pipelines and heat exchangers in the electrostatic precipitator, the temperature of the flue gas can be controlled, solving the problem that excessively high flue gas temperature affects the dust removal effect, ensuring the efficient operation of the electrostatic precipitator and saving energy.

CN116060211BActive Publication Date: 2024-11-19NAT ENERGY CHANGYUAN WUHAN QINGSHAN THERMAL POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211742993.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-30
Publication Date
2024-11-19
Estimated Expiration
2042-12-30

AI Technical Summary

Technical Problem

The existing flue gas only undergoes a short cooling process before electrostatic precipitator (ESP), which cannot effectively reduce the temperature to below 400℃, thus affecting the dust removal efficiency of the ESP.

Method used

A circulation pipeline controlled by a first electrically controlled three-way valve and a second electrically controlled three-way valve is adopted. Combined with a heat exchanger, when the flue gas temperature is higher than 400℃, it is cooled by water through the spiral heat exchange tube in the circulation pipeline. When the flue gas temperature is lower than 400℃, it directly enters the electrostatic precipitator to ensure the dust removal efficiency of the electrostatic precipitator.

Benefits of technology

It effectively reduces the flue gas temperature to below 400℃, ensuring the dust removal effect of the electrostatic precipitator, saving energy consumption, and uses wind power to drive the drive shaft to generate electricity, extending the service life of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116060211B_ABST
    Figure CN116060211B_ABST
Patent Text Reader

Abstract

The present invention discloses an electrostatic precipitator and a dust removal method for coal-fired boiler smoke treatment, which relates to the technical field of coal-fired boiler smoke treatment. The invention aims to solve the problem that the existing flue gas is usually only cooled for a period of time before the electrostatic precipitator. When the flue gas temperature is high, the flue gas temperature cannot be effectively reduced to below 400°C, which is easy to affect the dust removal effect of the electrostatic precipitator. A first electrically controlled three-way valve is installed at one end of the air intake pipe, a temperature measuring tube is installed at the front end of the first electrically controlled three-way valve, a transducer tube is installed at the front end of the temperature measuring tube, a first blast tube is installed at the front end of the transducer tube, a second electrically controlled three-way valve is installed at the front end of the first blast tube, and an electrostatic precipitator mechanism is installed at the front end of the second electrically controlled three-way valve; a first circulation tube is installed at the lower end of the first electrically controlled three-way valve, a second circulation tube is installed at the lower end of the second electrically controlled three-way valve, and a second blast tube is installed at the front end of the first circulation tube.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of smoke treatment of coal-fired boilers, and in particular to an electric precipitator and a dust removal method for smoke treatment of coal-fired boilers. Background Art

[0002] A coal-fired boiler is a boiler that uses coal as fuel. It refers to a thermal power device that releases heat through the combustion of coal in the furnace, heating the heat medium water or other organic heat carriers (such as thermal oil, etc.) to a certain temperature (or pressure). Generally, the temperature is controlled at 900-1100℃. The flue gas generated after heating usually needs to be dedusted by an electrostatic precipitator to meet the emission indicators. Before emission, the flue gas temperature is relatively high, so it usually needs to be cooled.

[0003] However, the existing flue gas is usually only cooled for a period of time before electrostatic precipitator. When the flue gas temperature is high, it is impossible to effectively reduce the flue gas temperature to below 400°C, which is easy to affect the dust removal effect of the electrostatic precipitator. For this reason, we provide an electrostatic precipitator and a dust removal method for coal-fired boiler smoke control. Summary of the invention

[0004] The object of the present invention is to provide an electrostatic precipitator and a dust removal method for coal-fired boiler smoke treatment, so as to solve the problem proposed in the above background technology that the existing flue gas is usually only cooled for a period of time before electrostatic precipitator, and when the flue gas temperature is high, the flue gas temperature cannot be effectively reduced to below 400°C, which is easy to affect the dust removal effect of the electrostatic precipitator.

[0005] To achieve the above-mentioned object, the present invention provides the following technical solution: an electrostatic precipitator for treating smoke from a coal-fired boiler, comprising an air inlet pipe;

[0006] Also includes:

[0007] a first electrically controlled three-way valve, which is installed at one end of the air intake pipe, a temperature measuring tube is installed at the front end of the first electrically controlled three-way valve, a transducer tube is installed at the front end of the temperature measuring tube, a first blast tube is installed at the front end of the transducer tube, a second electrically controlled three-way valve is installed at the front end of the first blast tube, and an electric dust removal mechanism is installed at the front end of the second electrically controlled three-way valve;

[0008] A first circulation pipe is installed at the lower end of the first electrically controlled three-way valve, a second circulation pipe is installed at the lower end of the second electrically controlled three-way valve, a second blast pipe is installed at the front end of the first circulation pipe, a heat exchange pipe is installed between the second blast pipe and the second circulation pipe, and a heat exchanger is installed inside the heat exchange pipe.

