A new cloud-based construction factory support system and its operation process

Through the new cloud-based construction factory support system, the use of column heightening sections, guide rail columns, wall-mounted seats and hydraulic cylinders and other components, the frame body automatic climbing during high-rise building construction is achieved, solving the low construction efficiency and carbon emissions of traditional mold frames High problems improve construction efficiency and safety.

CN116065809BActive Publication Date: 2024-11-19CHINA CONSTR FOURTH ENG DIV CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310109800.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-02-14
Publication Date
2024-11-19
Estimated Expiration
2043-02-14

AI Technical Summary

Technical Problem

The construction process of traditional formwork frames cannot achieve sectional flow construction during high-rise buildings, resulting in low formwork turnover and requiring tedious support frames and lifting machinery, which increases construction costs and carbon emissions.

Method used

Adopt a new cloud-based factory support system, including column lifting sections, guide rail columns, wall-mounted seats, crawler belts, hydraulic cylinders and crawler belt lifting devices, to realize the overall climb and automation of the frame body, and reduce the dependence on the support frame. .

Benefits of technology

It realizes simple, fast and reliable support and climbing work at the construction site, reduces manual operations, reduces dual carbon emissions, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116065809B_ABST
    Figure CN116065809B_ABST
Patent Text Reader

Abstract

The present invention relates to a novel cloud-based construction factory support system and its operation process. The support system provides vertical and horizontal forces for the construction and shutdown stages of the cloud-based construction factory through the interaction between the guide rail column and the bracket, thereby ensuring the construction safety and the overall stability of the frame. The support system provides climbing power for the frame through the interaction with the hydraulic system. The column heightening section is connected to the upper Bailey frame to form an overall truss of the cloud-based construction factory. The guide rail column plays a connecting role, and the upper part is fixed to the column heightening section to provide support for the overall truss. The climbing belt is the travel path of the column, and the lower part also provides multi-level fulcrums for the hydraulic cylinder. The wall-mounted bracket is a wall-mounted node, which transmits all the forces of the support system to the wall and also provides a path for the column. The hydraulic cylinder provides power for the support system. It can provide a simple, fast and reliable support and climbing process according to construction requirements, and there is no need to set up a support frame, thereby realizing the overall climbing of the frame.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of formwork support technology, and in particular to a novel cloud-based construction factory support system and its operation process. Background Art

[0002] Climbing formwork is the abbreviation of climbing formwork, which consists of three parts: climbing formwork, climbing frame (some climbing formwork do not have climbing frame) and climbing equipment. It is an effective tool in the construction of high-rise structures such as shear wall systems, cylinder systems and bridge piers. Due to its self-climbing ability, it does not require lifting by lifting machinery, which reduces the lifting workload of transportation machinery during construction. Hanging scaffolding on the self-climbing formwork can eliminate the need for external scaffolding during the construction process. The structure of the climbing formwork can be divided into two parts: the supporting frame and the lifting frame (or gantry). The lifting frame is hung on the supporting frame with the formwork, enclosure and work platform. The supporting frame is a simple frame inserted in the lifting frame. The lower end has a fastening device that can be fixed to the hardened concrete wall under the formwork. The upper end extends out of the top of the lifting frame. Various lifting devices can be installed to transfer the entire load of the lifting frame.

[0003] During the structural construction phase, climbing formwork is attached to the building's vertical structure and rises floor by floor as the structure is constructed. This makes it suitable for constructing multi-story or high-rise buildings on confined sites. Climbing formwork is installed floor by floor, requiring a larger quantity than large formwork. This is because its construction process doesn't allow for a continuous, staged construction process, resulting in a low formwork turnover rate.

