A method and system for controlling light storage

By building a building photo-storage DC networking system and formulating corresponding control strategies, the problem of dispersed layout of photovoltaic and energy storage equipment is solved, the economic electricity consumption in the building and the energy efficiency of the grid side is improved, and the effective utilization of distributed clean energy is realized. The peak-to-valley difference between the power grid interface is flat.

CN116316750BActive Publication Date: 2024-12-06CHINA CONSTR SCI & IND CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310122680.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-02-08
Publication Date
2024-12-06
Estimated Expiration
2043-02-08

AI Technical Summary

Technical Problem

In the prior art, the design of photovoltaic and energy storage projects on the construction industry user side lacks unified management and control and scheduling capabilities, resulting in the dispersed layout of photovoltaic and energy storage equipment, and the energy consumption capabilities that are at will and flexible can be achieved.

Method used

Build a building photo-storage DC networking system, formulate control strategies in self-use mode, time period charging and discharging mode, grid connection mode and peak-cutting and valley filling mode, through photovoltaic arrays, photovoltaic DC/DC converters, commercial building loads, Energy storage batteries, chargers, central controllers and AC/DC bidirectional converters realize bidirectional flow of electrical energy and on-demand adjustment.

Benefits of technology

It realizes economical electricity consumption at the energy consumption end, absorbs distributed clean energy power generation on the spot, smoothes the peak-to-valley difference between the power grid interface, improves the grid side energy efficiency and friendly interactive response on the demand side, and enhances the flexible regulation capability and power quality regulation of power electronic devices. Effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116316750B_ABST
    Figure CN116316750B_ABST
Patent Text Reader

Abstract

The present invention provides a photovoltaic storage control method and system, which includes: building a building photovoltaic storage DC networking system; formulating control strategies under the self-generation and self-use mode, time period charging and discharging mode, grid-connected mode and peak shaving and valley filling mode based on the building photovoltaic storage DC networking system; executing the control strategy corresponding to the operating condition according to the operating condition of the building photovoltaic storage DC networking system and the priority of the control strategy. Through the above system strategy investment, it is possible to achieve economical electricity consumption at the energy consumption end, local consumption of distributed clean energy generation, smoothing the peak-valley difference of the grid interface, improving the energy efficiency of the grid side, and the friendly interactive response of the demand side.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of light storage regulation, and in particular to a light storage regulation method and system. Background Art

[0002] At present, user-side photovoltaic and energy storage projects in the construction industry are generally divided into two independent project packages, that is, photovoltaic only constructs the photovoltaic part, including components, brackets, inverters and cables. During the construction of the energy storage project, it is attached to the distribution side and a separate outdoor distribution room is built. Each of them is an independent control module. Photovoltaic and energy storage equipment are arranged in a scattered manner and there is no associated management and control system, which is not convenient for unified energy control and scheduling. In addition, building energy conservation, as the main form of reducing energy consumption, is of great significance for the control and regulation of energy use in buildings. At this stage, the electrical design and photovoltaic storage design in buildings are in two dimensions, and the energy use perspective does not have the ability to generate on-demand and flexibly complement each other. Summary of the invention

[0003] Therefore, the technical problem to be solved by the present invention is to overcome the defects of the gas design and photovoltaic storage end design in the prior art, which are in two dimensions and do not have the ability of on-demand generation and flexible complementarity from the perspective of energy use, thereby providing a photovoltaic storage control method and system.

[0004] In order to achieve the above object, the present invention provides the following technical solutions:

[0005] In a first aspect, an embodiment of the present invention provides a method for controlling a solar energy storage, comprising:

[0006] Build a building photovoltaic storage DC networking system;

[0007] Based on the building photovoltaic storage DC networking system, formulate control strategies under the self-generation and self-use mode, time period charging and discharging mode, grid-connected mode and peak shaving and valley filling mode;

[0008] According to the operating conditions of the building photovoltaic storage DC networking system and the priority of the control strategy, the control strategy corresponding to the operating conditions is executed.

