Installation method of steel structure outrigger truss

By optimizing the segmented position of the steel structure outrigger truss and the inverted chain hoisting technology, the problems of supporting the tire frame and high-altitude welding in the traditional installation method are solved, achieving a more efficient and safe installation process, and reducing the number of butt welds and auxiliary materials. waste.

CN116657925BActive Publication Date: 2024-10-25CHINA CONSTR SECOND BUREAU SUNSHINE INTELLIGENT MFG CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202310688755.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-06-12
Publication Date
2024-10-25
Estimated Expiration
2043-06-12

AI Technical Summary

Technical Problem

In super high-rise construction, the traditional installation method of steel structure outrigger trusses involves a large number of support frames and high-altitude welding, which results in slow construction progress and high safety risks. There are also a large number of butt welds, which wastes auxiliary materials and construction time.

Method used

By optimizing the segmented position of the steel structure outrigger truss, canceling the support tire frame, and using inverted chain hoisting and welding fixation technology, we can reduce butt welds, improve installation efficiency, and reduce safety risks.

Benefits of technology

It reduces high-altitude operations and high-altitude welding, reduces safety risks, saves construction period and auxiliary materials, improves construction efficiency, and optimizes the segmented installation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116657925B_ABST
    Figure CN116657925B_ABST
Patent Text Reader

Abstract

The invention discloses a method for installing a steel structure cantilever truss, and the specific steps include: S1, setting the segmented positions of the upper chord and the diagonal web; S2, setting the first lifting lug and the second lifting lug; S3, hoisting the diagonal web and installing the fall chain; S4, hoisting the upper chord and welding and fixing it; S5, removing the fall chain. The invention reduces the amount of butt welds by optimizing the segmented positions, and supports and adjusts the position of the diagonal web by the fall chain, cancels the support frame in the traditional installation method, reduces the amount of high-altitude operations and high-altitude welding, reduces the safety risk, saves construction time, and saves auxiliary materials.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel structure installation, and in particular to an installation method of a steel structure outrigger truss. Background Art

[0002] During the construction of super high-rise buildings, truss members with large size, thick steel plates and complex nodes are encountered. Such members are mainly characterized by heavy weight. When installing such trusses, the traditional method is to install the cantilever trusses in sections. The sectioning method is as follows: Figure 1 As shown in the figure, the connection between the diagonal brace and the upper chord is divided into one section as a node, the two ends of the upper chord are divided into two sections respectively, and the two diagonal braces are divided into two sections respectively, a total of five sections are installed step by step. Figures 2 to 6 As shown, step one: welding a plurality of support frames on the lower chord to support the diagonal web; step two: hoisting the diagonal web and welding the diagonal web to the support frames to form a stable system; step three: hoisting the upper chord and the diagonal web node section, and welding the node section to the diagonal web; step four: hoisting the segments at both ends of the upper chord and welding them; step five: removing the support frames.

[0003] The disadvantages of the traditional segmentation and installation method of the outrigger truss are that a large number of supporting frames need to be set up during the installation process and there are a large number of on-site butt welds, which is not conducive to the progress of on-site construction. A large amount of high-altitude welding and frame removal work will pose a great safety hazard.

[0004] Therefore, how to create a new installation method for a steel structure outrigger truss is one of the current important research and development topics. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide an installation method for a steel structure cantilever truss, so as to optimize the truss segment position, reduce butt welds, eliminate the supporting frame, reduce the waste of auxiliary materials, reduce high-altitude operations and high-altitude welding, reduce safety risks, save construction time, thereby overcoming the shortcomings of the prior art.

[0006] In order to solve the above technical problems, the present invention provides a method for installing a steel structure outrigger truss, and the specific steps include:

[0007] S1. Set the segmented positions of the upper chord and diagonal brace

[0008] The upper chord and the diagonal member are divided into sections at the connection, the upper chord is one section, and the two diagonal members are each one section, and the upper ends of the two diagonal members have inverted L-shaped end surfaces at the section positions, wherein the vertical end surface is used to be abutted and welded with the opposite diagonal member, and the horizontal end surface is used to be welded with the lower surface of the upper chord;

[0009] S2. Setting the first lifting lug and the second lifting lug

[0010] Weld the first lifting lug on the upper chord corbel and the second lifting lug on the diagonal brace;

[0011] S3. Lift the diagonal brace and install the fall chain

[0012] After hoisting the diagonal brace to the installation position, hang the fall chain on the first lifting lug, connect the hook of the fall chain to the second lifting lug, slowly adjust the fall chain until the fall chain is fully stressed, and then release the lifting shackle;

[0013] S4. Hoist the upper chord and fix it by welding:

[0014] Lift the upper chord rod so that the lower surface of the upper chord rod fits with the horizontal end surface of the top of the diagonal web rod. Adjust the fall chain to slowly lower the horizontal end surface of the upper port of the diagonal web rod until the upper chord rod reaches the installation position, and then weld and fix the upper chord rod.

