Metal matrix composite material processing equipment and process
By separating the negative and positive pressures in the vacuum pressure immersion equipment and completing them in a high-temperature furnace and a high-pressure chamber, the problems of high sealing performance and low processing efficiency in the prior art are solved, and higher strength and denseness are achieved Metal-based composite materials processing improves production efficiency and processing volume.
Patent Information
- Application Number
- CN202211546977.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-05
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2042-12-05
AI Technical Summary
Existing vacuum pressure immersion equipment has high requirements for equipment sealing performance in high temperature environments, resulting in high cost and low processing efficiency and limited one-time processing volume.
Separate the negative and positive pressures in the process, and complete them in the high-temperature furnace and the high-pressure chamber respectively. Use the high-temperature furnace to provide a high-temperature negative pressure environment and the high-pressure chamber to provide a high-positive pressure environment. The prefabricated matrix is transported between the two through the carrier assembly. , reduce the equipment's requirements for negative and positive pressure, and improve equipment space and processing efficiency.
Matrix processing with higher strength and stronger density is achieved, reducing equipment costs and space restrictions, and significantly improving production efficiency.
Smart Images

Figure CN116219340B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of metal impregnation, and in particular to a metal-based composite material processing device and process. Background Art
[0002] Vacuum pressure impregnation uses vacuum negative pressure to extract the air in the fluffy substrate, and then immerses the impregnation liquid into the fluffy substrate under high positive pressure conditions to make the substrate stronger. The key point of this process is the control of vacuum pressure and positive pressure.
[0003] Vacuum pressure impregnation equipment in the prior art is as follows Figure 1 As shown, after the preform 301 and the crucible 201 are placed in the impregnation furnace 300 and the melting furnace 200 respectively, the impregnation furnace 300 is evacuated by the vacuum pump 400, and then the melting furnace 200 and the impregnation furnace 300 are heated to melt the metal in the crucible 201 in the melting furnace 200, and then the melting furnace 200 is pressurized by the cylinder 100 so that the molten metal in the melting furnace 200 enters the impregnation furnace 300. After the molten metal enters the impregnation furnace 300, the continuous pressurization process of the cylinder 100 applies positive pressure to the impregnation furnace 300 to complete the impregnation;
[0004] The disadvantage of the prior art is that negative pressure and positive pressure are applied in the same impregnation furnace, accompanied by high temperature in the impregnation furnace, which places very high requirements on the impregnation furnace itself and the sealing performance of various parts of the equipment, making the cost very high. At the same time, due to the high requirements on the equipment, the equipment space is usually not too large, resulting in a small one-time processing volume. The equipment in the prior art can process a maximum of 20 kilograms of preforms at a time, and the processing efficiency is low. Summary of the invention
[0005] In order to solve the problems existing in the prior art, the present invention provides a metal-based composite material processing equipment and process. The metal-based composite material processing equipment and process separate the negative pressure and positive pressure in the process and complete them in a high-temperature furnace and a high-pressure chamber respectively, which greatly reduces the requirements for the equipment itself, has lower costs, and has a greater increase in the upper limits of negative and positive pressures. It is capable of processing a matrix with higher strength and higher density, and the equipment space can be designed to be larger, so a large number of prefabricated matrixes can be processed at one time, and production efficiency is significantly improved.
[0006] To achieve the above object, the present invention adopts the following technical solution:
[0007] In one aspect, the present invention provides a metal matrix composite material processing device, comprising:
[0008] A high temperature furnace, which is used to provide a high temperature negative pressure impregnation environment for the prefabricated substrate;
[0009] A high pressure chamber, which is used to provide a normal temperature and high positive pressure impregnation environment for the prefabricated substrate;
[0010] A loading assembly includes a containing bucket and a lifting basket with a volume smaller than the containing bucket, and the loading assembly is used to carry the prefabricated matrix for transfer between the high-temperature furnace and the high-pressure chamber.
[0011] The metal-based composite material processing equipment of the present invention places a prefabricated substrate in a loading assembly, and the loading assembly is loaded with the prefabricated substrate to complete the removal of air from the prefabricated substrate and the immersion of the prefabricated substrate in a high-temperature furnace, so that the impregnation liquid is impregnated in the interior of the prefabricated substrate. The loading assembly is taken out of the high-temperature furnace as a whole and placed in a high-pressure chamber. During this process, the prefabricated substrate is always in the impregnation liquid and will not contact the outside air. A high positive pressure is applied in the high-pressure chamber to complete the further impregnation of the prefabricated substrate.