[0009] Optionally, the building photovoltaic storage DC networking system includes: a photovoltaic array, a photovoltaic DC / DC converter, a commercial building load, an energy storage battery, a charger, a central controller and an AC / DC bidirectional converter, wherein:

[0010] The photovoltaic array is connected to the DC bus through the photovoltaic DC / DC converter, and provides charging power to the commercial building load through the charger, and the remaining photovoltaic power is stored in the energy storage battery or fed to the power grid through the photovoltaic AC / DC bidirectional converter;

[0011] The central controller is used to monitor and control the photovoltaic DC / DC converter, the AC / DC bidirectional converter and the charger.

[0012] Optionally, the control strategy in the self-generation and self-use mode includes:

[0013] During the day, the photovoltaic array generates electricity to supply the commercial building load first, and the excess electricity is used to charge the energy storage battery. If the battery reaches the maximum charging power, the remaining electricity is fed into the grid without triggering the maximum grid feed limit.

[0014] When the photovoltaic array is not generating electricity at night, the building photovoltaic storage DC networking system automatically switches to the energy storage battery power supply mode, and the energy storage battery is used to supply the commercial building load first. If the power of the energy storage battery is insufficient, the power grid and the energy storage battery will supply the commercial building load at the same time.

[0015] Optionally, the control strategy in the charging and discharging mode during the time period includes:

[0016] During the charging period, the building photovoltaic storage DC networking system charges the energy storage battery, and takes power from the photovoltaic array first. If the photovoltaic array generates insufficient power, it will take power from the grid. When the power of the energy storage battery reaches the remaining capacity before charging, the energy storage battery is charged only through the photovoltaic array.

[0017] During the discharge period, it is self-generated and used by oneself.

[0018] Optionally, the control strategy in the grid-connected mode includes:

[0019] After the grid connection point function is set, within the first preset time period, the building photovoltaic storage DC networking system draws electricity from the grid or feeds electricity to the grid at a constant power;

[0020] Outside the first preset time period, normal grid-connected logic is executed.

[0021] Optionally, the control strategy in the peak shaving and valley filling mode includes:

[0022] In the second preset time period, when the power taken by the building photovoltaic storage DC networking system is greater than the peak value or lower than the valley value, the building photovoltaic storage DC networking system charges and discharges to make the meter power lower than the peak value or higher than the valley value. When peak shaving and valley filling is not triggered, the system output and input are 0;

[0023] Outside the second preset time period, normal grid-connected logic is executed.

[0024] Optionally, the priorities of the control strategies are as follows from high to low: control strategy in peak shaving and valley filling mode, control strategy in grid connection point mode, control strategy in time period charging and discharging mode, and control strategy in self-generation and self-use mode.

[0025] In a second aspect, an embodiment of the present invention provides a solar storage control system, including:

[0026] Building modules for building building photovoltaic storage DC networking system;

[0027] A strategy formulation module, for formulating control strategies under the self-generation and self-use mode, time period charging and discharging mode, grid-connected mode and peak shaving and valley filling mode based on the building photovoltaic storage DC networking system;

[0028] The strategy execution module is used to execute the control strategy corresponding to the operating condition according to the operating condition of the building photovoltaic storage DC networking system and the priority of the control strategy.

[0029] In a third aspect, an embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable the computer to execute the optical storage control method described in the first aspect of the embodiment of the present invention.

[0030] In a fourth aspect, an embodiment of the present invention provides a computer device, comprising: a memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the light storage control method described in the first aspect of the embodiment of the present invention by executing the computer instructions.

[0031] The technical solution of the present invention has the following advantages:

[0032] The present invention provides a photovoltaic storage control method, including: building a building photovoltaic storage DC networking system; formulating control strategies under the self-generation and self-use mode, time period charging and discharging mode, grid-connected mode and peak shaving and valley filling mode based on the building photovoltaic storage DC networking system; executing the control strategy corresponding to the operating condition according to the operating condition of the building photovoltaic storage DC networking system and the priority of the control strategy. Through the above system strategy investment, it is possible to achieve economical electricity consumption at the energy consumption end, local consumption of distributed clean energy generation, smoothing the peak-valley difference of the grid interface, improving the energy efficiency of the grid side, and friendly interactive response on the demand side. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0034] Figure 1A flowchart of a specific example of the light storage control method in an embodiment of the present invention;

