A method for constructing a tall steel column

By dividing the towering steel columns into sections and using light lifting poles and lifting devices, the construction of towering steel columns was realized in the mountainous environment, which solved the problem of large machinery being unable to enter the site, improved the economy and safety of the construction, and avoided Damage to the outer wall of the steel column.

CN116181077BActive Publication Date: 2024-10-01ZHEJIANG ZHONGNAN CONSTR GRP STEEL STRUCTURE CO LTD
View PDF 15 Cites 0 Cited by

Patent Information

Application Number
CN202310353755.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-01
Estimated Expiration
2043-03-31

AI Technical Summary

Technical Problem

During construction in mountainous scenic areas, due to the lack of roads and road condition restrictions, large construction machinery cannot enter the site, making it impossible to use conventional lifting machinery to hoist towering steel columns, causing construction difficulties.

Method used

By dividing the towering steel column into several column sections, and installing a lightweight lifting pole on the top of the installed steel column, setting up a lightweight lifting device, and using manual installation and removal of the pole to ensure that the lifting device can be lifted to the set elevation. and fixed to complete the installation of column sections, using temporary machinery and stabilizing devices to improve safety and economy.

Benefits of technology

The construction of towering steel columns is realized in a mountainous environment, which reduces the friction between the lifting device and the outer wall of the steel column, avoids damage to the anti-corrosion coating, ensures the safety and overall performance of the lifting device, and improves economy and environmental protection sex.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116181077B_ABST
    Figure CN116181077B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for constructing a tall steel column, comprising the following steps: vertically segmenting the tall steel column; setting a fixed base on the column section; installing the first column section on the ground foundation; installing a lifting device; moving the hoisting hoist to a set position, and bolting the lifting hoist on each lug plate of the digging rod; operating the lifting hoist to raise the lifting device to a predetermined elevation; installing a stabilizing device, operating the lifting hoist to lower the lifting device; installing a column bottom beam on the lifting base on the second column section; operating the lifting hoist to raise the lifting device again, removing the stabilizing device, and operating the lifting hoist again to lower the lifting device; removing the lifting digging rod, hoisting the third column section, and completing the installation of each column section in a cycle according to the above steps; after the Nth column section at the top is installed, the lifting device is removed. The present invention implements the construction of the tall steel column under the condition that it is impossible to ensure that large-scale lifting and hoisting machinery enters the construction site, or the lifting height of the lifting machinery cannot be met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a method for constructing a tall steel column. Background Art

[0002] With the development of society, people's pursuit of tourism, leisure and cultural needs are constantly increasing. In the in-depth development of tourist facilities in mountain scenic areas, there is no shortage of tourist facilities built on towering steel columns to better meet people's spiritual and cultural needs. Compared with conventional regional construction, the construction of towering steel columns in mountain scenic areas has the following difficulties:

[0003] 1. Mountain scenic areas generally have no roads available for cargo transportation;

[0004] 2. Road conditions restrict large construction machinery from entering the construction site. Since large construction machinery cannot enter the site, the tall steel columns cannot be hoisted using conventional lifting machinery such as truck cranes, crawler cranes, tower cranes, etc.

[0005] A method for hoisting tall steel columns under special mountainous environmental conditions has been developed to solve the difficulty of not being able to use standardized lifting machinery for hoisting construction in mountainous environments. Summary of the invention

[0006] The purpose of the present invention is to provide a technical solution for a method of constructing tall steel columns in response to the deficiencies in the prior art. In mountainous environmental conditions, it is impossible to ensure that large-scale lifting and hoisting machinery can enter the construction site, or when the site environment allows large-scale lifting and hoisting machinery to enter the construction site but the lifting height of the lifting machinery cannot be met. In this way, the construction of tall steel columns can be completed. By installing a lifting rod on the top of the tall steel column that has been installed, it is ensured that the lifting device can be lifted to the set elevation and fixed, and then the installation of the column section of the tall steel column to be installed is completed. The steel column is divided into several column sections for processing in advance, and then a lightweight lifting device is set to install each column section, and finally the construction of the tall steel column is realized, thereby improving the economy.

[0007] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0008] A method for constructing a tall steel column, characterized by comprising the following steps:

[0009] S1. Divide the tall steel column into several column sections vertically, and mark them from bottom to top as: the first column section, the second column section, the third column section, ..., the Nth column section;

[0010] S2. Except for the Nth column section at the top, a fixed base for fixing the lifting device and the lifting lever is set on each column section. The fixed base includes a lifting base and a lever base. The lifting base is distributed on three adjacent outer walls outside the column section, and the lever base is distributed on the inner wall of the column section. By placing a light lifting lever on the top of the towering steel column, the lifting lever is light in weight and can be installed and removed manually without the need for additional large tools, thereby ensuring the feasibility of the lifting operation of the lifting device.