[0012] In the above process, since the high-temperature furnace only bears negative pressure and the high-pressure chamber only bears positive pressure, the requirements for equipment are lower, the upper limits of negative and positive pressures are higher, and the effect is better. Therefore, the internal space of the equipment can also be increased, which greatly increases the processing volume and improves processing efficiency.
[0013] In a further technical solution, the high temperature furnace comprises a heating furnace body and a furnace cover, the furnace cover is provided with a liquid inlet hopper, the liquid inlet hopper is provided with a liquid inlet channel, and a solid immersion block made of the same material as the immersion liquid is provided above the liquid inlet channel;
[0014] A heating component is arranged in the heating furnace body;
[0015] The high temperature furnace is provided with an exhaust pipeline.
[0016] The vacuum negative pressure can be sucked by using the exhaust pipe, and the heating furnace body can be heated by using the heating component. The liquid inlet hopper, liquid inlet channel and immersion block are arranged so that before the prefabricated substrate is completely submerged in the immersion liquid, no air will enter the interior of the heating furnace body from the liquid inlet channel, thereby ensuring that the prefabricated substrate is submerged in the immersion liquid in a vacuum environment. The processed prefabricated substrate has a higher density, an air-free internal structure, is more stable and has a higher strength.
[0017] In a further technical solution, the high-pressure chamber includes an inverted cover body and a sealing base, and a gas injection pipeline is arranged on the high-pressure chamber.
[0018] The inverted cover body and the sealing base can provide a stable sealing environment, which is convenient for gas injection and pressurization.
[0019] In a further technical solution, the gas injection pipeline is opened in the sealing base.
[0020] Since the inverted cover needs to be moved during the transfer of the loading assembly, while the sealing base remains stationary, the gas injection pipeline is opened in the sealing base, which has a certain protective effect on the gas injection pipeline and the equipment.
[0021] In a further technical solution, the inverted cover, the containing bucket, the lifting basket and the furnace cover are all provided with lifting ears.
[0022] In the process of the prefabricated substrate entering and exiting the high-temperature furnace and the high-pressure chamber, it is necessary to move the inverted cover, the containing bucket, the lifting basket and the furnace cover, and lifting ears are respectively provided on them to facilitate their lifting and movement.
[0023] In a further technical solution, the loading assembly further includes a holding basket, and the holding basket matches the size of a single prefabricated matrix.
[0024] When processing multiple prefabricated substrates in the same batch, use a containing mesh basket to load the prefabricated substrates, and stack multiple containing mesh baskets in the pulling mesh basket. The containing mesh basket can separate the prefabricated substrates to prevent their surfaces from sticking to each other and affecting the impregnation effect.
[0025] On the other hand, the present invention also provides a metal matrix composite material processing process, using the metal matrix composite material processing equipment described in any of the above technical solutions, comprising the following steps:
[0026] The prefabricated substrate is sequentially placed in a lifting net basket and a containing bucket, and the containing bucket is placed in a high-temperature furnace to heat the high-temperature furnace;
[0027] Pump negative pressure into the high temperature furnace;
[0028] After the vacuum degree of the high temperature furnace reaches the standard, the impregnation liquid is added into the high temperature furnace, and the impregnation liquid enters the containing barrel to submerge the prefabricated substrate;
[0029] After the negative pressure impregnation is completed, the container is moved to the high pressure chamber;
[0030] Inject gas into the high pressure chamber to form a high positive pressure, which is maintained for a certain period of time;
[0031] The high pressure chamber is depressurized and opened, and the containing bucket and the lifting net basket are taken out in sequence. At this time, the prefabricated matrix in the lifting net basket is impregnated.
[0032] The metal-based composite material processing equipment and process of the present invention separate the negative pressure and positive pressure in the process and complete them in a high-temperature furnace and a high-pressure chamber respectively, thereby greatly reducing the requirements for the equipment itself, lowering the cost, and greatly improving the upper limits of negative and positive pressures. It is capable of processing a matrix with higher strength and greater density, and the equipment space can be designed to be larger, so a large number of prefabricated matrixes can be processed at one time, and production efficiency is significantly improved.
