A transmission line tower grounding device operating status evaluation system and method

Through the comprehensive evaluation system, combined with multiple grounding device status indicators and weight assignments, the problem that personal safety cannot be fully considered in the existing technology is solved, the scientific evaluation and safety level determination of the transmission line grounding device are realized, and the evaluation accuracy is improved. Comprehensive and scientific.

CN116703151BActive Publication Date: 2024-10-15WUHAN NARI LIABILITY OF STATE GRID ELECTRIC POWER RES INST +2
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202310548783.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-12
Publication Date
2024-10-15
Estimated Expiration
2043-05-12

AI Technical Summary

Technical Problem

When evaluating the operating status of transmission line tower grounding devices, the existing technology fails to fully consider equipment and personal safety, especially the impact of contact voltage and step voltage generated when lightning current passes through on personal safety, resulting in an unscientific and comprehensive evaluation.

Method used

A comprehensive evaluation system is designed, including an internal scoring module for evaluation indicators, an overall scoring module for grounding devices, and a grade evaluation module for grounding devices. It combines indicators such as power frequency grounding resistance, impact grounding resistance, grounding device corrosion rate, step voltage, and contact voltage. , calculate the overall score through weight assignment, determine the safety level and propose corrective measures.

Benefits of technology

It improves the comprehensiveness and scientificity of the grounding status assessment of transmission lines, can more accurately reflect the impact of grounding devices on equipment and personal safety, and provides corrective measures for different safety levels to ensure the safety and reliability of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116703151B_ABST
    Figure CN116703151B_ABST
Patent Text Reader

Abstract

The present invention discloses a transmission line tower grounding device operation state evaluation system. According to the tower grounding device's own state characterization index and the effect index on personal safety, the tower grounding device operation state is evaluated, and each evaluation index of the tower grounding device and the standard limit of each evaluation index are determined. According to the actual value of the tower grounding device under each evaluation index and the standard limit of each evaluation index, the score of the tower grounding device under each evaluation index is obtained; the weight of the evaluation index in the overall evaluation is determined, and the overall score of the tower grounding device operation state is determined based on the internal score of the tower grounding device under each evaluation index and the weight of each evaluation index in the overall evaluation; the safety level of the tower grounding device is determined according to the overall score of the tower grounding device operation state, and corresponding safety rectification measures are proposed for different safety levels. The present invention improves the comprehensiveness and scientificity of the transmission line grounding state evaluation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of grounding device status monitoring, and in particular to a transmission line tower grounding device operating status evaluation system and method. Background Art

[0002] In the early stage of designing overhead transmission lines, the grounding performance of transmission line towers needs to be considered, so that when a ground short circuit fault or lightning strike occurs in the transmission line, a good tower grounding device can quickly flow the fault current into the earth, thereby effectively reducing the failure rate of the transmission line and improving the lightning resistance level of the line. In order to determine the grounding performance of the transmission line tower, the operating status of the transmission line tower grounding device can be evaluated.

[0003] The power frequency grounding impedance is easy to measure. At present, the evaluation of the operating status of the transmission line tower grounding device is mostly based on the power frequency grounding resistance as the evaluation standard. When a short circuit fault occurs in the transmission line, the power frequency fault current enters the ground through the tower grounding device. At this time, the smaller the power frequency grounding resistance, the better the dispersion effect of the tower grounding device, and the better its operating status. On the contrary, the larger the power frequency grounding resistance, the worse the dispersion effect and the worse the operating status. However, when the tower is struck by lightning, it is the lightning current that flows through the tower grounding device. At this time, the parameter that can effectively characterize the grounding performance is the impulse grounding resistance, and when the fault current enters the ground, it may cause personal safety problems around the tower. Therefore, if the operating status of the tower grounding device is evaluated by the power frequency grounding resistance alone, it cannot truly reflect the actual operating status of the grounding device. Summary of the invention

[0004] The purpose of the present invention is to propose a system and method for evaluating the status of a comprehensive power transmission line grounding device, which takes into account the impact of the grounding device on equipment and personal safety and the safety of the grounding device itself, so as to improve the comprehensiveness and scientificity of the transmission line grounding status evaluation. In addition, in the process of lightning current flowing into the earth through the tower grounding device, contact voltage and step voltage that affect personal safety will also be generated near the tower, but most of the current status evaluations of the tower grounding device do not consider the aspect of personal safety. Therefore, it is necessary to comprehensively consider various factors, study a reasonable and feasible comprehensive evaluation method for the status of transmission lines, and scientifically evaluate the operating conditions of transmission lines.

[0005] To achieve this purpose, the transmission line tower grounding device operation status evaluation system designed by the present invention includes an evaluation index internal scoring module, a grounding device overall scoring module, and a grounding device grade evaluation module; the evaluation index internal scoring module is used to evaluate the operation status of the tower grounding device according to the tower grounding device's own state characterization index and the impact effect index on personal safety, determine each evaluation index of the tower grounding device and the standard limit of each evaluation index, and obtain the internal score of the tower grounding device under each evaluation index according to the actual value of the tower grounding device under each evaluation index and the standard limit of each evaluation index; the grounding device overall scoring module is used to determine the weight of the evaluation index in the overall evaluation, and determine the overall score of the tower grounding device operation status based on the internal score of the tower grounding device under each evaluation index and the weight of each evaluation index in the overall evaluation; the grounding device grade evaluation module is used to determine the safety level of the tower grounding device according to the overall score of the tower grounding device operation status, and propose corresponding safety rectification measures for different safety levels.

[0006] An embodiment of the present invention further provides a method for evaluating the operating status of a transmission line tower grounding device, comprising the following steps:

[0007] Step 1: evaluate the operation status of the tower grounding device according to the state characterization index of the tower grounding device itself and the index of the effect of the impact on personal safety, determine the actual value of the tower grounding device under each evaluation index and the standard limit value of each evaluation index, and obtain the internal score of the tower grounding device under each evaluation index according to the actual value of the tower grounding device under each evaluation index and the standard limit value of each evaluation index;

[0008] Step 2, determining the weight of the evaluation index in the overall evaluation, and determining the overall score of the operating status of the tower grounding device based on the internal score of the tower grounding device under each evaluation index and the weight of each evaluation index in the overall evaluation;

[0009] Step 3: Determine the safety level of the tower grounding device based on the overall score of the tower grounding device operation status, and propose corresponding safety rectification measures for different safety levels.