[0035] Figure 2 A block diagram of a specific example of a building photovoltaic storage DC networking system in an embodiment of the present invention;

[0036] Figure 3 (a)- Figure 3 (d) is a schematic diagram of the control strategy in the self-generation and self-use mode according to an embodiment of the present invention;

[0037] Figure 4 (a)- Figure 4 (b) is a schematic diagram of the control strategy under the time period charge and discharge mode in an embodiment of the present invention;

[0038] Figure 5 (a)- Figure 5 (b) is a schematic diagram of the control strategy in the grid-connected mode according to an embodiment of the present invention;

[0039] Figure 6 (a)- Figure 6 (b) is a schematic diagram of the control strategy in the peak shaving and valley filling mode in an embodiment of the present invention;

[0040] Figure 7 is a principle block diagram of a specific example of a light storage control system in an embodiment of the present invention;

[0041] Figure 8 A composition diagram of a specific example of a computer device provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0042] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0043] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0044] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, it can also be the internal connection of two components, it can be a wireless connection, or it can be a wired connection. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0045] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0046] The embodiment of the present invention provides a method for controlling light storage, such as Figure 1 As shown, the following steps are included:

[0047] Step S1: Build a building photovoltaic storage DC networking system.

[0048] In a specific embodiment, at present, photovoltaic and energy storage equipment in the construction industry are dispersedly arranged, and there is no associated control system, which is not convenient for unified energy control and scheduling. To solve the above problem, this embodiment builds a new building photovoltaic storage DC networking system, that is, by aggregating renewable energy, energy storage, and user-graded loads in one body.

[0049] Specifically, Figure 2 As shown in the figure, the building photovoltaic storage DC networking system includes: photovoltaic array, photovoltaic DC / DC converter, commercial building load, energy storage battery, charger, central controller and AC / DC bidirectional converter. Among them, the photovoltaic array is connected to the DC bus through the photovoltaic DC / DC converter, and the charging power is provided to the commercial building load through the charger. The remaining photovoltaic power is stored in the energy storage battery or fed to the grid through the photovoltaic AC / DC bidirectional converter. The central controller is used to monitor and control the photovoltaic DC / DC converter, AC / DC bidirectional converter and charger to achieve maximum photovoltaic power tracking, bidirectional flow of electric energy and on-demand adjustment of charging power. Among them, the energy storage battery is Figure 2 Not shown.

[0050] Step S2: Based on the building photovoltaic storage DC networking system, formulate control strategies for the self-generation and self-use mode, time period charging and discharging mode, grid-connected mode and peak shaving and valley filling mode.

[0051] In a specific embodiment, the control strategy in the self-generation and self-use mode includes the following: Figure 3As shown in (a), during the day, the photovoltaic array power generation is preferentially supplied to the commercial building load, and the excess power is used to charge the energy storage battery. If the battery reaches the maximum charging power, the remaining power is fed into the grid without triggering the maximum grid feed limit. Figure 3 As shown in (b), at night when the photovoltaic array is not generating electricity, the building photovoltaic storage DC networking system automatically switches to the energy storage battery power supply mode, and the energy storage battery is used to supply the commercial building load first. If the energy storage battery power is insufficient, the grid and the energy storage battery will supply the commercial building load at the same time. Figure 3 As shown in (c), during the day, when the photovoltaic array generates insufficient electricity, the energy storage battery begins to release electricity, and the photovoltaic array and the energy storage battery simultaneously supply the commercial building load. Figure 3 As shown in (d), during the day, when the photovoltaic array and the energy storage battery are insufficient in supply, electricity will be drawn from the grid. At this time, the grid, photovoltaic array and energy storage battery supply the commercial building load at the same time.

[0052] Furthermore, the control strategy in the time period charging and discharging mode includes the following: Figure 4 As shown in (a), during the charging period, the building photovoltaic storage DC networking system charges the energy storage battery, and takes power from the photovoltaic array first. If the photovoltaic array generates insufficient power, it will take power from the grid. When the energy storage battery reaches the remaining capacity after the charging cutoff, the energy storage battery is charged only through the photovoltaic array. At this time, the energy storage battery does not discharge, the photovoltaic output is normal, and the energy storage battery can be charged. Figure 4 As shown in (b), during the discharge time period, the energy is generated for self-use. Outside the time period, the energy storage battery does not discharge, the photovoltaic output is normal, and the energy storage battery can be charged.