[0033] In a further technical solution, before the negative pressure is pumped into the high-temperature furnace, the liquid inlet channel is blocked by a liquid immersion block;
[0034] When adding the impregnation liquid, the impregnation liquid is injected into the liquid inlet hopper whose liquid inlet channel is blocked by the impregnation block;
[0035] After the impregnation liquid melts the impregnation block, the impregnation liquid enters the high-temperature furnace.
[0036] The setting of the immersion block ensures that air will not enter the high-temperature furnace before the immersion liquid completely enters the high-temperature furnace, that is, only after the immersion liquid completely submerges the prefabricated substrate can air enter the high-temperature furnace from the liquid inlet channel to destroy the negative pressure in the high-temperature furnace. During the whole process, the prefabricated substrate will not contact the air.
[0037] In a further technical solution, in the above steps, the operations on the furnace cover, the containing barrel, the lifting basket and the high-pressure chamber are all carried out by lifting using the lifting ears thereon.
[0038] The use of hoisting mobile furnace cover, storage barrel, lifting basket and high-pressure chamber provides higher safety.
[0039] In a further technical solution, the positive pressure in the high pressure chamber is 20 MPa.
[0040] The positive pressure of 20Mpa can press the impregnating liquid and the prefabricated matrix more tightly, further improving the density, structural stability and strength of the composite material.
[0041] The beneficial effects are:
[0042] 1. The metal-based composite material processing equipment and process of the present invention separates the negative pressure and positive pressure in the process and completes them in a high-temperature furnace and a high-pressure chamber respectively, which greatly reduces the requirements for the equipment itself, has lower costs, and has a greater upper limit on negative and positive pressures. It can process a matrix with higher strength and higher density, and the equipment space can be designed to be larger, so a large number of prefabricated matrixes can be processed at one time, and the production efficiency is significantly improved.
[0043] 2. The vacuum negative pressure can be sucked by the exhaust pipe, and the heating component can be used to heat the heating furnace body 0. The arrangement of the liquid inlet hopper, the liquid inlet channel and the immersion block ensures that before the prefabricated substrate is completely submerged in the immersion liquid, no air will enter the interior of the heating furnace body from the liquid inlet channel, thereby ensuring that the prefabricated substrate is submerged in the immersion liquid in a vacuum environment. The processed prefabricated substrate has a higher density, an air-free internal structure, is more stable and has a higher strength.
[0044] 3. The inverted cover and sealing base can provide a stable sealing environment, which is convenient for gas injection and pressurization.
[0045] 54. Since the inverted cover needs to be moved during the transfer of the loading assembly, while the sealing base remains stationary, opening the gas injection pipeline in the sealing base has a certain protective effect on the gas injection pipeline and equipment.
[0046] 5. In the process of the prefabricated substrate entering and exiting the high-temperature furnace and the high-pressure chamber, it is necessary to move the inverted cover, the containing bucket, the lifting basket and the furnace cover, and lifting ears are set on them to facilitate their lifting and movement, which is safer.
[0047] 06. When processing multiple prefabricated substrates in the same batch, use a containing mesh basket to load the prefabricated substrates, and stack multiple containing mesh baskets in the lifting mesh basket. The containing mesh basket can separate the prefabricated substrates to avoid the surfaces of each other from sticking to each other and affecting the impregnation effect.
[0048] 7. The positive pressure of 20Mpa can press the impregnating liquid and the prefabricated matrix more tightly, further improving the density, structural stability and strength of the composite material. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 It is a schematic diagram of equipment for vacuum pressure impregnation process in the prior art;
[0050] Figure 2 It is a schematic diagram of the internal structure of a high-temperature furnace of a metal matrix composite material processing device and process according to an embodiment of the present invention;
[0051] Figure 3 It is a schematic diagram of a partially enlarged structure of a liquid inlet hopper in a high-temperature furnace of a metal matrix composite material processing equipment and process according to an embodiment of the present invention;
[0052] Figure 4 It is a schematic diagram of the internal structure of a high-pressure chamber of a metal matrix composite material processing device and process according to an embodiment of the present invention.
[0053] Figure 1 Reference numerals:
[0054] 100, cylinder; 200, melting furnace; 201, crucible; 300, impregnation furnace; 301, preform; 400, vacuum pump.