[0011] S3. Install the first column section on the ground foundation using temporary equipment, and hoist the other column sections into place using a lifting device;

[0012] S4, installing the lifting device, installing the lifting device on the lifting base of the first column section, completing the installation of the second column section and welding and fixing it to the first column section through a transverse weld;

[0013] S5. Move the hoisting hoist to the set position specified before the lifting device is lifted, fix the lifting lever on the lever base at the top of the second column section, fix the lever bottom plate on each lifting lever to the corresponding lever base by bolts, and bolt the lifting hoist on each lever ear plate. The lifting hoist is respectively connected and tensioned with the door post lifting ear plate set on the door post, the balance column lifting ear plate set on the balance column, and the chassis ear plate set on the frame chassis;

[0014] S6. Remove the fixing bolts between the lifting device and the column bottom beam, operate the lifting hoist, and make the lifting device rise to the predetermined elevation along the outer wall of the installed tall steel column through the door column rollers, the balance column rollers, and the chassis rollers, and stop lifting;

[0015] S7. After the lifting stops, a stabilizing device is installed on the top surface of the installed tall steel column, and the first stabilizing beam and the second stabilizing beam in the stabilizing device are connected to the door column stabilizing block set on the door column through a stabilizing pin, and one end of the third stabilizing beam in the stabilizing device is connected to the balancing column stabilizing block on the balancing column through a stabilizing pin, and the other end of the third stabilizing beam is connected to the stabilizing beam node plate on the second stabilizing beam through a stabilizing pin, and the lifting hoist is operated to make the lifting device land stably on the top surface of the installed tall steel column; after the lifting device is lifted to the preset elevation, the first stabilizing beam, the second stabilizing beam and the third stabilizing beam are first used to temporarily stabilize the lifting device to further ensure that the lifting device is in a safe state, avoid the deficiency of relying solely on the lifting hoist for stability, and eliminate the safety hazards of installing and fixing the column bottom beam.

[0016] S8. Install the column bottom beam on the lifting base on the second column section, and connect the column bottom beam to the lifting base through bolts;

[0017] S9, operate the lifting hoist to lift the lifting device again, and control the lifting distance within 5mm to ensure that the first stabilizing beam, the second stabilizing beam and the third stabilizing beam are removed without obstacles, remove the stabilizing device, and operate the lifting hoist again to lower the lifting device until the lifting device is lowered to the top surface of the door post bottom connecting plate, the balance column bottom connecting plate to the column bottom beam, and connect the door post bottom connecting plate and the balance column bottom connecting plate to the column bottom beam by bolts;

[0018] S10, remove the lifting rod, hoist the third column section, and complete the installation of each column section in a cycle according to the above steps;

[0019] S11. After the Nth column section at the top is installed, the lifting device is removed by setting up temporary equipment on the top of the tall steel column.

[0020] The method for constructing the tall steel column has simple steps. It can be implemented under mountainous environmental conditions when it is impossible to ensure that large-scale lifting machinery can enter the construction site, or when the site environment allows large-scale lifting machinery to enter the construction site but the lifting height of the lifting machinery cannot be met. By installing a lifting rod on the top of the already installed tall steel column, it is ensured that the lifting device can be lifted to the set elevation and fixed, and then the installation of the column section of the tall steel column to be installed is completed. The steel column is divided into several column sections for processing in advance, and then a lightweight lifting device is set to install each column section, and finally the construction of the tall steel column is realized, thereby improving the economy.

[0021] Furthermore, the lifting device in step S2 includes a door beam, a door post, a balance column, a lifting beam and a lifting hoist. The door beam is installed between the tops of the two door posts and fixedly connected by bolts. The lifting beam is suspended below the door beam. The balance column is connected to the lifting beam through a pin shaft, and the lifting hoist is moved and placed on the lifting beam.

[0022] Furthermore, the door post includes a door post top connecting plate, a door post main rod, a door post stabilizing block, a door post corbel, a door post corbel joint plate, a door post lifting ear plate, a door post roller and a door post bottom connecting plate. The door post top connecting plate and the door post bottom connecting plate are arranged at the top and bottom ends of the door post main rod, the door post stabilizing block, the door post corbel, the door post lifting ear plate and the door post roller are all arranged on the side of the door post main rod, and the door post corbel joint plates are arranged at both ends of the door post corbel.

[0023] Furthermore, the door beam includes a door beam main rod, a door beam end support plate and a door beam ear plate. The door beam end support plate is arranged at the bottom of both ends of the door beam main rod. The door beam end support plate is connected to the door column top connecting plate by bolts, and the door beam ear plate is arranged at the bottom center of the door beam main rod.

[0024] Furthermore, the lifting beam includes a lifting beam main rod, a lifting beam lifting ear plate and a lifting beam balancing ear plate. The lifting beam main rod is made of H-shaped steel or I-shaped steel. The lifting ear plate and the lifting beam balancing ear plate are respectively arranged on the top surface and the bottom surface of the lifting beam main rod. The lifting ear plate of the lifting beam is connected to the door beam ear plate through a pin shaft.

[0025] Furthermore, the balancing column includes a balancing column top ear plate, a balancing column top connecting plate, a balancing column main rod, a balancing column stabilizing block, a balancing column corbel, a balancing column corbel joint plate, a balancing column roller, a balancing column lifting ear plate and a balancing column bottom connecting plate. The balancing column top ear plate is connected to the top of the balancing column main rod through the balancing column top connecting plate, the balancing column top ear plate is connected to the lifting beam balancing ear plate through a pin shaft, the balancing column bottom connecting plate is connected to the bottom end of the balancing column main rod, the balancing column stabilizing block, the balancing column corbel, the balancing column roller and the balancing column lifting ear plate are all arranged on the side of the balancing column, and the balancing column corbel joint plates are arranged at both ends of the balancing column corbel.