[0053] Furthermore, the control strategy in the grid-connected mode includes the following: after the grid-connected point function is set, within the first preset time period, the building photovoltaic storage DC networking system draws power from the grid or feeds power to the grid at a constant power. Figure 5 As shown in (a), after the grid connection point function is set, the building photovoltaic storage DC networking system draws electricity from the grid at a constant power, and the above electricity is supplied to the commercial building load and charges the energy storage battery. Figure 5 As shown in (b), after the grid connection point function is set, the photovoltaic array generates electricity and the energy storage battery discharges, and the above electricity is fed to the grid while supplying the commercial building load. Outside the first preset time period, the normal grid connection logic is executed.

[0054] Furthermore, the control strategy in the peak-shaving and valley-filling mode includes the following: in the second preset time period, when the power taken by the building photovoltaic storage DC networking system is greater than the peak value or lower than the valley value, the building photovoltaic storage DC networking system charges and discharges to make the meter power lower than the peak value or higher than the valley value. When the peak-shaving and valley-filling mode is not triggered, the system output and input are 0. Figure 6As shown in (a), during the peak-shaving period, when the power drawn by the building photovoltaic storage DC networking system is greater than the peak value, the power drawn from the grid is reduced, and the photovoltaic array and energy storage battery are increased to supply power, so that the meter power is lower than the peak value. Figure 6 As shown in (b), during the valley filling period, when the power taken by the building photovoltaic storage DC networking system is lower than the valley value, the power taken by the grid is increased, the photovoltaic array is stopped from generating electricity, and the energy storage battery is charged at the same time, so that the meter power is higher than the valley value. Outside the second preset time period, the normal grid connection logic is executed.

[0055] In the embodiment of the present invention, the priorities of the control strategies are as follows from high to low: the control strategy in the peak shaving and valley filling mode, the control strategy in the grid connection mode, the control strategy in the time period charging and discharging mode, and the control strategy in the self-generation and self-use mode. The first preset time period and the second preset time period are set according to each control strategy.

[0056] Step S3: Execute the control strategy corresponding to the operating condition according to the operating condition of the building photovoltaic storage DC networking system and the priority of the control strategy.

[0057] In a specific embodiment, according to the operating conditions of the building photovoltaic storage DC networking system, the control strategy under the operating conditions is selected, and then according to the priority of the control strategy, the above-selected control strategies are executed in sequence to solve the problem of maximizing the utilization of low-capacity photovoltaic storage in the building. The building photovoltaic storage DC networking system adopts a sequential execution strategy, which is based on a priority strategy system, and the strategy systems can be freely changed.

[0058] The present invention provides a photovoltaic storage control method, including: building a building photovoltaic storage DC networking system; based on the building photovoltaic storage DC networking system, formulating control strategies for self-generation and self-use mode, time period charging and discharging mode, grid-connected mode and peak shaving and valley filling mode; according to the operating conditions of the building photovoltaic storage DC networking system and the priority of the control strategy, executing the control strategy corresponding to the operating condition. Through the above system strategy investment, it is possible to achieve economical electricity consumption at the energy consumption end, local consumption of distributed clean energy generation, smoothing of peak-valley differences at the grid interface, improving grid-side energy efficiency and friendly interactive response on the demand side. At the same time, the flexible adjustment capability of the power electronic device also has the power quality adjustment functions such as reactive power adjustment and harmonic suppression.

[0059] The embodiment of the present invention also provides a light storage control system, such as Figure 7 As shown, including:

[0060] The construction module 1 is used to construct a building photovoltaic storage DC networking system. For details, please refer to the relevant description of step S1 in the above method embodiment, which will not be repeated here.

[0061] Strategy formulation module 2 is used to formulate control strategies for self-generation and self-use mode, time period charging and discharging mode, grid-connected mode and peak shaving and valley filling mode based on the building photovoltaic storage DC networking system. For details, please refer to the relevant description of step S2 in the above method embodiment, which will not be repeated here.