[0015] S5. Remove the fall chain.

[0016] As an improvement of the present invention, in step S2, the welding position of the first lifting lug is located at 200 mm from the upper chord corbel to the port, and the welding position of the second lifting lug is located at 600 mm from the diagonal brace to the port.

[0017] Furthermore, in step S2, the outer dimensions of the first lifting ear and the second lifting ear are both 230 mm in length, 130 mm in width, 25 mm in thickness, the radius of the lifting hole is 65 mm, the material is both Q235B, and the weld grade is both level 2.

[0018] Furthermore, the step S3 specifically includes:

[0019] S31. Hoist the diagonal brace located on one side of the outer frame giant column to the installation position;

[0020] S32, welding the lower port plate of the diagonal brace;

[0021] S33. Slowly operate the tower crane to make the upper end of the diagonal brace reach the vicinity of the installation position;

[0022] S34, temporarily connect the lower end plate of the diagonal web member and the lower chord corbel through a splint, and weld them after the top is capped;

[0023] S35. Install the fall chain and slowly adjust it until it is fully stressed, then release the lifting shackle;

[0024] S36. Hoist the diagonal brace located on one side of the core tube to the installation position;

[0025] S37, repeat steps S32 to S35;

[0026] S38. Butt and weld the two diagonal webs into a whole.

[0027] After adopting such a design, the present invention has at least the following advantages:

[0028] 1. By optimizing the segmented position, the truss butt welds are reduced. By adjusting the installation sequence, the construction process of welding and dismantling the support frame is cancelled, and high-altitude operations and high-altitude welding are reduced, thereby reducing safety risks;

[0029] 2. Canceling the supporting frame also improves construction efficiency, saves construction time, reduces waste of auxiliary materials, and saves resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] The above is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0031] Figure 1 It is a schematic diagram of the layout of the truss segment positions in the traditional outrigger truss installation method.

[0032] Figure 2 This is a construction diagram of step one in the traditional outrigger truss installation method.

[0033] Figure 3 This is a construction diagram of step two in the traditional outrigger truss installation method.

[0034] Figure 4 This is a construction diagram of step three in the traditional outrigger truss installation method.

[0035] Figure 5 This is a construction diagram of step 4 in the traditional outrigger truss installation method.

[0036] Figure 6 This is a construction diagram of step five in the traditional outrigger truss installation method.

[0037] Figure 7 It is a schematic flow chart of a method for installing a steel structure outrigger truss provided by the present invention.

[0038] Figure 8 It is a schematic diagram of the arrangement of truss segment positions in a method for installing a steel structure outrigger truss provided by the present invention.

[0039] Fig. 9 It is a construction schematic diagram of step S3 in a method for installing a steel structure outrigger truss provided by the present invention.

[0040] Fig.10 It is a construction schematic diagram of step S4 in a method for installing a steel structure outrigger truss provided by the present invention.

[0041] Fig.11It is a construction schematic diagram of step S5 in a method for installing a steel structure outrigger truss provided by the present invention.

[0042] Explanation of the reference numerals: 1. lower chord; 2. upper chord; 3. diagonal tie rod; 4. first lifting eye; 5. second lifting eye; 6. fall chain; 7. outer frame column; 8. core tube; 9. support frame; 10. segment position. DETAILED DESCRIPTION

[0043] See also Figures 7 to 11 The present invention provides a method for installing a steel structure outrigger truss, and the specific construction steps include S1 to S5, which are described in detail below. It should be noted that the following steps are all performed on the basis that the lower chord 1 has been installed.

[0044] Step S1: Setting the segmented positions 10 of the upper chord and the diagonal brace.

