Method and device for monitoring the long life of nuclear power steam turbine rotor stress corrosion and fatigue

By acquiring and analyzing the stress data of the nuclear power steam turbine rotor, calculating its stress corrosion and fatigue life, and optimizing the abnormal data in the design stage, the problem of the nuclear power steam turbine's failure to effectively monitor stress corrosion is solved and the long-life and safe operation of the rotor is ensured.

CN116776586BActive Publication Date: 2024-10-11SHANGHAI POWER EQUIPMENT RESEARCH INSTITUTE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310715724.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-06-15
Publication Date
2024-10-11
Estimated Expiration
2043-06-15

AI Technical Summary

Technical Problem

The crack growth life safety monitoring of nuclear power steam turbines fails to effectively consider stress corrosion issues, resulting in insufficient operational safety.

Method used

By obtaining the basic stress calculation data and material testing data of the nuclear power steam turbine rotor, the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life are calculated, and based on these data, the crack growth life safety is monitored. If If the monitoring qualification conditions are not met, the abnormal data in the design stage should be optimized to improve the rotor structure.

Benefits of technology

Comprehensive consideration of stress corrosion, low-cycle fatigue and high-cycle fatigue ensures the long-life and safe operation of the nuclear power turbine rotor and improves the safety of the crack growth life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116776586B_ABST
    Figure CN116776586B_ABST
Patent Text Reader

Abstract

The present disclosure provides a method and device for monitoring the long life of stress corrosion and fatigue of a nuclear power steam turbine rotor. The method includes: obtaining the basic data of stress calculation and material test of the rotor of the nuclear power steam turbine, and obtaining the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life of the rotor based on the basic data of stress calculation and material test; based on the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life, the rotor is monitored for crack growth life safety, and if the rotor crack growth life safety monitoring does not meet the monitoring qualification conditions, the abnormal data of the rotor in the design stage is optimized and improved. Thus, the rotor can be monitored for crack growth life safety by comprehensively considering stress corrosion, low cycle fatigue and high cycle fatigue, so as to ensure the long life and safe operation of the nuclear power steam turbine rotor.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the technical field of nuclear power steam turbines, and in particular to a method, device, electronic equipment, storage medium and platform for monitoring the long life of rotor stress corrosion and fatigue of nuclear power steam turbines. Background Art

[0002] At present, with the aggravation of energy shortage, people are in urgent need of developing new energy to meet people's energy needs. Nuclear power is a clean energy, with no carbon dioxide emissions and little environmental impact; nuclear power is an efficient energy with high energy density and low resource consumption; nuclear power is a stable energy without intermittency, long utilization hours and stable power supply capacity; nuclear power is a safe energy with low possibility of accidents, and is an important option to enhance energy security. Nuclear power turbines are important equipment in nuclear power technology. In related technologies, crack propagation life safety monitoring of nuclear power turbines is required to ensure the normal operation of nuclear power turbines. However, the crack propagation life safety monitoring of nuclear power turbines does not take stress corrosion into consideration. Summary of the invention

[0003] The present disclosure aims to solve one of the technical problems in the above-mentioned technologies at least to some extent.

[0004] To this end, the first objective of the present disclosure is to provide a method for monitoring the long life of stress corrosion and fatigue of a rotor of a nuclear power steam turbine.

[0005] The second objective of the present disclosure is to provide a long-life monitoring device for rotor stress corrosion and fatigue of a nuclear power steam turbine.

[0006] A third objective of the present disclosure is to provide an electronic device.

[0007] A fourth objective of the present disclosure is to provide a computer-readable storage medium.

[0008] The fifth objective of the present disclosure is to provide a monitoring platform suitable for nuclear power steam turbines.

[0009] The first aspect of the present disclosure provides a method for monitoring the long-life stress corrosion and fatigue of a rotor of a nuclear power steam turbine, comprising: obtaining basic stress calculation data and material test basic data of the rotor of the nuclear power steam turbine, and obtaining the stress corrosion crack growth life, low-cycle fatigue crack growth life and high-cycle fatigue crack growth life of the rotor based on the stress calculation basic data and the material test basic data; based on the stress corrosion crack growth life, the low-cycle fatigue crack growth life and the high-cycle fatigue crack growth life, performing crack growth life safety monitoring on the rotor, if the crack growth life safety monitoring of the rotor does not meet the monitoring qualification conditions, obtaining abnormal data of the rotor in the design stage, and optimizing and improving the abnormal data of the rotor in the design stage.

[0010] The second aspect of the present disclosure provides a long-life monitoring device for stress corrosion and fatigue of a rotor of a nuclear power steam turbine, comprising: an acquisition module for acquiring basic stress calculation data and material test basic data of the rotor of the nuclear power steam turbine, and acquiring the stress corrosion crack growth life, low-cycle fatigue crack growth life and high-cycle fatigue crack growth life of the rotor based on the stress calculation basic data and the material test basic data; a monitoring module for performing crack growth life safety monitoring of the rotor based on the stress corrosion crack growth life, the low-cycle fatigue crack growth life and the high-cycle fatigue crack growth life, and if the crack growth life safety monitoring of the rotor does not meet the monitoring qualification conditions, acquiring abnormal data of the rotor in the design stage, and optimizing and improving the abnormal data of the rotor in the design stage.

[0011] The third aspect embodiment of the present disclosure proposes an electronic device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, the method for monitoring the rotor stress corrosion and fatigue long life of a nuclear power steam turbine as described in the first aspect embodiment of the present disclosure is implemented.

[0012] The fourth aspect of the present application provides a computer-readable storage medium having a computer program stored thereon. When the program is executed by a processor, the method for monitoring the rotor stress corrosion and fatigue long life of a nuclear power steam turbine as described in the first aspect of the present disclosure is implemented.

[0013] The fifth aspect embodiment of the present application proposes a monitoring platform suitable for a nuclear power steam turbine, including a rotor stress corrosion and fatigue long-life monitoring device for a nuclear power steam turbine as described in the second aspect embodiment of the present disclosure; or an electronic device as described in the third aspect embodiment of the present disclosure; or a computer-readable storage medium as described in the fourth aspect embodiment of the present disclosure.

[0014] The technical solution provided by the embodiment of the present disclosure brings at least the following beneficial effects: obtaining the basic stress calculation data and material test basic data of the rotor of the nuclear power steam turbine, and based on the basic stress calculation data and the basic material test data, obtaining the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life of the rotor, based on the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life, the rotor is subjected to crack growth life safety monitoring, if the rotor crack growth life safety monitoring does not meet the monitoring qualified conditions, the abnormal data of the rotor in the design stage is obtained, and the abnormal data of the rotor in the design stage is optimized and improved. Therefore, the rotor can be subjected to crack growth life safety monitoring by comprehensively considering stress corrosion, low cycle fatigue and high cycle fatigue, so as to ensure the long life and safe operation of the nuclear power steam turbine rotor.

[0015] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The above and / or additional aspects and advantages of the present disclosure will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0017] Figure 1 A schematic flow chart of a method for monitoring the long life of a rotor stress corrosion and fatigue of a nuclear power steam turbine according to an embodiment of the present disclosure;

[0018] Figure 2 A schematic flow chart of a method for monitoring the long life of a rotor stress corrosion and fatigue of a nuclear power steam turbine according to another embodiment of the present disclosure;

[0019] Figure 3 A schematic diagram of a process for obtaining stress corrosion crack growth life in a method for monitoring stress corrosion and fatigue long life of a nuclear power steam turbine rotor according to an embodiment of the present disclosure;

[0020] Figure 4 A schematic diagram of a process for obtaining high cycle fatigue crack growth life in a method for monitoring rotor stress corrosion and fatigue long life of a nuclear power steam turbine according to an embodiment of the present disclosure;

[0021] Figure 5 A schematic diagram of a process for obtaining low-cycle fatigue crack growth life in a method for monitoring rotor stress corrosion and fatigue long life of a nuclear power steam turbine according to an embodiment of the present disclosure;

[0022] Figure 6 A schematic flow chart of a method for monitoring the long life of a rotor stress corrosion and fatigue of a nuclear power steam turbine according to another embodiment of the present disclosure;

[0023] Figure 7It is a schematic structural diagram of a device for monitoring the rotor stress corrosion and fatigue long life of a nuclear power steam turbine according to an embodiment of the present disclosure;

[0024] Figure 8 The figure is a schematic diagram of the structure of an electronic device according to an embodiment of the present disclosure. DETAILED DESCRIPTION

[0025] Embodiments of the present disclosure are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present disclosure, and should not be construed as limiting the present disclosure.

[0026] The following describes the method, device, electronic equipment, storage medium and platform for long-life monitoring of stress corrosion and fatigue of a nuclear power steam turbine rotor in accordance with the embodiments of the present disclosure in conjunction with the accompanying drawings.

[0027] Figure 1 The present invention is a flow chart of a method for monitoring the long life of a nuclear power steam turbine rotor stress corrosion and fatigue according to an embodiment of the present invention.

[0028] like Figure 1 As shown, the method for monitoring the rotor stress corrosion and fatigue long life of a nuclear power steam turbine according to the embodiment of the present disclosure includes:

[0029] S101, obtaining stress calculation basic data and material test basic data of a rotor of a nuclear power steam turbine, and based on the stress calculation basic data and material test basic data, obtaining the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life of the rotor.

[0030] It should be noted that the method for long-life monitoring of rotor stress corrosion and fatigue of a nuclear power steam turbine according to the embodiment of the present disclosure can be executed by the device for long-life monitoring of rotor stress corrosion and fatigue of a nuclear power steam turbine according to the embodiment of the present disclosure, and the device for long-life monitoring of rotor stress corrosion and fatigue of a nuclear power steam turbine according to the embodiment of the present disclosure can be configured in any monitoring platform suitable for a nuclear power steam turbine to execute the method for long-life monitoring of rotor stress corrosion and fatigue of a nuclear power steam turbine according to the embodiment of the present disclosure.

