Online sewage quality early warning method combined with offline simulation data
By combining offline simulation data and online real-time monitoring information, an optimized online model is generated, and the problem of inaccurate sewage water quality warning in the existing technology is solved, accurate prediction and early warning of sewage water quality is achieved, and the accuracy of sewage water quality information warning is improved. Spend.
Patent Information
- Application Number
- CN202211621374.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-16
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2042-12-16
AI Technical Summary
The prior art cannot provide accurate sewage water quality early warning methods, rely on human experience and inaccurate predictions, and lack effective online model prediction capabilities.
Combining offline simulation data and online real-time monitoring information, an online model is generated, and a variety of scenarios are simulated through ASM models, optimized into an online model with prediction functions, monitoring and triggering sewage warning in real time.
Accurate prediction and early warning of sewage water quality has been achieved, the accuracy of sewage water quality information has been improved, and the gap in combining online and offline warning technology has been filled.
Smart Images

Figure CN116263850B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of smart water management services, and in particular to an online sewage quality early warning method combined with offline simulation data. Background Art
[0002] The statements in this section merely provide background information related to the present disclosure and may not constitute prior art.
[0003] For the biological treatment process of sewage, the promotion and application of commercial mechanism models began in the early 1990s. However, the application of mechanism models was mainly in the form of offline modeling and analysis. However, due to the lack of corresponding rich professional training for relevant operating technicians in sewage treatment plants and the shortage of professional modeling talents in the industry, commercial modeling tools are not well applied in the market. However, with the development of smart water services, the construction of information and data platforms for sewage treatment plants has been vigorously developed, and the models have been embedded in the digital system platform to form online models. Based on the quantitative analysis of the models, the technicians and managers of sewage treatment plants are assisted to better guide the actual operation of sewage treatment plants. However, relevant technicians have found in actual operations that the current attempts at online models cannot guarantee the accuracy of the model's online prediction capabilities.
[0004] Based on this, those skilled in the art urgently need to provide a method for online prediction or early warning of sewage water quality that can accurately predict the water quality of sewage. Summary of the invention
[0005] The inventors have discovered through research that currently, most of the research and analysis on sewage quality relies on actual past experience, and even some forecasting and early warning operations simply rely on human experience. This creates a risk of potential inaccurate predictions. Different technicians have different experiences and levels, so it is necessary to provide a method for accurately warning of dynamic information on sewage quality.
[0006] The purpose of the present invention is to provide an online sewage water quality early warning method combined with offline simulation data to solve the technical problem that the prior art cannot provide an accurate sewage water quality early warning method.
[0007] According to one aspect of the present disclosure, an online sewage water quality early warning method combined with offline simulation data includes the following steps:
[0008] Step 1. Obtain water quality information of the designated sewage treatment plant and the operating properties of the water treatment equipment;
[0009] Step 2. Write the acquired water quality information data and operation attributes into the ASM model, generate an offline model, and calibrate the offline model;
[0010] Step 3. Use the offline model to simulate multiple scenarios in sequence to obtain simulation conclusion information, wherein the simulation conclusion information obtained from the multiple scenarios at least includes the effluent water quality of the sewage treatment plant under the following situations: average influent water volume and average pollution load, different sludge and mixed liquor return, different sludge retention time, different dissolved oxygen set values, peak water volume, rainstorm, peak load, low temperature, equipment maintenance and partial corridor shutdown and maintenance, and then quantify the impact of the above factors on the effluent water quality of the sewage treatment plant;
[0011] Step 4. Write the offline model into the smart water platform to generate an online model, and then simulate and debug the online model to optimize it into an online model with prediction function;
[0012] Step 5. Write the simulation conclusion information of the offline model into the data platform, and after synchronously calling the online model calculation, trigger a comprehensive sewage warning;
[0013] Step 6. Execute steps 1 to 5 at least once.
[0014] The method obtained by the inventor after long-term practical work combines the offline model with the online water platform to realize the monitoring of dynamic sewage water quality, filling the gap in the field of domestic sewage early warning technology in terms of online and offline combined early warning technology.