[0004] In response to the above-mentioned cumbersome working mode of traditional formwork, research on carrier tools suitable for intelligent construction mode of high-rise buildings, creating a less-manned or unmanned mode on the construction site, and reducing dual carbon emissions with a new type of lightweight support system for intelligent building construction machines is a new trend in the development of the industry. Summary of the Invention

[0005] In order to overcome the shortcomings of the existing technology, the purpose of the present invention is to provide a new cloud-based construction factory support system and its operation process, which can perform simple, fast and reliable support and climbing work according to construction requirements, and does not require the setting of a support frame, thereby realizing the overall climbing of the frame.

[0006] In order to achieve the above-mentioned object of the invention, the present invention adopts the following technical solutions:

[0007] A new cloud-based factory construction support system, including:

[0008] The column heightening section is used to connect the upper truss of the formwork and the lower supporting guide rail column, and a connecting mechanism is provided at the top of the column heightening section;

[0009] The guide rail column includes ladder steps, connecting plates, guide rail channel steels, heightening section connecting plates and oil cylinder lifting seats, wherein the guide rail channel steels are connected by ladder steps and connecting plates;

[0010] The wall mount includes an anti-overturning wheel, a flip load-bearing tongue, a wall mounting plate, and a lug plate. The anti-overturning wheel and the wall mounting plate are connected by a latch and a fixing plate.

[0011] The climbing belt includes a climbing belt body and a connecting nut. The climbing belt body is used to provide support for the lifting legs and plan the travel path for the oil cylinder. The connecting nut connects the two climbing belt bodies into a whole, controls the distance between them, and ensures that the lifting legs of the frame are in firm contact with the fulcrum.

[0012] Hydraulic cylinder is used to provide climbing power for the formwork system.

[0013] The lifting legs include a lifting tongue and a lifting frame. The lifting tongue is buckled with the climbing belt body. A connecting seat is provided on the upper side of the lifting frame and is connected to the oil cylinder as a whole.

[0014] The climbing belt lifting device is used to rotate the climbing belt after the mold frame has completed climbing; it includes a sliding track, a motor, a hook, a self-moving trolley and a winding device. The sliding track is fixed to the column heightening section, and the self-moving trolley is fixed on the sliding track and can move automatically along the track. The winding device is fixed to the motor, and the hook drives the climbing belt to rise through the contraction and extension of the winding device.

[0015] As a preferred embodiment of the above technical solution, the cross-sectional shape of the column heightening section is set to be rectangular, and the column heightening section is a group of lattice columns, which can bear the weight of the upper truss and maintain stability.

[0016] As a preferred embodiment of the above technical solution, a connecting diagonal brace is provided between the heightening connecting plate and the guide rail channel steel, and the heightening connecting plate matches the upper column heightening section.

[0017] As a preferred embodiment of the above technical solution, a pad is provided at the bottom of the flip load-bearing tongue, and the pad can keep the flip load-bearing tongue from bearing vertical force.

[0018] As a preferred embodiment of the above technical solution, the climbing belt is provided with ladder openings at intervals, the ladder openings provide support for the lifting tongue, the ladder opening spacing coincides with the oil cylinder climbing spacing, and the upper end is provided with a connecting port and a lifting port, the connecting port is connected to the ear plate, and the lifting port is used for lifting the climbing belt with a hook.

[0019] The operational process of the new cloud-based factory construction support system is as follows:

[0020] (1) After pouring the concrete layer, install the hanging bracket, and do not install the anti-overturning wheel at this time;

[0021] (2) The oil cylinder drives the lifting tongue to engage with the lowest step of the lifting climbing belt;

[0022] (3) The oil cylinder lifts the oil cylinder lifting seat, and the oil cylinder lifting seat drives the guide rail column to climb upward, thereby realizing the overall climbing of the frame. After the oil cylinder climbs one stroke, the guide rail column ladder and the hanging seat flip load-bearing tongue contact each other, and the oil cylinder drives the lifting legs to retract. After the lifting tongue rises, it is locked with the ladder step on the climbing belt, and then the next step of climbing is carried out;

[0023] (4) During the climbing process, the heightened section connecting plate is installed beyond the wall mount and the anti-overturning wheel is installed. The upper mount forms a front and rear constraint on the guide rail column, and the frame continues to climb to the designated position;

[0024] (5) Remove the connecting nut of the climbing belt, move the self-moving trolley to one side, control the reeling device with a motor to lower the hook to the lower end bracket, and use the hook to lift the climbing belt to one floor height. Move the self-moving trolley to the other side through the sliding track, control the reeling device with a motor to lower the hook to the lower end bracket, and use the hook to lift the climbing belt to one floor height.