[0031] It should be noted that there are no excessive restrictions on the basic data for stress calculation and the basic data for rotor material testing.

[0032] For example, the basic data for stress calculation include the maximum stress σ at the rotor crack site maxH , the maximum stress σ at the rotor crack site under normal shutdown transient conditions maxn , Maximum stress σ at the rotor crack site under transient conditions of 110% overspeed test max110%, Maximum stress σ at the rotor crack site under 120% overspeed transient condition max120% wait.

[0033] For example, the basic test data of rotor materials include the fracture toughness K of the rotor material. IC , Stress corrosion fracture toughness K of rotor material ISCC , annual average stress corrosion crack growth rate test value Crack shape parameter Q, high cycle fatigue crack growth threshold of rotor material Test values, etc.

[0034] It should be noted that the stress corrosion crack growth life refers to the crack growth life of the rotor when the damage type to which the rotor is subjected includes stress corrosion; the low-cycle fatigue crack growth life refers to the crack growth life of the rotor when the damage type to which the rotor is subjected includes low-cycle fatigue; and the high-cycle fatigue crack growth life refers to the crack growth life of the rotor when the damage type to which the rotor is subjected includes high-cycle fatigue.

[0035] In one embodiment, based on the stress calculation basic data and the material test basic data, the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life of the rotor are obtained, including inputting the stress calculation basic data and the material test basic data into the setting model, and the setting model outputs the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life of the rotor. It should be noted that there are no excessive restrictions on the setting model, for example, it can include a deep learning model.

[0036] S102, based on the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life, the crack growth life of the rotor is safely monitored. If the crack growth life safety monitoring of the rotor does not meet the qualified monitoring conditions, the abnormal data of the rotor in the design stage is obtained, and the abnormal data of the rotor in the design stage is optimized and improved.

[0037] It should be noted that there are not too many restrictions on the monitoring qualification conditions. For example, the stress corrosion crack growth life, low-cycle fatigue crack growth life and high-cycle fatigue crack growth life can be determined as monitoring qualification conditions if they are all greater than the set thresholds, and there are no excessive restrictions on the set thresholds.

[0038] In one embodiment, crack growth life safety monitoring of the rotor is performed based on stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life, including obtaining a rotor stress corrosion and fatigue long life monitoring criterion value, if the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life are all greater than or equal to the monitoring criterion value, it is determined that the crack growth life safety monitoring of the rotor meets the monitoring qualification condition, if at least one of the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life is less than the monitoring criterion value, it is determined that the crack growth life safety monitoring of the rotor does not meet the monitoring qualification condition.

[0039] In some examples, a mapping relationship between the rotor model and the monitoring criterion value can be established in advance to obtain the rotor stress corrosion and fatigue long life monitoring criterion value, including querying the monitoring criterion value in the above mapping relationship based on the rotor model, and determining the queried monitoring criterion value as the rotor stress corrosion and fatigue long life monitoring criterion value.

[0040] In one embodiment, if the crack propagation life safety monitoring of the rotor does not meet the monitoring qualification conditions, it also includes generating indication information for indicating that a safety abnormality has occurred in the rotor, so as to promptly inform the user that the safety abnormality has occurred in the rotor.

[0041] It should be noted that there are not too many restrictions on the abnormal data of the rotor in the design stage. For example, it may include the design process parameters of the rotor, the basic data for stress calculation of the rotor in the design stage, the basic data for rotor material testing, etc.

[0042] In one embodiment, the abnormal data of the rotor in the design stage is optimized and improved, including selecting materials with good stress corrosion resistance; selecting materials with good fatigue performance; adopting a welded rotor structure; adopting a whole rotor structure; avoiding structures that cause stress concentration in high stress areas; increasing the fillet radius of the rotor blade root slot structure to reduce the stress concentration coefficient; changing the axial key of the set impeller to a radial key; increasing the assembly gap between the set rotor key and the keyway; optimizing the starting parameter change curve of the nuclear power steam turbine to reduce the rotor thermal stress under the starting transient condition; optimizing the normal shutdown parameter change curve of the nuclear power steam turbine to reduce the rotor thermal stress under the shutdown transient condition; optimizing the load change parameter change curve of the nuclear power steam turbine to reduce the rotor thermal stress under the starting transient condition; using heat treatment technology to improve material toughness; improving processing accuracy and eliminating machining stress concentration; using heat treatment technology to reduce residual tensile stress; rolling the impeller surface to form surface compressive stress; shot peening the blade root slot to improve fatigue performance, etc.

[0043] In one embodiment, after optimizing and improving the abnormal data of the rotor in the design stage, it also includes returning to execute the process of obtaining stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life until the crack growth life safety monitoring of the rotor meets the monitoring qualification conditions.

[0044] In summary, according to the method for monitoring the long life of the rotor stress corrosion and fatigue of the nuclear power steam turbine of the embodiment of the present disclosure, the basic stress calculation data and the basic material test data of the rotor of the nuclear power steam turbine are obtained, and based on the basic stress calculation data and the basic material test data, the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life of the rotor are obtained. Based on the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life, the rotor is monitored for crack growth life safety. If the rotor crack growth life safety monitoring does not meet the monitoring qualification conditions, the abnormal data of the rotor in the design stage is obtained, and the abnormal data of the rotor in the design stage is optimized and improved. Therefore, the rotor can be monitored for crack growth life safety by comprehensively considering stress corrosion, low cycle fatigue and high cycle fatigue to ensure the long life and safe operation of the nuclear power steam turbine rotor.

[0045] Figure 2 The present invention is a flow chart of a method for monitoring the long life of a nuclear power steam turbine rotor stress corrosion and fatigue according to another embodiment of the present invention.

[0046] like Figure 2 As shown, the method for monitoring the rotor stress corrosion and fatigue long life of a nuclear power steam turbine according to the embodiment of the present disclosure includes:

[0047] S201, obtaining basic stress calculation data and material test basic data of a nuclear power steam turbine rotor.

[0048] For the relevant contents of step S201, please refer to the above embodiment, which will not be described again here.

[0049] S202, determining a set of crack extension sizes of the rotor based on stress calculation basic data and material experiment basic data.

[0050] It should be noted that there are no excessive restrictions on the crack extension size set. For example, it can include the stress corrosion crack extension size threshold value a SCC , high cycle fatigue crack growth size threshold value a th , high cycle fatigue critical crack size a cH , Low cycle fatigue critical crack size a of the rotor of nuclear power steam turbine under normal shutdown transient condition cn 、Critical crack size of low cycle fatigue of rotor in transient condition of nuclear power steam turbine 110% overspeed test a c110%, Low cycle fatigue critical crack size a of the rotor of nuclear power steam turbine under transient condition of 120% overspeed operation c120% wait.

[0051] In one implementation, based on stress calculation basic data and material experiment basic data, a set of crack extension sizes of a rotor is determined, including the following possible implementations:

[0052] Method 1: Determine the threshold value of the rotor stress corrosion crack extension size based on the rotor crack shape parameters, the rotor material stress corrosion fracture toughness and the maximum stress at the rotor crack site under steady-state conditions of nuclear power steam turbine under load operation.

[0053] Method 2: Determine the high-cycle fatigue crack extension size threshold of the rotor based on the crack shape parameters of the rotor, the test value of the high-cycle fatigue crack extension threshold of the rotor material, and the high-cycle fatigue stress range of the rotor under steady-state conditions of load operation of the nuclear power steam turbine.

[0054] Method 3: Determine the high cycle fatigue critical crack size of the rotor based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the rotor crack site under steady-state conditions of nuclear power steam turbine operation with load.

[0055] Method 4: Based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the rotor crack site under the normal shutdown transient condition of the nuclear power steam turbine, the low-cycle fatigue critical crack size of the rotor under the normal shutdown transient condition of the nuclear power steam turbine is determined.

[0056] Method 5: Based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the rotor crack site under the transient operating condition of the nuclear power steam turbine 110% overspeed test, the low-cycle fatigue critical crack size of the rotor under the transient operating condition of the nuclear power steam turbine 110% overspeed test is determined.

[0057] Method 6: Based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the rotor crack site under the transient operating condition of 120% overspeed of the nuclear power steam turbine, the low-cycle fatigue critical crack size of the rotor under the transient operating condition of 120% overspeed of the nuclear power steam turbine is determined.

[0058] For example, for a certain type of 1200MW nuclear power steam turbine, the weak part of the weld life of the welded low-pressure rotor is the weld on the outer surface of the rotor. During the design stage of the nuclear power steam turbine, the basic data for stress calculation and material testing of the welded low-pressure rotor are shown in Tables 1 and 2 respectively.

[0059] Table 1 Basic data for stress calculation of welded low-pressure rotor

[0060]

[0061] Table 2 Basic data of material test for welded low-pressure rotor

[0062]

[0063] The calculation process of the crack growth size set of the welded low-pressure rotor is as follows:

[0064]

[0065]

[0066]

[0067]

[0068]

[0069]

[0070] S203, based on the crack growth size set, obtain the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life.

[0071] In one embodiment, based on a crack growth size set, a stress corrosion crack growth life, a low cycle fatigue crack growth life, and a high cycle fatigue crack growth life are obtained, including obtaining the stress corrosion crack growth life, the low cycle fatigue crack growth life, and the high cycle fatigue crack growth life based on at least one crack growth size in the crack growth size set.

[0072] In one embodiment, based on a crack extension size set, obtaining a stress corrosion crack extension life includes obtaining at least one crack extension size that matches the stress corrosion crack extension life from the crack extension size set, and obtaining the stress corrosion crack extension life based on at least one crack extension size that matches the stress corrosion crack extension life.