[0055] Figure 2-Figure 4 Reference numerals:
[0056] 10. High-temperature furnace; 11. Heating furnace body; 111. Heating wire; 112. Exhaust pipe; 12. Furnace cover; 121. Liquid inlet bucket; 122. Liquid inlet channel; 123. Immersing block; 13. Immersing liquid; 20. Loading assembly; 21. Holding bucket; 22. Lifting basket; 23. Holding basket; 30. Prefabricated base; 40. High-pressure chamber; 41. Inverted cover; 411. Gas injection pipe; 42. Sealed base. DETAILED DESCRIPTION
[0057] The present invention will be further described below in conjunction with the accompanying drawings:
[0058] Example:
[0059] A metal matrix composite material processing equipment, such as Figure 2 As shown, including:
[0060] A high temperature furnace 10, which is used to provide a high temperature negative pressure impregnation environment for the prefabricated substrate 30;
[0061] like Figure 4 The high pressure chamber 40 shown is used to provide a normal temperature and high positive pressure impregnation environment for the prefabricated substrate 30;
[0062] like Figure 2 and Figure 4 The loading assembly 20 shown includes a holding bucket 21 and a lifting basket 22 whose volume is smaller than the holding bucket 21 . The loading assembly 20 is used to carry the prefabricated matrix 30 for transfer between the high-temperature furnace 10 and the high-pressure chamber 40 .
[0063] The metal-based composite material processing equipment of the present invention places a prefabricated substrate 30 in a loading assembly 20. The loading assembly 20 is loaded with the prefabricated substrate 30 and the air of the prefabricated substrate 30 is removed and the impregnation liquid 13 is immersed in the high-temperature furnace 10, so that the impregnation liquid 13 is immersed in the interior of the prefabricated substrate 30. The loading assembly 20 is taken out of the high-temperature furnace 10 as a whole and placed in a high-pressure chamber 40. During this process, the prefabricated substrate 30 is always in the impregnation liquid 13 and will not contact the outside air. A high positive pressure is applied in the high-pressure chamber 40 to complete the further impregnation of the prefabricated substrate 30.
[0064] In the above process, since the high temperature furnace 10 is only subjected to negative pressure and the high pressure chamber 40 is only subjected to positive pressure, the requirements for equipment are lower, the upper limits of negative pressure and positive pressure are higher, and the effect is better. Therefore, the internal space of the equipment can also be increased, which greatly increases the processing volume and improves the processing efficiency.
[0065] In this embodiment, the immersion liquid 13 is selected according to processing requirements, and aluminum and copper are more commonly used.
[0066] In another embodiment, if Figure 2 As shown, the high temperature furnace 10 includes a heating furnace body 11 and a furnace cover 12, and a liquid inlet hopper 121 is provided on the furnace cover 12. Figure 3 As shown, a liquid inlet channel 122 is provided in the liquid inlet hopper 121, and a solid liquid immersion block 123 made of the same material as the immersion liquid 13 is provided above the liquid inlet channel 122. The material of the liquid immersion block 123 is the same as that of the immersion liquid 13, that is, when the immersion liquid 13 is aluminum, the liquid immersion block 123 is an aluminum block, and when the immersion liquid 13 is copper, the liquid immersion block 123 is a copper block;
[0067] A heating component is arranged in the heating furnace body 11;
[0068] In this embodiment, the heating component is a heating wire 111 embedded in the heating furnace body 11 .
[0069] The high temperature furnace 10 is provided with an exhaust pipe 112 , and the exhaust pipe 112 is connected to the vacuum pump 400 .
[0070] A seal is provided between the furnace cover 12 and the heating furnace body 11 .
[0071] The vacuum pipe 112 can be used to perform vacuum suction to evacuate the air in the prefabricated substrate 30, and the heating assembly can be used to heat the heating furnace body 11. The liquid inlet hopper 121, the liquid inlet channel 122 and the immersion block 123 are set. After the temperature reaches the standard, the immersion liquid 13 is injected into the liquid inlet hopper 121. The immersion liquid 13 will first be blocked by the immersion block 123 and cannot enter the interior of the heating furnace body 11. At this time, the interior of the heating furnace body 11 maintains a negative pressure and no air enters. Subsequently, the high-temperature impregnation liquid 13 melts the impregnation block 123, and the impregnation liquid 13 falls into the containing barrel 21 of the heating furnace body 11. At this time, there is enough impregnation liquid 13 in the liquid inlet hopper 121, so no air will enter the heating furnace body 11 until all the liquid flows out of the liquid inlet hopper 121. Only then will air enter the heating furnace body 11. At this time, the impregnation liquid 13 has completely submerged the prefabricated substrate 30 in the containing barrel 21, and the air in the heating furnace body 11 will not enter the prefabricated substrate 30.