[0025] (6) Remove the bottom wall bracket and install the climbing belt connecting nut to connect the climbing belt into a whole. Beneficial effects

[0026] The present invention provides a novel support system for a cloud-based construction factory, which comprises a column heightening section, a guide rail column, a wall mount, a climbing belt, a hydraulic cylinder, a lifting leg, and a climbing belt lifting device. The support system provides vertical and horizontal forces for the construction phase, climbing phase, and shutdown phase of the cloud-based construction factory through the interaction between the guide rail column and the mount, thereby ensuring construction safety and the overall stability of the frame. The guide rail column plays a connecting role, and the upper part is fixed to the column heightening section to provide support for the overall truss. The hydraulic cylinder provides power for the entire system, the guide rail column continuously climbs upward along the climbing belt, the wall mount provides a support point for the support system, and transmits all the force of the formwork system to the wall.

[0027] The column extensions connect to the upper Bailey frame, forming the overall truss structure of the cloud-based construction factory. The column extensions raise the upper truss structure by one floor, allowing the truss structure to be adjusted according to construction needs and adapt to different construction phases. The climbing belt, fixed to the wall mounts, defines the travel path for the guide rail columns and provides multiple fulcrums for the hydraulic cylinders. A climbing belt hoist, installed on the column extensions, prevents collisions with the wall mounts and automatically raises the climbing belt into position, saving labor and meeting construction site requirements.

[0028] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are specifically listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 This is a schematic diagram of the overall structure of the new cloud-based factory construction support system of the present invention;

[0030] Figure 2 This is a structural diagram of the column heightening section 1;

[0031] Figure 3 It is a structural diagram of the guide rail column 2;

[0032] Figure 4 It is a structural diagram of the wall mount 3;

[0033] Figure 5 It is a structural schematic diagram of the crawling belt 4;

[0034] Figure 6 It is a structural diagram of the lifting leg 6;

[0035] Figure 7 Schematic diagram of the structure of the climbing belt lifting device 7;

[0036] In the figure: 1-column heightening section, 2-guide rail column, 3-wall mounting bracket, 4-climbing belt, 5-hydraulic cylinder, 6-lifting legs, 7-climbing belt lifting device, 11-column truss, 12-connecting mechanism, 21-ladder step, 22-connecting plate, 23-guide rail channel steel, 24-heightening section connecting plate, 25-cylinder lifting seat, 31-anti-overturning wheel, 32-flip load-bearing tongue, 33-wall mounting plate, 34-hanging ear plate, 41-climbing belt body, 42-connecting nut, 61-lifting tongue, 62-lifting frame, 71-sliding track, 72-motor, 73-hook, 74-self-moving trolley, 75-winding device, 711-limiting plate. DETAILED DESCRIPTION

[0037] In order to make the purposes, features, and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative efforts shall fall within the scope of protection of the present invention. Example

[0038] Figure 1 This is a schematic diagram of the overall structure of the new cloud-based factory support system of the present invention; see Figure 1 As shown, a new type of cloud-based construction factory support system includes: a column heightening section 1, a guide rail column 2, a wall mount 3, a climbing belt 4, a hydraulic cylinder 5, a lifting leg 6 and a climbing belt lifting device 7;

[0039] The column heightening section 1 is arranged at the upper end of the guide rail column 2 and is used to connect the upper truss of the formwork and the lower supporting guide rail column. It includes a column truss 11 and a connecting mechanism 12. A diagonal brace is provided between the column truss 11 and the connecting mechanism 12. The connecting mechanism 12 is provided with multiple rows of connection points, which can meet the various truss arrangements on the construction site.