[0015] In some embodiments of the present disclosure, step 1 specifically includes: the water quality information includes at least the chemical oxygen demand concentration, ammonia nitrogen concentration, total phosphorus concentration, and suspended particulate solids concentration of the inlet and outlet water; the operating properties of the water treatment equipment include at least the equipment's maximum operating power and the equipment's maximum operating speed.
[0016] In some embodiments of the present disclosure, the water quality information and the way of obtaining the operating properties of the water treatment equipment include at least process drawings, experimental analysis, on-site investigations, historical data, and data results of supplementary experiments.
[0017] In some embodiments of the present disclosure, step 2 specifically includes: the ASM-type model includes a public ASM-type model released by the International Water Association or a purchased commercial model; the offline model calibration includes the following steps: first, the influent water quality characteristics are determined, then the kinetic parameters are determined, and finally the sludge properties are determined, wherein when the offline model uses historical input data, the calculated result is consistent with the historical effluent data.
[0018] In some embodiments of the present disclosure, step 4 specifically includes: sorting the real-time online monitoring data automatically collected in the smart water platform, and writing the sorted data into a database for online model call; at the same time, classifying and sorting the manual record data and laboratory test analysis data manually uploaded to the smart water platform by the technicians, and then integrating the above manual record data and laboratory test analysis data into the online model of the platform according to the water inlet data and operation data, and generating an online model with a prediction function for the process operation status and effluent water quality calculated according to the platform data update frequency;
[0019] The collated data at least includes the average value within the hour after removing unreasonable data.
[0020] In some embodiments of the present disclosure, the data sorting process is to combine the simulation data conclusions with the state parameters of real-time monitoring or periodic monitoring, compare and analyze the differences between the values, and then obtain the compared conclusion data, which is the sorted data.
[0021] In some embodiments of the present disclosure, the state parameters include at least the biochemical reactor state parameters of mixed liquor volatile suspended solids concentration, oxygen concentration dissolved in water, and the secondary sedimentation tank state parameters of surface overflow rate, solid loading rate and underflow sludge concentration.
[0022] In some embodiments of the present disclosure, step 5 specifically includes writing one or more of the maximum water volume and load that the sewage treatment plant can process in the simulation conclusion information, the restrictive factors under different scenarios, the key factors causing the effluent to exceed the standard under different scenarios, the core control elements of the sewage treatment plant, and the possible response measures when the sewage treatment plant encounters different extreme situations into the online model. After synchronously calling the online model for calculation, the online model will comprehensively determine the risk of exceeding the standard based on the degree of increase in the effluent water quality indicators, the duration of the increase in the indicators, and the comparative conclusion data of the state parameters in real time. When the value reaches the warning threshold, the sewage warning is triggered.
[0023] In some embodiments of the present disclosure, the warning types of the online model include model validity warning, model prediction warning, high-risk scenario warning and operation monitoring warning.
[0024] Compared with the currently disclosed technologies, the present invention has the following advantages and beneficial effects: the present invention forms an online model by combining offline simulation data with online real-time monitoring information, thereby accurately predicting sewage water quality conditions. At the same time, it can solve the uncertainty of early warning conclusion information based on artificial experience, and substantially improve the accuracy of domestic sewage water quality information early warning. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1It is a schematic flow chart of the early warning method of the present invention.
[0026] The present invention is attached Figure 1 The arrows in the figure only indicate the connection between the method processing steps and do not specifically refer to the processing logic of the program flow. DETAILED DESCRIPTION
[0027] Please refer to the attached instructions Figure 1 This embodiment provides an online sewage water quality early warning method combined with offline simulation data. The online sewage water quality early warning method combined with offline simulation data is already in the actual use stage. The inventor has conducted actual sewage plant sewage water quality early warning tests based on relevant public data and the method disclosed in this invention, and achieved good results.
[0028] The present invention will be described more fully hereinafter with reference to the accompanying drawings, in which illustrative embodiments of the present invention are shown. However, the present invention may also be embodied in many different forms and should not be construed as being limited to the embodiments described herein. Instead, these embodiments are provided so that this disclosure is full and complete and fully conveys the scope of the present invention to those skilled in the art.
