Self-buffering berthing structure and use method

By using buffer components and connecting components in the berthing structure of offshore wind power equipment, the impact force and maintenance problems caused by ship impact are solved in the prior art, and the structure protection and protection are achieved Improve maintenance efficiency.

CN116971335BActive Publication Date: 2024-11-12SHANGHAI INVESTIGATION DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310827320.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-07-06
Publication Date
2024-11-12
Estimated Expiration
2043-07-06

AI Technical Summary

Technical Problem

The berthing structure of existing offshore wind power equipment will produce a large impact force when the ship hits, and it will not be easy to replace after long-term impact, making it difficult to maintain.

Method used

Adopt a self-buffered berthing structure, including berthing columns, wind turbine foundations, horizontal pipes, L-shaped pipes, berthing connecting rods, buffer components and connecting components, through pipe-type rubber, vertical circular pipes, movable flanges and fixing methods Components such as Lan, buffering and disassembly design, reduce impact force and convenient replacement of berthing columns.

Benefits of technology

Effectively reduce the impact of ship impact on wind turbine foundations, reduce structural wear, realize convenient onshore maintenance and replacement, and improve the reliability and maintenance efficiency of berthing structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116971335B_ABST
    Figure CN116971335B_ABST
Patent Text Reader

Abstract

The present invention provides a self-buffering berthing structure and a method of use, which are applied to the berthing operation of offshore wind power ships; it includes a berthing column, a wind turbine foundation, a horizontal tube, an L-shaped tube, a berthing connecting rod, a buffer assembly, and a connecting assembly, wherein a plurality of the berthing connecting rods are arranged on the wind turbine foundation; a plurality of the horizontal tubes and the L-shaped tubes are arranged on the berthing column; the berthing connecting rod includes a long connecting rod and a short connecting rod, wherein the long connecting rod is connected to the L-shaped tube by a buffer assembly and a connecting assembly, and the short connecting rod is connected to the horizontal tube by a buffer assembly and a connecting assembly. In the present invention, the impact force in the vertical direction is buffered and offset by the tubular rubber between the L-shaped tube and the vertical circular tube, and the impact force in the horizontal direction is buffered and offset by the tubular rubber and the end rubber in the horizontal tube, thereby reducing the impact force on the wind turbine foundation. In addition, this berthing structure is detachable and easy to install, which is convenient for realizing the onshore corrosion protection and maintenance of the berthing column.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of offshore wind power equipment, and in particular to a self-buffering berthing structure and a use method thereof. Background Art

[0002] my country is rich in offshore wind energy resources. As a green and clean energy, offshore wind power has been widely developed, and the development and construction of offshore wind power is in full swing. The foundation of offshore wind turbines is equipped with a berthing structure for operation and maintenance ships to dock and land. At present, the berthing structure commonly used in wind turbine foundations is composed of a circular steel column plus a rear connecting rod. The rear connecting rod is rigidly welded to the circular steel column and the rear foundation. The collision of the ship on the berthing column will produce a large impact force on the wind turbine foundation, which is not good for the foundation structure. In addition, the berthing structure and the wind turbine foundation are usually fixedly connected. After the anti-corrosion coating on the surface of the berthing column falls off due to wear and deformation due to impact, on-site maintenance can only be carried out at sea, which is difficult to operate and the effect is not good.