[0073] It should be noted that, based on the crack growth size set, the low-cycle fatigue crack growth life and the high-cycle fatigue crack growth life can be obtained. The relevant content of obtaining the stress corrosion crack growth life based on the crack growth size set can be referred to, which will not be repeated here.

[0074] S204, based on the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life, the crack growth life safety monitoring of the rotor is performed. If the crack growth life safety monitoring of the rotor does not meet the monitoring qualification conditions, the abnormal data of the rotor in the design stage is obtained, and the abnormal data of the rotor in the design stage is optimized and improved.

[0075] For the relevant contents of step S204, please refer to the above embodiment, which will not be repeated here.

[0076] In summary, according to the method for monitoring the long life of stress corrosion and fatigue of a rotor of a nuclear power steam turbine according to the embodiment of the present disclosure, the crack extension size set of the rotor is determined based on the stress calculation basic data and the material experiment basic data, and the stress corrosion crack extension life, low cycle fatigue crack extension life and high cycle fatigue crack extension life are obtained based on the crack extension size set. Therefore, the crack extension size set of the rotor can be determined by comprehensively considering the stress calculation basic data and the material experiment basic data, and the stress corrosion crack extension life, low cycle fatigue crack extension life and high cycle fatigue crack extension life can be obtained based on the crack extension size set.

[0077] Based on any of the above embodiments, the crack expansion stage of the rotor includes three stages, wherein in the first stage, the crack size of the rotor increases from the initial crack size a 0 Extended to the high cycle fatigue crack growth size threshold a th In the second stage, the crack size of the rotor increases from the high cycle fatigue crack growth threshold value a th Extend to the stress corrosion crack growth size threshold a SCC In the third stage, the crack size of the rotor increases from the stress corrosion crack growth threshold value a SCC Extended to the critical crack size of low cycle fatigue a cj Among them, the critical crack size of low cycle fatigue is a cj for a cn or a c110% or a c120% .

[0078] Based on any of the above embodiments, Figure 3 As shown, the stress corrosion crack growth life of the rotor is obtained, including:

[0079] S301, obtaining basic stress calculation data and material test basic data of a nuclear power steam turbine rotor.

[0080] S302, determining a threshold value of a stress corrosion crack extension size of the rotor based on stress calculation basic data and material test basic data.

[0081] S303, based on the stress calculation basic data and the material test basic data, determine the low cycle fatigue critical crack size of the rotor of the nuclear power steam turbine in the normal shutdown transient condition.

[0082] For the relevant contents of steps S301 - S303 , please refer to the above embodiment and will not be described again here.

[0083] S304, based on the stress corrosion crack growth size threshold value, the annual average stress corrosion crack growth rate test value of the rotor material, and the low-cycle fatigue critical crack size of the rotor under normal shutdown transient conditions of the nuclear power steam turbine, the stress corrosion crack growth life is obtained.

[0084] In one embodiment, the calculation process of stress corrosion crack growth life is as follows:

[0085]

[0086] For example, continuing to take the welded low-pressure rotor of a certain type of 1200MW nuclear power steam turbine in the above embodiment as an example, the basic data for stress corrosion life damage design monitoring of the welded low-pressure rotor is shown in Table 3.

[0087] Table 3 Basic data for stress corrosion life damage design monitoring of welded low-pressure rotors

[0088]

[0089]

[0090] The calculation process of stress corrosion crack growth life of welded low-pressure rotor is as follows:

[0091]

[0092] Therefore, this method can comprehensively consider the threshold value of stress corrosion crack growth size, the annual average stress corrosion crack growth rate test value of the rotor material, and the low-cycle fatigue critical crack size of the rotor under normal shutdown transient conditions of the nuclear power steam turbine to obtain the stress corrosion crack growth life.

[0093] Based on any of the above embodiments, Figure 4 As shown, the high cycle fatigue crack growth life of the rotor is obtained, including:

[0094] S401, obtaining basic stress calculation data and material test basic data of a nuclear power steam turbine rotor.

[0095] S402: Determine a high cycle fatigue crack growth size threshold of the rotor based on stress calculation basic data and material test basic data.

[0096] S403, determining a high cycle fatigue critical crack size of the rotor based on stress calculation basic data and material test basic data.

[0097] For the relevant contents of steps S401 - S403 , please refer to the above embodiment and will not be described again here.

[0098] S404, based on the high cycle fatigue crack growth size threshold value, the high cycle fatigue critical crack size, the crack shape parameters of the rotor, the high cycle fatigue crack growth test constants of the rotor material, and the high cycle fatigue stress range of the rotor under the steady-state condition of nuclear power steam turbine under load operation, the high cycle fatigue crack growth life is obtained.

[0099] In one embodiment, the high cycle fatigue crack growth life is calculated as follows:

[0100]

[0101] For example, continuing to take the welded low-pressure rotor of a certain type of 1200MW nuclear power steam turbine in the above embodiment as an example, the basic data for high-cycle fatigue life damage design monitoring of the welded low-pressure rotor is shown in Table 4.

[0102] Table 4 Basic data for high cycle fatigue life damage design monitoring of welded low pressure rotor

[0103]

[0104]

[0105] The calculation process of high cycle fatigue crack growth life of welded low pressure rotor is as follows:

[0106]

[0107] Therefore, this method can comprehensively consider the high-cycle fatigue crack growth size threshold value, high-cycle fatigue critical crack size, rotor crack shape parameters, rotor material high-cycle fatigue crack growth test constants, and rotor high-cycle fatigue stress range of nuclear power steam turbine under steady-state load operation to obtain the high-cycle fatigue crack growth life.

[0108] Based on any of the above embodiments, Figure 5 As shown, the low cycle fatigue crack growth life of the rotor is obtained, including:

[0109] S501, obtaining basic stress calculation data and material test basic data of a nuclear power steam turbine rotor.

[0110] S502: Determine a crack extension size set of the rotor based on stress calculation basic data and material test basic data.

[0111] For the relevant contents of steps S501-S502, please refer to the above embodiment and will not be repeated here.

[0112] S503, based on the crack growth size set, obtaining the low cycle fatigue crack growth life of the first stage of the normal shutdown transient condition of the nuclear power steam turbine.

[0113] In one embodiment, based on a crack extension size set, a low-cycle fatigue crack extension life of a first stage of a nuclear power steam turbine normal shutdown transient operating condition is obtained, including an initial crack size of the rotor, a high-cycle fatigue crack extension size threshold value, a crack shape parameter of the rotor, a low-cycle fatigue crack extension test constant of the rotor material, and a maximum stress at a rotor crack site of a nuclear power steam turbine normal shutdown transient operating condition, to obtain a low-cycle fatigue crack extension life of a first stage of a nuclear power steam turbine normal shutdown transient operating condition.

[0114] In some examples, the low-cycle fatigue crack growth life N of the first stage of the normal shutdown transient condition of a nuclear power steam turbine is fn,1 The calculation process is as follows:

[0115]

[0116] Among them, C 0 、m 0 Low cycle fatigue crack growth test constant of rotor material.

[0117] S504, based on the crack growth size set, obtaining the low cycle fatigue crack growth life of the second stage of the normal shutdown transient condition of the nuclear power steam turbine.

[0118] In one embodiment, based on the crack growth size set, the low-cycle fatigue crack growth life of the second stage of the normal shutdown transient condition of the nuclear power steam turbine is obtained, including based on the high-cycle fatigue crack growth size threshold value, the stress corrosion crack growth size threshold value, the crack shape parameters of the rotor, the low-cycle fatigue crack growth test constants of the rotor material, and the maximum stress of the rotor crack site of the normal shutdown transient condition of the nuclear power steam turbine, to obtain the low-cycle fatigue crack growth life of the second stage of the normal shutdown transient condition of the nuclear power steam turbine.

[0119] In some examples, the low-cycle fatigue crack growth life N of the second stage of the normal shutdown transient condition of a nuclear power steam turbine is fn,2 The calculation process is as follows:

[0120]

[0121] S505, based on the crack growth size set, obtaining the low cycle fatigue crack growth life of the third stage of the normal shutdown transient condition of the nuclear power steam turbine.

[0122] In one embodiment, based on the crack extension size set, the low-cycle fatigue crack extension life of the third stage of the normal shutdown transient condition of the nuclear power steam turbine is obtained, including the low-cycle fatigue critical crack size of the rotor under the normal shutdown transient condition of the nuclear power steam turbine based on the stress corrosion crack extension size threshold value, the low-cycle fatigue critical crack size of the rotor under the normal shutdown transient condition of the nuclear power steam turbine, the crack shape parameters of the rotor, the low-cycle fatigue crack extension test constant of the rotor material, and the maximum stress of the rotor crack site under the normal shutdown transient condition of the nuclear power steam turbine, so as to obtain the low-cycle fatigue crack extension life of the third stage of the normal shutdown transient condition of the nuclear power steam turbine.

[0123] In some examples, the low-cycle fatigue crack growth life N of the third stage of the normal shutdown transient condition of a nuclear power steam turbine is fn,3 The calculation process is as follows:

[0124]

[0125] S506, based on the crack growth size set, obtaining the low cycle fatigue crack growth life of the first stage of the nuclear power steam turbine 110% overspeed test transient condition.

[0126] In one embodiment, based on a crack extension size set, a low-cycle fatigue crack extension life of a nuclear power steam turbine in the first stage of a 110% overspeed test transient condition is obtained, including an initial crack size of the rotor, a high-cycle fatigue crack extension size threshold, a crack shape parameter of the rotor, a low-cycle fatigue crack extension test constant of the rotor material, and a maximum stress at a rotor crack site of a nuclear power steam turbine in a 110% overspeed test transient condition, to obtain a low-cycle fatigue crack extension life of a nuclear power steam turbine in the first stage of a 110% overspeed test transient condition.