[0029] It will also be understood that, although the terms first, second, etc. may be used herein to describe various elements, these elements should not be limited by these terms. These terms are only used to distinguish one element from another.
[0030] The terms used herein are only used for the purpose of describing specific embodiments and are not intended to limit the present invention. As used herein, the singular forms "a", "an", and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms "include" and "comprise" when used herein specify the presence of the illustrated features, steps, operations, elements, and / or components, but do not exclude the presence or addition of one or more other features, steps, operations, elements, components, and / or combinations thereof.
[0031] Unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which the invention belongs. It will be further understood that terms such as those defined in commonly used dictionaries should be interpreted as having a meaning consistent with their meaning in the context of the relevant art, and will not be interpreted according to an idealized or very formal meaning unless specifically defined herein.
[0032] It should also be noted that in some alternative implementations, the functions / actions annotated in the flow chart may not occur in the order annotated in the flow chart. For example, two boxes shown in succession may in fact be executed substantially concurrently, or these boxes may sometimes be executed in reverse order, depending on the functions / actions involved. Finally, the functions of one or more boxes may be separate or combined with the functions of other boxes.
[0033] In order to better understand the present disclosure, the relevant contents of the present disclosure are explained first: the models involved in the present disclosure are all existing models disclosed in the art, including but not limited to the public ASM models published by the International Water Association or the commercial models purchased by the inventor. The present disclosure only provides a specific treatment method for sewage water quality treatment.
[0034] Example
[0035] This example at least includes the following contents: an online sewage water quality early warning method combined with offline simulation data includes the following steps to obtain water quality information of a designated sewage plant and operating properties of water treatment equipment.
[0036] First, the means of obtaining the water quality information of the designated sewage treatment plant at least include process drawings, experimental analysis, on-site investigation, historical data and supplementary experimental plans, etc., wherein the designated sewage treatment plant at least includes large, medium and small municipal sewage treatment plants that need to carry out sewage quality warning. The present embodiment preferably uses the sewage treatment of the municipal sewage treatment plant, because the pollutants in the sewage of the municipal sewage treatment plant mainly come from the lives of residents, namely, various sugars, oils, proteins and various inorganic components, among which there are few special substances; at the same time, the water quality information collection content of the municipal sewage treatment plant is relatively standardized, and the water quality information at least includes the chemical oxygen demand concentration, ammonia nitrogen concentration, total phosphorus concentration, suspended solid particles, etc. of the inlet and outlet water. In actual operation, the inventor will select the relevant pollutant measurement indicators according to the needs, which are not limited here;
[0037] Next, after understanding the sewage water quality information, it is necessary to understand and determine the operating properties of the water treatment equipment. The operating properties of the sewage treatment plant include at least the maximum operating power of equipment such as pumps and blowers, and the maximum operating speed of the equipment. The reason why the equipment operating properties need to be obtained is that in the field of sewage treatment, the hardware factors of the equipment will also have a substantial impact on the final result of water treatment. Therefore, relevant considerations must be made. In this implementation, the main focus is on determining the maximum power and maximum speed of the equipment to prevent the subsequent sewage treatment equipment hardware performance from being unable to bear the relevant treatment process.
[0038] Furthermore, the acquired water quality information data and operation attributes are written into an ASM model to generate an offline model. The inventors here need to explain that the ASM model includes a public ASM model published by the International Water Association or a purchased commercial model. The selectable types of ASM models can be specifically referred to in an article entitled "ACTIVATED SLUDGE MODELS ASM1, ASM2, ASM2d AND ASM3" published by IWA in its scientific and technological report series. The models mentioned therein can be used as long as they can achieve the effects mentioned in this embodiment or solve related problems, and this embodiment does not specifically limit them. The commercial model is a processing model in this field that can be purchased through public channels.