[0026] Furthermore, the lifting lever in step S2 includes a lever main rod, a lever ear plate and a lever bottom plate. The lever ear plate is arranged on one side of the lever main rod, and the lever bottom plate is arranged at the bottom of the lever main rod. The lifting lever is connected to the lever base by bolts through the lever bottom plate.

[0027] Furthermore, the frame chassis includes a first chassis rod and a second chassis rod, the door post corbel is connected to the balance column corbel through the first chassis rod, and the two door post corbels are connected through the second chassis rod. The frame chassis is provided with chassis rollers, and the door post corbel, the balance column corbel, the first chassis rod and the second chassis rod together form the frame chassis, ensuring that the lifting device maintains good overall performance during the use of the lifting column section and during the lifting process of the lifting device. The firm and stable frame chassis avoids the problem of structural deformation of the lifting device and the integrity of the lifting device being destroyed during the use and operation of the lifting device or during the lifting process. The door post roller works together with the balance column roller and the chassis roller to ensure that the lifting device rolls up along the outer wall of the installed towering steel column under the action of the lifting hoist, effectively reducing the friction between the lifting device and the outer wall of the towering steel column during the lifting process. The lifting device rolls and lifts along the outer wall of the towering steel column to avoid the damage of the anti-corrosion coating of the outer wall of the towering steel column caused by the sliding friction between the lifting device and the outer wall of the towering steel column.

[0028] Furthermore, the lifting device is fixed to the lifting base of each column section through the column bottom beam with bolts, so that the lifting device can ensure that the door post and the balance column are not affected by the lifting base during the lifting process. If there is no column bottom beam, the door post and the balance column will be located in the same vertical line with the lifting base, causing the lifting base of the previous column section to restrict the vertical movement of the lifting device, making it impossible to achieve lifting.

[0029] Further, when installing the lifting device in step S4:

[0030] 1) First, install the column bottom beam on the lifting base of the first column section;

[0031] 2) Install the door posts and balance posts along the top of the column base beam;

[0032] 3) Install the first chassis rod and the second chassis rod;

[0033] 4) Then install the door beam between the tops of the two door posts;

[0034] 5) Finally, install the lifting beam along the bottom of the door beam and the top of the balance column;

[0035] 6) Install the hoist on the lifting beam.

[0036] The present invention has the following beneficial effects due to the adoption of the above technical solution:

[0037] 1. A construction method for building tall steel columns in mountainous environments is provided. In mountainous environments, it is impossible to ensure that large-scale lifting machinery can enter the construction site, or when the site environment allows large-scale lifting machinery to enter the construction site but the lifting height of the lifting machinery cannot be met, the construction of tall steel columns is implemented.

[0038] 2. By setting door column rollers, balance column rollers and chassis rollers, the friction between the lifting device and the outer wall of the tall steel column during lifting is effectively reduced. The lifting device rolls along the outer wall of the tall steel column to avoid the damage to the anti-corrosion coating of the outer wall of the tall steel column caused by sliding friction between the lifting device and the outer wall of the tall steel column.

[0039] 3. The bottom of the lifting device has excellent integrity and stability. The bottom of the door post and the balance column are connected through the door post bracket, the balance column bracket, the first chassis rod and the second chassis rod to form a closed frame chassis, which supports the upper lifting device. The firm and stable frame chassis avoids the problem of structural deformation of the lifting device and the integrity of the lifting device being damaged during the use and operation of the lifting device or during the lifting process.

[0040] 4. The door post and the balance column are connected to the lifting base through the column bottom beam, which effectively makes the lifting base, the door post and the balance column not located on the same vertical line, ensuring that the door post and the balance column can be lifted.

[0041] 5. The fixation of the lifting device after lifting is safe. After the lifting device is lifted to the preset elevation, the first stabilizing beam, the second stabilizing beam, and the third stabilizing beam are used to temporarily stabilize the lifting device, further ensuring that the lifting device is in a safe state, avoiding the shortcomings of relying solely on the hoisting hoist for stabilization, and eliminating the potential safety hazards of installing and fixing the column bottom beam.

[0042] 6. By placing a light lifting lever on the top of the towering steel column, the lifting lever is light in weight and can be installed and removed manually without the need for additional large tools, thus ensuring the feasibility of the lifting operation of the lifting device.

[0043] 7. Economy: When lifting machinery cannot be used, a lifting rod is installed on the top of the already installed tall steel column to ensure that the lifting device can be lifted to the set elevation and fixed, and then the installation of the tall steel column section to be installed is completed. The steel column is divided into several column sections for processing in advance, and then a lightweight lifting device is set up to install each column section, finally realizing the construction of the tall steel column and improving the economy.