[0062] The strategy execution module 3 is used to execute the control strategy corresponding to the operating condition according to the operating condition of the building photovoltaic storage DC networking system and the priority of the control strategy. For details, please refer to the relevant description of step S3 in the above method embodiment, which will not be repeated here.

[0063] An embodiment of the present invention provides a computer device, such as Figure 8 As shown, the device may include a processor 81 and a memory 82, wherein the processor 81 and the memory 82 may be connected via a bus or other means. Figure 8 Take the example of connecting via a bus.

[0064] The processor 81 may be a central processing unit (CPU). The processor 81 may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or a combination of the above chips.

[0065] The memory 82 is a non-transitory computer-readable storage medium that can be used to store non-transitory software programs, non-transitory computer executable programs and modules, such as the corresponding program instructions / modules in the embodiment of the present invention. The processor 81 executes various functional applications and data processing of the processor by running the non-transitory software programs, instructions and modules stored in the memory 82, that is, to implement the light storage control method in the above method embodiment.

[0066] The memory 82 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required by at least one function; the data storage area may store data created by the processor 81, etc. In addition, the memory 82 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some embodiments, the memory 82 may optionally include a memory remotely arranged relative to the processor 81, and these remote memories may be connected to the processor 81 via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, an intranet, a mobile communication network, and combinations thereof.

[0067] One or more modules are stored in the memory 82, and when executed by the processor 81, the execution is as follows: Figure 1 The light storage control method in the illustrated embodiment.

[0068] For details of the above computer equipment, please refer to Figure 1-Figure 6 The corresponding related descriptions and effects in the illustrated embodiments can be understood and will not be repeated here.

[0069] Those skilled in the art can understand that the implementation of all or part of the processes in the above-mentioned embodiments can be completed by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, the storage medium can be a disk, an optical disk, a read-only memory (ROM), a random access memory (RAM), a flash memory, a hard disk drive (HDD) or a solid-state drive (SSD), etc.; the storage medium can also include a combination of the above-mentioned types of memory.

[0070] Obviously, the above embodiments are merely examples for clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from these are still within the protection scope of the invention.

Claims

1. A method for regulating light storage, characterized in that: include: Build a building photovoltaic storage DC networking system; Based on the building photovoltaic storage DC networking system, control strategies are formulated for self-generation and self-use mode, time period charging and discharging mode, grid connection mode, and peak shaving and valley filling mode; Executing the control strategy corresponding to the operating condition according to the operating condition of the building photovoltaic storage DC networking system and the priority of the control strategy; According to the operating conditions of the building photovoltaic storage DC networking system, the control strategy under the operating conditions is selected, and then the selected control strategies are executed in sequence according to the priority of the control strategies. The priority of the control strategies is from high to low: the control strategy under the peak shaving and valley filling mode, the control strategy under the grid connection point mode, the control strategy under the time period charging and discharging mode, and the control strategy under the self-generation and self-use mode; The building photovoltaic storage DC networking system includes: photovoltaic arrays, photovoltaic DC / DC converters, commercial building loads, energy storage batteries, chargers, central controllers and AC / DC bidirectional converters, wherein: The photovoltaic array is connected to the DC bus through the photovoltaic DC / DC converter, and provides charging power to the commercial building load through the charger, and the remaining photovoltaic power is stored in the energy storage battery or fed to the power grid through the AC / DC bidirectional converter; The central controller is used to monitor and control the photovoltaic DC / DC converter, the AC / DC bidirectional converter and the charger; The control strategy in the self-generation and self-consumption mode includes: During the day, the photovoltaic array generates electricity to supply the commercial building load first, and the excess electricity is used to charge the energy storage battery. If the battery reaches the maximum charging power, the remaining electricity is fed into the grid without triggering the maximum grid feed limit. At night, when the photovoltaic array is not generating electricity, the building photovoltaic storage DC networking system automatically switches to the energy storage battery power supply mode, with the energy storage battery giving priority to supplying the commercial building load. If the energy storage battery power is insufficient, the grid and the energy storage battery will simultaneously supply the commercial building load. The control strategy in the charge and discharge mode during the time period includes: During the charging period, the building photovoltaic storage DC networking system charges the energy storage battery, giving priority to drawing power from the photovoltaic array. If the photovoltaic array generates insufficient power, it will draw power from the grid. When the energy storage battery reaches the remaining capacity after the charging cut-off, the energy storage battery will be charged only through the photovoltaic array. During the discharge period, it is self-generated and used by the user; The control strategy in the grid-connected mode includes: After the grid connection point function is set, within a first preset time period, the building photovoltaic storage DC networking system draws electricity from the grid or feeds electricity to the grid at a constant power; Outside the first preset time period, normal grid connection logic is executed; The control strategy in the peak shaving and valley filling mode includes: During the second preset time period, when the power drawn by the building's photovoltaic storage DC network system is greater than the peak value or lower than the valley value, the building's photovoltaic storage DC network system charges and discharges to make the meter power lower than the peak value or higher than the valley value. If peak shaving and valley filling is not triggered, the system output and input are 0; Outside the second preset time period, normal grid-connected logic is executed.