[0003] In the prior art, an invention patent with publication number CN114370059A submitted to the State Intellectual Property Office of China discloses an offshore wind power energy dissipation type berthing and collision avoidance system, which includes at least two vertical berthing tubes, and a plurality of transverse berthing tube groups are arranged between two adjacent vertical berthing tubes from top to bottom, and the two ends of the transverse berthing tube group are rigidly connected to the vertical berthing tubes on the same side; an elastic support assembly is connected between the transverse berthing tube group and the offshore wind power single column, one end of the elastic support assembly is hinged to the transverse berthing tube group, and the other end of the elastic support assembly is rigidly connected to the offshore wind power single column. The present invention dissipates the external impact energy through its own elastic deformation and interaction with seawater, thereby achieving the purpose of reducing damage to the berthing structure itself. The above patent reduces the damage to the berthing structure itself to a certain extent, but the patent uses hinges in many places. The hinges are prone to rust due to long-term immersion in seawater. When the maintenance ship docks at the berthing structure, the hinges will not be able to rotate flexibly after rusting, and the docking force cannot be offset in time. The hinges are even easy to fall apart when subjected to the docking force. Therefore, it can be further improved. Summary of the invention

[0004] In view of the shortcomings of the prior art described above, the purpose of the present invention is to provide a self-buffering berthing structure and a method of use, which are used to solve the problems in the prior art that a ship collides with the berthing structure to generate a large impact force on the wind turbine foundation, and that the berthing structure is difficult to replace after being deformed due to long-term impact.

[0005] To achieve the above-mentioned purpose and other related purposes, the present invention provides a self-buffering berthing structure, which is used in offshore wind power ship berthing operations; it includes a berthing column, a wind turbine foundation, a horizontal pipe, an L-shaped pipe, a berthing connecting rod, a buffer assembly, and a connecting assembly, and several of the berthing connecting rods are arranged on the wind turbine foundation; several of the horizontal pipes and L-shaped pipes are arranged on the berthing column; the berthing connecting rod includes a long connecting rod and a short connecting rod, the long connecting rod is connected to the L-shaped pipe by a buffer assembly and a connecting assembly, and the short connecting rod is connected to the horizontal pipe by a buffer assembly and a connecting assembly.

[0006] Preferably, the buffer assembly includes a tubular rubber, and the connecting assembly includes a vertical circular tube, the vertical circular tube is arranged at the end of the long connecting rod away from the foundation of the wind turbine generator set, and the extension directions of the long connecting rod and the vertical circular tube are perpendicular to each other; the buffer assembly is arranged in the vertical circular tube, the vertical tube of the L-shaped tube is inserted in the vertical circular tube, and the tubular rubber is located between the outer wall of the vertical tube and the inner wall of the vertical circular tube.

[0007] Preferably, the L-shaped tube includes a horizontal tube and a vertical tube, the horizontal tube has the same diameter as the vertical tube, and the vertical tube is fixedly connected to the horizontal tube vertically downward; the diameter of the vertical tube is smaller than the diameter of the vertical circular tube.

[0008] Preferably, the connecting assembly also includes a movable flange and a fixed flange, and the fixed flange is arranged at the end of the short connecting rod away from the foundation of the wind turbine generator set; the buffer assembly also includes an end rubber; the horizontal tube includes a small horizontal tube and a large horizontal tube, the small horizontal tube is arranged on the mooring column, the large horizontal tube is sleeved on the outer periphery of the small horizontal tube, and a tubular rubber is arranged between the outer wall of the small horizontal tube and the inner wall of the large horizontal tube; the movable flange is arranged at the end of the large horizontal tube away from the mooring column, and the movable flange is connected to the fixed flange; the end rubber is arranged between the end of the small horizontal tube away from the mooring column and the movable flange.

[0009] Preferably, the movable flange is detachably connected to the fixed flange via flange bolts, and an anti-corrosion coating is provided on the outer periphery of the flange bolts.

[0010] Preferably, the number of the mooring columns is at least two, and the outer periphery of the mooring columns is provided with an anti-corrosion coating.

[0011] Preferably, one of the mooring columns is fixed to the foundation of the wind turbine generator set through three to four mooring connecting rods.