[0044] 8. Green and environmentally friendly: The lifting device and lifting rod are made of green steel, and the towering steel columns can be recycled after installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] The present invention will be further described below in conjunction with the accompanying drawings:

[0046] Figure 1 A flow chart of a method for constructing a tall steel column according to the present invention;

[0047] Figure 2 It is a front view of the towering steel column in the present invention;

[0048] Figure 3 It is a schematic diagram of the vertical segmentation of the tall steel column structure in the present invention;

[0049] Figure 4 for Figure 2 Structural diagram of the middle A direction;

[0050] Figure 5 It is a schematic diagram of the second column section being hoisted in the present invention;

[0051] Figure 6 for Figure 5 Schematic diagram of the structure in the middle BB direction;

[0052] Figure 7 It is a schematic diagram of the spatial structure of the lifting device in the present invention;

[0053] Figure 8 It is a structural schematic diagram of the lifting beam in the present invention;

[0054] Fig. 9 for Figure 8 Schematic diagram of the structure in the UU direction;

[0055] Fig.10 It is a structural schematic diagram of the door beam in the present invention;

[0056] Fig.11 for Fig.10Schematic diagram of the structure in the CC direction;

[0057] Fig.12 for Fig.10 Schematic diagram of the structure in the EE direction;

[0058] Fig.13 It is a structural schematic diagram of the door post in the present invention;

[0059] Fig.14 for Fig.13 Schematic diagram of the structure in the FF direction;

[0060] Fig.15 for Fig.13 Schematic diagram of the structure in the GG direction;

[0061] Fig.16 It is a structural schematic diagram of the balance column in the present invention;

[0062] Fig.17 for Fig.16 Schematic diagram of the structure in the HH direction;

[0063] Fig.18 for Fig.17 Schematic diagram of the structure in the II direction;

[0064] Fig.19 for Figure 5 Schematic diagram of the structure in the middle JJ direction;

[0065] Fig. 20 It is a structural schematic diagram of the lifting lever in the present invention;

[0066] Fig.21 for Fig. 20 Schematic diagram of the structure in the middle TT direction;

[0067] Fig. 22 for Figure 5 Structural diagram of the middle KK direction;

[0068] Fig.23 It is a structural schematic diagram of the bottom beam of the center column of the present invention;

[0069] Fig.24 for Fig.23 Schematic diagram of the structure in the RR direction;

[0070] Fig.25 for Fig.23 Schematic diagram of the structure in the SS direction;

[0071] Fig.26 It is a structural schematic diagram of the lifting device of the present invention before lifting;

[0072] Fig. 27It is a schematic diagram of the temporary stable structure of the lifting device in the present invention during lifting;

[0073] Fig.28 It is a structural schematic diagram of the lifting device of the present invention after it has been lifted and formally fixed;

[0074] Fig.29 It is a structural schematic diagram of the third column section when hoisting in the present invention;

[0075] Fig.30 for Fig. 27 The schematic diagram of the structure after enlarging at L in the middle;

[0076] Fig.31 for Fig.30 Schematic diagram of the structure in the MM direction;

[0077] Fig.32 is a schematic structural diagram of the first stabilizing beam in the present invention;

[0078] Fig.33 for Fig.32 Schematic diagram of the structure in the NN direction;

[0079] Fig.34 is a schematic structural diagram of the second stabilizing beam in the present invention;

[0080] Fig.35 for Fig.34 Schematic diagram of the structure in the PP direction;

[0081] Fig.36 is a schematic structural diagram of the third stabilizing beam in the present invention;

[0082] Fig.37 for Fig.36 Structural diagram of the middle QQ direction;

[0083] Among them: 1, tall steel column; 1-2-1, steel plate part a; 1-2-2, steel plate part b; 1-2-3, steel plate part c; 1-2-4, steel plate part d; 1-3-1, longitudinal weld; 1-3-2, transverse weld;

[0084] 2. Lifting device;

[0085] 2-1, door beam; 2-1-1, door beam main rod; 2-1-2, door beam end support plate; 2-1-3, door beam ear plate;

[0086] 2-2, door post; 2-2-1, door post main rod; 2-2-2, door post stabilizing block; 2-2-3, door post corbel; 2-2-4, door post corbel joint plate; 2-2-5, door post top connecting plate; 2-2-6, door post roller; 2-2-7, door post lifting ear plate; 2-2-8, door post bottom connecting plate;

[0087] 2-3, balance column; 2-3-1, balance column main rod; 2-3-2, balance column stabilizing block; 2-3-3, balance column corbel; 2-3-4, balance column corbel joint plate; 2-3-5, balance column top connecting plate; 2-3-6, balance column roller; 2-3-7, balance column lifting ear plate; 2-3-8, balance column top ear plate; 2-3-9, balance column bottom connecting plate;

[0088] 2-4, lifting beam; 2-4-1, main rod of lifting beam; 2-4-2, lifting lug of lifting beam; 2-4-3, balancing lug of lifting beam;

[0089] 2-5, lifting hoist;

[0090] 3. Frame chassis; 3-1. First chassis rod; 3-2. Second chassis rod; 3-2-1. Chassis ear plate; 3-2-2. Chassis roller;

[0091] 4. Stabilizing device; 4-1. First stabilizing beam; 4-1-1. Main rod of first stabilizing beam; 4-2. Second stabilizing beam; 4-2-1. Main rod of second stabilizing beam; 4-2-2. Node plate of stabilizing beam; 4-3. Third stabilizing beam; 4-3-1. Main rod of third stabilizing beam; 4-4. Insertion hole of stabilizing pin; 4-5. Stabilizing pin;

[0092] 5. Column bottom beam; 5-1. Column bottom beam top connection hole; 5-2. Column bottom beam bottom connection hole;

[0093] 6. Lifting pole; 6-1. Main pole of pole; 6-2. Ear plate of pole; 6-3. Bottom plate of pole; 6-4. Lifting hoist;

[0094] 7. Fixed base; 7-1. Lifting base; 7-2. Lifting rod base. DETAILED DESCRIPTION

[0095] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0096] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only embodiments of a part of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0097] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions.