[0009] Preferably, a spiral heat exchange tube is installed inside the heat exchanger, one end of the spiral heat exchange tube passes through and extends to the outside of the heat exchanger and is provided with a water inlet, and the other end of the spiral heat exchange tube passes through and extends to the outside of the heat exchanger and is provided with a water return port.

[0010] Preferably, a flow meter is installed at the upper end of the air inlet pipe, and a thermometer is installed at the upper end of the temperature measuring tube.

[0011] Preferably, a base is installed inside the transducer tube, two bases are provided, and the upper ends of the two bases pass through and extend to the outside of the transducer tube, a blade is provided at the front end of the base, a blade shaft is installed at the rear end of the blade, one end of the blade shaft passes through and extends to the inside of the base, and a first bevel gear is installed, a transmission shaft is provided above the first bevel gear, a generator is installed at the upper end of the base, the output end of the generator passes through and extends to the inside of the base, and is connected to the transmission shaft through a coupling, a second bevel gear is installed at the lower end of the transmission shaft, and the second bevel gear is meshed and driven with the first bevel gear.

[0012] Preferably, a bearing is installed at the connection between the blade shaft and the base, and a bearing sheet is installed on the outer wall of the transmission shaft.

[0013] Preferably, a first electrode plate is installed inside the electrostatic precipitator mechanism, and a plurality of first electrode plates are provided, a second electrode plate is provided between adjacent first electrode plates, a valve plate is installed inside the lower end of the electrostatic precipitator mechanism, a sealing groove is provided at the connection between the valve plate and the first electrode plate, a gantry frame is installed in front of the lower end of the electrostatic precipitator mechanism, a hydraulic cylinder is installed at the rear end of the gantry frame, and the output end of the hydraulic cylinder is transmission-connected to the valve plate.

[0014] Preferably, a dust sweeping plate is provided above the interior of the electrostatic precipitator mechanism, an electrode groove is provided inside the dust sweeping plate, and a brush is installed on the inner wall of the electrode groove.

[0015] Preferably, a guide rail is installed at the middle position of the rear end of the electrostatic precipitator mechanism, a ball screw is installed inside the guide rail, a slider is installed on the ball screw, and the slider is transmission connected to the dust sweeping plate, a stepper motor is installed at the upper end of the guide rail, and the output end of the stepper motor is transmission connected to the ball screw.

[0016] Preferably, an exhaust port is provided at the front end of the electrostatic precipitator mechanism, and a dust hopper is installed at the lower end of the electrostatic precipitator mechanism.

[0017] Preferably, a dust removal method for an electrostatic precipitator used for coal-fired boiler smoke treatment comprises the following steps:

[0018] Step 1: The coal-fired flue gas first enters from the air intake pipe. When entering, the first electrically controlled three-way valve is in a state of connecting the air intake pipe and the temperature measuring tube, blocking the state of the first circulation tube, and the flow meter at the air intake pipe detects the amount of flue gas entering, and the flue gas is introduced in stages. When the first wave of flue gas is introduced, the flow meter sends a signal to the controller to switch the first electrically controlled three-way valve to a state of connecting the temperature measuring tube and the first circulation tube, blocking the air intake pipe. At this time, the incoming flue gas first passes through the temperature measuring tube, and the current flue gas temperature is detected by the thermometer;

[0019] Step 2: After the flue gas temperature is detected, if the temperature is lower than 400 degrees Celsius, the second electrically controlled three-way valve is connected to the first blast pipe and the electrostatic precipitator mechanism, blocking the state of the second circulation pipe. After the flue gas passes through the transducer pipe, it can directly enter the electrostatic precipitator mechanism under the action of the first blast pipe. If the temperature is higher than 400 degrees Celsius, the thermometer feedback signal is sent to the controller, and the second electrically controlled three-way valve is switched to connect the first blast pipe and the second circulation pipe, blocking the state of the electrostatic precipitator mechanism. At this time, after the flue gas passes through the transducer pipe, it can enter the second circulation pipe under the action of the first blast pipe. The flue gas is cooled by passing water through the spiral heat exchange tube in the heat exchanger at the end of the second circulation tube, and then returns to the temperature measuring tube along the first circulation tube under the action of the second blast tube. After re-measuring the temperature, if the temperature is lower than 400 degrees Celsius, the feedback signal is sent to the controller to switch the state of the second electrically controlled three-way valve, and the flue gas is discharged into the electrostatic precipitator mechanism along the energy conversion tube. If the temperature is still higher than 400 degrees Celsius, the state of the second electrically controlled three-way valve is maintained to allow the flue gas to continue to circulate and exchange heat until the temperature drops below 400 degrees Celsius, and then it is discharged into the electrostatic precipitator mechanism.