[0072] exist Figure 1 In the process of the prior art shown, the pipeline between the melting furnace 200 and the impregnation furnace 300 has a valve, and the pipeline between the impregnation furnace 300 and the vacuum pump 400 has a valve. Before the molten metal in the melting furnace 200 enters the impregnation furnace 300, it is necessary to stop the vacuum pump 400 to evacuate, then close the valve on the pipeline between the vacuum pump 400 and the impregnation furnace 300, open the valve on the pipeline between the melting furnace 200 and the impregnation furnace 300, and then apply positive pressure. When the molten metal in the melting furnace 200 enters the impregnation furnace 300, the residual air in the pipeline between the melting furnace 200 and the valve will enter the impregnation furnace 300 before the molten metal. At this time, the preform 301 in the impregnation furnace 300 will contact a certain amount of air, affecting the quality of the final product.
[0073] In this embodiment, before the impregnation liquid 13 completely submerges the prefabricated substrate 30, no air will enter the interior of the heating furnace body 11 from the liquid inlet channel 122, thereby ensuring that the prefabricated substrate 30 is submerged in the impregnation liquid 13 in a vacuum environment. The processed prefabricated substrate 30 has higher density, an air-free internal structure, is more stable, and has higher strength.
[0074] It can be understood that, in this embodiment, a seal is provided between the heating furnace body 11 and the furnace cover 12 to ensure the stability of the negative pressure, and the furnace cover 12 is opened when the loading assembly 20 enters and exits the high-temperature furnace 10 .
[0075] In another embodiment, if Figure 4 As shown, the high pressure chamber 40 includes an inverted cover body 41 and a sealing base 42 , and a gas injection pipeline 411 is provided on the high pressure chamber 40 .
[0076] In this embodiment, the high-pressure chamber 40 is composed of a bell jar and a base, that is, the base is stationary, and the opening and closing of the high-pressure chamber 40 is achieved by moving the bell jar.
[0077] The inverted cover body 41 and the sealing base 42 can provide a stable sealing environment, which is convenient for gas injection and pressurization.
[0078] In this embodiment, if Figure 4 As shown, the gas injection pipeline 411 is connected to the inverted cover body 41.
[0079] It is understandable that a seal is provided between the inverted cover body 41 and the sealing base 42 to ensure that the inverted cover body 41 does not move when high pressure is injected into the inverted cover body 41 .
[0080] In another embodiment, the gas injection pipeline 411 is opened in the sealing base 42 .
[0081] Since the inverted cover 41 needs to be moved during the transfer of the carrier assembly 20, while the sealing base 42 remains stationary, the gas injection pipeline 411 is opened in the sealing base 42 to have a certain protective effect on the gas injection pipeline 411 and the equipment.
[0082] In another embodiment, the inverted cover 41 , the containing bucket 21 , the lifting basket 22 and the furnace cover 12 are all provided with lifting ears.
[0083] When the prefabricated base 30 enters and exits the high-temperature furnace 10 and the high-pressure chamber 40, it is necessary to move the inverted cover 41, the containing barrel 21, the lifting basket 22 and the furnace cover 12, and lifting ears are respectively provided on them to facilitate their lifting and movement.
[0084] The operating steps for the prefabricated substrate 30 to enter the high-temperature furnace 10 are as follows: the prefabricated substrate 30 is first placed in the lifting basket 22, the lifting basket 22 is hoisted into the containing barrel 21, and then the furnace cover 12 is opened, and the containing barrel 21 is hoisted into the heating furnace body 11, and vice versa.
[0085] The operation steps for the prefabricated base 30 to enter the high-pressure chamber 40 are as follows: lift the inverted cover 41, lift the container 21 onto the sealing base 42, and then lift the inverted cover 41 back to cover the container 21, and vice versa.
[0086] The operation steps for discharging are as follows: the lifting basket 22 is lifted out of the containing barrel 21, and the remaining metal liquid in the containing barrel 21 is poured out for standby use. After the lifting basket 22 is cooled, the impregnated prefabricated matrix 30 can be taken out from the lifting basket 22.
[0087] In another embodiment, if Figure 2 and Figure 4 As shown, the material loading assembly 20 further includes a holding basket 23 , and the holding basket 23 matches the size of a single prefabricated base 30 .