[0127] In some examples, the low-cycle fatigue crack growth life N of the first stage of transient conditions of a nuclear power steam turbine 110% overspeed test is f110%,1 The calculation process is as follows:

[0128]

[0129] S507, based on the crack growth size set, obtaining the low cycle fatigue crack growth life of the second stage of the nuclear power steam turbine 110% overspeed test transient condition.

[0130] In one embodiment, based on the crack extension size set, the low-cycle fatigue crack extension life of the second stage of the nuclear power steam turbine 110% overspeed test transient condition is obtained, including based on the high-cycle fatigue crack extension size threshold value, the stress corrosion crack extension size threshold value, the crack shape parameters of the rotor, the rotor material low-cycle fatigue crack extension test constant, and the maximum stress of the rotor crack site of the nuclear power steam turbine 110% overspeed test transient condition, to obtain the low-cycle fatigue crack extension life of the second stage of the nuclear power steam turbine 110% overspeed test transient condition.

[0131] In some examples, the low-cycle fatigue crack growth life N of the second stage of the transient condition of the nuclear power steam turbine 110% overspeed test is f110%,2 The calculation process is as follows:

[0132]

[0133] S508, based on the crack growth size set, obtaining the low cycle fatigue crack growth life of the third stage of the nuclear power steam turbine 110% overspeed test transient condition.

[0134] In one embodiment, based on the crack extension size set, the low-cycle fatigue crack extension life of the third stage of the nuclear power steam turbine 110% overspeed test transient condition is obtained, including the low-cycle fatigue critical crack size of the rotor of the nuclear power steam turbine 110% overspeed test transient condition, the crack shape parameters of the rotor, the rotor material low-cycle fatigue crack extension test constant, and the maximum stress of the rotor crack site of the nuclear power steam turbine 110% overspeed test transient condition, so as to obtain the low-cycle fatigue crack extension life of the third stage of the nuclear power steam turbine 110% overspeed test transient condition.

[0135] In some examples, the low-cycle fatigue crack growth life N of the third stage of transient conditions of a nuclear power steam turbine 110% overspeed test is f110%,3 The calculation process is as follows:

[0136]

[0137] S509, based on the crack growth size set, obtaining the low cycle fatigue crack growth life of the first stage of the nuclear power steam turbine 120% overspeed transient operation condition.

[0138] In one embodiment, based on a crack extension size set, a low-cycle fatigue crack extension life of a nuclear power steam turbine in the first stage of a 120% overspeed transient operating condition is obtained, including an initial crack size of the rotor, a high-cycle fatigue crack extension size threshold value, a crack shape parameter of the rotor, a low-cycle fatigue crack extension test constant of the rotor material, and a maximum stress at a rotor crack site in a nuclear power steam turbine in a 120% overspeed transient operating condition, to obtain a low-cycle fatigue crack extension life of a nuclear power steam turbine in the first stage of a 120% overspeed transient operating condition.

[0139] In some examples, the low-cycle fatigue crack growth life N of the first stage of a nuclear power steam turbine transient operating condition of 120% overspeed operation is f120%,1 The calculation process is as follows:

[0140]

[0141] S510, based on the crack growth size set, obtaining the low cycle fatigue crack growth life of the second stage of the nuclear power steam turbine 120% overspeed transient operation condition.

[0142] In one embodiment, based on the crack extension size set, the low-cycle fatigue crack extension life of the second stage of the nuclear power steam turbine 120% overspeed transient operating condition is obtained, including based on the high-cycle fatigue crack extension size threshold value, the stress corrosion crack extension size threshold value, the crack shape parameters of the rotor, the rotor material low-cycle fatigue crack extension test constants, and the maximum stress of the rotor crack site of the nuclear power steam turbine 120% overspeed transient operating condition, to obtain the low-cycle fatigue crack extension life of the second stage of the nuclear power steam turbine 120% overspeed transient operating condition.

[0143] In some examples, the low-cycle fatigue crack growth life N of the second stage of a nuclear power steam turbine under 120% overspeed transient condition is f120%,2 The calculation process is as follows:

[0144]

[0145] S511, based on the crack growth size set, obtain the low cycle fatigue crack growth life of the third stage of the nuclear power steam turbine 120% overspeed transient operating condition.

[0146] In one embodiment, based on a crack extension size set, a low-cycle fatigue crack extension life of a third stage of a nuclear power steam turbine under a 120% overspeed transient operating condition is obtained, including a stress corrosion crack extension size threshold value, a low-cycle fatigue critical crack size of a rotor under a 120% overspeed transient operating condition of a nuclear power steam turbine, a crack shape parameter of a rotor, a low-cycle fatigue crack extension test constant of a rotor material, and a maximum stress at a rotor crack site under a 120% overspeed transient operating condition of a nuclear power steam turbine, to obtain a low-cycle fatigue crack extension life of a third stage of a nuclear power steam turbine under a 120% overspeed transient operating condition.

[0147] In some examples, the low-cycle fatigue crack growth life N of the third stage of a nuclear power steam turbine in a transient condition of 120% overspeed operation is f120%,3 The calculation process is as follows:

[0148]

[0149] For example, continuing to take the welded low-pressure rotor of a certain type of 1200MW nuclear power steam turbine in the above embodiment as an example, the basic data for low-cycle fatigue life damage design monitoring of the welded low-pressure rotor is shown in Table 5.

[0150] Table 5 Basic data for low cycle fatigue life damage design monitoring of welded low pressure rotor

[0151]

[0152] The calculation process of the low cycle fatigue crack growth life of the rotor is as follows:

[0153]

[0154]

[0155]

[0156]

[0157]

[0158]

[0159]

[0160]

[0161] Therefore, this method can comprehensively consider the rotor crack shape parameters, rotor material low cycle fatigue crack growth test constants, the maximum stress at the rotor crack site, and the rotor crack growth size set to obtain the low cycle fatigue crack growth life.

[0162] Figure 6 The present invention is a flow chart of a method for monitoring the long life of a nuclear power steam turbine rotor stress corrosion and fatigue according to another embodiment of the present invention.

[0163] like Figure 6 As shown, the method for monitoring the rotor stress corrosion and fatigue long life of a nuclear power steam turbine according to the embodiment of the present disclosure includes:

[0164] S601, obtain stress calculation basic data and material test basic data of the rotor of the nuclear power steam turbine, and based on the stress calculation basic data and material test basic data, obtain the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life of the rotor.

[0165] For the relevant contents of step S601, please refer to the above embodiment, which will not be repeated here.

[0166] S602, based on the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life, the crack growth calendar life of the rotor is obtained.

[0167] In one embodiment, based on the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life, the crack growth calendar life of the rotor is obtained, including inputting the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life into a setting model, and the setting model outputs the crack growth calendar life. It should be noted that there are no excessive restrictions on the setting model, for example, it can include a deep learning model.

[0168] In one embodiment, based on the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life, the crack growth calendar life of the rotor is obtained, including obtaining the calendar life of each stage of the rotor based on the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life, and determining the sum of the calendar life of each stage of the rotor as the crack growth calendar life of the rotor. It should be noted that the stage refers to the crack growth stage of the rotor, and the number of stages is multiple.

[0169] In one embodiment, the calendar life of the first stage is obtained based on the low-cycle fatigue crack growth life of the first stage of the normal shutdown transient condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the first stage of the 110% overspeed test transient condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the first stage of the 120% overspeed operation transient condition of the nuclear power steam turbine, the average annual number of normal shutdowns of the nuclear power steam turbine, the average annual number of 110% overspeed tests and the average annual number of 120% overspeed operations.

[0170] In one embodiment, the calendar life of the second stage is obtained based on the high-cycle fatigue crack growth life, the low-cycle fatigue crack growth life of the second stage of the normal shutdown transient condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the second stage of the 110% overspeed test transient condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the second stage of the 120% overspeed operation transient condition of the nuclear power steam turbine, the average annual normal shutdown times of the nuclear power steam turbine, the average annual 110% overspeed test times, the average annual 120% overspeed operation times and the average annual fatigue times of the rotor.

[0171] In one embodiment, it also includes the calendar life of the third stage based on the stress corrosion crack growth life, the high cycle fatigue crack growth life, the low cycle fatigue crack growth life of the third stage of the normal shutdown transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the third stage of the 110% overspeed test transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the third stage of the 120% overspeed operation transient condition of the nuclear power steam turbine, the average annual normal shutdown times of the nuclear power steam turbine, the average annual 110% overspeed test times, the average annual 120% overspeed operation times and the average annual fatigue times of the rotor.

[0172] In one embodiment, the method further includes obtaining a crack growth calendar life based on the calendar life of the first stage, the calendar life of the second stage, and the calendar life of the third stage. For example, obtaining a crack growth calendar life based on the calendar life of the first stage, the calendar life of the second stage, and the calendar life of the third stage includes determining the sum of the calendar life of the first stage, the calendar life of the second stage, and the calendar life of the third stage as the crack growth calendar life.

[0173] In some examples, the crack growth calendar life τ CL The calculation process is as follows:

[0174]

[0175]

[0176]

[0177] τ CL =τ CL1 +τ CL2 +τ CL3

[0178] Among them, τ CL1 is the calendar life of the first stage, τ CL2 is the calendar life of the second stage, τ CL3 is the calendar life of the third stage, y n is the annual average number of normal shutdowns of nuclear power steam turbines, y 110% is the annual average number of 110% overspeed tests, y 120% is the annual average of 120% overspeed operation times, y H is the annual average high cycle fatigue number of the rotor.