[0012] To achieve the above purpose or other purposes, the present invention also discloses a method for using a self-buffering berthing structure, using the above self-buffering berthing structure, the steps are as follows:

[0013] S1: Install the berthing columns, wind turbine foundation, horizontal pipes, L-shaped pipes, berthing connecting rods, buffer components, and connection components;

[0014] S2: When the ship berths to the wind turbine foundation, the ship hits the berthing column, and the impact force is offset by the buffer assembly between the long connecting rod and the L-shaped pipe, and the buffer assembly between the short connecting rod and the horizontal pipe, reducing the load on the wind turbine foundation;

[0015] S3: When the berthing column needs to be replaced, first remove the connection assembly between the short connecting rod and the horizontal pipe, then remove the berthing column from the connection assembly between the long connecting rod and the L-shaped pipe by lifting and lift it to the operation and maintenance vessel, so as to facilitate the onshore maintenance of the berthing column.

[0016] As described above, the self-buffering berthing structure and the use method of the present invention have the following beneficial effects:

[0017] The self-buffering berthing structure and use method of the present invention are provided with an L-shaped tube and a horizontal tube on the berthing column. The L-shaped tube is connected to the foundation of the wind turbine generator set through a tube-shaped rubber, a vertical round tube, and a long connecting rod. The horizontal tube is connected to the foundation of the wind turbine generator set through a tube-shaped rubber, an end rubber, a movable flange, a fixed flange, and a short connecting rod. When a ship applies an impact force to the berthing column, the impact force in the up and down directions is buffered and offset by the tube-shaped rubber between the L-shaped tube and the vertical round tube, and the impact force in the horizontal direction is buffered and offset by the tube-shaped rubber and the end rubber in the horizontal tube, thereby protecting the foundation of the wind turbine generator set and reducing the impact force on the foundation of the wind turbine generator set. In the present invention, when the anti-corrosion coating on the surface of the berthing column is excessively worn and damaged, the operator disassembles the flange bolts between the movable flange and the fixed flange, and the vertical tube of the berthing column along the L-shaped tube can be pulled out from the vertical round tube, and hoisted to the shore by the operation and maintenance ship, thereby conveniently realizing the onshore maintenance of the berthing structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the spatial structure of the self-buffering berthing structure involved in the present invention;

[0019] Figure 2 It is a front view of the self-buffering berthing structure involved in the present invention;

[0020] Figure 3 The figure is a schematic diagram of the connection of the self-buffering berthing structure involved in the present invention.

[0021] Description of reference numerals:

[0022] 1. Berthing column; 11. L-shaped pipe; 121. Small horizontal pipe; 122. Large horizontal pipe; 123. Movable flange; 2. Long connecting rod; 21. Vertical circular pipe; 3. Tube rubber; 4. End rubber; 5. Short connecting rod; 51. Fixed flange; 6. Wind turbine foundation. DETAILED DESCRIPTION

[0023] The following is a description of the implementation of the present invention by means of specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.

[0024] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change of the proportional relationship or adjustment of the size should still fall within the scope of the technical content disclosed by the present invention without affecting the effects and purposes that can be achieved by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.

[0025] like Figure 1-Figure 3 As shown, the present invention provides a self-buffering berthing structure, which is applied to offshore wind power ship berthing operations; it includes a berthing column 1, a wind turbine foundation 6, a horizontal pipe, an L-shaped pipe 11, a berthing connecting rod, a buffer assembly, and a connecting assembly, the right ends of several berthing connecting rods are welded to the wind turbine foundation 6; the left ends of several horizontal pipes and L-shaped pipes 11 are welded to the berthing column 1; the berthing connecting rod includes a long connecting rod 2 and a short connecting rod 5, the long connecting rod 2 and the L-shaped pipe 11 are connected by a buffer assembly and a connecting assembly, and the short connecting rod 5 and the horizontal pipe are connected by a buffer assembly and a connecting assembly.