[0010] The beneficial effects of the present invention are as follows: the present invention is different from the traditional method of using only the power frequency grounding resistance as the indicator for evaluating the state of the tower grounding device, and adds two indicators, namely the impact grounding resistance and the corrosion rate of the grounding device, for evaluating the operating state of the tower grounding device itself, as well as personal safety indicators such as the contact voltage and step voltage near the tower that may affect personal safety. A scoring and grading method for each indicator and an overall evaluation method are proposed, which can comprehensively evaluate the impact of the transmission line grounding device on equipment and personal safety and the safe operating state of the grounding device itself, and comprehensively improve the comprehensiveness and scientificity of the transmission line grounding state evaluation. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 is a schematic diagram of the system structure;

[0012] Figure 2 is a flow chart of the method of the present invention;

[0013] Figure 3 Flowchart for training the tower grounding device status assessment algorithm;

[0014] Among them, 1-evaluation index internal scoring module, 2-grounding device overall scoring module, 3-grounding device level assessment module. DETAILED DESCRIPTION

[0015] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments:

[0016] A transmission line tower grounding device operating status assessment system, such as Figure 1 As shown, it includes an evaluation index internal scoring module 1, a grounding device overall scoring module 2, and a grounding device grade evaluation module 3;

[0017] The evaluation index internal scoring module 1 is used to evaluate the operation status of the tower grounding device according to the tower grounding device's own status characterization index and the impact effect index on personal safety, determine the evaluation indexes of the tower grounding device and the standard limit values ​​of the evaluation indexes, and obtain the internal score of the tower grounding device under each evaluation index according to the actual value of the tower grounding device under each evaluation index and the standard limit values ​​of each evaluation index; if the internal score of the evaluation index is 0, it means that there is a serious problem in the index, and the grounding device is deemed to be unqualified, and the tower grounding device or the surrounding key objects need to be modified, otherwise, the grounding device overall scoring module 2 continues to evaluate the grounding device status;

[0018] The overall scoring module 2 of the grounding device is used to determine the weight of the evaluation index in the overall evaluation, and determine the overall score of the operation status of the tower grounding device based on the internal score of the tower grounding device under each evaluation index and the weight of each evaluation index in the overall evaluation;

[0019] The grounding device level assessment module 3 is used to determine the safety level of the tower grounding device according to the overall score of the tower grounding device operation status, and to propose corresponding safety rectification measures for different safety levels.

[0020] In the above technical solution, the indicators characterizing the state of the tower grounding device include power frequency grounding resistance value, impulse grounding resistance value, grounding device corrosion rate, and conduction resistance value;

[0021] The indicators of impact on personal safety include contact voltage, step voltage, and ground potential gradient;

[0022] The evaluation indicators include power frequency grounding resistance, impulse grounding resistance, grounding device corrosion rate, step voltage and contact voltage.

[0023] The power frequency grounding resistance, impulse grounding resistance and grounding device corrosion rate are important indicators for evaluating the pole tower grounding device itself, and are used to reflect whether the operation of the pole tower itself meets the requirements; the step voltage and contact voltage are used to reflect whether the impact of the pole tower leakage on the personal safety of the surrounding people meets the safety standards.

[0024] In the above technical solution, the standard limit values ​​of each evaluation index determined by the evaluation index internal scoring module 1 include:

[0025] The standard limit of the power frequency grounding resistance in the evaluation index is obtained based on the grounding design standard of AC electrical equipment, namely the national standard GB50065-2011 "Grounding Design Specification for AC Electrical Equipment", and the control value of the tower grounding resistance with different soil resistivity;

[0026] The standard limit of impulse grounding resistance in the evaluation index is calculated based on the lightning resistance level of transmission lines of different voltage levels and the resistivity of the surrounding soil;

[0027] The standard limit value of the corrosion rate of the grounding device in the evaluation index is obtained according to the standard for evaluating the soil corrosivity of the grounding grid, namely DL / T 1554-2016 "Guidelines for Corrosion Rating of Soil Corrosivity Evaluation of Grounding Grids";

[0028] The step voltage standard limit value in the evaluation index is calculated based on the human body tolerance current limit value and the human body resistance value under step conditions;

[0029] The standard limit of contact voltage in the evaluation index is calculated based on the human body tolerance current limit and the human body resistance value when in contact with the pole tower.

[0030] In the above technical solution, the evaluation index internal scoring module 1 obtains the internal score of the tower grounding device under each evaluation index according to the actual value of the tower grounding device under each evaluation index and the standard limit value of each evaluation index, including:

[0031] The internal score of the tower grounding device under power frequency grounding resistance is 100 points, and the calculation formula is as follows:

[0032]

[0033] Among them, R 工 is the internal score of the tower grounding device under power frequency grounding resistance; R控 is the standard limit of the power frequency grounding resistance, in Ω; R 实 It is the actual value of the power frequency grounding resistance, in Ω.

[0034] The standard limit value R of the power frequency grounding resistance 控 The method of obtaining is: if the soil resistivity is ≤100Ω·m, then R 控 =10Ω; if 100Ω·m<soil resistivity≤500Ω·m, then R 控 =15Ω; if 500Ω·m<soil resistivity≤1000Ω·m, then R 控 =20Ω; if 1000Ω·m<soil resistivity≤2000Ω·m, then R 控 =25Ω; ​​if soil resistivity>2000Ω·m, then R 控 =30Ω.

[0035] Table 1 Standard limit values ​​of power frequency grounding resistance

[0036]

[0037] The actual value of the power frequency grounding resistance is real-time data directly obtained by on-site measurement; since the actual value of the power frequency grounding resistance can be measured on-site, it has high authenticity and should occupy a higher weight in the overall evaluation.

[0038] The internal score of the tower grounding device under impulse grounding resistance is 100 points, and the calculation formula is:

[0039]

[0040] Among them, R 冲 R′ is the internal score of the tower grounding device under impulse grounding resistance; 控 is the standard limit of the impulse grounding resistance, in Ω; R′ 实 is the actual value of impulse grounding resistance, in Ω;

[0041] The actual value of the impulse grounding resistance is obtained by the fitting formula of the impulse grounding resistance of the tower grounding device, and the fitting formula is obtained by the relevant national standards or research; since the actual value of the impulse grounding resistance is obtained by calculation rather than actual measurement, the reliability of the data is not as good as the actual on-site measurement value, and the weight in the overall assessment should be appropriately reduced in the subsequent planning weight.

[0042] According to the actual value of the corrosion rate of the tower grounding device and the standard limit of the corrosion rate of the grounding device, the corrosion rate level corresponding to the actual value of the tower grounding device under the corrosion rate is determined. The internal score of the tower grounding device under the corrosion rate of the grounding device is 100 points, and the calculation formula is:

[0043]

[0044] Among them, V 腐 V is the internal score of the tower grounding device under the grounding device corrosion rate; L V is the corrosion rate grade score; max V is the maximum value of the corrosion rate limit under the corrosion rate level, in g / (dm2·a); 实 is the actual value of corrosion rate, in g / (dm2·a); V min V is the minimum corrosion rate limit value under the corrosion rate level, in g / (dm2·a); s The evaluation score for the corrosion rate level;

[0045] The actual value of the corrosion rate is directly obtained by on-site measurement. Since the actual value of the corrosion rate of the tower grounding device can be obtained by on-site measurement, it has high authenticity and its weight in the overall assessment should be appropriately increased in subsequent planning weights.