[0179] In some examples, the average annual operating hours of nuclear power turbines can be based on t y and the operating speed n of the nuclear power steam turbine 0 , the annual average high cycle fatigue number of the rotor y is obtained H For example, this can be achieved by the following formula:

[0180]

[0181] For example, continuing to take the welded low-pressure rotor of a certain type of 1200MW nuclear power steam turbine in the above embodiment as an example, the calendar design monitoring basic data of the welded low-pressure rotor is shown in Table 6.

[0182] Table 6 Calendar design monitoring basic data for welded low-pressure rotor

[0183]

[0184]

[0185] The calculation process of the annual average high-cycle fatigue number of welded low-pressure rotors is as follows:

[0186]

[0187] The calculation process of the crack growth calendar life of the welded low-pressure rotor is as follows:

[0188]

[0189]

[0190]

[0191] τ CL =τ CL1 +τ CL2 +τ CL3 =133.54+11.37+17.78=162.69 years

[0192] S603: Based on the crack growth calendar life, the crack growth life safety of the rotor is monitored.

[0193] In one embodiment, crack growth life safety monitoring is performed on the rotor based on the crack growth calendar life, including obtaining a crack growth life safety monitoring criterion value of the rotor, and if the crack growth calendar life is less than the crack growth life safety monitoring criterion value, judging that the crack growth calendar life does not meet the monitoring qualification conditions, so as to perform crack growth life safety monitoring on the rotor, or, if the crack growth calendar life is greater than or equal to the crack growth life safety monitoring criterion value, judging that the crack growth calendar life meets the monitoring qualification conditions, so as to perform crack growth life safety monitoring on the rotor.

[0194] For example, taking the welded low-pressure rotor of a certain type of 1200MW nuclear power steam turbine in the above embodiment as an example, the crack propagation calendar life τ of the welded low-pressure rotor is CL The crack growth life safety monitoring criterion value τ of the welded low-pressure rotor is 162.69 years. 0 As shown in Table 6, τ 0 = 60 years, then τ CL >τ 0 , it can be judged that the crack extension calendar life meets the monitoring qualification conditions.

[0195] S604: If the crack growth life safety monitoring of the rotor does not meet the monitoring qualification condition, obtain the abnormal data of the rotor in the design stage, and optimize and improve the abnormal data of the rotor in the design stage.

[0196] For the relevant contents of step S604, please refer to the above embodiment, which will not be repeated here.

[0197] In summary, according to the method for monitoring the long life of stress corrosion and fatigue of a nuclear power steam turbine rotor in the embodiment of the present disclosure, the crack growth calendar life of the rotor is obtained based on the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life, and the crack growth life safety monitoring of the rotor is performed based on the crack growth calendar life. Therefore, the influence of stress corrosion, low cycle fatigue and high cycle fatigue on the life of the rotor can be comprehensively considered to monitor the crack growth life safety of the rotor, so as to ensure the long life and safe operation of the nuclear power steam turbine rotor.

[0198] In order to realize the above-mentioned embodiments, the present disclosure also proposes a nuclear power steam turbine rotor stress corrosion and fatigue long-life monitoring device.

[0199] Figure 7 The present invention is a schematic structural diagram of a device for monitoring the rotor stress corrosion and fatigue of a nuclear power steam turbine for a long life according to an embodiment of the present invention.

[0200] like Figure 7 As shown, the device 100 for monitoring the long life of a nuclear power steam turbine rotor stress corrosion and fatigue according to the embodiment of the present disclosure includes: an acquisition module 110 and a monitoring module 120 .

[0201] The acquisition module 110 is used to acquire stress calculation basic data and material test basic data of the rotor of the nuclear power steam turbine, and based on the stress calculation basic data and the material test basic data, acquire the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life of the rotor;

[0202] The monitoring module 120 is used to perform crack growth life safety monitoring on the rotor based on the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life. If the crack growth life safety monitoring of the rotor does not meet the monitoring qualification conditions, the abnormal data of the rotor in the design stage is obtained, and the abnormal data of the rotor in the design stage is optimized and improved.

[0203] In one embodiment of the present disclosure, the acquisition module 110 is further used to: determine the crack extension size set of the rotor based on the stress calculation basic data and the material experiment basic data; and obtain the stress corrosion crack extension life, the low cycle fatigue crack extension life and the high cycle fatigue crack extension life based on the crack extension size set.

[0204] In one embodiment of the present disclosure, the acquisition module 110 is further configured to:

[0205] Determining a stress corrosion crack extension size threshold value of the rotor based on the crack shape parameters of the rotor, the stress corrosion fracture toughness of the rotor material, and the maximum stress at the rotor crack site under the steady-state condition of the nuclear power steam turbine under load operation;

[0206] Determine the high cycle fatigue crack growth size threshold value of the rotor based on the crack shape parameters of the rotor, the test value of the high cycle fatigue crack growth threshold value of the rotor material, and the high cycle fatigue stress range of the rotor under the steady-state working condition of the nuclear power steam turbine under load operation;

[0207] Determine the critical crack size of the rotor for high cycle fatigue based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the crack site of the rotor under the steady-state condition of the nuclear power steam turbine under load operation;

[0208] Determine the low-cycle fatigue critical crack size of the rotor under the normal shutdown transient condition of the nuclear power steam turbine based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the crack site of the rotor under the normal shutdown transient condition of the nuclear power steam turbine;

[0209] Determine the low cycle fatigue critical crack size of the rotor under the transient operating condition of the nuclear power steam turbine 110% overspeed test based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the rotor crack site under the transient operating condition of the nuclear power steam turbine 110% overspeed test;

[0210] Based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the rotor crack site under the transient operating condition of 120% overspeed operation of the nuclear power steam turbine, the low-cycle fatigue critical crack size of the rotor under the transient operating condition of 120% overspeed operation of the nuclear power steam turbine is determined.

[0211] In one embodiment of the present disclosure, the crack propagation stage of the rotor includes three stages, wherein in the first stage, the crack size of the rotor propagates from the initial crack size to the high cycle fatigue crack propagation size threshold value, in the second stage, the crack size of the rotor propagates from the high cycle fatigue crack propagation size threshold value to the stress corrosion crack propagation size threshold value, and in the third stage, the crack size of the rotor propagates from the stress corrosion crack propagation size threshold value to the low cycle fatigue critical crack size.

[0212] In one embodiment of the present disclosure, the acquisition module 110 is also used to obtain the stress corrosion crack growth life based on the stress corrosion crack growth size threshold value, the annual average stress corrosion crack growth rate test value of the rotor material, and the low-cycle fatigue critical crack size of the rotor under the normal shutdown transient condition of the nuclear power steam turbine.

[0213] In one embodiment of the present disclosure, the acquisition module 110 is also used to obtain the high-cycle fatigue crack extension life based on the high-cycle fatigue crack extension size threshold value, the high-cycle fatigue critical crack size, the crack shape parameters of the rotor, the high-cycle fatigue crack extension test constants of the rotor material, and the high-cycle fatigue stress range of the rotor under steady-state conditions of load operation of the nuclear power steam turbine.

[0214] In one embodiment of the present disclosure, the acquisition module 110 is further configured to:

[0215] Based on the initial crack size of the rotor, the high cycle fatigue crack growth size threshold value, the crack shape parameter of the rotor, the low cycle fatigue crack growth test constant of the rotor material, and the maximum stress of the rotor crack position under the normal shutdown transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the first stage of the normal shutdown transient condition of the nuclear power steam turbine is obtained;

[0216] Based on the high cycle fatigue crack growth size threshold value, the stress corrosion crack growth size threshold value, the crack shape parameter of the rotor, the rotor material low cycle fatigue crack growth test constant, and the maximum stress of the rotor crack part under the normal shutdown transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the second stage of the normal shutdown transient condition of the nuclear power steam turbine is obtained;

[0217] Based on the stress corrosion crack growth size threshold value, the low-cycle fatigue critical crack size of the rotor under the normal shutdown transient condition of the nuclear power steam turbine, the crack shape parameters of the rotor, the low-cycle fatigue crack growth test constants of the rotor material, and the maximum stress at the rotor crack site under the normal shutdown transient condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the third stage of the normal shutdown transient condition of the nuclear power steam turbine is obtained.

[0218] In one embodiment of the present disclosure, the acquisition module 110 is further configured to:

[0219] Based on the initial crack size of the rotor, the high cycle fatigue crack growth size threshold value, the crack shape parameter of the rotor, the low cycle fatigue crack growth test constant of the rotor material, and the maximum stress of the rotor crack position of the nuclear power steam turbine 110% overspeed test transient condition, the low cycle fatigue crack growth life of the first stage of the nuclear power steam turbine 110% overspeed test transient condition is obtained;

[0220] Based on the high cycle fatigue crack growth size threshold value, the stress corrosion crack growth size threshold value, the crack shape parameter of the rotor, the rotor material low cycle fatigue crack growth test constant, and the maximum stress of the rotor crack part of the nuclear power steam turbine 110% overspeed test transient condition, the low cycle fatigue crack growth life of the second stage of the nuclear power steam turbine 110% overspeed test transient condition is obtained;

[0221] Based on the stress corrosion crack growth size threshold value, the low cycle fatigue critical crack size of the rotor under the 110% overspeed test transient condition of the nuclear power steam turbine, the crack shape parameters of the rotor, the low cycle fatigue crack growth test constant of the rotor material, and the maximum stress at the rotor crack site under the 110% overspeed test transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the third stage of the 110% overspeed test transient condition of the nuclear power steam turbine is obtained.