[0026] The self-buffering berthing structure of the present invention is welded on the wind turbine foundation 6, and the berthing link includes a long link 2 and a short link 5, the long link 2 is detachably connected to the L-shaped tube 11 through a buffer assembly and a connecting assembly, and the short link 5 is detachably and firmly connected to the horizontal tube through a buffer assembly and a connecting assembly. When a ship applies an impact force to the berthing column 1, the impact force in the horizontal direction is offset by the horizontal tube and the buffer assembly, and the impact force in the vertical direction is offset by the buffer assembly on the periphery of the L-shaped tube 11, thereby reducing the impact force applied by the ship to the wind turbine foundation 6 and protecting the wind turbine foundation 6. When the anti-corrosion coating of the berthing column 1 is excessively worn after multiple impacts or the berthing column 1 is bent and deformed, the operator disassembles the horizontal tube and the short link 5, and pulls the berthing link upward along the vertical tube of the L-shaped tube 11, and hoists it to the shore through the maintenance ship, so as to conveniently realize the onshore maintenance of the berthing structure.

[0027] In this embodiment, the mooring connecting rod and the mooring column 1 are both round tubes. The mooring column 1 is arranged in a vertical direction, and the mooring connecting rod is arranged in a horizontal direction.

[0028] Preferably, Figure 2 , Figure 3 As shown, the buffer assembly includes a tubular rubber 3, and the connecting assembly includes a vertical circular tube 21. The vertical circular tube 21 is welded to the right end of the long connecting rod 2, and the extension directions of the long connecting rod 2 and the vertical circular tube 21 are perpendicular to each other; the buffer assembly is arranged in the vertical circular tube 21, the vertical tube of the L-shaped tube 11 is inserted into the vertical circular tube 21, and the tubular rubber 3 is located between the outer wall of the vertical tube and the inner wall of the vertical circular tube 21. In this embodiment, the long connecting rod 2 extends in the left-right direction, the vertical circular tube 21 extends in the up-down direction, and the long connecting rod 2 is welded and fixed to the outer wall of the vertical circular tube 21.

[0029] Preferably, Figure 3 As shown, the L-shaped tube 11 includes a horizontal tube and a vertical tube. The horizontal tube has the same diameter as the vertical tube, and the vertical tube is fixedly connected to the horizontal tube vertically downward; the diameter of the vertical tube is smaller than the diameter of the vertical circular tube 21.

[0030] Preferably, Figure 2 , Figure 3As shown, the connection assembly also includes a movable flange 123 and a fixed flange 51, and the fixed flange 51 is arranged at the left end of the short connecting rod 5; the buffer assembly also includes an end rubber 4; the horizontal pipe includes a small horizontal pipe 121 and a large horizontal pipe 122, the left end of the small horizontal pipe 121 is welded on the berthing column 1, the large horizontal pipe 122 is sleeved on the outer periphery of the small horizontal pipe 121, and a tube-shaped rubber 3 is arranged between the outer wall of the small horizontal pipe 121 and the inner wall of the large horizontal pipe 122; the movable flange 123 is arranged at the right end of the large horizontal pipe 122, and the movable flange 123 is connected to the fixed flange 51; the end rubber 4 is arranged between the right end of the small horizontal pipe 121 and the movable flange 123. Further, in this embodiment, the movable flange 123 and the fixed flange 51 are detachably connected by flange bolts, and the outer periphery of the flange bolts is provided with an anti-corrosion coating.

[0031] Preferably, Figure 1 As shown, the number of the mooring columns 1 is at least two, and an anti-corrosion coating is provided on the outer periphery of the mooring columns 1. In this embodiment, the number of the mooring columns 1 is two, and the two mooring columns 1 are arranged in parallel.

[0032] Preferably, Figure 1-Figure 3 As shown, a mooring column 1 is fixed to the wind turbine foundation 6 through three to four mooring connecting rods. In this embodiment, the number of long connecting rods 2 is two, which are respectively arranged at the upper end and the lower end of the wind turbine foundation 6, and the number of short connecting rods 5 is two, which are respectively arranged at the middle end of the wind turbine foundation 6. In other examples, the arrangement of the long connecting rods 2 and the short connecting rods 5 can be set according to the needs of the site.