[0045] See also Figure 8 When the outrigger truss is segmented, a total of five segmentation positions 10 are set, namely, two positions between the two ends of the upper chord 2 and the two side brackets, one position at the connection between the upper chord 2 and the diagonal member 3, and two positions between the two diagonal members 3 and the two lower chord brackets. The five segmentation positions 10 divide the upper chord 2 and the diagonal member 3 into three sections. The segmentation position 10 at the connection between the upper chord 2 and the diagonal member 3 has a T-shaped segmentation surface, so that the upper chord is one section and the two diagonal members are each one section.

[0046] The upper ends of the two diagonal web members 3 have inverted L-shaped end surfaces at the segmented position 10 , wherein the vertical end surface is used for abutting and welding with the opposite diagonal web member 3 , and the horizontal end surface is used for welding with the lower surface of the upper chord 2 .

[0047] It should be noted that after adopting the above-mentioned segmentation method, the maximum segment length is 16.3m, the maximum width is 3.8m, the heaviest component is 19.7t, and the component is lifted 3 times, while in the traditional segmentation method, the component is lifted 5 times. In terms of the number of lifts and difficulty, the segmentation method in step S1 is more advantageous.

[0048] In addition, the upper chord is 100mm thick, the diagonal web is 80mm thick, and the components are V-grooved with a groove angle of 35°. The welding wire filling section S=0.521T²+2.709T+89.524, T represents the base material thickness. The gas shielded welding wire filling amount N=(S×L×ρ) / 1000, where L represents the weld length and ρ represents the metal density. According to the formula for weld length and welding wire filling amount, in the traditional segmentation method, the length of the 100mm plate thickness butt weld is 12.8m, the length of the 80mm plate thickness butt weld is 12.8m, and the welding wire filling amount is 723Kg. In the step S1 segmentation method, the length of the 100mm plate thickness butt weld is 6.4m, the length of the 80mm plate thickness butt weld is 12.8m, and the welding wire filling amount is 504.4Kg. By adopting the segmentation method of step S1, the weld length is reduced by 6.4m, and a single truss can save about 218.6kg of welding wire raw materials.

[0049] Step S2: Setting the first lifting lug 4 and the second lifting lug 5 .

[0050] A first lifting lug 4 is welded on the upper chord bracket, and the welding position of the first lifting lug 4 is located 200 mm from the upper chord bracket to the port. The first lifting lug 4 has an overall dimension of 230 mm in length, 130 mm in width, 25 mm in thickness, a lifting hole radius of 65 mm, and is made of Q235B, with a weld grade of Class II.

[0051] The second lifting lug 4 is welded on the diagonal brace 3, and the welding position of the second lifting lug 5 is located 600mm away from the end of the diagonal brace 3. The overall dimensions of the second lifting lug 5 are 230mm long, 130mm wide, 25mm thick, and the radius of the lifting hole is 65mm. The material is Q235B, and the weld grade is level 2.

[0052] Step S3: hoist the diagonal brace 3 and install the fall chain 6.

[0053] See also Fig. 9 The overall method of step S3 is to hoist the diagonal brace 3 into place, hang the fall chain 6 on the first lifting lug 4, connect the hook of the fall chain 6 to the second lifting lug 5, slowly adjust the fall chain 6 until the fall chain 6 is fully stressed, and then release the hoisting buckle.

[0054] It should be noted that the first lifting lug 4, the second lifting lug 5 and the fall chain 6 need to be subjected to force calculation before use, and construction can only be carried out after the force requirements are met and the test is qualified. By setting the first lifting lug 4, the second lifting lug 5 and the fall chain 6, the traditional support tire frame 9 is replaced, and the amount of high-altitude work for installing and removing the support tire frame 9 is reduced, which greatly saves construction time and materials.

[0055] The specific construction steps of step S3 include: S31, hoisting the diagonal brace 3 located on one side of the outer frame giant column 7 to the installation position; S32, welding the lower end plate of the diagonal brace 3; S33, slowly operating the tower crane to make the upper end of the diagonal brace 3 reach the vicinity of the installation position; S34, temporarily connecting the lower end plate of the diagonal brace 3 and the lower chord bracket through a plywood, and then welding after the capping; S35, installing the fall chain 6, and slowly adjusting the fall chain 6 until the fall chain 6 is fully stressed, and then releasing the hoisting buckle; S36, hoisting the diagonal brace 3 located on one side of the core tube 8 (the concrete structure has been cast) to the installation position; S37, repeating steps S32 to S35; S38, aligning and welding the two diagonal braces 3 into a whole.