[0020] Step 3: Whenever the flue gas circulates and enters the transducer tube, the wind can drive the blades in the tube to rotate, so that the first bevel gear at one end of the blade shaft meshes with the second bevel gear, driving the transmission shaft to rotate, providing mechanical energy for the output end of the generator, and achieving the effect of power generation and energy storage;

[0021] Step 4: When the flue gas enters the electrostatic precipitator mechanism, the gantry valve at the bottom of the electrostatic precipitator mechanism is in a closed state. At this time, the power supply device connects the first electrode plate and the second electrode plate to generate a discharge magnetic field to charge the dust in the flue gas. According to the basic characteristics of electricity, the principle of like charges repel and opposite charges attract, a large number of charged dust particles are adsorbed on the electrode plates. Because the gantry valve plate is closed and the lower end of the first electrode plate is sealed, the flue gas can be deflected between the dislocated first and second electrode plates, prolonging the time it stays in the electrostatic precipitator mechanism, so that the dust particles can be fully charged and adsorbed on the electrode plates, and the gas after dust removal is discharged along the exhaust port;

[0022] Step 5: After the first wave of gas is discharged, the first electrically controlled three-way valve is switched back to connect the air intake pipe and the temperature measuring pipe, blocking the state of the first circulation pipe. At the same time, the flow meter detects the second wave of flue gas, and this cycle is repeated to achieve continuous staged treatment of flue gas.

[0023] Step 6: When a lot of dust is deposited on the electrode plate, the electric field can be turned off to drive the stepper motor to run, driving the dust sweeping plate on the top of the electrode plate to move from top to bottom along the guide rail under the action of the slider, and use the brush on the inner wall of the electrode slot to brush the dust into the dust hopper to achieve dust removal.

[0024] Compared with the prior art, the present invention has the following beneficial effects:

[0025] 1. The present invention provides a circulation pipeline controlled by a first electrically controlled three-way valve and a second electrically controlled three-way valve on the air intake pipeline, and a heat exchanger is provided on the circulation pipeline. When the flue gas enters, if the temperature is lower than 400 degrees Celsius, the second electrically controlled three-way valve is in a state of connecting the first blast pipe and the electrostatic precipitator mechanism and blocking the second circulation pipe. After the flue gas passes through the transducer pipe, it can directly enter the electrostatic precipitator mechanism under the action of the first blast pipe. If the temperature is higher than 400 degrees Celsius, the thermometer feeds back a signal to the controller, switches the second electrically controlled three-way valve to a state of connecting the first blast pipe and the second circulation pipe and blocking the electrostatic precipitator mechanism. At this time, after the flue gas passes through the transducer pipe, it can enter the second circulation pipe under the action of the first blast pipe, and water is passed through the spiral heat exchange pipe in the heat exchanger at the end of the second circulation pipe for heat exchange. , to achieve cooling, and then under the action of the second blast pipe, it returns to the temperature measuring tube along the first circulation tube. After re-measuring the temperature, if the temperature is lower than 400 degrees Celsius, the feedback signal is sent to the controller to switch the state of the second electrically controlled three-way valve, and the flue gas is discharged into the electrostatic precipitator mechanism along the energy conversion tube. If the temperature is still higher than 400 degrees Celsius, the state of the second electrically controlled three-way valve is maintained, so that the flue gas continues to circulate and exchange heat until the temperature drops below 400 degrees Celsius, and then it is discharged into the electrostatic precipitator mechanism, which ensures the dust removal efficiency of the electrostatic precipitator mechanism and reduces the impact of temperature on it. It solves the problem that the existing flue gas is usually only cooled for a period of time before electrostatic precipitator. When the flue gas temperature is high, the flue gas temperature cannot be effectively reduced to below 400°C, which is easy to affect the dust removal effect of the electrostatic precipitator.