[0046] The step voltage level is obtained according to the current threshold that the human body can tolerate. The internal score calculation formula of the tower grounding device under the step voltage is:

[0047]

[0048] Among them, U 跨总 is the internal score of the tower grounding device under step voltage; U L U is the step voltage level score; max is the maximum value of the step voltage limit under the step voltage level; U 实 is the actual value of the step voltage, obtained by simulating the tower parameters; U min is the minimum value of the step voltage limit under the step voltage level; U s It is the evaluation score of step voltage level;

[0049] The contact voltage level is obtained according to the current threshold that the human body can tolerate. The internal score calculation formula of the tower grounding device under the contact voltage is:

[0050]

[0051] Among them, U 接总 is the internal score of the tower grounding device under contact voltage; U′ L It is the contact voltage level score; U' max U′ is the maximum contact voltage limit under the contact voltage level; 实 is the actual value of contact voltage, obtained by simulation calculation of tower parameters; U′ minU′ is the minimum contact voltage limit under the contact voltage level; s It is the assessment score of contact voltage level.

[0052] In the above technical solution, the corrosion rate grades include corrosion rate grade I, corrosion rate grade II, corrosion rate grade III, corrosion rate grade IV and corrosion rate grade V; the method for judging the corrosion rate grade corresponding to the actual value of the tower grounding device at the corrosion rate is as follows: if the actual value of the corrosion rate is ≤1g / (dm2·a), the actual value of the tower grounding device at the corrosion rate corresponds to the corrosion rate grade I; if 1g / (dm2·a)<the actual value of the corrosion rate is ≤3g / (dm2·a), the tower grounding device at the corrosion rate is The actual value of the corrosion rate corresponds to the corrosion rate level II. If 3g / (dm2·a)<the actual value of the corrosion rate≤5g / (dm2·a), the actual value of the tower grounding device at the corrosion rate corresponds to the corrosion rate level III. If 5g / (dm2·a)<the actual value of the corrosion rate≤7g / (dm2·a), the actual value of the tower grounding device at the corrosion rate corresponds to the corrosion rate level IV. If the actual value of the corrosion rate>7g / (dm2·a), the actual value of the tower grounding device at the corrosion rate corresponds to the corrosion rate level V.

[0053] Table 1 Corrosion rate benchmark values ​​of grounding devices

[0054]

[0055]

[0056] The V L 、V max 、V min and V s The value of is as follows: If the corrosion rating is level I, V L =V 2 +V 3 +V 4 , Vmax=1g / (dm 2 a), Vmin=0g / (dm 2 a), V s =V 1 ; If the corrosion rating is Ⅱ, V L =V 3 +V 4 , Vmax=3g / (dm 2 a), Vmin=1g / (dm 2 a), V s =V 2 ; If the corrosion rating is level III, V L =V 4 , Vmax=5g / (dm2 a), Vmin = 3 g / (dm 2 a), V s =V 3 ; If the corrosion rating is IV, V L =0, Vmax = 7g / (dm 2 a), Vmin=5g / (dm 2 a), V s =V 4 ; If the corrosion rating is level V, the overall score for determining the operating status of the tower grounding device is 0 points;

[0057] The evaluation score V 1 、V 2 、V 3 and V 4 It is obtained through the graded evaluation score algorithm and the actual tower data optimization, and meets V 1 +V 2 +V 3 +V 4 =100.

[0058] In the above technical solution, the step voltage level is obtained according to the current threshold that the human body can tolerate, including step voltage level I, step voltage level II, step voltage level III and step voltage level IV;

[0059] When the human body endures the current I 1 When there is no threat to personal safety, the step voltage level is step voltage level I; when the human body is enduring current I 2 When the human body is enduring the current I 3 When the human body is subjected to the current I 4 There is a risk of life and the degree of danger is very high. The step voltage level is step voltage level IV. Among them, step voltage level I has the highest safety and poses almost no threat to human safety, while step voltage level IV has the lowest safety and poses the greatest threat to human safety.

[0060] The U L , U max , U min , U s The confirmation method is: if the step voltage level is step voltage level I, U L =U 2 +U 3 , U max is the maximum value of the step voltage I level range, U min is the minimum value of the step voltage I level range, Us =U 1 ; If the step voltage level is step voltage level II, U L =U 3 , U max is the maximum value of step voltage level II, U min is the minimum value of step voltage II level range, U s =U 2 ; If the step voltage level is step voltage level III, U L =0,U max is the maximum value of step voltage level III, U min is the minimum value of step voltage level III, U s =U 3 ; If the step voltage level is step voltage level IV, the overall score for determining the operating status of the tower grounding device is 0 points;

[0061] The evaluation score U 1 , U 2 and U 3 It is obtained through the optimization of graded evaluation score algorithm and actual tower data.

[0062] Table 3. Ratio of step voltage safety level assessment scores

[0063]

[0064] In the above technical solution, the contact voltage level is obtained according to the current threshold that the human body can tolerate, including contact voltage level I, contact voltage level II, contact voltage level III and contact voltage level IV;

[0065] When the human body endures the current I 1 'When there is no threat to personal safety, the step voltage level is contact voltage level I; when the human body is enduring current I 2 ' can get rid of it by itself, and the threat to personal safety is small. The step voltage level is contact voltage level II; when the human body is enduring the current I 3 'When the human body is subjected to the current I 4 'There is a risk of life, and the degree of danger is very high. The step voltage level is contact voltage level IV. Among them, contact voltage level I has the highest safety, and the threat to human safety is almost zero, while contact voltage level IV has the lowest safety and poses the greatest threat to human safety.

[0066] The U′ L , U′ max , U′ min , U′ sThe confirmation method is: if the contact voltage level is contact voltage level I, U' L =U' 2 +U' 3 , U′ max is the maximum value of the contact voltage level I, U′ min is the minimum value of the contact voltage level I range, U' s =U' 1 ; If the contact voltage level is contact voltage level II, U' L =U' 3 , U′ max is the maximum value of the contact voltage level II, U min is the minimum value of the contact voltage level II range, U' s =U' 2 ; If the contact voltage level is contact voltage level III, U' L =0, U′ max is the maximum value of the contact voltage level III, U′ min is the minimum value of the contact voltage level III, U' s =U' 3 ; If the contact voltage level is contact voltage level IV, the overall score for determining the operating status of the tower grounding device is 0 points;

[0067] The evaluation score U' 1 , U' 2 and U' 3 It is obtained through the optimization of graded evaluation score algorithm and actual tower data.