[0088] When processing multiple prefabricated substrates 30 in the same batch, the prefabricated substrates 30 are loaded using the containing mesh baskets 23, and multiple containing mesh baskets 23 are stacked in the pulling mesh basket 22. The containing mesh baskets 23 can separate the prefabricated substrates 30 to prevent the surfaces from sticking to each other and affecting the impregnation effect.
[0089] In this embodiment, a metal matrix composite material processing process is also disclosed, using the metal matrix composite material processing equipment in any of the above embodiments, including the following steps:
[0090] The prefabricated substrate 30 is placed in the loading assembly 20. Specifically, the prefabricated substrate 30 is first placed in the lifting basket 22, and then the lifting basket 22 containing the prefabricated substrate 30 is placed in the containing barrel 21, and the lifting basket 22 and the prefabricated substrate 30 are moved by transferring the containing barrel 21.
[0091] The holding barrel 21 is placed in a high temperature furnace 10, and the high temperature furnace 10 is heated. When the impregnating liquid 13 is aluminum, the heating temperature is 800° C.-900° C., and when the impregnating liquid 13 is copper, the heating temperature is 1100° C.-1200° C.;
[0092] Pumping negative pressure into the high temperature furnace 10;
[0093] It should be emphasized that there is no restriction on the order of heating the high-temperature furnace 10 and evacuating the negative pressure from the high-temperature furnace 10 . Heating can be performed first, or the negative pressure can be evacuated first, or both can be performed simultaneously.
[0094] After the vacuum degree of the high temperature furnace 10 reaches the standard, the impregnation liquid 13 is added into the high temperature furnace 10, and the impregnation liquid 13 enters the holding barrel 21 to submerge the prefabricated substrate 30. The impregnation liquid 13 is melted in other furnaces in advance;
[0095] After the negative pressure impregnation is completed, the holding barrel 21 is moved to the high pressure chamber 40;
[0096] After the impregnation liquid 13 submerges the prefabricated substrate 30 , the impregnation liquid 13 penetrates into the fluffy structure of the prefabricated substrate 30 , and the prefabricated substrate 30 is isolated from the outside by the impregnation liquid 13 , so opening the furnace cover 12 at this time will not affect the prefabricated substrate 30 .
[0097] Gas is injected into the high pressure chamber 40 to form a high positive pressure, which is maintained for a certain period of time; the injected air is an inert gas.
[0098] The high positive pressure can further compress the prefabricated substrate 30 and the impregnating liquid 13. At this time, the high pressure chamber 40 is at room temperature, so the equipment requirements are low and a higher pressure can be applied.
[0099] It should be emphasized that although the high pressure chamber 40 is at room temperature, the immersion liquid 13 can still remain in a liquid state for a relatively long time in the material loading assembly 20 , and therefore will not solidify in the containing barrel 21 .
[0100] The high-pressure chamber 40 is depressurized and opened, and the holding barrel 21 is taken out. At this time, the prefabricated substrate 30 in the holding barrel 21 is impregnated. Then, the lifting basket 22 immersed in the impregnation liquid 13 in the holding barrel 21 is taken out, and the prefabricated substrate 30 can be taken out. Then, the impregnation liquid 13 in the holding barrel 21 which is still in liquid state is poured back to other stoves to prepare for the next round of impregnation.
[0101] The metal matrix composite material processing equipment and process of the present invention are to achieve the following goals:
[0102] The processing is separated and completed in the high temperature furnace 10 and the high pressure chamber 40 respectively, which greatly reduces the requirements for the equipment itself, has lower costs, and has a greater upper limit on negative pressure and positive pressure. It can process a matrix with higher strength and higher density, and the equipment space can be designed to be larger, and a large number of prefabricated matrixes 30 can be processed at one time.
[0103] The production efficiency is significantly improved. The present process can process 200 kg of prefabricated substrate 30 at a time, which is 510 times that of the prior art.
[0104] In another embodiment, before the negative pressure is pumped into the high temperature furnace 10, the liquid inlet channel 122 is blocked by the immersion block 123;
[0105] When the immersion liquid 13 is added, the immersion liquid 13 is injected into the liquid inlet channel 122 and sealed by the immersion block 123.
[0106] The liquid inlet hopper 121 is blocked;
[0107] After the immersion liquid 13 melts the immersion block 123, the immersion liquid 13 enters the high-temperature furnace 10.