[0098] like Figures 1 to 37 As shown, a method for constructing a tall steel column according to the present invention comprises the following steps:

[0099] S1. Divide the tall steel column 1 into several column sections vertically, and mark them from bottom to top as: the first column section, the second column section, the third column section, ..., the Nth column section; install them in sections, and control the lifting weight of each column section within a preset specified range, so that it is feasible to set up a lightweight lifting device 2.

[0100] The towering steel column 1 is composed of four steel plate parts, namely steel plate part a1-2-1, steel plate part b1-2-2, steel plate part c1-2-3, and steel plate part d1-2-4, and the steel plate parts are welded and connected by four longitudinal welds 1-3-1.

[0101] The height of the first column section at the bottom is Hz1, the height of the Nth column section at the top is Hzn, and the height of the remaining intermediate column sections is Hz2. The column sections are welded together by transverse welds 1-3-2.

[0102] S2. Except for the Nth column section at the top, a fixed base 7 for fixing the lifting device 2 and the lifting lever 6 is set on each other column section. The fixed base 7 includes a lifting base 7-1 and a lever base 7-2. The lifting base 7-1 is distributed on three adjacent outer walls outside the column section, and the lever base 7-2 is distributed on the inner wall of the column section. This application preferably uses 6 lifting bases 7-1 and 4 lever bases 7-2. On the three adjacent outer walls outside the column section, 2 lifting bases 7-1 are set on each outer wall, and 4 lever bases 7-2 are symmetrically arranged on the inner wall of the column section; by placing a lightweight lifting lever 6 on the top of the towering steel column 1 that has been installed and constructed, the lifting lever 6 is light in weight and can be installed and removed manually without the need for additional large tools, thereby ensuring the feasibility of the lifting operation of the lifting device 2. The door column 2-2 is connected to the column bottom beam top connecting hole 5-1 of the column bottom beam 5 through the door column bottom connecting plate 2-2-8 by bolts, the balance column 2-3 is connected to the column bottom beam top connecting hole 5-1 of the column bottom beam 5 through the balance column bottom connecting plate 2-3-9 by bolts, and the column bottom beam bottom connecting hole 5-2 at the bottom of the column bottom beam 5 is connected to the lifting base 7-1 arranged on each column section by bolts.

[0103] The lifting device 2 includes a door beam 2-1, two door posts 2-2, a balance column 2-3, a lifting beam 2-4 and a lifting hoist 2-5. The door beam 2-1 is installed between the tops of the two door posts 2-2 and fixedly connected by bolts. The lifting beam 2-4 is suspended below the door beam 2-1. The door beam 2-1 is connected to the lifting beam 2-4 through a pin shaft. The balance column 2-3 is connected to the lifting beam 2-4 through a pin shaft. The lifting hoist 2-5 is moved and placed on the lifting beam 2-4.

[0104] The door post 2-2 includes a door post top connecting plate 2-2-5, a door post main rod 2-2-1, a door post stabilizing block 2-2-2, a door post corbel 2-2-3, a door post corbel joint plate 2-2-4, a door post lifting ear plate 2-2-7, a door post roller 2-2-6 and a door post bottom connecting plate 2-2-8. The door post top connecting plate 2-2-5 and the door post bottom connecting plate 2-2-8 are arranged at the top and bottom ends of the door post main rod 2-2-1, the door post stabilizing block 2-2-2, the door post corbel 2-2-3, the door post lifting ear plate 2-2-7 and the door post roller 2-2-6 are all arranged on the side of the door post main rod 2-2-1, and the door post corbel joint plate 2-2-4 is arranged at both ends of the door post corbel 2-2-3.

[0105] The door beam 2-1 includes a door beam main rod 2-1-1, a door beam end support plate 2-1-2 and a door beam ear plate 2-1-3. The door beam end support plate 2-1-2 is arranged at the bottom of both ends of the door beam main rod 2-1-1. The door beam end support plate 2-1-2 is connected to the door column top connection plate 2-2-5 by bolts. The door beam ear plate 2-1-3 is arranged at the bottom center of the door beam main rod 2-1-1.

[0106] The lifting beam 2-4 includes a lifting beam main rod 2-4-1, a lifting beam lifting ear plate 2-4-2 and a lifting beam balancing ear plate 2-4-3. The lifting beam main rod 2-4-1 is made of H-shaped steel or I-shaped steel. The lifting beam lifting ear plate 2-4-2 and the lifting beam balancing ear plate 2-4-3 are respectively arranged on the top surface and the bottom surface of the lifting beam main rod 2-4-1. The lifting beam lifting ear plate 2-4-2 is connected to the door beam ear plate 2-1-3 through a pin shaft.

[0107] The balancing column 2-3 includes a balancing column top ear plate 2-3-8, a balancing column top connecting plate 2-3-5, a balancing column main rod 2-3-1, a balancing column stabilizing block 2-3-2, a balancing column corbel 2-3-3, a balancing column corbel joint plate 2-3-4, a balancing column roller 2-3-6, a balancing column lifting ear plate 2-3-7 and a balancing column bottom connecting plate 2-3-9. The balancing column top ear plate 2-3-8 is connected to the balancing column main rod 2-3-1 through the balancing column top connecting plate 2-3-5. The top of the balance column 3-1, the balance column top ear plate 2-3-8 is connected to the lifting beam balance ear plate 2-4-3 through a pin shaft, the balance column bottom connecting plate 2-3-9 is connected to the bottom end of the balance column main rod 2-3-1, the balance column stabilizing block 2-3-2, the balance column corbel 2-3-3, the balance column roller 2-3-6 and the balance column lifting ear plate 2-3-7 are all arranged on the side of the balance column 2-3, and the balance column corbel joint plates 2-3-4 are arranged at both ends of the balance column corbel 2-3-3.