[0222] In one embodiment of the present disclosure, the acquisition module 110 is further configured to:

[0223] Based on the initial crack size of the rotor, the high cycle fatigue crack growth size threshold value, the crack shape parameter of the rotor, the low cycle fatigue crack growth test constant of the rotor material, and the maximum stress of the rotor crack position under the 120% overspeed transient operating condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the first stage of the 120% overspeed transient operating condition of the nuclear power steam turbine is obtained;

[0224] Based on the high cycle fatigue crack growth size threshold value, the stress corrosion crack growth size threshold value, the crack shape parameter of the rotor, the rotor material low cycle fatigue crack growth test constant, and the maximum stress of the rotor crack part of the nuclear power steam turbine under the 120% overspeed transient operating condition, the low cycle fatigue crack growth life of the second stage of the nuclear power steam turbine under the 120% overspeed transient operating condition is obtained;

[0225] Based on the stress corrosion crack growth size threshold value, the low-cycle fatigue critical crack size of the rotor under the 120% overspeed transient operating condition of the nuclear power steam turbine, the crack shape parameters of the rotor, the low-cycle fatigue crack growth test constants of the rotor material, and the maximum stress at the rotor crack site under the 120% overspeed transient operating condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the third stage of the 120% overspeed transient operating condition of the nuclear power steam turbine is obtained.

[0226] In one embodiment of the present disclosure, the monitoring module 120 is further used to: obtain the crack growth calendar life of the rotor based on the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life; and perform crack growth life safety monitoring on the rotor based on the crack growth calendar life.

[0227] In one embodiment of the present disclosure, the monitoring module 120 is further configured to:

[0228] Based on the low-cycle fatigue crack growth life of the first stage of the normal shutdown transient condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the first stage of the 110% overspeed test transient condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the first stage of the 120% overspeed operation transient condition of the nuclear power steam turbine, the annual average number of normal shutdowns, the annual average number of 110% overspeed tests and the annual average number of 120% overspeed operations of the nuclear power steam turbine, the calendar life of the first stage is obtained;

[0229] The calendar life of the second stage is obtained based on the high cycle fatigue crack growth life, the low cycle fatigue crack growth life of the second stage of the normal shutdown transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the second stage of the 110% overspeed test transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the second stage of the 120% overspeed operation transient condition of the nuclear power steam turbine, the annual average number of normal shutdowns of the nuclear power steam turbine, the annual average number of 110% overspeed tests, the annual average number of 120% overspeed operations and the annual average fatigue number of the rotor;

[0230] Based on the stress corrosion crack growth life, the high cycle fatigue crack growth life, the low cycle fatigue crack growth life of the third stage of the normal shutdown transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the third stage of the 110% overspeed test transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the third stage of the 120% overspeed operation transient condition of the nuclear power steam turbine, the annual average number of normal shutdowns of the nuclear power steam turbine, the annual average number of 110% overspeed tests, the annual average number of 120% overspeed operations and the annual average fatigue number of the rotor, the calendar life of the third stage is obtained;

[0231] The crack growth calendar life is obtained based on the calendar life of the first stage, the calendar life of the second stage and the calendar life of the third stage.

[0232] In one embodiment of the present disclosure, the monitoring module 120 is further used to determine the sum of the calendar life of the first stage, the calendar life of the second stage, and the calendar life of the third stage as the crack extension calendar life.

[0233] In one embodiment of the present disclosure, the monitoring module 120 is further used to: obtain a crack extension life safety monitoring criterion value of the rotor; if the crack extension calendar life is less than the crack extension life safety monitoring criterion value, determine that the crack extension calendar life does not meet the monitoring qualification condition, so as to perform crack extension life safety monitoring on the rotor; or, if the crack extension calendar life is greater than or equal to the crack extension life safety monitoring criterion value, determine that the crack extension calendar life meets the monitoring qualification condition, so as to perform crack extension life safety monitoring on the rotor.

[0234] It should be noted that for details not disclosed in the device for long-life monitoring of rotor stress corrosion and fatigue of a nuclear power steam turbine in the embodiment of the present disclosure, please refer to the details disclosed in the method for long-life monitoring of rotor stress corrosion and fatigue of a nuclear power steam turbine in the embodiment of the present disclosure, which will not be repeated here.

[0235] In summary, the rotor stress corrosion and fatigue long-life monitoring device of the nuclear power steam turbine of the embodiment of the present disclosure obtains the stress calculation basic data and material test basic data of the rotor of the nuclear power steam turbine, and based on the stress calculation basic data and material test basic data, obtains the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life of the rotor, and based on the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life, performs crack growth life safety monitoring on the rotor, if the crack growth life safety monitoring of the rotor does not meet the monitoring qualified conditions, obtains the abnormal data of the rotor in the design stage, and optimizes and improves the abnormal data of the rotor in the design stage. Therefore, stress corrosion, low cycle fatigue and high cycle fatigue can be comprehensively considered to perform crack growth life safety monitoring on the rotor to ensure the long-life safe operation of the nuclear power steam turbine rotor.

[0236] In order to implement the above embodiment, Figure 8 As shown, an embodiment of the present disclosure proposes an electronic device 200, including: a memory 210, a processor 220, and a computer program stored in the memory 210 and executable on the processor 220. When the processor 220 executes the program, the above-mentioned method for monitoring the rotor stress corrosion and fatigue long life of a nuclear power steam turbine is implemented.

[0237] In one embodiment of the present disclosure, the electronic device 200 further includes: a wireless communication component, wherein the wireless communication component is connected to the nuclear power turbine, and data is transmitted between the electronic device 200 and the nuclear power turbine via the wireless communication component.

[0238] In one embodiment of the present disclosure, the memory 210 is used to store stress calculation basic data and material test basic data of the rotor of the nuclear power steam turbine;

[0239] The processor 220 is used to obtain a crack extension life safety monitoring instruction, and based on the crack extension life safety monitoring instruction, obtain stress calculation basic data and material test basic data of the target rotor of the nuclear power steam turbine to be monitored from the memory 210, and perform crack extension life safety monitoring on the target rotor based on the stress calculation basic data and material test basic data of the target rotor.

[0240] In one embodiment of the present disclosure, the electronic device 200 further includes: a remote client, which is connected to the processor 220; the remote client is used to send the crack extension life safety monitoring instruction to the processor 220, and receive the monitoring result fed back by the processor 220.

[0241] In one embodiment of the present disclosure, the remote client is further used to obtain control information of a user who controls the remote client, and generate the crack extension life safety monitoring instruction based on the control information.

[0242] In one embodiment of the present disclosure, the processor 220 is further configured to determine the rotor of the nuclear power steam turbine associated with the remote client as the target rotor.

[0243] The electronic device of the disclosed embodiment executes a computer program stored in a memory through a processor to obtain stress calculation basic data and material test basic data of the rotor of a nuclear power steam turbine, and based on the stress calculation basic data and the material test basic data, obtains the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life of the rotor, and performs crack growth life safety monitoring on the rotor based on the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life. If the crack growth life safety monitoring of the rotor does not meet the monitoring qualification conditions, obtain the abnormal data of the rotor in the design stage, and optimize and improve the abnormal data of the rotor in the design stage. Therefore, stress corrosion, low cycle fatigue and high cycle fatigue can be comprehensively considered to perform crack growth life safety monitoring on the rotor to ensure the long-life safe operation of the nuclear power steam turbine rotor.

[0244] In order to implement the above-mentioned embodiment, the embodiment of the present disclosure proposes a computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the above-mentioned nuclear power steam turbine rotor stress corrosion and fatigue long-life monitoring method is implemented.

[0245] The computer-readable storage medium of the disclosed embodiment acquires the basic stress calculation data and material test basic data of the rotor of the nuclear power steam turbine by storing the computer program and being executed by the processor, and acquires the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life of the rotor based on the stress calculation basic data and the material test basic data, and performs crack growth life safety monitoring on the rotor based on the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life, and acquires the abnormal data of the rotor in the design stage if the crack growth life safety monitoring of the rotor does not meet the monitoring qualified conditions, and optimizes and improves the abnormal data of the rotor in the design stage. Thus, the rotor can be comprehensively considered to perform crack growth life safety monitoring on the rotor to ensure the long-life safe operation of the nuclear power steam turbine rotor.

[0246] In order to implement the above embodiment, the present disclosure provides a monitoring platform suitable for nuclear power steam turbines, including the above Figure 7 The rotor stress corrosion and fatigue long-life monitoring device for a nuclear power steam turbine shown; or the above-mentioned electronic device; or the above-mentioned computer-readable storage medium.

[0247] The monitoring platform for nuclear power steam turbines of the disclosed embodiment obtains the basic stress calculation data and material test basic data of the rotor of the nuclear power steam turbine, and obtains the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life of the rotor based on the stress calculation basic data and material test basic data. Based on the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life, the rotor is subjected to crack growth life safety monitoring. If the crack growth life safety monitoring of the rotor does not meet the monitoring qualification conditions, the abnormal data of the rotor in the design stage is obtained, and the abnormal data of the rotor in the design stage is optimized and improved. Thus, the rotor can be subjected to crack growth life safety monitoring by comprehensively considering stress corrosion, low cycle fatigue and high cycle fatigue, so as to ensure the long life and safe operation of the nuclear power steam turbine rotor.

[0248] In the description of the present disclosure, it needs to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present disclosure and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present disclosure.

[0249] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present disclosure, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0250] In the present disclosure, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present disclosure can be understood according to specific circumstances.

[0251] In the present disclosure, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0252] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present disclosure. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0253] Although the embodiments of the present disclosure have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present disclosure. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present disclosure.