[0068] Table 4. Percentage of contact voltage safety level assessment scores

[0069]

[0070] In the above technical solution, if the actual value of the evaluation index exceeds the standard limit, it can be determined that the safety status of the tower grounding device is unqualified.

[0071] Due to the large number of pole towers in actual situations, it is difficult to measure the step voltage and touch voltage for each pole tower individually. Therefore, the actual value of the step voltage and the actual value of the touch voltage are obtained by simulation calculation of the pole tower parameters. The standard limit of the step voltage and the standard limit of the touch voltage are calculated based on the fitting formula of the step voltage and contact voltage limit calculated based on the personal safety limit. Since the data are all obtained by calculation, the reliability of the data is not as good as the actual measurement. When planning the weights in the subsequent period, the weight in the overall assessment should be appropriately reduced.

[0072] In the above technical solution, the specific implementation of the hierarchical evaluation score algorithm is as follows:

[0073] Firstly, an initial value of the evaluation score corresponding to each grade is assigned, and a number of pole tower grounding devices are randomly set. Based on the initial value of the evaluation score of the evaluation index, the part of the index of the several pole tower grounding devices is scored, and it is determined whether the score corresponds to the operation status of the index of the several pole tower grounding devices. If it corresponds, the evaluation score corresponding to each grade is considered appropriate. If not, the evaluation score corresponding to each grade is continuously changed until it corresponds. If it is reasonable, the evaluation score corresponding to each grade of the index is verified using the data of the actual pole tower. If it is unreasonable, the scores of each level are re-planned. When the actual pole tower data is used to verify the evaluation method, if the verification result is in line with expectations, the evaluation score corresponding to each grade can be determined, otherwise the scores of each level are recalculated.

[0074] In the above technical solution, the method for obtaining the weight of the evaluation index in the overall evaluation in the grounding device overall scoring module 2 is as follows: Figure 3 As shown:

[0075] Step 2.1, based on the historical tower data of the tower grounding device, determine the historical internal score of the tower grounding device under each evaluation index;

[0076] Step 2.2, setting the initial weight value of each evaluation index, and using the initial weight value of each evaluation index and the historical internal score of the tower grounding device under each evaluation index, calculating the historical overall score of the tower grounding device;

[0077] Step 2.3: If the overall historical score matches the operating status of the tower grounding device, the initial weight value of each evaluation index is consistent with expectations, and the initial weight value of each evaluation index is used as the weight of each evaluation index.

[0078] The basis for selecting the initial value of the weight of the evaluation index is:

[0079] The corrosion rate of the grounding device and the parameters of the power frequency grounding resistance are obtained by on-site online measurement, which have good reference value, so their evaluation weight is relatively large; the impulse grounding resistance, step voltage and contact voltage of the tower are mostly obtained by simulation calculation, and the calculated values ​​will be different from the actual values. Considering the error reasons, their weight is slightly reduced; if the impulse grounding resistance of the tower and the nearby step voltage and contact voltage can be measured on-site, the weights of the three should be increased accordingly in the status assessment of the tower; considering that the step voltage and contact voltage involve the personal safety of operation and maintenance personnel and nearby residents, their weights should be slightly larger; the weight relationship of the evaluation indicators is: k1=k3>k4=k5>k2, among which, k 1 k is the power frequency grounding resistance in the total assessment weight; 2 k is the total assessment weight of the impulse grounding resistance; 3 k is the corrosion rate of the grounding device in the total assessment weight;4 k is the total evaluation weight of step voltage; 5 The contact voltage accounts for the total evaluation weight, and the recommended values ​​are as follows (appropriate adjustments can be made based on the specific measurement conditions of the grounding device): k1=k3=0.25, k2=0.12, k4=k5=0.19.

[0080] In the above technical solution, the specific implementation method of the grounding device overall scoring module 2 to determine the overall score of the tower grounding device operating status is:

[0081] Based on the internal scoring of the evaluation index and the weight of the evaluation index, the safety status of the tower grounding device is generally evaluated. The overall score calculation formula for the operation status of the tower grounding device is:

[0082] S=R 工 ×k 1 +R 冲 ×k 2 +V 腐 ×k 3 +U 跨总 ×k 4 +U 接总 ×k 5

[0083] Where: S is the overall score of the tower grounding device operating status; R 工 is the internal score of the tower grounding device under power frequency grounding resistance; R 冲 V is the internal score of the tower grounding device under impulse grounding resistance; 腐 is the internal score of the tower grounding device under the grounding device corrosion rate; U 跨总 is the internal score of the tower grounding device under step voltage; U 接总 k is the internal score of the tower grounding device under contact voltage; 1 k is the power frequency grounding resistance in the total assessment weight; 2 k is the total assessment weight of the impulse grounding resistance; 3 k is the corrosion rate of the grounding device in the total assessment weight; 4 k is the total evaluation weight of step voltage; 5 The contact voltage accounts for the total assessment weight;

[0084] The k 1 +k 2 +k 3 +k 4 +k 5 =1.

[0085] In the above technical solution, the method for determining the safety level of the tower grounding device by the grounding device level assessment module 3 is: determining the safety level of the grounding device according to the overall score range of each safety level and the overall score of the grounding device; the safety level of the tower grounding device includes very safe (V 1 ), safer (V 2 )、Safety(V 3 ), less safe (V 4 ), unsafe(V 5 ) 5 levels; the V 1 The overall score range of the tower grounding device operation status corresponding to the level is 85-100. 2 The overall score range of the tower grounding device operation status corresponding to the level is 70-85. 3 The overall score range of the tower grounding device operation status corresponding to the level is 60-70. 4 The overall score range of the tower grounding device operation status corresponding to the level is 40 to 60. 5 The overall score range of the tower grounding device operation status corresponding to the level is <40;

[0086] The grounding device level assessment module 3 proposes corresponding safety rectification measures for different safety levels as follows: When the safety level of the grounding device is a preset level, the grounding device is rectified and repaired:

[0087] The V 1 Grade means that the grounding device is in good condition and the performance indicators are almost not reduced;

[0088] The V 2 The level indicates that the grounding device is currently in good operating condition, some electrodes may be slightly corroded, the electrical performance of the grounding device is slightly reduced, the possibility of failure is low, and the maintenance cycle can be appropriately extended;

[0089] The V 3 The level indicates that the tower grounding device is in safe operation. Some key electrical performance indicators may increase significantly, but are still within safety limits. The electrodes may be moderately corroded, and regular maintenance of the grounding device should be ensured.