[0026] 2. By setting up the transducer tube, whenever the flue gas circulates into the transducer tube, the blades in the tube can be driven to rotate under the action of wind, so that the first bevel tooth at one end of the blade shaft engages with the second bevel tooth to drive the transmission shaft to rotate, providing mechanical energy for the output end of the generator, achieving the effect of power generation and energy storage, and saving energy consumption of the device.

[0027] 3. By installing a dust-sweeping plate in the electrostatic precipitator mechanism, when a lot of dust is deposited on the electrode plate, the electric field can be turned off to drive the stepper motor to run, driving the dust-sweeping plate on the top of the electrode plate to move from top to bottom along the guide rail under the action of the slider, and using the brush on the inner wall of the electrode slot to shake the dust into the dust hopper to achieve dust removal. Compared with conventional mechanical vibration dust removal, it causes less damage to the electrode plate and extends the service life of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0029] Figure 2 It is a schematic diagram of the internal structure of the heat exchanger of the present invention;

[0030] Figure 3 It is a schematic diagram of the internal structure of the transducer tube of the present invention;

[0031] Figure 4 It is a schematic diagram of the internal front structure of the transducer tube of the present invention;

[0032] Figure 5 It is a schematic diagram of the internal structure of the electric dust removal mechanism of the present invention;

[0033] In the figure: 1, air intake pipe; 2, flow meter; 3, first electric-controlled three-way valve; 4, temperature measuring tube; 5, thermometer; 6, transducer tube; 7, base; 8, generator; 9, first blast pipe; 10, second electric-controlled three-way valve; 11, first circulation pipe; 12, second circulation pipe; 13, second blast pipe; 14, heat exchange pipe; 15, heat exchanger; 16, electrostatic precipitator; 17, guide rail; 18, stepper motor; 19, exhaust port; 20, dust bucket; 21, dragon Door frame; 22. Hydraulic cylinder; 23. Valve plate; 24. Spiral heat exchange tube; 25. Water inlet; 26. Water return port; 27. Blade; 28. Blade shaft; 29. ​​First bevel gear; 30. Bearing; 31. Transmission shaft; 32. Coupling; 33. Second bevel gear; 34. Bearing plate; 35. First electrode plate; 36. Second electrode plate; 37. Ball screw; 38. Sliding block; 39. Dust sweeping plate; 40. Electrode slot; 41. Brush; 42. Sealing slot. DETAILED DESCRIPTION

[0034] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0035] See also Figure 1-5 , an embodiment provided by the present invention: an electrostatic precipitator for treating smoke from a coal-fired boiler, comprising an air inlet pipe 1;

[0036] Also includes:

[0037] A first electrically controlled three-way valve 3 is installed at one end of the air intake pipe 1, a temperature measuring tube 4 is installed at the front end of the first electrically controlled three-way valve 3, a transducer tube 6 is installed at the front end of the temperature measuring tube 4, a first blast tube 9 is installed at the front end of the transducer tube 6, a second electrically controlled three-way valve 10 is installed at the front end of the first blast tube 9, and an electric dust removal mechanism 16 is installed at the front end of the second electrically controlled three-way valve 10;

[0038] A first circulation pipe 11 is installed at the lower end of the first electrically controlled three-way valve 3, a second circulation pipe 12 is installed at the lower end of the second electrically controlled three-way valve 10, a second blast pipe 13 is installed at the front end of the first circulation pipe 11, a heat exchange pipe 14 is installed between the second blast pipe 13 and the second circulation pipe 12, and a heat exchanger 15 is installed inside the heat exchange pipe 14;

[0039] When in use, if the flue gas inlet temperature is lower than 400 degrees Celsius, the second electrically controlled three-way valve is in a state of connecting the first blast pipe and the electrostatic precipitator mechanism and blocking the second circulation pipe. After passing through the energy conversion pipe, the flue gas can directly enter the electrostatic precipitator mechanism under the action of the first blast pipe. If the temperature is higher than 400 degrees Celsius, the thermometer feeds back a signal to the controller, switching the second electrically controlled three-way valve to a state of connecting the first blast pipe and the second circulation pipe and blocking the electrostatic precipitator mechanism. At this time, after passing through the energy conversion pipe, the flue gas can enter the second circulation pipe under the action of the first blast pipe. The temperature is lowered by passing water through the spiral heat exchange tube in the heat exchanger at the end of the second circulation tube for heat exchange. Then, under the action of the second blast tube, the flue gas returns to the temperature measuring tube along the first circulation tube. After re-measuring the temperature, if the temperature is lower than 400 degrees Celsius, the feedback signal is sent to the controller to switch the state of the second electrically controlled three-way valve, and the flue gas is discharged into the electrostatic precipitator mechanism along the energy conversion tube. If the temperature is still higher than 400 degrees Celsius, the state of the second electrically controlled three-way valve is maintained to allow the flue gas to continue to circulate and exchange heat until the temperature drops below 400 degrees Celsius and is discharged into the electrostatic precipitator mechanism.