2. A solar storage control system, characterized in that: include: Building modules for constructing building photovoltaic storage DC networking systems; A strategy formulation module is used to formulate control strategies for self-generation and self-use mode, time period charging and discharging mode, grid connection mode and peak shaving and valley filling mode based on the building photovoltaic storage DC networking system; A strategy execution module, configured to execute the control strategy corresponding to the operating condition according to the operating condition of the building photovoltaic storage DC networking system and the priority of the control strategy; According to the operating conditions of the building photovoltaic storage DC networking system, the control strategy under the operating conditions is selected, and then the selected control strategies are executed in sequence according to the priority of the control strategies. The priority of the control strategies is from high to low: the control strategy under the peak shaving and valley filling mode, the control strategy under the grid connection point mode, the control strategy under the time period charging and discharging mode, and the control strategy under the self-generation and self-use mode; The building photovoltaic storage DC networking system includes: photovoltaic arrays, photovoltaic DC / DC converters, commercial building loads, energy storage batteries, chargers, central controllers and AC / DC bidirectional converters, wherein: The photovoltaic array is connected to the DC bus through the photovoltaic DC / DC converter, and provides charging power to the commercial building load through the charger, and the remaining photovoltaic power is stored in the energy storage battery or fed to the power grid through the AC / DC bidirectional converter; The central controller is used to monitor and control the photovoltaic DC / DC converter, the AC / DC bidirectional converter and the charger; The control strategy in the self-generation and self-consumption mode includes: During the day, the photovoltaic array generates electricity to supply the commercial building load first, and the excess electricity is used to charge the energy storage battery. If the battery reaches the maximum charging power, the remaining electricity is fed into the grid without triggering the maximum grid feed limit. At night, when the photovoltaic array is not generating electricity, the building photovoltaic storage DC networking system automatically switches to the energy storage battery power supply mode, with the energy storage battery giving priority to supplying the commercial building load. If the energy storage battery power is insufficient, the grid and the energy storage battery will simultaneously supply the commercial building load. The control strategy in the charge and discharge mode during the time period includes: During the charging period, the building photovoltaic storage DC networking system charges the energy storage battery, giving priority to drawing power from the photovoltaic array. If the photovoltaic array generates insufficient power, it will draw power from the grid. When the energy storage battery reaches the remaining capacity after the charging cut-off, the energy storage battery will be charged only through the photovoltaic array. During the discharge period, it is self-generated and used by the user; The control strategy in the grid-connected mode includes: After the grid connection point function is set, within a first preset time period, the building photovoltaic storage DC networking system draws electricity from the grid or feeds electricity to the grid at a constant power; Outside the first preset time period, normal grid connection logic is executed; The control strategy in the peak shaving and valley filling mode includes: During the second preset time period, when the power drawn by the building's photovoltaic storage DC network system is greater than the peak value or lower than the valley value, the building's photovoltaic storage DC network system charges and discharges to make the meter power lower than the peak value or higher than the valley value. If peak shaving and valley filling is not triggered, the system output and input are 0; Outside the second preset time period, normal grid-connected logic is executed.

3. A computer-readable storage medium, characterized in that The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable the computer to execute the solar energy storage control method according to claim 1.

4. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the solar energy storage control method as claimed in claim 1 by executing the computer instructions.