[0040] The guide rail column 2 includes a ladder rung 21, a connecting plate 22, a guide rail channel steel 23, a heightened section connecting plate 24, and a cylinder lifting seat 25. The ladder rung 21 is the main load-bearing component, connected to the flip load-bearing tongue of the wall-mounted bracket, serving as a fulcrum and anti-falling measure for the cloud-based construction factory. The connecting plate 22 connects between the two guide rail channels to form a whole. At the same time, the connecting plate also serves as a limit plate for the cylinder to limit the position of the cylinder to prevent the cylinder from exceeding the structure and colliding with the wall-mounted device, avoiding scratches on site. The cylinder lifting seat 25 is fixed to the ladder rung 21, and its lower end supports the upper end of the cylinder. Therefore, the guide rail column 2 is connected to the hydraulic cylinder 5 through the cylinder lifting seat. The continuous extension and retraction of the cylinder drives the guide rail column and the entire frame to climb together without the need for a reversing device, serving as the frame's force transmission device. This reduces workload and is simple and quick on site.

[0041] The wall mount 3 is fixed to the wall through four embedded parts, and includes an anti-overturning wheel 31, a tilting bearing tongue 32, a wall plate 33 and a lug plate 34; the anti-overturning wheel 31 is set on the wall plate 33 and is detachable. The anti-overturning wheel 31 simultaneously holds the front and rear sides of the guide rail channel steel 23, restricting the guide rail column from tilting forward and backward at each stage, while not hindering the rise and fall of the guide rail column. The tilting bearing tongue is the main bearing component, which can avoid the guide rail column (2) during the climbing process, and can be reset to support the ladder step after the ladder step rises. The tilting bearing tongue will rotate upward when it encounters the ladder step during the climbing process, and will return to its original position after the ladder step climbs, supporting the ladder step. The lug plate is fixed to the climbing belt, and plans the path for the climbing belt.

[0042] The climbing belt 4 comprises a main climbing belt body 41 and a connecting nut 42. The connecting nut 42 is located at the bottom end of the climbing belt 4 and is used to secure the two main climbing belt bodies 41. The main climbing belt bodies 41 are configured as two flat belts, one of which has a threaded buckle on its underside for fastening and detaching. The upper end of the climbing belt is connected to the lug plate of the wall mount via a pin, defining a path for the overall lifting of the frame. Connectors are evenly distributed throughout the main climbing belt body 41 for securing the lifting tongue 61.

[0043] The lifting leg 6 includes a lifting tongue 61 and a lifting frame 62. The lifting tongue 61 is connected to the lower end of the lifting frame 62. The upper portion of the lifting leg is connected to the oil cylinder, and the lower portion is fixed to the connection port on the climbing belt via the lifting tongue. As the oil cylinder continuously extends and retracts, the lifting leg gradually climbs along the connection port from bottom to top along the climbing belt, achieving a gradual multi-stage climb. Specifically, a connecting seat is provided at the upper end of the lifting frame 62, which is fixed to the lower portion of the hydraulic cylinder. The lifting tongue 61 is configured to be rotatable. When the oil cylinder retracts upward, the lifting tongue 61 can automatically retract and no longer contact the connection port of the climbing belt body 41. After the oil cylinder retracts into place, the lifting tongue 61 interlocks with the connection port (the lifting frame 62 has a V-shaped cross-section, and the angle decreases when it is lifted upward. When it is pressed downward, the lifting tongue 61 is fixed by the inward pressure provided by the connection port).