[0040] See also Figure 2 A spiral heat exchange tube 24 is installed inside the heat exchanger 15. One end of the spiral heat exchange tube 24 passes through and extends to the outside of the heat exchanger 15, and is provided with a water inlet 25. The other end of the spiral heat exchange tube 24 passes through and extends to the outside of the heat exchanger 15, and is provided with a water return port 26. The water inlet 25 and the water return port 26 at both ends of the spiral heat exchange tube 24 are connected to an external circulating water cooling device. When the flue gas passes through, it can exchange heat with the cooling water in the spiral heat exchange tube 24 to achieve cooling.

[0041] See also Figure 1 A flow meter 2 is installed at the upper end of the air inlet pipe 1, and a thermometer 5 is installed at the upper end of the temperature measuring tube 4. The flow meter 2 can detect and control the amount of flue gas entering, and the thermometer 5 can detect the flue gas temperature.

[0042] See also Figure 3A base 7 is installed inside the transducer tube 6. Two bases 7 are provided, and the upper ends of the two bases 7 penetrate and extend to the outside of the transducer tube 6. A blade 27 is provided at the front end of the base 7, and a blade shaft 28 is installed at the rear end of the blade 27. One end of the blade shaft 28 penetrates and extends to the inside of the base 7, and is installed with a first bevel gear 29. A transmission shaft 31 is provided above the first bevel gear 29. A generator 8 is installed at the upper end of the base 7. The output end of the generator 8 penetrates and extends to the inside of the base 7, and is connected to the transmission shaft 31 through a coupling 32. A second bevel gear 33 is installed at the lower end of the transmission shaft 31, and the second bevel gear 33 is meshed and connected with the first bevel gear 29. When the flue gas enters the transducer tube 14, the blade 27 in the tube can be driven to rotate under the action of wind, so that the first bevel gear 29 at one end of the blade shaft 28 is meshed and driven with the second bevel gear 33, driving the transmission shaft 31 to rotate, providing mechanical energy for the output end of the generator 8, cutting the magnetic flux lines inside the generator 8, and achieving the effect of power generation and energy storage.

[0043] See also Figure 3 A bearing 30 is installed at the connection between the blade shaft 28 and the base 7, and a bearing sheet 34 is installed on the outer wall of the transmission shaft 31. The bearing 30 can improve the transmission accuracy of the blade shaft 28 and the transmission shaft 31.

[0044] See also Figure 5 A first electrode plate 35 is installed inside the electrostatic precipitator mechanism 16, and a plurality of first electrode plates 35 are provided, and a second electrode plate 36 is provided between adjacent first electrode plates 35. A valve plate 23 is installed inside the lower end of the electrostatic precipitator mechanism 16, and a sealing groove 42 is provided at the connection between the valve plate 23 and the first electrode plate 35. A gantry frame 21 is installed in front of the lower end of the electrostatic precipitator mechanism 16, and a hydraulic cylinder 22 is installed at the rear end of the gantry frame 21, and the output end of the hydraulic cylinder 22 is transmission-connected to the valve plate 23. The power supply device connects the first electrode plate 35 and the second electrode plate 36 to generate a discharge magnetic field to charge the dust in the flue gas. According to the basic characteristics of electricity, the principle that like charges repel and opposite charges attract, a large number of charged dust particles are adsorbed on the electrode plates to achieve the dust removal effect.

[0045] See also Figure 5 A dust sweeping plate 39 is arranged above the inside of the electrostatic precipitator 16, and an electrode groove 40 is arranged inside the dust sweeping plate 39. A brush 41 is installed on the inner wall of the electrode groove 40. The dust sweeping plate 39 can use the brush 41 to brush off the dust accumulated on the electrode plate.