[0090] The V 4 The level indicates that there is a high safety risk in the operation of the tower grounding device. Due to the long operation period or the harsh operating environment, the electrode corrosion is serious, and some key electrical performance indicators have declined significantly. The grounding device can continue to operate for a period of time when the ground current is limited to a low level, but its key electrical parameters should be retested in time to further confirm the safety status. If there is indeed a high safety risk, rectification and maintenance should be carried out;

[0091] The V 5 The level means that there is a high safety risk in the operation of the tower grounding device. The key electrical performance of the grounding device is greatly reduced. The electrodes may have been severely corroded. When the ground current is high, there is a high possibility of safety accidents. The grounding device should be rectified and repaired.

[0092] A method for evaluating the operating status of a transmission line tower grounding device, such as Figure 2 As shown, it includes the following steps:

[0093] Step 1: evaluate the operation status of the tower grounding device according to the state characterization index of the tower grounding device itself and the effect index on personal safety, determine the evaluation indexes of the tower grounding device and the standard limit values ​​of the evaluation indexes, and obtain the internal score of the tower grounding device under each evaluation index according to the actual value of the tower grounding device under each evaluation index and the standard limit values ​​of each evaluation index;

[0094] Step 2, determining the weight of the evaluation index in the overall evaluation, and determining the overall score of the operating status of the tower grounding device based on the internal score of the tower grounding device under each evaluation index and the weight of each evaluation index in the overall evaluation;

[0095] Step 3: Determine the safety level of the tower grounding device based on the overall score of the tower grounding device operation status, and propose corresponding safety rectification measures for different safety levels.

[0096] In the above technical solution, the standard limits of the evaluation indicators determined in step 1 include:

[0097] The standard limit value of the power frequency grounding resistance in the evaluation index is obtained according to the control value of the tower grounding resistance with different soil resistivity in the grounding design standard of AC electrical equipment;

[0098] The standard limit of impulse grounding resistance in the evaluation index is calculated based on the lightning resistance level of transmission lines of different voltage levels and the resistivity of the surrounding soil;

[0099] The standard limit value of the corrosion rate of the grounding device in the evaluation index is obtained according to the evaluation standard for soil corrosivity of the grounding grid;

[0100] The step voltage standard limit value in the evaluation index is calculated based on the human body tolerance current limit value and the human body resistance value under step conditions;

[0101] The standard limit of contact voltage in the evaluation index is calculated based on the human body tolerance current limit and the human body resistance value when in contact with the tower;

[0102] The method of obtaining the internal score of the tower grounding device under each evaluation index according to the actual value of the tower grounding device under each evaluation index and the standard limit value of each evaluation index in step 1 includes:

[0103] The internal score calculation formula of the tower grounding device under power frequency grounding resistance is as follows:

[0104]

[0105] Among them, R 工 is the internal score of the tower grounding device under power frequency grounding resistance; R 控 is the standard limit of the power frequency grounding resistance; R 实 is the actual value of the power frequency grounding resistance;

[0106] The internal score calculation formula of the tower grounding device under impulse grounding resistance is:

[0107]

[0108] Among them, R 冲 R′ is the internal score of the tower grounding device under impulse grounding resistance; 控 is the standard limit value of the impulse grounding resistance; R′ 实 is the actual value of impulse grounding resistance;

[0109] According to the actual value of the corrosion rate of the tower grounding device and the standard limit value of the corrosion rate of the grounding device, the corrosion rate level corresponding to the actual value of the tower grounding device under the corrosion rate is determined. The internal score calculation formula of the tower grounding device under the corrosion rate of the grounding device is:

[0110]

[0111] Among them, V 腐 V is the internal score of the tower grounding device under the grounding device corrosion rate; L V is the corrosion rate grade score; max V is the maximum value of the corrosion rate limit under the corrosion rate level; 实 is the actual value of corrosion rate; V min V is the minimum corrosion rate limit value under the corrosion rate level; s The evaluation score for the corrosion rate level;

[0112] The step voltage level is obtained according to the current threshold that the human body can tolerate. The internal score calculation formula of the tower grounding device under the step voltage is:

[0113]

[0114] Among them, U 跨总 is the internal score of the tower grounding device under step voltage; U L U is the step voltage level score; max is the maximum value of the step voltage limit under the step voltage level; U 实 is the actual value of the step voltage, obtained by simulating the tower parameters; U min is the minimum value of the step voltage limit under the step voltage level; U s It is the evaluation score of step voltage level;

[0115] The contact voltage level is obtained according to the current threshold that the human body can tolerate. The internal score calculation formula of the tower grounding device under the contact voltage is:

[0116]

[0117] Among them, U 接总 is the internal score of the tower grounding device under contact voltage; U′ L It is the contact voltage level score; U' max U′ is the maximum contact voltage limit under the contact voltage level; 实 is the actual value of contact voltage, obtained by simulation calculation of tower parameters; U′ min U′ is the minimum contact voltage limit under the contact voltage level; s It is the assessment score of contact voltage level.

[0118] According to the actual value of the corrosion rate of the tower grounding device and the standard limit value of the corrosion rate of the grounding device, determine the corrosion rate level corresponding to the actual value of the tower grounding device under the corrosion rate, wherein the corrosion rate level includes corrosion rate level I, corrosion rate level II, corrosion rate level III, corrosion rate level IV and corrosion rate level V;

[0119] When the corrosion rate is level I, V L =V 2 +V 3 +V 4 , Vmax=1g / (dm 2 a), Vmin=0g / (dm 2 a), V s =V 1 , when V 实 When it is less than or equal to Vmax in corrosion rate level I, the corrosion rate level corresponding to the actual value of the tower grounding device under the corrosion rate is level I;

[0120] When the corrosion rate is level II, V L =V 3 +V 4, Vmax=3g / (dm 2 a), Vmin = 1g / (dm 2 a), V s =V 2 , when V 实 When it is between Vmax and Vmin in the corrosion rate level II, the corrosion rate level corresponding to the actual value of the tower grounding device under the corrosion rate is level II;

[0121] When the corrosion rate is level III, V L =V 4 , Vmax=5g / (dm 2 a), Vmin = 3 g / (dm 2 a), V s =V 3 , when V 实 When it is between Vmax and Vmin in the corrosion rate level III, the corrosion rate level corresponding to the actual value of the tower grounding device under the corrosion rate is level III;

[0122] When the corrosion rate is level IV, V L =0, Vmax = 7g / (dm 2 a), Vmin=5g / (dm 2 a), V s =V 4 , when V 实 When it is between Vmax and Vmin in the corrosion rate level IV, the corrosion rate level corresponding to the actual value of the tower grounding device under the corrosion rate is level IV;

[0123] When the corrosion rate is level V, Vmin=7g / (dm 2 ·a), when V 实 More than 7g / (dm 2 a), the actual value of the tower grounding device under the corrosion rate corresponds to the corrosion rate level V, and the overall score for determining the operating status of the tower grounding device is 0 points;

[0124] The evaluation score V 1 、V 2 、V 3 and V 4 It is obtained through the optimization of graded evaluation score algorithm and actual tower data.