[0039] After obtaining the above offline model, the offline model is calibrated. The calibration process is to complete the determination of the influent water quality characteristics, kinetic parameters and sludge properties in sequence. The influent water quality characteristics, kinetic parameters and sludge properties are as follows: the influent water quality characteristics include the proportion of rapidly biodegradable organic matter, slowly biodegradable organic matter, particulate non-biodegradable organic matter, soluble non-biodegradable organic matter in the influent to the total organic pollutants, the proportion of ammonia nitrogen in the influent total nitrogen, and the proportion of soluble orthophosphate in the influent total phosphorus; the kinetic parameters include the relevant parameters of the main biochemical reactions in the biochemical treatment process, such as the maximum growth rate of microorganisms such as nitrifying bacteria (ammonia nitrogen oxidizing bacteria and nitrite oxidizing bacteria) and ordinary heterotrophic bacteria, the half-saturated dissolved oxygen concentration, the substrate half-saturation coefficient, etc.; the sludge properties refer to the parameters related to its sedimentation characteristics, such as the maximum sedimentation rate, the maximum compressible concentration, the Vesline model obstructive sedimentation parameters that describe the change of sedimentation rate with sludge concentration, etc.
[0040] Furthermore, the calibrated offline model is used to perform simulation multi-scenario operations in sequence to obtain simulation conclusion information, wherein the simulation conclusion information obtained in multiple scenarios at least includes the effluent water quality of the sewage treatment plant under the following circumstances: average influent water volume and average pollution load, different sludge and mixed liquor return, different sludge retention time, different dissolved oxygen set values, peak water volume, rainstorm, peak load, low temperature, equipment maintenance and partial corridor shutdown and maintenance. One or several situations, in this embodiment, in order to obtain comprehensive data information, this embodiment preferably uses all the above information data;
[0041] In the dynamic simulation of the offline model, the simulated data such as mixed liquor volatile suspended solids concentration (MLSS), chemical oxygen demand (COD), total nitrogen content (TN), ammonia nitrogen (NH4-N) and solids after sludge dehydration and drying (SS) must fit the actual water quality data to more than 80% and have a consistent trend over time. A consistent trend means that the actual situation is rising and the model prediction is also rising, but the degree of increase may be different.
[0042] Furthermore, when the result calculated by the calibrated offline model using historical input data is consistent with the trend of historical water output data changes, that is, after the model is calibrated, the model code is integrated and written into the smart water platform to form an online model. After the online model is formed, the online model is simulated and debugged to be optimized into an online model with prediction function, wherein the writing method is an existing publicly available method for data writing and processing, which is not limited here in this embodiment; at the same time, the above process is specifically as follows: first, the real-time online monitoring data automatically collected and obtained in the smart water platform is sorted, and the sorted data is written into the database for online model call, and then the manual record data and laboratory test and analysis data manually uploaded to the smart water platform by the technicians are classified and sorted, and the above manual record data and laboratory test and analysis data are integrated into the online model of the platform according to the water inlet data and operation data, and an online model with prediction function for the process operation status and effluent water quality is generated according to the platform data update frequency;
[0043] Among them, the sorted data at least includes the average value within the hour after removing unreasonable data; the data sorting process is to combine the simulation data conclusion with the state parameters of real-time monitoring or periodic monitoring, compare and analyze the differences between the values, and then obtain the compared conclusion data, and the conclusion data is the sorted data. It should be further explained that the state parameters in this embodiment include at least the state parameters of the biochemical reactor, the concentration of volatile suspended solids in the mixed liquor, the concentration of oxygen dissolved in water, the surface overflow rate of the secondary sedimentation tank state parameters, the solid loading rate and the bottom flow sludge concentration.
[0044] Furthermore, after optimizing the online model, the water quality analysis of the target sewage plant in the model and the operating limit of the water treatment equipment are combined with the offline model after step calibration to simulate the aforementioned average influent water volume and pollution load, backflow conditions, sludge retention time, dissolved oxygen set value, peak water volume, rainstorm conditions, peak load, low temperature conditions, equipment maintenance, and water inflow conditions and operation plans during the shutdown and maintenance of some corridors. The simulated offline model conclusion information is then written into the optimized online model. After the online model calculation is executed synchronously, the online model will comprehensively determine the risk of exceeding the standard based on the degree of increase in the effluent water quality indicators, the duration of the increase in the indicators, and the comparative conclusion data of the status parameters in real time. When the value reaches the warning threshold, a sewage warning is triggered.