Claims

1. A method for monitoring the long life of a nuclear power steam turbine rotor stress corrosion and fatigue, characterized in that: include: Obtaining stress calculation basic data and material test basic data of a rotor of a nuclear power steam turbine, and based on the stress calculation basic data and the material test basic data, obtaining the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life of the rotor; Based on the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life, crack growth life safety monitoring is performed on the rotor, if the crack growth life safety monitoring of the rotor does not meet the monitoring qualification condition, abnormal data of the rotor in the design stage is obtained, and the abnormal data of the rotor in the design stage is optimized and improved; The obtaining of the stress corrosion crack growth life of the rotor based on the stress calculation basic data and the material experiment basic data comprises: Determining a stress corrosion crack extension size threshold value of the rotor based on the crack shape parameters of the rotor, the stress corrosion fracture toughness of the rotor material, and the maximum stress at the rotor crack site under the steady-state condition of the nuclear power steam turbine under load operation; Determine the low-cycle fatigue critical crack size of the rotor under the normal shutdown transient condition of the nuclear power steam turbine based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the crack site of the rotor under the normal shutdown transient condition of the nuclear power steam turbine; Based on the stress corrosion crack growth size threshold value, the annual average stress corrosion crack growth rate test value of the rotor material, and the low-cycle fatigue critical crack size of the rotor under the normal shutdown transient condition of the nuclear power steam turbine, the stress corrosion crack growth life is obtained, wherein the stress corrosion crack growth life N fscc The calculation of is as follows: a SCC is the stress corrosion crack growth threshold, a cn is the critical crack size for low cycle fatigue, It is the annual average stress corrosion crack growth rate test value of rotor material.

2. The method according to claim 1, characterized in that The step of obtaining the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life of the rotor based on the stress calculation basic data and the material experiment basic data includes: Determining a crack extension size set of the rotor based on the stress calculation basic data and the material experiment basic data; Based on the crack growth size set, the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life are obtained.

3. The method according to claim 2, characterized in that The step of determining a set of crack extension sizes of the rotor based on the stress calculation basic data and the material experiment basic data includes: Determine the high cycle fatigue crack growth size threshold value of the rotor based on the crack shape parameters of the rotor, the test value of the high cycle fatigue crack growth threshold value of the rotor material, and the high cycle fatigue stress range of the rotor under the steady-state working condition of the nuclear power steam turbine under load operation; Determine the critical crack size of the rotor for high cycle fatigue based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the crack site of the rotor under the steady-state condition of the nuclear power steam turbine under load operation; Determine the low cycle fatigue critical crack size of the rotor under the transient operating condition of the nuclear power steam turbine 110% overspeed test based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the rotor crack site under the transient operating condition of the nuclear power steam turbine 110% overspeed test; Based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the rotor crack site under the transient operating condition of 120% overspeed operation of the nuclear power steam turbine, the low-cycle fatigue critical crack size of the rotor under the transient operating condition of 120% overspeed operation of the nuclear power steam turbine is determined.

4. The method according to claim 3, characterized in that The crack extension stage of the rotor includes three stages, wherein in the first stage, the crack size of the rotor extends from the initial crack size to the high cycle fatigue crack extension size threshold value, in the second stage, the crack size of the rotor extends from the high cycle fatigue crack extension size threshold value to the stress corrosion crack extension size threshold value, and in the third stage, the crack size of the rotor extends from the stress corrosion crack extension size threshold value to the low cycle fatigue critical crack size.

5. The method according to claim 3, characterized in that: Based on the crack extension size set, obtaining the high cycle fatigue crack extension life includes: The high cycle fatigue crack growth life is obtained based on the high cycle fatigue crack growth size threshold value, the high cycle fatigue critical crack size, the crack shape parameters of the rotor, the high cycle fatigue crack growth test constants of the rotor material, and the high cycle fatigue stress range of the rotor under steady-state conditions of the nuclear power steam turbine under load operation.

6. The method according to claim 3, characterized in that: Based on the crack extension size set, obtaining the low cycle fatigue crack extension life includes: Based on the initial crack size of the rotor, the high cycle fatigue crack growth size threshold value, the crack shape parameter of the rotor, the low cycle fatigue crack growth test constant of the rotor material, and the maximum stress of the rotor crack position under the normal shutdown transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the first stage of the normal shutdown transient condition of the nuclear power steam turbine is obtained; Based on the high cycle fatigue crack growth size threshold value, the stress corrosion crack growth size threshold value, the crack shape parameter of the rotor, the rotor material low cycle fatigue crack growth test constant, and the maximum stress of the rotor crack part under the normal shutdown transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the second stage of the normal shutdown transient condition of the nuclear power steam turbine is obtained; Based on the stress corrosion crack growth size threshold value, the low-cycle fatigue critical crack size of the rotor under the normal shutdown transient condition of the nuclear power steam turbine, the crack shape parameters of the rotor, the low-cycle fatigue crack growth test constants of the rotor material, and the maximum stress at the rotor crack site under the normal shutdown transient condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the third stage of the normal shutdown transient condition of the nuclear power steam turbine is obtained.

7. The method according to claim 3, characterized in that Based on the crack extension size set, obtaining the low cycle fatigue crack extension life includes: Based on the initial crack size of the rotor, the high cycle fatigue crack growth size threshold value, the crack shape parameter of the rotor, the low cycle fatigue crack growth test constant of the rotor material, and the maximum stress of the rotor crack position of the nuclear power steam turbine 110% overspeed test transient condition, the low cycle fatigue crack growth life of the first stage of the nuclear power steam turbine 110% overspeed test transient condition is obtained; Based on the high cycle fatigue crack growth size threshold value, the stress corrosion crack growth size threshold value, the crack shape parameter of the rotor, the rotor material low cycle fatigue crack growth test constant, and the maximum stress of the rotor crack part of the nuclear power steam turbine 110% overspeed test transient condition, the low cycle fatigue crack growth life of the second stage of the nuclear power steam turbine 110% overspeed test transient condition is obtained; Based on the stress corrosion crack growth size threshold value, the low cycle fatigue critical crack size of the rotor under the 110% overspeed test transient condition of the nuclear power steam turbine, the crack shape parameters of the rotor, the low cycle fatigue crack growth test constant of the rotor material, and the maximum stress at the rotor crack site under the 110% overspeed test transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the third stage of the 110% overspeed test transient condition of the nuclear power steam turbine is obtained.

8. The method according to claim 3, characterized in that Based on the crack extension size set, obtaining the low cycle fatigue crack extension life includes: Based on the initial crack size of the rotor, the high cycle fatigue crack growth size threshold value, the crack shape parameter of the rotor, the low cycle fatigue crack growth test constant of the rotor material, and the maximum stress of the rotor crack position under the 120% overspeed transient operating condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the first stage of the 120% overspeed transient operating condition of the nuclear power steam turbine is obtained; Based on the high cycle fatigue crack growth size threshold value, the stress corrosion crack growth size threshold value, the crack shape parameter of the rotor, the rotor material low cycle fatigue crack growth test constant, and the maximum stress of the rotor crack part of the nuclear power steam turbine under the 120% overspeed transient operating condition, the low cycle fatigue crack growth life of the second stage of the nuclear power steam turbine under the 120% overspeed transient operating condition is obtained; Based on the stress corrosion crack growth size threshold value, the low-cycle fatigue critical crack size of the rotor under the 120% overspeed transient operating condition of the nuclear power steam turbine, the crack shape parameters of the rotor, the low-cycle fatigue crack growth test constants of the rotor material, and the maximum stress at the rotor crack site under the 120% overspeed transient operating condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the third stage of the 120% overspeed transient operating condition of the nuclear power steam turbine is obtained.

9. The method according to claim 3, characterized in that: The crack growth life safety monitoring of the rotor based on the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life includes: Obtaining a crack growth calendar life of the rotor based on the stress corrosion crack growth life, the low cycle fatigue crack growth life, and the high cycle fatigue crack growth life; Based on the crack growth calendar life, crack growth life safety monitoring is performed on the rotor.

10. The method according to claim 9, characterized in that The step of obtaining the crack growth calendar life of the rotor based on the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life comprises: Based on the low-cycle fatigue crack growth life of the first stage of the normal shutdown transient condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the first stage of the 110% overspeed test transient condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the first stage of the 120% overspeed operation transient condition of the nuclear power steam turbine, the annual average number of normal shutdowns, the annual average number of 110% overspeed tests and the annual average number of 120% overspeed operations of the nuclear power steam turbine, the calendar life of the first stage is obtained; The calendar life of the second stage is obtained based on the high cycle fatigue crack growth life, the low cycle fatigue crack growth life of the second stage of the normal shutdown transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the second stage of the 110% overspeed test transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the second stage of the 120% overspeed operation transient condition of the nuclear power steam turbine, the annual average number of normal shutdowns of the nuclear power steam turbine, the annual average number of 110% overspeed tests, the annual average number of 120% overspeed operations and the annual average fatigue number of the rotor; Based on the stress corrosion crack growth life, the high cycle fatigue crack growth life, the low cycle fatigue crack growth life of the third stage of the normal shutdown transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the third stage of the 110% overspeed test transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the third stage of the 120% overspeed operation transient condition of the nuclear power steam turbine, the annual average number of normal shutdowns of the nuclear power steam turbine, the annual average number of 110% overspeed tests, the annual average number of 120% overspeed operations and the annual average fatigue number of the rotor, the calendar life of the third stage is obtained; The crack growth calendar life is obtained based on the calendar life of the first stage, the calendar life of the second stage and the calendar life of the third stage.

11. The method according to claim 10, characterized in that The step of obtaining the crack growth calendar life based on the calendar life of the first stage, the calendar life of the second stage, and the calendar life of the third stage comprises: The sum of the calendar life of the first stage, the calendar life of the second stage, and the calendar life of the third stage is determined as the crack growth calendar life.