[0108] The lifting lever 6 includes a lever main member 6-1, a lever ear plate 6-2 and a lever bottom plate 6-3. The lever ear plate 6-2 is arranged on one side of the lever main member 6-1, and the lever bottom plate 6-3 is arranged at the bottom of the lever main member 6-1. The lifting lever 6 is connected to the lever base 7-2 by bolts through the lever bottom plate 6-3.

[0109] The lifting device 2 is fixed to the lifting base 7-1 of each column section by bolts through the column bottom beam 5, so that the lifting device 2 can ensure that the door column 2-2 and the balance column 2-3 are not affected by the lifting base 7-1 during the lifting process. If there is no column bottom beam 5, the door column 2-2 and the balance column 2-3 will be located in the same vertical line with the lifting base 7-1, causing the lifting base 7-1 of the previous column section to limit the vertical movement of the lifting device 2, making it impossible to achieve lifting.

[0110] S3, the first column section is installed on the ground foundation using a temporary machine, and the other column sections are hoisted into place using a hoisting device 2;

[0111] S4, install the lifting device 2, install the lifting device 2 on the lifting base 7-1 of the first column section, complete the installation of the second column section and weld and fix it to the first column section through the transverse weld 1-3-2;

[0112] When installing the lifting device:

[0113] 1) First, install the column bottom beam 5 on the lifting base 7-1 of the first column section 1-1-1;

[0114] 2) Install the door post 2-2 and the balance post 2-3 along the top of the column bottom beam 5;

[0115] 3) Install the first chassis rod 3-1 and the second chassis rod 3-2;

[0116] 4) Then install the door beam 2-1 between the tops of the two door posts 2-2;

[0117] 5) Finally, install the lifting beam 2-4 along the bottom of the door beam 2-1 and the top of the balance column 2-3;

[0118] 6) Install the lifting hoist 2-5 on the lifting beam 2-4.

[0119] S5, move the hoisting hoist 2-5 to the set position specified before the lifting device 2 is lifted, fix the lifting lever 6 on the lever base 7-2 on the top of the second column section 1-1-2, fix the lever bottom plate 6-3 on each lifting lever 6 to the corresponding lever base 7-2 by bolts, and bolt the lifting hoist 6-4 on each lever ear plate 6-2, and connect and tension the lifting hoist 6-4 with the door column lifting ear plate 2-2-7 set on the door column 2-2, the balance column lifting ear plate 2-3-7 set on the balance column 2-3, and the chassis ear plate 3-2-1 set on the frame chassis 3 respectively;

[0120] The frame chassis 3 includes a first chassis rod 3-1 and a second chassis rod 3-2. The door post bracket 2-2-3 is connected to the balance column bracket through the first chassis rod 3-1. The two door post brackets 2-2-3 are connected through the second chassis rod 3-2. The frame chassis 3 is provided with a chassis roller 3-2-2. The door post bracket 2-2-3, the balance column bracket 2-3-3, the first chassis rod 3-1 and the second chassis rod 3-2 together form the frame chassis 3, ensuring that the lifting device 2 maintains good overall performance during the use of the lifting column section and during the lifting process of the lifting device 2. The frame chassis 3 is firm and stable, avoiding the problem of structural deformation of the lifting device 2 and the integrity of the lifting device 2 being destroyed during the use and operation of the lifting device 2 or during the lifting process, ensuring the safety of the lifting device 2 during lifting and hoisting, and also facilitating the balance control of the lifting device 2 during lifting. The door post roller 2-2-6 works together with the balance column roller 2-3-6 and the chassis roller 3-2-2 to ensure that the lifting device 2 rolls up along the outer wall of the installed tall steel column 1 under the action of the lifting hoist 6-4, effectively reducing the friction between the lifting device 2 and the outer wall of the tall steel column 1 during lifting. The lifting device 2 rolls up along the outer wall of the tall steel column 1 to avoid damage to the anti-corrosion coating of the outer wall of the tall steel column 1 caused by sliding friction between the lifting device 2 and the outer wall of the tall steel column 1.

[0121] S6, remove the fixing bolts between the lifting device 2 and the column bottom beam 5, operate the lifting hoist 6-4, make the lifting device 2 rise to the predetermined elevation along the outer wall of the installed tall steel column 1 through the door column rollers 2-2-6, the balance column rollers 2-3-6, and the chassis rollers 3-2-2, and stop lifting;

[0122] S7. After the lifting stops, the stabilizing device 4 is installed on the top surface of the towering steel column 1 that has been installed, and the first stabilizing beam 4-1 and the second stabilizing beam 4-2 in the stabilizing device 4 are connected to the door column stabilizing block 2-2-2 set on the door column 2-2 through the stabilizing pin 4-5, and one end of the third stabilizing beam 4-3 in the stabilizing device 4 is connected to the balancing column stabilizing block 2-3-2 on the balancing column 2-3 through the stabilizing pin 4-5, and the other end of the third stabilizing beam 4-3 is connected to the stabilizing beam node plate 4-2-2 on the second stabilizing beam 4-2 through the stabilizing pin 4-5, and the lifting hoist 6-4 is operated to make the lifting device 2 stably land on the top surface of the towering steel column 1 that has been installed; after the lifting device 2 is lifted to the preset elevation, the first stabilizing beam 4-1, the second stabilizing beam 4-2, and the third stabilizing beam 4-3 are first used to temporarily stabilize the lifting device 2, so as to further ensure that the lifting device 2 is in a safe state, avoid the deficiency of relying solely on the lifting hoist 6-4 for stability, and eliminate the safety hazards of installing and fixing the column bottom beam 5.