[0056] Step S4: hoist the upper chord rod 2 and fix it by welding.

[0057] See also Fig.10 , hoist the upper chord rod 2 so that the lower surface of the upper chord rod 2 fits with the top horizontal end surface of the diagonal web member 3, adjust the fall chain 6 to slowly lower the horizontal end surface of the upper port of the diagonal web member 3, until the upper chord rod 2 reaches the installation position, and then weld and fix the upper chord rod 2.

[0058] Step S5: removing the fall chain 6.

[0059] See also Fig.11 After completing the welding between the upper chord rod 2 and the diagonal web rod 3, and the welding and fixing between the two ends of the upper chord rod 2 and the upper chord rod bracket, the fall chain 6 is removed.

[0060] The present invention reduces the amount of butt welds by optimizing the segmented positions, and supports and adjusts the positions of the diagonal web members by means of fall chains, thereby eliminating the supporting cradle in the traditional installation method, reducing the amount of high-altitude operations and high-altitude welding, and reducing safety risks while saving construction time and auxiliary materials.

[0061] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Those skilled in the art may make some simple modifications, equivalent changes or modifications using the technical contents disclosed above, which all fall within the protection scope of the present invention.

Claims

1. A method for installing a steel structure outrigger truss, characterized in that: The specific steps include: S1. Set the segmented positions of the upper chord and diagonal brace The upper chord and the diagonal web are divided into sections at the connection, the upper chord is one section, and the two diagonal webs are each one section, and the upper ends of the two diagonal webs have inverted L-shaped end surfaces at the section positions, wherein the vertical end surface is used to be abutted and welded with the opposite diagonal web, and the horizontal end surface is used to be welded with the lower surface of the upper chord; S2. Setting the first lifting lug and the second lifting lug Weld the first lifting lug on the upper chord corbel and the second lifting lug on the diagonal brace; S3. Lift the diagonal brace and install the fall chain After hoisting the diagonal brace to the installation position, hang the fall chain on the first lifting lug, connect the hook of the fall chain to the second lifting lug, slowly adjust the fall chain until the fall chain is fully stressed, and then release the lifting shackle; S4. Hoist the upper chord and fix it by welding Lift the upper chord rod so that the lower surface of the upper chord rod fits with the horizontal end surface of the top of the diagonal web rod. Adjust the fall chain to slowly lower the horizontal end surface of the upper port of the diagonal web rod until the upper chord rod reaches the installation position, and then weld and fix the upper chord rod. S5. Remove the fall chain.

2. The method for installing a steel structure outrigger truss according to claim 1, characterized in that: In the step S2, the welding position of the first lifting lug is located at a position 200 mm from the upper chord corbel to the port, and the welding position of the second lifting lug is located at a position 600 mm from the diagonal brace to the port.

3. The method for installing a steel structure outrigger truss according to claim 1, characterized in that: In step S2, the first lifting ear and the second lifting ear have outer dimensions of 230 mm in length, 130 mm in width, 25 mm in thickness, a lifting hole radius of 65 mm, are made of Q235B, and have weld grades of level 2.

4. The method for installing a steel structure outrigger truss according to claim 1, characterized in that: The step S3 specifically includes: S31. Hoist the diagonal brace located on one side of the outer frame giant column to the installation position; S32, welding the lower port plate of the diagonal brace; S33. Slowly operate the tower crane to make the upper end of the diagonal brace reach the vicinity of the installation position; S34, temporarily connect the lower end plate of the diagonal web member and the lower chord corbel through a splint, and weld them after the top is capped; S35. Install the fall chain and slowly adjust it until it is fully stressed, then release the lifting shackle; S36. Hoist the diagonal brace located on one side of the core tube to the installation position; S37, repeat steps S32 to S35; S38. Butt and weld the two diagonal webs into a whole.

Citation Information

Patent Citations

  • Truss construction method

    CN113445740A

  • Conversion truss and welding method of truss joints of conversion truss

    CN113833107A

  • Adjustable temporary tensioning device for hoisting side-rod-free truss

    CN218619823U

  • Concrete-filled steel tube outer frame-steel support cylinder truss system

    CN218933785U

  • Suspension connection node for large-span cantilever steel truss and construction method therefor

    WO2022062294A1