[0125] The step voltage level is obtained according to the current threshold that the human body can tolerate, including step voltage level I, step voltage level II, step voltage level III and step voltage level IV;

[0126] The U L , U max , Umin , U s The confirmation method is: if the step voltage level is step voltage level I, U L =U 2 +U 3 , U max is the maximum value of the step voltage I level range, U min is the minimum value of the step voltage I level range, U s =U 1 ; If the step voltage level is step voltage level II, U L =U 3 , U max is the maximum value of step voltage level II, U min is the minimum value of step voltage level II, U s =U 2 ; If the step voltage level is step voltage level III, U L =0,U max is the maximum value of step voltage level III, U min is the minimum value of the step voltage level III, U s =U 3 ; If the step voltage level is step voltage level IV, the overall score for determining the operating status of the tower grounding device is 0 points;

[0127] The evaluation score U 1 , U 2 and U 3 It is obtained through the optimization of graded evaluation score algorithm and actual tower data.

[0128] The contact voltage level is obtained based on the current threshold that the human body can tolerate, including contact voltage level I, contact voltage level II, contact voltage level III and contact voltage level IV;

[0129] The U′ L , U′ max , U′ min , U′ s The confirmation method is: if the contact voltage level is contact voltage level I, U' L =U' 2 +U' 3 , U′ max is the maximum value of the contact voltage level I, U′ min is the minimum value of the contact voltage level I range, U' s =U' 1 ; If the contact voltage level is contact voltage level II, U' L =U' 3 , U′ max is the maximum value of the contact voltage level II, U′ minis the minimum value of the contact voltage level II range, U' s =U' 2 ; If the contact voltage level is contact voltage level III, U' L =0, U′ max is the maximum value of the contact voltage level III, U′ min is the minimum value of the contact voltage level III, U' s =U' 3 ; If the contact voltage level is contact voltage level IV, the overall score for determining the operating status of the tower grounding device is 0 points;

[0130] The evaluation score U' 1 , U' 2 and U' 3 Obtained through the hierarchical evaluation score algorithm and data optimization of actual towers;

[0131] The specific implementation method of the hierarchical evaluation score algorithm is as follows: first, an initial value of the evaluation score corresponding to each grade is assigned, a number of pole tower grounding devices are randomly set, and the partial indicators of the several pole tower grounding devices are scored based on the initial value of the evaluation score of the evaluation indicator, and it is determined whether this score corresponds to the operating conditions of the indicator of the several pole tower grounding devices. If it corresponds, it is considered that the evaluation score corresponding to each grade is appropriate. If not, the evaluation score corresponding to each grade is continuously changed until it corresponds.

[0132] The method for obtaining the weight of the evaluation index in the overall evaluation in step 2 is:

[0133] Step 2.1, based on the historical tower data of the tower grounding device, determine the historical internal score of the tower grounding device under each evaluation index;

[0134] Step 2.2, setting the initial weight value of each evaluation index, and using the initial weight value of each evaluation index and the historical internal score of the tower grounding device under each evaluation index, calculating the historical overall score of the tower grounding device;

[0135] Step 2.3, if the historical overall score matches the operating status of the tower grounding device, then the initial weight value of each evaluation index is consistent with expectations, and the initial weight value of each evaluation index is used as the weight of each evaluation index;

[0136] The specific implementation method of step 2 for determining the overall score of the tower grounding device operating status is:

[0137] Based on the internal scoring of the evaluation index and the weight of the evaluation index, the safety status of the tower grounding device is generally evaluated. The overall score calculation formula for the operation status of the tower grounding device is:

[0138] S=R 工 ×k 1 +R 冲 ×k 2 +V 腐 ×k 3 +U 跨总 ×k 4 +U 接总 ×k 5

[0139] Where: S is the overall score of the tower grounding device operating status; R 工 is the internal score of the tower grounding device under power frequency grounding resistance; R 冲 V is the internal score of the tower grounding device under impulse grounding resistance; 腐 is the internal score of the tower grounding device under the grounding device corrosion rate; U 跨总 is the internal score of the tower grounding device under step voltage; U 接总 k is the internal score of the tower grounding device under contact voltage; 1 k is the power frequency grounding resistance in the total assessment weight; 2 k is the total assessment weight of the impulse grounding resistance; 3 k is the corrosion rate of the grounding device in the total assessment weight; 4 k is the total evaluation weight of step voltage; 5 is the contact voltage in the total assessment weight; k 1 +k 2 +k 3 +k 4 +k 5 =1;

[0140] The method for determining the safety level of the tower grounding device in step 3 is: determining the safety level of the tower grounding device according to the overall score range of each safety level and the overall score of the tower grounding device;

[0141] The step 3 proposes corresponding safety rectification measures for different safety levels as follows: when the safety level of the pole tower grounding device is a preset level, the pole tower grounding device is rectified and repaired.

[0142] The contents not described in detail in this specification belong to the prior art known to those skilled in the art. It should be understood by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.

[0143] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0144] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0145] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0146] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit its protection scope. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the field should understand that after reading the present invention, those skilled in the art can still make various changes, modifications or equivalent substitutions to the specific implementation methods of the invention, but these changes, modifications or equivalent substitutions are all within the protection scope of the pending claims of the invention.