[0045] It should be noted that some of the sewage warning types in this implementation are:
[0046] Model validity warning is to determine whether the online model needs manual professional maintenance by judging whether the sewage treatment plant state parameters and effluent water quality calculated by the online model using the input data obtained from the smart water platform are consistent with the state parameters and effluent water quality obtained from actual monitoring, including adjustment of influent water quality characteristics, kinetic parameters, and sludge state parameters. It should be noted that the influent water quality characteristics include the proportion of rapidly biodegradable organic matter, slowly biodegradable organic matter, particulate non-biodegradable organic matter, soluble non-biodegradable organic matter in the influent to the total organic pollutants, the proportion of ammonia nitrogen in the influent total nitrogen, and the proportion of soluble orthophosphate in the influent total phosphorus; the kinetic parameters include the relevant parameters of the main biochemical reactions in the biochemical treatment process, such as the maximum growth rate of microorganisms such as nitrifying bacteria (ammonia nitrogen oxidizing bacteria and nitrite oxidizing bacteria) and ordinary heterotrophic bacteria, the half-saturated dissolved oxygen concentration, the substrate half-saturation coefficient, etc.; sludge properties refer to parameters related to its sedimentation characteristics, such as the maximum sedimentation rate, the maximum compressible concentration, and the parameters describing the sedimentation rate. Vesline model obstructive sedimentation parameters whose rate changes with sludge concentration; model prediction and early warning will use real-time data, because after the offline model is moved to the online platform, two types of simulation calculations are required. The steady-state calculation uses the manual test data (chemical detection and inspection data) uploaded to the platform every day, and the dynamic calculation uses the result of the steady-state model as the initial value of the dynamic calculation. According to the real-time monitoring data, a dynamic calculation is performed every 2 hours to predict the effluent water quality in 2 hours. Based on the calculated effluent water quality, it is predicted whether there is a risk of exceeding the standard in 2 hours. The triggering warning process is that the indicators presented by the online model calculation results increase to exceed the effluent standard;
[0047] High-risk scenario warning is combined with the evaluation results of the offline model. It uses the monitoring data of the water quality, water volume, water temperature, etc. of the incoming water. It finds that they are beyond the range of ensuring the healthy operation of the biochemical treatment process in the offline evaluation, and then issues an alarm. This alarm does not necessarily look at a certain instantaneous value, such as temperature. An instantaneous high temperature may not have a big impact on the system, but if it continues for 1-3 days, it may cause a greater risk.
[0048] Operation monitoring and early warning are divided into two categories: process variables and effluent water quality. The characteristics of operation monitoring and early warning are to directly read the real-time data of monitoring and compare it with the threshold, including:
[0049] 1. Process variables: There will be some monitoring during the process to remind operators of possible risks, such as dissolved oxygen DO. If it is lower than 1.0 mg / L, it may cause risks such as incomplete nitrification reaction. These can be classified into the more traditional threshold warning categories, including dissolved oxygen DO, redox electrode potential ORP, pH, etc.;
[0050] 2. Effluent water quality: This part is also a threshold warning; however, our warning logic will be more comprehensive, and the warning process is triggered by the degree of indicator growth and the duration of indicator growth. For example, other sewage treatment plants often issue warnings when the effluent concentration exceeds the national standard. We will set up one more, for example, when the monitored water quality concentration reaches 80% of the national effluent standard, an alarm will be issued, but if it is only reached instantaneously and does not last long, then the risk is not high; but if the national effluent standard concentration reaches 80% for 1-3 consecutive days, there is a risk that the effluent will really exceed the standard.
[0051] Finally, the above process is performed at least once according to the actual needs of sewage treatment and the actual environmental conditions.
[0052] Based on the above, the present invention completes a comprehensive sewage water quality early warning operation by combining traditional early warning methods, using model calculation results to predict early warnings, and using offline evaluation results to set early warnings.