[0046] See also Figure 5A guide rail 17 is installed at the middle position of the rear end of the electrostatic precipitator mechanism 16, and a ball screw 37 is installed inside the guide rail 17. A slider 38 is installed on the ball screw 37, and the slider 38 is transmission-connected to the dust-sweeping plate 39. A stepper motor 18 is installed at the upper end of the guide rail 17, and the output end of the stepper motor 18 is transmission-connected to the ball screw 37. When the stepper motor 18 is driven to run, the dust-sweeping plate 39 on the top of the electrode plate can be driven to move along the guide rail 17 under the action of the slider 38.

[0047] See also Figure 5 An exhaust port 19 is provided at the front end of the electrostatic precipitator mechanism 16, and a dust hopper 20 is installed at the lower end of the electrostatic precipitator mechanism 16. The exhaust port 19 is used to discharge the filtered gas.

[0048] See also Figure 1-5 A dust removal method for an electrostatic precipitator used for coal-fired boiler smoke treatment comprises the following steps:

[0049] Step 1: The coal-fired flue gas first enters from the air intake pipe 1. When entering, the first electrically controlled three-way valve 3 is in a state of connecting the air intake pipe 1 and the temperature measuring tube 4, blocking the first circulation pipe 11, and the flow meter 2 at the air intake pipe 1 detects the amount of flue gas entering, and the flue gas is introduced in stages. When the first wave of flue gas is introduced, the flow meter 2 sends a signal to the controller to switch the first electrically controlled three-way valve 3 to a state of connecting the temperature measuring tube 4 and the first circulation pipe 11, blocking the air intake pipe 1. At this time, the incoming flue gas first passes through the temperature measuring tube 4, and the current flue gas temperature is detected by the thermometer 5;

[0050] Step 2: After the flue gas temperature is detected, if the temperature is lower than 400 degrees Celsius, the second electrically controlled three-way valve 10 is in a state of connecting the first blast pipe 9 and the electrostatic precipitator mechanism 16, blocking the second circulation pipe 12, and the flue gas can directly enter the electrostatic precipitator mechanism 16 under the action of the first blast pipe 9 after passing through the transducer pipe 14. If the temperature is higher than 400 degrees Celsius, the thermometer 5 feeds back a signal to the controller, switching the second electrically controlled three-way valve 10 to a state of connecting the first blast pipe 9 and the second circulation pipe 12, blocking the electrostatic precipitator mechanism 16, and at this time, the flue gas can enter the second circulation pipe 12 under the action of the first blast pipe 9 after passing through the transducer pipe 14. The flue gas is cooled by passing water through the spiral heat exchange tube 24 in the heat exchanger 15 at the end of the second circulation tube 12, and then returns to the temperature measuring tube 4 along the first circulation tube 11 under the action of the second blast tube 13. After re-measuring the temperature, if the temperature is lower than 400 degrees Celsius, the feedback signal is sent to the controller to switch the state of the second electrically controlled three-way valve 10, and the flue gas is discharged into the electrostatic precipitator 16 along the energy conversion tube 14. If the temperature is still higher than 400 degrees Celsius, the state of the second electrically controlled three-way valve 10 is maintained, so that the flue gas continues to circulate and exchange heat until the temperature drops below 400 degrees Celsius, and then it is discharged into the electrostatic precipitator 16;

[0051] Step 3: Whenever the flue gas circulates and enters the transducer tube 14, the wind can drive the blades 27 in the tube to rotate, so that the first bevel gear 29 at one end of the blade shaft 28 is meshed with the second bevel gear 33 to drive the transmission shaft 31 to rotate, providing mechanical energy to the output end of the generator 8, thereby achieving the effect of power generation and energy storage;

[0052] Step 4: When the flue gas enters the electrostatic precipitator 16, the gantry valve at the bottom of the electrostatic precipitator 16 is in a closed state. At this time, the power supply device connects the first electrode plate 35 and the second electrode plate 36 to generate a discharge magnetic field to charge the dust in the flue gas. According to the basic characteristics of electricity, the principle that like charges repel and opposite charges attract, a large number of charged dust particles are adsorbed on the electrode plates. Since the gantry valve plate 23 is closed and the lower end of the first electrode plate 35 is sealed, the flue gas can be deflected between the dislocated first electrode plate 35 and the second electrode plate 36, thereby extending the time the flue gas stays in the electrostatic precipitator 16, so that the dust particles can be fully charged and adsorbed on the electrode plates, and the gas after dust removal is discharged along the exhaust port 19;

[0053] Step 5: After the first wave of gas is discharged, the first electrically controlled three-way valve 3 is switched back to connect the air inlet pipe 1 and the temperature measuring pipe 4, blocking the first circulation pipe 11, and at the same time, the flow meter 2 detects the second wave of flue gas, and this cycle is repeated to achieve continuous staged treatment of flue gas;

[0054] Step 6: When a lot of dust is deposited on the electrode plate, the electric field can be turned off to drive the stepper motor 18 to run, driving the dust sweeping plate 39 on the top of the electrode plate to move from top to bottom along the guide rail 17 under the action of the slider 38, and using the brush 41 on the inner wall of the electrode groove 40 to brush the dust into the dust hopper 20 to achieve dust removal.