Claims

1. A transmission line tower grounding device operating status assessment system, characterized in that: It includes an evaluation index internal scoring module (1), a grounding device overall scoring module (2), and a grounding device grade assessment module (3); The evaluation index internal scoring module (1) is used to evaluate the operation status of the tower grounding device according to the tower grounding device's own status characterization index and the impact effect index on personal safety, determine the actual value of the tower grounding device under each evaluation index and the standard limit value of each evaluation index, and obtain the internal score of the tower grounding device under each evaluation index according to the actual value of the tower grounding device under each evaluation index and the standard limit value of each evaluation index; The grounding device overall scoring module (2) is used to determine the weight of each evaluation index in the overall evaluation, and determine the overall score of the tower grounding device operating status based on the internal score of the tower grounding device under each evaluation index and the weight of each evaluation index in the overall evaluation; The grounding device level assessment module (3) is used to determine the safety level of the tower grounding device according to the overall score of the tower grounding device operation status, and to propose corresponding safety rectification measures for different safety levels; The evaluation index internal scoring module (1) obtains the internal score of the tower grounding device under each evaluation index according to the actual value of the tower grounding device under each evaluation index and the standard limit value of each evaluation index, including: The internal score calculation formula of the tower grounding device under power frequency grounding resistance is as follows: Among them, R 工 is the internal score of the tower grounding device under power frequency grounding resistance; R 控 is the standard limit of the power frequency grounding resistance; R 实 is the actual value of the power frequency grounding resistance; The internal score calculation formula of the tower grounding device under impulse grounding resistance is: Among them, R 冲 R′ is the internal score of the tower grounding device under impulse grounding resistance; 控 is the standard limit value of the impulse grounding resistance; R′ 实 is the actual value of impulse grounding resistance; According to the actual value of the corrosion rate of the tower grounding device and the standard limit value of the corrosion rate of the grounding device, the corrosion rate level corresponding to the actual value of the tower grounding device under the corrosion rate is determined. The internal score calculation formula of the tower grounding device under the corrosion rate of the grounding device is: Among them, V 腐 V is the internal score of the tower grounding device under the grounding device corrosion rate; L V is the corrosion rate grade score; max V is the maximum value of the corrosion rate limit under the corrosion rate level; 实 is the actual value of corrosion rate; V min V is the minimum corrosion rate limit value under the corrosion rate level; s The evaluation score for the corrosion rate level; The step voltage level is obtained according to the current threshold that the human body can tolerate. The internal score calculation formula of the tower grounding device under the step voltage is: Among them, U 跨总 is the internal score of the tower grounding device under step voltage; U L U is the step voltage level score; max is the maximum value of the step voltage limit under the step voltage level; U 实 is the actual value of the step voltage, obtained by simulating the tower parameters; U min is the minimum value of the step voltage limit under the step voltage level; U s It is the evaluation score of step voltage level; The contact voltage level is obtained based on the current threshold that the human body can tolerate. The internal score calculation formula of the tower grounding device under the contact voltage is: Among them, U 接总 is the internal score of the tower grounding device under contact voltage; U′ L It is the contact voltage level score; U' max U′ is the maximum contact voltage limit under the contact voltage level; 实 is the actual value of contact voltage, obtained by simulation calculation of tower parameters; U′ min U′ is the minimum contact voltage limit under the contact voltage level; s It is the assessment score of contact voltage level.

2. The transmission line tower grounding device operation status evaluation system according to claim 1, characterized in that: The self-status characterization indicators of the tower grounding device include power frequency grounding resistance value, impulse grounding resistance value, grounding device corrosion rate, and conduction resistance value; The indicators of impact on personal safety include contact voltage, step voltage, and ground potential gradient; The evaluation indicators include power frequency grounding resistance, impulse grounding resistance, grounding device corrosion rate, step voltage and contact voltage.

3. The transmission line tower grounding device operation status evaluation system according to claim 1, characterized in that: The standard limit values ​​of the evaluation indicators determined by the evaluation indicator internal scoring module (1) include: The standard limit value of the power frequency grounding resistance in the evaluation index is obtained according to the control value of the tower grounding resistance with different soil resistivity in the grounding design standard of AC electrical equipment; The standard limit of impulse grounding resistance in the evaluation index is calculated based on the lightning resistance level of transmission lines of different voltage levels and the resistivity of the surrounding soil; The standard limit value of the corrosion rate of the grounding device in the evaluation index is obtained according to the evaluation standard for soil corrosivity of the grounding grid; The step voltage standard limit value in the evaluation index is calculated based on the human body tolerance current limit value and the human body resistance value under step conditions; The standard limit of contact voltage in the evaluation index is calculated based on the human body tolerance current limit and the human body resistance value when in contact with the pole tower.

4. The transmission line tower grounding device operation status evaluation system according to claim 1, characterized in that: According to the actual value of the corrosion rate of the tower grounding device and the standard limit value of the corrosion rate of the grounding device, the corrosion rate level corresponding to the actual value of the tower grounding device under the corrosion rate is determined, including: The corrosion rate grades include corrosion rate grade I, corrosion rate grade II, corrosion rate grade III, corrosion rate grade IV and corrosion rate grade V; When the corrosion rate is level I, V L =V2+V3+V4, Vmax=1g / (dm 2 a), Vmin=0g / (dm 2 a), V s = V1, when V 实 When it is less than or equal to Vmax in the corrosion rate level I, the corrosion rate level corresponding to the actual value of the tower grounding device under the corrosion rate is level I; When the corrosion rate is level II, V L =V3+V4, Vmax=3g / (dm 2 a), Vmin = 1g / (dm 2 a), V s = V2, when V 实 When it is between Vmax and Vmin in the corrosion rate level II, the corrosion rate level corresponding to the actual value of the tower grounding device under the corrosion rate is level II; When the corrosion rate is level III, V L =V4, Vmax = 5g / (dm 2 a), Vmin = 3 g / (dm 2 a), V s = V3, when V 实 When it is between Vmax and Vmin in the corrosion rate level III, the corrosion rate level corresponding to the actual value of the tower grounding device under the corrosion rate is level III; When the corrosion rate is level IV, V L =0, Vmax = 7g / (dm 2 a), Vmin=5g / (dm 2 a), V s = V4, when V 实 When it is between Vmax and Vmin in the corrosion rate level IV, the corrosion rate level corresponding to the actual value of the tower grounding device under the corrosion rate is level IV; When the corrosion rate is level V, Vmin=7g / (dm 2 ·a), when V 实 More than 7g / (dm 2 a), the actual value of the tower grounding device under the corrosion rate corresponds to the corrosion rate level V, and the overall score for determining the operating status of the tower grounding device is 0 points; The evaluation scores V1, V2, V3 and V4 are obtained by optimizing the graded evaluation score algorithm and actual tower data.

5. The transmission line tower grounding device operation status evaluation system according to claim 1, characterized in that: Step voltage level I, step voltage level II, step voltage level III and step voltage level IV, wherein the step voltage level is obtained based on the current threshold that the human body can tolerate, including; If the step voltage level is step voltage level Ⅰ, U L =U2+U3,U max is the maximum value of step voltage level I, U min is the minimum value of step voltage level I, U s =U1, when the human body is enduring the current I1, there is no threat to personal safety, and the step voltage level is step voltage level I; If the step voltage level is step voltage level II, U L =U3,U max is the maximum value of step voltage level II, U min is the minimum value of step voltage II level range, U s =U2, when the human body can get rid of the current I2 by itself, the threat to personal safety is small, and the step voltage level is step voltage level II; If the step voltage level is step voltage level III, U L =0,U max is the maximum value of step voltage level III, U min is the minimum value of step voltage level III, U s =U3, when the human body endures the current I3, it will have physiological reactions such as increased blood pressure and difficulty breathing, but the heart will not be damaged. The danger is relatively high, and the step voltage level is step voltage level III; If the step voltage level is step voltage level IV, the overall score of the tower grounding device operation status is determined to be 0 points. When a human body endures the current I4, there is a risk of life, and the degree of danger is very high. The step voltage level is step voltage level IV. The evaluation scores U1, U2 and U3 are obtained by optimizing the graded evaluation score algorithm and actual tower data.