12. The method according to claim 9, characterized in that The crack growth life safety monitoring of the rotor based on the crack growth calendar life includes: Obtaining a crack extension life safety monitoring criterion value of the rotor; If the crack growth calendar life is less than the crack growth life safety monitoring criterion value, it is determined that the crack growth calendar life does not meet the monitoring qualification condition, so as to perform crack growth life safety monitoring on the rotor; or, If the crack growth calendar life is greater than or equal to the crack growth life safety monitoring criterion value, it is determined that the crack growth calendar life meets the monitoring qualification condition, so as to perform crack growth life safety monitoring on the rotor.

13. A nuclear power steam turbine rotor stress corrosion and fatigue long life monitoring device, characterized in that: include: An acquisition module, used to acquire stress calculation basic data and material test basic data of a rotor of a nuclear power steam turbine, and based on the stress calculation basic data and the material test basic data, acquire the stress corrosion crack growth life, low cycle fatigue crack growth life and high cycle fatigue crack growth life of the rotor; A monitoring module, for performing crack growth life safety monitoring on the rotor based on the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life, and if the crack growth life safety monitoring of the rotor does not meet the monitoring qualification condition, obtaining abnormal data of the rotor in the design stage, and optimizing and improving the abnormal data of the rotor in the design stage; The acquisition module is further used for: Determining a stress corrosion crack extension size threshold value of the rotor based on the crack shape parameters of the rotor, the stress corrosion fracture toughness of the rotor material, and the maximum stress at the rotor crack site under the steady-state condition of the nuclear power steam turbine under load operation; Determine the low-cycle fatigue critical crack size of the rotor under the normal shutdown transient condition of the nuclear power steam turbine based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the crack site of the rotor under the normal shutdown transient condition of the nuclear power steam turbine; Based on the stress corrosion crack growth size threshold value, the annual average stress corrosion crack growth rate test value of the rotor material, and the low-cycle fatigue critical crack size of the rotor under the normal shutdown transient condition of the nuclear power steam turbine, the stress corrosion crack growth life is obtained, wherein the stress corrosion crack growth life N fscc The calculation of is as follows: a SCC is the stress corrosion crack growth threshold, a cn is the critical crack size for low cycle fatigue, It is the annual average stress corrosion crack growth rate test value of rotor material.

14. The device according to claim 13, characterized in that The acquisition module is further used for: Determining a crack extension size set of the rotor based on the stress calculation basic data and the material experiment basic data; Based on the crack growth size set, the stress corrosion crack growth life, the low cycle fatigue crack growth life and the high cycle fatigue crack growth life are obtained.

15. The device according to claim 14, characterized in that The acquisition module is further used for: Determine the high cycle fatigue crack growth size threshold value of the rotor based on the crack shape parameters of the rotor, the test value of the high cycle fatigue crack growth threshold value of the rotor material, and the high cycle fatigue stress range of the rotor under the steady-state working condition of the nuclear power steam turbine under load operation; Determine the critical crack size of the rotor for high cycle fatigue based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the crack site of the rotor under the steady-state condition of the nuclear power steam turbine under load operation; Determine the low cycle fatigue critical crack size of the rotor under the transient operating condition of the nuclear power steam turbine 110% overspeed test based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the rotor crack site under the transient operating condition of the nuclear power steam turbine 110% overspeed test; Based on the crack shape parameters of the rotor, the fracture toughness of the rotor material, and the maximum stress at the rotor crack site under the transient operating condition of 120% overspeed operation of the nuclear power steam turbine, the low-cycle fatigue critical crack size of the rotor under the transient operating condition of 120% overspeed operation of the nuclear power steam turbine is determined.

16. The device according to claim 15, characterized in that The crack extension stage of the rotor includes three stages, wherein in the first stage, the crack size of the rotor extends from the initial crack size to the high cycle fatigue crack extension size threshold value, in the second stage, the crack size of the rotor extends from the high cycle fatigue crack extension size threshold value to the stress corrosion crack extension size threshold value, and in the third stage, the crack size of the rotor extends from the stress corrosion crack extension size threshold value to the low cycle fatigue critical crack size.

17. The device according to claim 15, characterized in that The acquisition module is further used for: The high cycle fatigue crack growth life is obtained based on the high cycle fatigue crack growth size threshold value, the high cycle fatigue critical crack size, the crack shape parameters of the rotor, the high cycle fatigue crack growth test constants of the rotor material, and the high cycle fatigue stress range of the rotor under steady-state conditions of the nuclear power steam turbine under load operation.

18. The device according to claim 15, characterized in that The acquisition module is further used for: Based on the initial crack size of the rotor, the high cycle fatigue crack growth size threshold value, the crack shape parameter of the rotor, the low cycle fatigue crack growth test constant of the rotor material, and the maximum stress of the rotor crack position under the normal shutdown transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the first stage of the normal shutdown transient condition of the nuclear power steam turbine is obtained; Based on the high cycle fatigue crack growth size threshold value, the stress corrosion crack growth size threshold value, the crack shape parameter of the rotor, the rotor material low cycle fatigue crack growth test constant, and the maximum stress of the rotor crack part under the normal shutdown transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the second stage of the normal shutdown transient condition of the nuclear power steam turbine is obtained; Based on the stress corrosion crack growth size threshold value, the low-cycle fatigue critical crack size of the rotor under the normal shutdown transient condition of the nuclear power steam turbine, the crack shape parameters of the rotor, the low-cycle fatigue crack growth test constants of the rotor material, and the maximum stress at the rotor crack site under the normal shutdown transient condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the third stage of the normal shutdown transient condition of the nuclear power steam turbine is obtained.

19. The device according to claim 15, characterized in that The monitoring module is also used for: Obtaining a crack growth calendar life of the rotor based on the stress corrosion crack growth life, the low cycle fatigue crack growth life, and the high cycle fatigue crack growth life; Based on the crack growth calendar life, crack growth life safety monitoring is performed on the rotor.

20. The device according to claim 19, characterized in that The monitoring module is also used for: Based on the low-cycle fatigue crack growth life of the first stage of the normal shutdown transient condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the first stage of the 110% overspeed test transient condition of the nuclear power steam turbine, the low-cycle fatigue crack growth life of the first stage of the 120% overspeed operation transient condition of the nuclear power steam turbine, the annual average number of normal shutdowns, the annual average number of 110% overspeed tests and the annual average number of 120% overspeed operations of the nuclear power steam turbine, the calendar life of the first stage is obtained; The calendar life of the second stage is obtained based on the high cycle fatigue crack growth life, the low cycle fatigue crack growth life of the second stage of the normal shutdown transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the second stage of the 110% overspeed test transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the second stage of the 120% overspeed operation transient condition of the nuclear power steam turbine, the annual average number of normal shutdowns of the nuclear power steam turbine, the annual average number of 110% overspeed tests, the annual average number of 120% overspeed operations and the annual average fatigue number of the rotor; Based on the stress corrosion crack growth life, the high cycle fatigue crack growth life, the low cycle fatigue crack growth life of the third stage of the normal shutdown transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the third stage of the 110% overspeed test transient condition of the nuclear power steam turbine, the low cycle fatigue crack growth life of the third stage of the 120% overspeed operation transient condition of the nuclear power steam turbine, the annual average number of normal shutdowns of the nuclear power steam turbine, the annual average number of 110% overspeed tests, the annual average number of 120% overspeed operations and the annual average fatigue number of the rotor, the calendar life of the third stage is obtained; The crack growth calendar life is obtained based on the calendar life of the first stage, the calendar life of the second stage and the calendar life of the third stage.

21. The device according to claim 20, characterized in that The monitoring module is also used for: The sum of the calendar life of the first stage, the calendar life of the second stage, and the calendar life of the third stage is determined as the crack growth calendar life.

22. The device according to claim 19, characterized in that The monitoring module is also used for: Obtaining a crack extension life safety monitoring criterion value of the rotor; If the crack growth calendar life is less than the crack growth life safety monitoring criterion value, it is determined that the crack growth calendar life does not meet the monitoring qualification condition, so as to perform crack growth life safety monitoring on the rotor; or, If the crack growth calendar life is greater than or equal to the crack growth life safety monitoring criterion value, it is determined that the crack growth calendar life meets the monitoring qualification condition, so as to perform crack growth life safety monitoring on the rotor.

23. An electronic device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, a method for monitoring the rotor stress corrosion and fatigue long life of a nuclear power steam turbine as described in any one of claims 1 to 12 is implemented.

24. The electronic device according to claim 23, characterized in that: Also includes: A wireless communication component is connected to the nuclear power steam turbine, and data is transmitted between the electronic device and the nuclear power steam turbine via the wireless communication component.

25. The electronic device according to claim 23, characterized in that: The memory is used to store the basic data of stress calculation and basic data of material testing of the rotor of the nuclear power steam turbine; The processor is used to obtain a crack growth life safety monitoring instruction, obtain stress calculation basic data and material test basic data of a target rotor of a nuclear power steam turbine to be monitored from the memory based on the crack growth life safety monitoring instruction, and perform crack growth life safety monitoring on the target rotor based on the stress calculation basic data and material test basic data of the target rotor.

26. The electronic device according to claim 25, characterized in that: Also includes: a remote client, the remote client being connected to the processor; The remote client is used to send the crack extension life safety monitoring instruction to the processor and receive the monitoring result fed back by the processor.

27. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method for monitoring the rotor stress corrosion and fatigue long life of a nuclear power steam turbine as described in any one of claims 1 to 12 is implemented.

28. A monitoring platform suitable for nuclear power steam turbines, characterized in that: include: A nuclear power steam turbine rotor stress corrosion and fatigue long life monitoring device as described in any one of claims 13 to 22; or an electronic device as described in any one of claims 23 to 26; or a computer readable storage medium as described in claim 27.