[0033] Furthermore, in this embodiment, the buffer components used include the tubular rubber 3 and the end rubber 4, and other elastic materials or spring structures that can achieve repeated large deformations may also be used.

[0034] Furthermore, in the present embodiment, the outer periphery of the mooring column 1, the movable flange 123, the fixed flange 51, and the outer periphery of the flange bolts are provided with an anti-corrosion coating, which effectively prevents the connection parts of the self-buffering mooring structure from being corroded by the sea, and when the mooring column 1 needs to be disassembled, it can be disassembled quickly and effectively.

[0035] To achieve the above purpose or other purposes, the present invention also discloses a method for using a self-buffering berthing structure, using the above self-buffering berthing structure, the steps are as follows:

[0036] A1: The operator connects the components according to the above contents;

[0037] A2: When the ship approaches the berthing structure, the ship applies an impact force to the berthing column 1. Since the impact force applied by the ship is not entirely in the horizontal or vertical direction, the impact force can be decomposed into the impact force in the up-down direction and the impact force in the front-back direction. When the impact force in the front-back direction is applied to the berthing column 1, the small horizontal tube 121 will move toward the end of the large horizontal tube 122, and the tubular rubber 3 and the end rubber 4 on the periphery of the small horizontal tube 121 will offset the impact force in the front-back direction through rubber deformation; similarly, the vertical tube of the L-shaped tube 11 will also approach the inner wall of the vertical circular tube 21, and the impact force in the front-back direction applied by the vertical tube of the L-shaped tube 11 will be offset by the tubular rubber 3 set on the periphery of the vertical tube.

[0038] When the impact force in the up-and-down directions is applied to the berthing column 1, the small horizontal tube 121 will move toward the inner wall of the large horizontal tube 122, and the tubular rubber 3 on the outer periphery of the small horizontal tube 121 will offset the impact force in the up-and-down directions; similarly, the vertical tube of the L-shaped tube 11 will move up and down along the extension direction of the vertical circular tube 21, and the impact force in the up-and-down directions applied by the vertical tube of the L-shaped tube 11 will be offset by the friction force of the tubular rubber 3 arranged on the outer periphery of the vertical tube.

[0039] A3: When the anti-corrosion coating on the surface of the berthing column 1 is damaged or the berthing column 1 is bent after the ship has docked for many times, the operator can remove the flange bolts between the movable flange 123 and the fixed flange 51, so as to separate the large horizontal pipe 122 from the short connecting rod 5. In this way, the berthing column 1 is lifted upward by the crane, and the vertical pipe of the L-shaped pipe 11 is pulled upward and separated from the vertical circular pipe 21, thereby realizing the separation of the berthing column 1 and the wind turbine foundation 6. The operator lifts it to the shore by the operation and maintenance ship, which is convenient for the operator to replace the berthing column 1.

[0040] The self-buffering berthing structure and the use method thereof according to the present invention have the following beneficial effects:

[0041] 1. The self-buffering berthing structure of the present invention comprises an L-shaped tube 11 on the berthing column 1, a long connecting rod 2 on the wind turbine foundation 6, a vertical round tube 21 on the long connecting rod 2, the vertical tube of the L-shaped tube 11 is inserted into the vertical round tube 21, and a tube-shaped rubber 3 is also arranged at the annular gap between the two. A short connecting rod 5 is arranged on the wind turbine foundation 6, a fixing flange 51 is arranged on the short connecting rod 5, a small horizontal tube 121 and a large horizontal tube 122 are arranged on the berthing column 1, the large horizontal tube 122 is sleeved on the outer periphery of the small horizontal tube 121, and a tube-shaped rubber 3 and an end rubber 4 are arranged between the two. The arrangement of the tube-shaped rubber 3 and the end rubber 4 can offset the impact force of the ship on the berthing column 1, and reduce the impact of the ship collision on the wind turbine foundation 6.