[0108] The setting of the immersion block 123 ensures that air will not enter the high-temperature furnace 10 before the immersion liquid 13 completely enters the high-temperature furnace 10, that is, only after the immersion liquid 13 completely submerges the prefabricated substrate 30 can air enter the high-temperature furnace 10 from the liquid inlet channel 122 to destroy the negative pressure in the high-temperature furnace 10. During the whole process, the prefabricated substrate 30 will not contact the air.
[0109] In another embodiment, in the above steps, the furnace cover 12, the containing barrel 21, the lifting basket 22 and the high-pressure chamber 40 are all operated by lifting using the lifting ears thereon.
[0110] By hoisting the movable furnace cover 12, the containing barrel 21, the lifting basket 22 and the high-pressure chamber 40, safety is improved.
[0111] In another embodiment, the positive pressure in the high pressure chamber 40 is 20 MPa.
[0112] The positive pressure of 20 MPa can press the impregnating liquid 13 and the prefabricated matrix 30 more tightly, further improving the density, structural stability and strength of the composite material.
[0113] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.
Claims
1. A metal matrix composite material processing equipment, characterized in that: include: A high temperature furnace, which is used to provide a high temperature negative pressure impregnation environment for the prefabricated substrate; A high pressure chamber, which is used to provide a normal temperature and high positive pressure impregnation environment for the prefabricated substrate; A material loading assembly, the material loading assembly comprising a holding bucket and a lifting basket smaller in volume than the holding bucket, the material loading assembly being used to carry the prefabricated substrate for transfer between the high-temperature furnace and the high-pressure chamber; the high-temperature furnace comprising a heating furnace body and a furnace cover, the furnace cover being provided with a liquid inlet hopper, the liquid inlet hopper being provided with a liquid inlet channel, and a solid immersion block made of the same material as the immersion liquid being provided above the liquid inlet channel; A heating component is arranged in the heating furnace body; The high temperature furnace is provided with an exhaust pipe; A sealing member is arranged between the furnace cover and the heating furnace body.
2. The metal matrix composite material processing equipment according to claim 1, characterized in that: The high pressure chamber comprises an inverted cover body and a sealing base, and a gas injection pipeline is arranged on the high pressure chamber.
3. The metal matrix composite material processing equipment according to claim 2, characterized in that: The gas injection pipeline is arranged in the sealing base.
4. The metal matrix composite material processing equipment according to claim 2, characterized in that: The inverted cover body, the containing bucket, the lifting net basket and the furnace cover are all provided with lifting ears.
5. The metal matrix composite material processing equipment according to claim 1, characterized in that: The material loading assembly further comprises a holding basket, and the holding basket matches the size of a single prefabricated substrate.
6. A metal matrix composite material processing process, characterized in that: The metal matrix composite material processing equipment according to any one of claims 1 to 5 comprises the following steps: The prefabricated substrate is sequentially placed in a lifting net basket and a containing bucket, and the containing bucket is placed in a high-temperature furnace to heat the high-temperature furnace; Pump negative pressure into the high temperature furnace; After the vacuum degree of the high temperature furnace reaches the standard, the impregnation liquid is added into the high temperature furnace, and the impregnation liquid enters the containing barrel to submerge the prefabricated substrate; After the negative pressure impregnation is completed, the container is moved to the high pressure chamber; Inject gas into the high pressure chamber to form a high positive pressure, which is maintained for a certain period of time; The high pressure chamber is depressurized and opened, and the containing bucket and the lifting net basket are taken out in sequence. At this time, the prefabricated matrix in the lifting net basket is impregnated.
7. The metal matrix composite material processing process according to claim 6, characterized in that: Before pumping negative pressure into the high-temperature furnace, use the immersion block to block the liquid inlet channel; When adding the impregnation liquid, the impregnation liquid is injected into the liquid inlet hopper whose liquid inlet channel is blocked by the impregnation block; After the impregnation liquid melts the impregnation block, the impregnation liquid enters the high-temperature furnace.
8. The metal matrix composite material processing process according to claim 7, characterized in that: In the above steps, the furnace cover, the containing barrel, the lifting basket and the high-pressure chamber are all operated by hoisting using the lifting ears thereon.
9. The metal matrix composite material processing process according to claim 6, characterized in that: The positive pressure in the high pressure chamber is 20 MPa.