[0044] The climbing belt lifting device 7 includes a sliding track 71, a motor 72, a hook 73, a self-moving trolley 74, and a reeling device 75. The sliding track 71 is located in the middle of the column heightening section, with its upper edge connected to the column heightening section and a motor installed at the bottom. The lower edge of the sliding track 71 provides a running track for the self-moving trolley 74, facilitating the lifting of the climbing belt on both sides while eliminating the need for a lifting device on both sides. The motor is connected to the hook and the self-moving trolley, and the motor controls the up and down path of the hook through the reeling device. The self-moving trolley is fixed to the sliding track and is controlled by the motor to move horizontally, thereby achieving the lifting of the climbing belt on both sides.

[0045] The above-mentioned new cloud-based construction factory support system uses a hydraulic cylinder 5 as a power system to provide power. The guide rail column 2 is attached to the wall mount 3 to transfer all the force of the formwork system to the wall. The climbing belt 4 provides a track path for the formwork to climb. The column heightening section 1 determines the position of the frame at different stages of construction, meets the requirements of the construction site for the frame, and brings each auxiliary system to the corresponding vertical position. At the same time, the climbing belt 4 is fixed on the wall mount 3. In the climbing plan of the frame, it provides a fulcrum for the frame and lifts the frame to the next working surface. The climbing belt lifting device 7 can automatically lift the climbing belt 4 into place after the frame climbs into place, while avoiding collision with the wall mount 3, saving labor and meeting the needs of the construction site.

[0046] In a further feasible embodiment of this embodiment, the anti-tipping holding wheel 31 includes two anti-tipping rollers, and the distance between the two is the thickness of the flange of the guide rail channel steel 23 plus three millimeters, which is convenient for installation during construction while also ensuring the verticality of the column. The anti-tipping holding wheel 31 can be disassembled separately after the climbing belt climbs, reducing the overall weight of the wall mount and facilitating construction.

[0047] The above-mentioned new cloud-based construction factory support system, the climbing belt 4 includes a climbing belt body 41 and a connecting nut 42. The climbing belt body 41 is divided into two flat belts, one of which is designed with a threaded hole at the lower end, and the connecting nut 42 connects the two flat belts into a whole. The upper end of the climbing belt 4 is connected to the ear plate 34 of the wall mount 3 through a pin shaft, planning the path for the overall lifting of the frame.

[0048] In a further feasible embodiment of this embodiment, the end of the lifting tongue 61 is designed to be rotatable, and the force point continuously changes during the climbing process of the frame. It can be tightly engaged with the climbing belt 4 during climbing. When the cylinder contracts, the lifting tongue 61 automatically retracts and rises along the edge of the climbing belt 4.

[0049] In a further feasible embodiment of this embodiment, limit plates 711 are provided at both ends of the sliding track 71, and the self-moving trolley cannot exceed the limit plates to prevent safety accidents caused by the inertia of the trolley. A manual operator is provided on the self-moving trolley 74 to prevent the system from being out of control when the self-moving control system makes mistakes, thereby affecting on-site construction. The winding device 75 is provided on the motor 72 to control the up and down movement of the hook and drive the turnover of the climbing belt 4.

[0050] The operation process of the new cloud-based factory support system is as follows:

[0051] (1) After pouring the concrete layer, install the wall mount 3. At this time, the anti-overturning wheel 31 is not installed.

[0052] (2) The hydraulic cylinder drives the lifting tongue 61 of the lifting leg 6 to engage with the bottom connection port of the climbing belt 4. The upper end of the climbing belt is connected to the hanging ear plate of the wall hanging bracket 3 through a pin shaft, planning the lifting path for the entire frame;

[0053] (3) The oil cylinder lifts the oil cylinder lifting seat, and the oil cylinder lifting seat drives the guide rail column to climb upward, thereby realizing the overall climbing of the frame. After the oil cylinder climbs one stroke, the guide rail column ladder step and the flip load-bearing tongue of the wall hanging seat contact each other, and the oil cylinder drives the lifting legs to retract. After the lifting tongue rises, it interlocks with the ladder step on the climbing belt, and then proceeds to the next step of climbing;