6. The transmission line tower grounding device operation status evaluation system according to claim 1, characterized in that: The contact voltage level is obtained based on the current threshold that the human body can tolerate, including contact voltage level I, contact voltage level II, contact voltage level III and contact voltage level IV; If the contact voltage level is contact voltage level I, U′ L =U'2+U'3,U' max is the maximum value of the contact voltage level I, U' min is the minimum value of the contact voltage level range, U' s =U'1, when the human body is enduring the current I1', there is no threat to personal safety, and the step voltage level is contact voltage level I; If the contact voltage level is contact voltage level II, U' L =U'3,U' max is the maximum value of the contact voltage level II, U′ min is the minimum value of the contact voltage level II range, U' s =U'2, when the human body can get rid of the current I2' by itself, the threat to personal safety is small, and the step voltage level is contact voltage level II; If the contact voltage level is contact voltage level III, U' L =0, U′ max is the maximum value of the contact voltage level III, U′ min is the minimum value of the contact voltage level III, U' s =U'3, when the human body endures the current I3', it will have physiological reactions such as increased blood pressure and difficulty breathing, but the heart will not be damaged. The danger is relatively high, and the step voltage level is contact voltage level III; If the contact voltage level is contact voltage level IV, the overall score of the tower grounding device operation status is determined to be 0 points. When the human body endures the current I4', there is a risk of life, and the degree of danger is very high. The step voltage level is contact voltage level IV; The evaluation scores U'1, U'2 and U'3 are obtained by optimizing the graded evaluation score algorithm and actual tower data.

7. The transmission line tower grounding device operation status evaluation system according to claim 4, 5 or 6, characterized in that: The specific implementation of the hierarchical evaluation score algorithm is as follows: Assigning a corresponding initial value of the evaluation score to each evaluation indicator corresponding to each level, randomly setting a number of pole tower grounding devices, determining the target scores of the several pole tower grounding devices under the corresponding evaluation indicators based on the initial values ​​of the evaluation scores of the various levels corresponding to the evaluation indicators, and judging whether the target scores correspond to the operating conditions of the indicators of the several pole tower grounding devices; If they correspond, then the initial values ​​of the evaluation scores corresponding to each evaluation indicator and each level are considered appropriate; If they do not correspond, the evaluation scores corresponding to each evaluation index and each level will be continuously changed until they correspond.

8. The transmission line tower grounding device operation status evaluation system according to claim 1, characterized in that: The method for obtaining the weight of the evaluation index in the overall evaluation in the grounding device overall scoring module (2) is as follows: Step 2.1, based on the historical tower data of the tower grounding device, determine the historical internal score of the tower grounding device under each evaluation index; Step 2.2, setting the initial weight value of each evaluation index, and using the initial weight value of each evaluation index and the historical internal score of the tower grounding device under each evaluation index, calculating the historical overall score of the tower grounding device; Step 2.3: If the overall historical score matches the operating status of the tower grounding device, the initial weight value of each evaluation index is consistent with expectations, and the initial weight value of each evaluation index is used as the weight of each evaluation index.

9. The transmission line tower grounding device operation status evaluation system according to claim 2, characterized in that: The specific implementation method of the grounding device overall scoring module (2) for determining the overall score of the tower grounding device operating status is: Based on the internal scoring of the evaluation index and the weight of the evaluation index, the safety status of the tower grounding device is generally evaluated. The overall score calculation formula for the operation status of the tower grounding device is: S=R 工 ×k1+R 冲 ×k2+V 腐 ×k3+U 跨总 ×k4+U 接总 ×k5 Where: S is the overall score of the tower grounding device operating status; R 工 is the internal score of the tower grounding device under power frequency grounding resistance; R 冲 V is the internal score of the tower grounding device under impulse grounding resistance; 腐 is the internal score of the tower grounding device under the grounding device corrosion rate; U 跨总 is the internal score of the tower grounding device under step voltage; U 接总 is the internal score of the tower grounding device under contact voltage; k1 is the power frequency grounding resistance in the total evaluation weight; k2 is the impulse grounding resistance in the total evaluation weight; k3 is the corrosion rate of the grounding device in the total evaluation weight; k4 is the step voltage in the total evaluation weight; k5 is the contact voltage in the total evaluation weight; among them, k1+k2+k3+k4+k5=1 must be satisfied.

10. The transmission line tower grounding device operation status evaluation system according to claim 1, characterized in that: The method for determining the safety level of the pole tower grounding device by the grounding device level assessment module (3) is: determining the safety level of the pole tower grounding device according to the overall score range of each safety level and the overall score of the pole tower grounding device; The grounding device level assessment module (3) proposes corresponding safety rectification measures for different safety levels as follows: when the safety level of the pole tower grounding device is a preset level, the pole tower grounding device is rectified and repaired.

11. A method for evaluating the operating status of a transmission line tower grounding device using the system of claim 1, characterized in that: It includes the following steps: Step 1: evaluate the operation status of the tower grounding device according to the state characterization index of the tower grounding device itself and the effect index on personal safety, determine the evaluation indexes of the tower grounding device and the standard limit values ​​of the evaluation indexes, and obtain the internal score of the tower grounding device under each evaluation index according to the actual value of the tower grounding device under each evaluation index and the standard limit values ​​of each evaluation index; Step 2, determining the weight of the evaluation index in the overall evaluation, and determining the overall score of the operating status of the tower grounding device based on the internal score of the tower grounding device under each evaluation index and the weight of each evaluation index in the overall evaluation; Step 3: Determine the safety level of the tower grounding device based on the overall score of the tower grounding device operation status, and propose corresponding safety rectification measures for different safety levels.

12. A computer-readable storage medium having a computer program stored thereon, wherein the computer program performs the method according to claim 11 when executed.

Citation Information

Patent Citations

  • Method for evaluating influence and damage of goafs on power transmission lines

    CN105488241A

  • Cloud-model-based transformer station grounding grid state evaluation method

    CN105894096A

  • Evaluation method for corrosion state of in-service power transmission line rod tower and metal framework

    CN109520913A

  • Method for evaluating state of grounding grid of transformer substation, and computer system

    CN110265906A

  • Overhead line aging state multi-index comprehensive rating method

    CN110490452A