[0055] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

Claims

1. A dust removal method for an electrostatic precipitator used for coal-fired boiler smoke treatment, characterized in that: The electrostatic precipitator comprises an air intake pipe (1); Also includes: a first electrically controlled three-way valve (3) mounted at one end of the air intake pipe (1); a temperature measuring tube (4) being mounted at the front end of the first electrically controlled three-way valve (3); a transducer tube (6) being mounted at the front end of the temperature measuring tube (4); a first blast tube (9) being mounted at the front end of the transducer tube (6); a second electrically controlled three-way valve (10) being mounted at the front end of the first blast tube (9); and an electric dust removal mechanism (16) being mounted at the front end of the second electrically controlled three-way valve (10); A first circulation pipe (11) is installed at the lower end of the first electrically controlled three-way valve (3); a second circulation pipe (12) is installed at the lower end of the second electrically controlled three-way valve (10); a second blast pipe (13) is installed at the front end of the first circulation pipe (11); a heat exchange pipe (14) is installed between the second blast pipe (13) and the second circulation pipe (12); a heat exchanger (15) is installed inside the heat exchange pipe (14); A flow meter (2) is installed at the upper end of the air inlet pipe (1), and a thermometer (5) is installed at the upper end of the temperature measuring tube (4); A base (7) is installed inside the transducer tube (6), two bases (7) are provided, and the upper ends of the two bases (7) both penetrate and extend to the outside of the transducer tube (6), a blade (27) is provided at the front end of the base (7), a blade shaft (28) is installed at the rear end of the blade (27), one end of the blade shaft (28) penetrates and extends to the inside of the base (7), and is installed with a first bevel tooth (29), a transmission shaft (31) is provided above the first bevel tooth (29), a generator (8) is installed at the upper end of the base (7), an output end of the generator (8) penetrates and extends to the inside of the base (7), and is connected to the transmission shaft (31) through a coupling (32), a second bevel tooth (33) is installed at the lower end of the transmission shaft (31), and the second bevel tooth (33) is meshed and transmission-connected with the first bevel tooth (29); A first electrode plate (35) is installed inside the electrostatic precipitator mechanism (16), and a plurality of first electrode plates (35) are provided, and a second electrode plate (36) is provided between adjacent first electrode plates (35); a valve plate (23) is installed inside the lower end of the electrostatic precipitator mechanism (16), and a sealing groove (42) is provided at the connection between the valve plate (23) and the first electrode plate (35); a gantry frame (21) is installed in front of the lower end of the electrostatic precipitator mechanism (16), and a hydraulic cylinder (22) is installed at the rear end of the gantry frame (21), and the output end of the hydraulic cylinder (22) is transmission-connected to the valve plate (23); A dust sweeping plate (39) is arranged above the interior of the electric dust removal mechanism (16), an electrode groove (40) is arranged inside the dust sweeping plate (39), and a brush (41) is installed on the inner wall of the electrode groove (40); A guide rail (17) is installed at a middle position of the rear end of the electric dust removal mechanism (16); a ball screw (37) is installed inside the guide rail (17); a slider (38) is installed on the ball screw (37); the slider (38) is in driving connection with a dust sweeping plate (39); a stepper motor (18) is installed at the upper end of the guide rail (17); and an output end of the stepper motor (18) is in driving connection with the ball screw (37); An exhaust port (19) is provided at the front end of the electrostatic precipitator mechanism (16), and a dust hopper (20) is installed at the lower end of the electrostatic precipitator mechanism (16); The dust removal method comprises the following steps: Step 1: The coal-fired flue gas first enters through the air intake pipe (1). When entering, the first electrically controlled three-way valve (3) is in a state of connecting the air intake pipe (1) and the temperature measuring pipe (4), blocking the first circulation pipe (11), and the flow meter (2) at the air intake pipe (1) detects the amount of flue gas entering, and the flue gas is introduced in stages. When the first wave of flue gas is introduced, the flow meter (2) sends a signal to the controller, switching the first electrically controlled three-way valve (3) to a state of connecting the temperature measuring pipe (4) and the first circulation pipe (11), blocking the air intake pipe (1). At this time, the incoming flue gas first passes through the temperature measuring pipe (4), and the current flue gas temperature is detected by the thermometer (5); Step 2: After the flue gas temperature is detected, if the temperature is lower than 400 degrees Celsius, the second electrically controlled three-way valve (10) is in a state of connecting the first blast pipe (9) and the electrostatic precipitator (16) and blocking the second circulation pipe (12). After the flue gas passes through the energy conversion pipe (6), it can directly enter the electrostatic precipitator (16) under the action of the first blast pipe (9). If the temperature is higher than 400 degrees Celsius, the thermometer (5) feeds back a signal to the controller, switching the second electrically controlled three-way valve (10) to a state of connecting the first blast pipe (9) and the second circulation pipe (12) and blocking the electrostatic precipitator (16). At this time, after the flue gas passes through the energy conversion pipe (6), it can enter the second circulation pipe (12) under the action of the first blast pipe (9). The loop pipe (12) is cooled by passing water through the spiral heat exchange pipe (24) in the heat exchanger (15) at the end of the second circulation pipe (12). The flue gas is then returned to the temperature measuring pipe (4) along the first circulation pipe (11) under the action of the second blast pipe (13). After re-measuring the temperature, if the temperature is lower than 400 degrees Celsius, a feedback signal is sent to the controller to switch the state of the second electrically controlled three-way valve (10), and the flue gas is discharged into the electrostatic precipitator (16) along the energy conversion pipe (14). If the temperature is still higher than 400 degrees Celsius, the state of the second electrically controlled three-way valve (10) is maintained, so that the flue gas continues to circulate and exchange heat until the temperature drops below 400 degrees Celsius, and the flue gas is discharged into the electrostatic precipitator (16); Step 3: Whenever the flue gas circulates and enters the energy conversion tube (14), the wind can drive the blades (27) in the tube to rotate, so that the first bevel gear (29) at one end of the blade shaft (28) is meshed with the second bevel gear (33) to drive the transmission shaft (31) to rotate, thereby providing mechanical energy to the output end of the generator (8), thereby achieving the effect of power generation and energy storage; Step 4: When the flue gas enters the electrostatic precipitator (16), the gantry valve at the bottom of the electrostatic precipitator (16) is in a closed state. At this time, the power supply device connects the first electrode plate (35) and the second electrode plate (36) to generate a discharge magnetic field to charge the dust in the flue gas. According to the basic characteristics of electricity, the principle that like charges repel and opposite charges attract, a large number of charged dust particles are adsorbed on the electrode plates. Since the gantry valve plate (23) is closed and the lower end of the first electrode plate (35) is sealed, the flue gas can be deflected between the dislocated first electrode plate (35) and the second electrode plate (36), thereby extending the time the flue gas stays in the electrostatic precipitator (16), so that the dust particles can be fully charged and adsorbed on the electrode plates, and the gas after dust removal is discharged along the exhaust port (19); Step 5: After the first wave of gas is discharged, the first electrically controlled three-way valve (3) is switched back to a state of connecting the air inlet pipe (1) and the temperature measuring pipe (4), blocking the first circulation pipe (11), and at the same time, the flow meter (2) detects the introduction of the second wave of flue gas, and this cycle is repeated to achieve continuous staged treatment of the flue gas; Step 6: When a large amount of dust is deposited on the electrode plate, the electric field can be turned off to drive the stepper motor (18) to operate, driving the dust sweeping plate (39) on the top of the electrode plate to move from top to bottom along the guide rail (17) under the action of the slider (38), and using the brush (41) on the inner wall of the electrode groove (40) to brush the dust into the dust hopper (20) to achieve dust removal.

2. The dust removal method of an electrostatic precipitator for coal-fired boiler smoke treatment according to claim 1, characterized in that: A spiral heat exchange tube (24) is installed inside the heat exchanger (15), one end of the spiral heat exchange tube (24) passes through and extends to the outside of the heat exchanger (15), and is provided with a water inlet (25), and the other end of the spiral heat exchange tube (24) passes through and extends to the outside of the heat exchanger (15), and is provided with a water return port (26).

3. The dust removal method of an electrostatic precipitator for coal-fired boiler smoke treatment according to claim 2, characterized in that: A bearing (30) is installed at the connection between the blade shaft (28) and the base (7), and a bearing sheet (34) is installed on the outer wall of the transmission shaft (31).