[0054] (4) During the climbing process, the heightened section connecting plate is installed beyond the wall mount and the anti-overturning wheel is installed. The upper mount forms a front and rear constraint on the guide rail column, and the frame continues to climb to the designated position;

[0055] (5) The climbing belt lifting device is used to rotate the climbing belt after the mold frame has been climbed. Its sliding track is fixed to the column heightening section, and the self-moving trolley is fixed on the sliding track and can move automatically along the track. Remove the climbing belt connection nut, move the self-moving trolley to one side, and the motor controls the winding device to lower the hook to the lower end hanging seat, and the climbing belt is raised by one floor height through the hook. The self-moving trolley moves to the other side through the sliding track, and the motor controls the winding device to lower the hook to the lower end hanging seat, and the climbing belt is raised by one floor height through the hook.

[0056] (6) Remove the bottom wall bracket and install the climbing belt connecting nut to connect the climbing belt into a whole.

[0057] In the description of this specification, reference to the terms "one embodiment," "some embodiments," "examples," "specific examples," or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. Moreover, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. In addition, those skilled in the art may combine and integrate different embodiments or examples described in this specification, as well as features of different embodiments or examples, unless otherwise inconsistent.

[0058] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any modifications or substitutions that can be easily conceived by a person skilled in the art within the technical scope disclosed in the present invention should be included in the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be based on the scope of protection of the claims.