[0123] The first stabilizing beam 4-1 includes a first stabilizing beam main rod 4-1-1, and both ends of the first stabilizing beam main rod 4-1-1 are provided with stabilizing pin insertion holes 4-4. The first stabilizing beam 4-1 is placed on the top surface of the completed towering steel column 1, and the door column 2-2 is fixed to the first stabilizing beam 4-1 through a door column stabilizing block 2-2-2 arranged thereon and a stabilizing pin 4-5.

[0124] The second stabilizing beam 4-2 includes a second stabilizing beam main rod 4-2-1, and both ends of the second stabilizing beam main rod 4-2-1 are provided with stabilizing pin insertion holes 4-4. The second stabilizing beam 4-2 is placed on the top surface of the completed towering steel column 1, and the door column 2-2 is fixed to the second stabilizing beam 4-2 through the door column stabilizing block 2-2-2 arranged thereon by the stabilizing pin 4-5. A stabilizing beam node plate 4-2-2 is arranged in the middle of the second stabilizing beam 4-2, and the stabilizing beam node plate 4-2-2 is connected to the third stabilizing beam 4-3 through the stabilizing pin 4-5.

[0125] The third stabilizing beam 4-3 includes a third stabilizing beam main rod 4-3-1, and both ends of the third stabilizing beam main rod 4-3-1 are provided with stabilizing pin insertion holes 4-4. One end of the third stabilizing beam 4-3 is connected to the balancing column stabilizing block 2-3-2 on the balancing column 2-3 through a stabilizing pin 4-5, and the other end is fixed to the stabilizing beam node plate 4-2-2 on the second stabilizing beam 4-2 through a stabilizing pin 4-5.

[0126] S8, installing the column bottom beam 5 on the lifting base 7-1 on the second column section 1-1-2, and connecting the column bottom beam 5 to the lifting base 7-1 through bolts;

[0127] S9, operate the lifting hoist 6-4 to lift the lifting device 2 again, and control the lifting distance within 5mm to ensure that the first stabilizing beam 4-1, the second stabilizing beam 4-2 and the third stabilizing beam 4-3 are removed without obstacles, remove the stabilizing device 4, and operate the lifting hoist 6-4 again to lower the lifting device 2 until the lifting device 2 is lowered to the top surface of the door post bottom connecting plate 2-2-8, the balance column bottom connecting plate 2-3-9 to the column bottom beam 5, and connect the door post bottom connecting plate 2-2-8 and the balance column bottom connecting plate 2-3-9 to the column bottom beam 5 by bolts;

[0128] S10, remove the lifting rod 6, hoist the third column section, and complete the installation of each column section in a cycle according to the above steps;

[0129] S11. After the Nth column section at the top is installed, the lifting device 2 is removed by setting up temporary equipment on the top of the towering steel column 1.

[0130] The method for constructing the tall steel column 1 has simple steps. In mountainous environmental conditions, it is impossible to ensure that large-scale lifting and hoisting machinery can enter the construction site, or when the site environment allows large-scale lifting and hoisting machinery to enter the construction site but the lifting height of the lifting machinery cannot be met, the construction of the tall steel column 1 is implemented. By installing a lifting rod 6 on the top of the already installed tall steel column 1, it is ensured that the lifting device 2 can be lifted to the set elevation and fixed, and then the installation of the column section of the tall steel column 1 to be installed is completed. The steel column is divided into several column sections for processing in advance, and then a lightweight lifting device is set to install each column section, and finally the construction of the tall steel column is realized, thereby improving the economy.

[0131] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to achieve basically the same technical effects are all included in the protection scope of the present invention.