[0053] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. Online sewage quality early warning method combined with offline simulation data, It is characterized in that The steps include: Step 1. Obtain water quality information of the designated sewage treatment plant and the operating properties of the water treatment equipment; Step 2. Write the acquired water quality information data and operation attributes into the ASM model, generate an offline model, and calibrate the offline model; Step 3. Use the offline model to simulate multiple scenarios in sequence to obtain simulation conclusion information, wherein the simulation conclusion information obtained from the multiple scenarios at least includes the effluent water quality of the sewage treatment plant under the following situations: average influent water volume and average pollution load, different sludge and mixed liquor return, different sludge retention time, different dissolved oxygen set values, peak water volume, rainstorm, peak load, low temperature, equipment maintenance and partial corridor shutdown and maintenance, and then quantify the impact of the above factors on the effluent water quality of the sewage treatment plant; Step 4. Write the offline model into the smart water platform to generate an online model, and then simulate and debug the online model to optimize it into an online model with prediction function; The step 4 specifically includes: sorting the real-time online monitoring data automatically collected in the smart water platform, writing the sorted data into the database for online model call; at the same time, classifying and sorting the manual record data and laboratory test analysis data manually uploaded to the smart water platform by the technicians, and then integrating the manual record data and laboratory test analysis data into the online model of the platform according to the water inlet data and operation data, and generating an online model with prediction function for the process operation status and effluent water quality calculated according to the platform data update frequency; The data collated at least includes the average value within the hour after removing unreasonable data; Step 5. Write the simulation conclusion information of the offline model into the data platform, and after synchronously calling the online model calculation, trigger a comprehensive sewage warning; Step 6. Execute steps 1 to 5 at least once.
2. The early warning method according to claim 1, It is characterized in that The step 1 specifically includes: the water quality information includes at least the chemical oxygen demand concentration, ammonia nitrogen concentration, total phosphorus concentration, and suspended particulate solids concentration of the inlet and outlet water; the operating properties of the water treatment equipment include at least the equipment's maximum operating power and the equipment's maximum operating speed.
3. The early warning method according to claim 2, It is characterized in that The water quality information and the operating properties of the water treatment equipment are obtained by at least process drawings, experimental analysis, on-site investigations, historical data, and data results of supplementary experiments.
4. The early warning method according to claim 1, It is characterized in that The step 2 specifically includes: the ASM model includes a public ASM model released by the International Water Association or a purchased commercial model; the offline model calibration includes the following steps: first, the influent water quality characteristics are determined, then the kinetic parameters are determined, and finally the sludge properties are determined, wherein when the offline model uses historical input data, the calculated result is consistent with the historical effluent data.
5. The early warning method according to claim 1, It is characterized in that The data sorting process is to combine the simulation data conclusion with the state parameters of real-time monitoring or periodic monitoring, compare and analyze the differences between the values, and then obtain the compared conclusion data, which is the sorted data.
6. The early warning method according to claim 5, It is characterized in that The state parameters at least include the biochemical reactor state parameters of the mixed liquor volatile suspended solids concentration, the oxygen concentration dissolved in water, and the secondary sedimentation tank state parameters of the surface overflow rate, the solid loading rate and the bottom flow sludge concentration.
7. The early warning method according to claim 5, It is characterized in that The step 5 specifically includes writing one or more of the maximum water volume and load that the sewage treatment plant can handle in the simulation conclusion information, the restrictive factors under different scenarios, the key factors causing effluent exceeding the standard under different scenarios, the core control elements of the sewage treatment plant, and the possible response measures when the sewage treatment plant encounters different extreme situations into the online model. After synchronously calling the online model for calculation, the online model will comprehensively determine the risk of exceeding the standard based on the degree of increase in the effluent water quality indicators, the duration of the increase in the indicators, and the comparative conclusion data of the status parameters in real time. When the value reaches the warning threshold, the sewage warning is triggered.
8. The early warning method according to claim 7, It is characterized in that The warning types of the online model include model validity warning, model prediction warning, high-risk scenario warning and operation monitoring warning.
Citation Information
Patent Citations
Pollution source diffusion early-warning method based on water quality on-line monitoring system
CN104392100A
Water quality early warning and forecasting system and water quality early warning and forecasting method
CN108009736A
AAO process optimization operation method based on WEST model in sewage treatment plant
CN108640276A
Water quality monitoring method and water quality monitoring device
CN110470810A
Sewage treatment data processing method and device, computer equipment and storage medium
CN113033092A