Claims

1. An operation process of a new cloud-based construction factory support system, the new cloud-based construction factory support system comprising: A column heightening section (1), a guide column (2), a wall-mounted mounting bracket (3), a climbing belt (4), a hydraulic cylinder (5), a lifting leg (6) and a climbing belt lifting device (7); wherein the upper end of the climbing belt (4) is fixed to the wall-mounted mounting bracket (3), and the upper and lower wall-mounted mounting brackets provide a fulcrum and a travel route for the climbing belt; The guide rail column (2) comprises a ladder step (21), a connecting plate (22), a guide rail channel steel (23), a heightening section connecting plate (24) and a cylinder top lifting seat (25); the guide rail column (2) is connected to the hydraulic cylinder (5) through the cylinder top lifting seat to provide climbing power for the cloud construction factory, and the guide rail column (2) is in contact with the wall hanging seat (3) through the ladder step to withstand the vertical force and horizontal force of the cloud construction factory; the climbing belt lifting device (7) is arranged on the column heightening section (1), the height exceeds the uppermost wall hanging seat position, and is used to lift the double-sided climbing belt (4) to achieve fully automatic turnover and reduce labor input; the upper part of the lifting leg (6) is connected to the cylinder, and the lower part is supported on the climbing belt. Through the continuous contraction and extension of the leg, it continuously rises along the climbing belt to achieve multi-stage climbing; The wall-mounted mount (3) comprises an anti-tilt holding wheel (31), a tilting bearing tongue (32), a wall-mounted plate (33) and a lug plate (34); the anti-tilt holding wheel is detachable and fixedly connected to the mount, and at the same time constrains the guide rail column to prevent the guide rail column from shaking back and forth; the tilting bearing tongue rotates upward when encountering the ladder step during the ascending process, and returns to the original position after the ladder step has climbed, supporting the ladder step; the lug plate is fixed to the climbing belt, and a path for the climbing belt is planned; The wall mount (3) is fixed to the wall through four embedded parts. The embedded parts ensure the stress conditions of the frame at all stages. The wall mount provides a support point for the system and transmits all the forces of the formwork system to the wall. The flip load-bearing tongue of the wall mount is the main load-bearing component. It can also avoid the guide rail column (2) during the climbing process. After the ladder steps are raised, they can be reset to serve as support for the ladder steps. The column heightening section (1) comprises a column truss (11) and a connecting mechanism (12), wherein the column truss is connected to the lower guide rail and supports the upper Bailey frame body, and a diagonal brace is provided between the column truss and the connecting mechanism, and the connecting mechanism is provided with multiple rows of connection points, which can meet the various truss arrangement forms at the construction site; The ladder rungs are connected to the flip load-bearing tongue of the wall-mounted hanging bracket, serving as a fulcrum and anti-falling measure for the cloud-based construction factory; the oil cylinder top lifting seat is fixedly connected to the lower ladder rungs, and the lower end receives the upper end of the oil cylinder, and through the continuous extension and retraction of the oil cylinder, the guide rail column and the entire frame are driven to rise, serving as a force transmission device for the frame; the connecting plate is connected between the two guide rail channel steels, and the ladder rungs and the connecting plate connect the two guide rail channel steels into a whole, and the connecting plate also serves as a limit plate for the oil cylinder to prevent the oil cylinder from exceeding the structure and colliding with the wall-mounted device; The climbing belt (4) comprises a climbing belt body (41) and a connecting nut (42). The climbing belt body is divided into two flat belts, one of which has a threaded opening at the lower end. The connecting nut connects the two flat belts into a whole. The upper end of the climbing belt is connected to the hanging ear plate of the wall hanging bracket through a pin shaft to plan a path for lifting the frame as a whole. The climbing belt body is evenly distributed with connecting openings for fixing the lifting tongue. The lifting leg (6) comprises a lifting tongue (61) and a lifting frame (62); the upper portion of the lifting leg is connected to the oil cylinder, and the lower portion is fixed to the climbing belt via the lifting tongue; the leg gradually climbs on the climbing belt by continuously extending and contracting the oil cylinder; The cross section of the lifting frame is an inverted V-shape, a connecting seat is arranged at the upper end of the lifting frame, the connecting seat is fixed to the lower part of the hydraulic cylinder, the lifting tongue is arranged to be rotatable, when the cylinder is retracted upward, the lifting tongue (61) can be automatically retracted and does not contact the connecting port of the climbing belt body (41), and when the cylinder is retracted into place, the lifting tongue is locked with the connecting port; The climbing belt lifting device (7) comprises a sliding track (71), a motor (72), a hook (73), a self-moving trolley (74) and a winding device (75), wherein the sliding track is arranged in the middle of the column heightening section, a motor is arranged at the bottom of the sliding track, the motor is connected to the hook and the self-moving trolley, the motor determines the up and down path of the hook through the winding device, the self-moving trolley is fixed on the sliding track, and is moved in a horizontal plane through the control of the motor, thereby realizing the lifting of the climbing belt on both sides; It is characterized in that the steps are as follows: (1) After pouring the concrete layer, install the upper wall mount, and do not install the anti-overturning wheel at this time; (2) The oil cylinder drives the lifting tongue (61) to engage with the connection port at the bottom layer of the climbing belt (4); (3) The oil cylinder lifts the oil cylinder lifting seat, and the oil cylinder lifting seat drives the guide rail column to climb upward, thereby realizing the overall climbing of the frame. After the oil cylinder climbs one stroke, the guide rail column ladder step and the hanging seat flip load-bearing tongue contact each other, and the oil cylinder drives the lifting legs to retract. After the lifting tongue rises, it interlocks with the ladder step on the climbing belt, and then proceeds to the next step of climbing; (4) During the climbing process, the heightened section connecting plate is installed beyond the wall mount and the anti-overturning wheels are installed. The upper mount forms front and rear constraints on the guide rail column, and the frame continues to climb to the designated position; (5) Remove the connecting nut of the climbing belt, move the self-moving trolley to one side of the sliding track, control the motor to lower the hook of the winding device to the lower end of the hanging seat, and lift the climbing belt by one floor height through the hook. Move the self-moving trolley to the other side through the sliding track, control the motor to lower the hook of the winding device to the lower end of the hanging seat, and lift the climbing belt by one floor height through the hook. (6) Remove the bottom wall bracket and install the climbing belt connecting nut to connect the climbing belt into a whole.