Claims

1. A method for constructing a tall steel column, characterized in that The steps include: S1. Divide the tall steel column into several sections vertically. Label them from bottom to top as: first section, second section, third section, ..., Nth section. S2. Except for the Nth column section at the top, each column section is provided with a fixed base for fixing the lifting device and the lifting rod. The fixed base includes a lifting base and a lifting rod base. The lifting base is distributed on three adjacent outer walls of the column section, and the lifting rod base is distributed on the inner wall of the column section. The lifting device includes a door beam, a door post, a balancing post, a lifting beam and a lifting hoist. The door beam is installed between the tops of the two door posts and is fixedly connected by bolts. The lifting beam is suspended below the door beam. The balancing post is connected to the lifting beam through a pin shaft. The lifting hoist is moved and placed on the lifting beam. The door post includes a door post top connecting plate, a door post main rod, a door post stabilizing block, a door post corbel, a door post corbel joint plate, a door post lifting ear plate, a door post roller and a door post bottom connecting plate. The door post main rod is provided with a plate and the door post bottom connecting plate, the door post stabilizing block, the door post corbel, the door post lifting ear plate and the door post roller are all provided on the side of the door post main rod, and the door post corbel joint plate is provided at both ends of the door post corbel; the door beam includes a door beam main rod, a door beam end support plate and a door beam ear plate, the door beam end support plate is provided at the bottom of both ends of the door beam main rod, the door beam end support plate is connected to the door post top connecting plate by bolts, and the door beam ear plate is provided at the door The bottom center of the main rod of the beam; the lifting beam includes a lifting beam main rod, a lifting beam lifting ear plate and a lifting beam balancing ear plate, the lifting beam main rod adopts H-shaped steel or I-shaped steel, the lifting beam lifting ear plate and the lifting beam balancing ear plate are respectively arranged on the top surface and bottom surface of the lifting beam main rod, and the lifting beam lifting ear plate is connected to the door beam ear plate through a pin shaft; the balancing column includes a balancing column top ear plate, a balancing column top connecting plate, a balancing column main rod, a balancing column stabilizing block, a balancing column corbel, a balancing column corbel joint plate, a flat The balancing column roller, the balancing column lifting lug plate and the balancing column bottom connecting plate, the balancing column top lug plate is connected to the top end of the balancing column main rod through the balancing column top connecting plate, the balancing column top lug plate is connected to the lifting beam balancing lug plate through a pin shaft, the balancing column bottom connecting plate is connected to the bottom end of the balancing column main rod, the balancing column stabilizing block, the balancing column corbel, the balancing column roller and the balancing column lifting lug plate are all arranged on the side of the balancing column, and the balancing column corbel joint plates are arranged at both ends of the balancing column corbel; The lifting grab bar includes a grab bar main rod, a grab bar ear plate and a grab bar bottom plate, the grab bar ear plate is arranged on one side of the grab bar main rod, the grab bar bottom plate is arranged at the bottom of the grab bar main rod, the lifting grab bar is connected to the grab bar base by bolts through the grab bar bottom plate; the frame chassis includes a first chassis rod and a second chassis rod, the door post corbel is connected to the balance column corbel through the first chassis rod, and the two door post corbels are connected through the second chassis rod, and the frame chassis is provided with a chassis roller; S3. Install the first column section on the ground foundation using temporary equipment, and hoist the other column sections into place using a lifting device; S4. Install the lifting device, install the lifting device on the lifting base of the first column section, complete the installation of the second column section and weld it to the first column section through a transverse weld; S5. Move the hoist to the set position specified before the lifting device is lifted. Fix the lifting lever on the lever base at the top of the second column section. Fix the lever base plate on each lifting lever to the corresponding lever base with bolts. Bolt the lifting hoist on each lever lug. Connect the lifting hoist to the door post lifting lug plate on the door post, the balance column lifting lug plate on the balance column, and the chassis lug plate on the frame chassis, and tighten them. S6. Remove the fixing bolts between the lifting device and the column bottom beam, operate the hoist, and raise the lifting device along the outer wall of the installed tall steel column to the predetermined elevation, then stop lifting. S7. After the lifting stops, install a stabilizing device on the top surface of the already installed tall steel column, connect the first and second stabilizing beams in the stabilizing device to the door column stabilizing block provided on the door column via stabilizing pins, connect one end of the third stabilizing beam in the stabilizing device to the balancing column stabilizing block on the balancing column via stabilizing pins, and connect the other end of the third stabilizing beam to the stabilizing beam gusset plate on the second stabilizing beam via stabilizing pins. Operate the hoist to stably land the lifting device on the top surface of the already installed tall steel column. S8. Install the column bottom beam on the lifting base on the second column section, and connect the column bottom beam to the lifting base with bolts; S9. Operate the hoist to raise the lifting device again, controlling the lifting distance within 5 mm to ensure that the first stabilizing beam, the second stabilizing beam, and the third stabilizing beam can be removed without obstruction. Remove the stabilizing device and operate the hoist again to lower the lifting device until it reaches the top surface of the door post bottom connecting plate and the balance column bottom connecting plate to the column bottom beam. Connect the door post bottom connecting plate and the balance column bottom connecting plate to the column bottom beam with bolts. S10, remove the lifting rod, hoist the third column section, and repeat the above steps to complete the installation of each column section; S11. After the Nth column section at the top is installed, the lifting device is removed by setting up temporary equipment on the top of the towering steel column.

2. A method for constructing a tall steel column according to claim 1, characterized in that: The lifting device is fixed on the lifting base of each column section through the column bottom beam by bolts.

3. The method for constructing a tall steel column according to claim 1, characterized in that: When installing the lifting device in step S4: 1) First, install the column bottom beam on the lifting base of the first column section; 2) Install the door posts and balancing posts along the top of the column base beam; 3) Install the first chassis member and the second chassis member; 4) Then install the door beam between the tops of the two door posts; 5) Finally, install the lifting beam along the bottom of the door beam and the top of the balance column; 6) Install the hoist on the lifting beam.

Citation Information

Patent Citations

  • Leaning tower self-stabilization upside-down mounting assembling apparatus and method thereof

    CN101429827A

  • Clamp, self-propelled climbing device and method for connecting clamp and tubular piece

    CN101614083A

  • Method for two-way hoisting construction of converter tower steel structure

    CN101899904A

  • Steel beam mounting equipment

    CN103291078A

  • Temporary lifting construction method for construction site

    CN105565155A