[0042] 2. The vertical pipe of the L-shaped pipe 11 is inserted into the vertical circular pipe 21, and the large horizontal pipe 122 and the short connecting rod 5 are detachably connected through a flange. When the anti-corrosion coating on the surface of the mooring column 1 is damaged or the mooring column 1 is bent and deformed, the flange can be removed, and then the mooring column 1 can be lifted up to the shore by the operation and maintenance ship, so as to conveniently realize the onshore maintenance of the mooring structure.

[0043] 3. The self-buffering berthing structure and the use method of the present invention solve the problems in the prior art that a ship collides with the berthing structure to generate a large impact force on the wind turbine foundation 6, and that the berthing structure is difficult to replace after being deformed due to long-term collision.

[0044] Therefore, the present invention effectively overcomes various shortcomings in the prior art and has high industrial utilization value.

[0045] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A self-buffering berthing structure, used in offshore wind power ship berthing operations; characterized by: The invention comprises a berthing column (1), a wind turbine foundation (6), a horizontal tube, an L-shaped tube (11), a berthing connecting rod, a buffer assembly, and a connecting assembly, wherein a plurality of the berthing connecting rods are arranged on the wind turbine foundation (6); a plurality of the horizontal tubes and the L-shaped tubes (11) are arranged on the berthing column (1); the berthing connecting rods comprise a long connecting rod (2) and a short connecting rod (5); the long connecting rod (2) and the L-shaped tube (11) are connected via a buffer assembly and a connecting assembly, and the short connecting rod (5) and the horizontal tube are connected via a buffer assembly and a connecting assembly; The buffer assembly comprises a tubular rubber (3); the connecting assembly comprises a vertical circular tube (21); the vertical circular tube (21) is arranged at an end of the long connecting rod (2) away from the wind turbine foundation (6); and the extension directions of the long connecting rod (2) and the vertical circular tube (21) are perpendicular to each other; the buffer assembly is arranged in the vertical circular tube (21); the vertical tube of the L-shaped tube (11) is inserted into the vertical circular tube (21); and the tubular rubber (3) is located between the outer wall of the vertical tube and the inner wall of the vertical circular tube (21); The connection assembly further comprises a movable flange (123) and a fixed flange (51), wherein the fixed flange (51) is arranged at an end of the short connecting rod (5) away from the wind turbine foundation (6); the buffer assembly further comprises an end rubber (4); the horizontal tube comprises a small horizontal tube (121) and a large horizontal tube (122), wherein the small horizontal tube (121) is arranged on the mooring column (1), the large horizontal tube (122) is sleeved on the outer periphery of the small horizontal tube (121), and a tube-shaped rubber (3) is arranged between the outer wall of the small horizontal tube (121) and the inner wall of the large horizontal tube (122); the movable flange (123) is arranged at an end of the large horizontal tube (122) away from the mooring column (1), and the movable flange (123) is connected to the fixed flange (51); and the end rubber (4) is arranged between the end of the small horizontal tube (121) away from the mooring column (1) and the movable flange (123).

2. The self-buffering berthing structure according to claim 1, characterized in that: The L-shaped tube (11) comprises a horizontal tube and a vertical tube, the horizontal tube and the vertical tube have the same diameter, and the vertical tube is vertically downward and fixedly connected to the horizontal tube; the diameter of the vertical tube is smaller than the diameter of the vertical circular tube (21).

3. The self-buffering berthing structure according to claim 1, characterized in that: The movable flange (123) and the fixed flange (51) are detachably connected via flange bolts, and an anti-corrosion coating is provided on the outer periphery of the flange bolts.

4. The self-buffering berthing structure according to claim 1, characterized in that: The number of the mooring columns (1) is at least two, and the outer periphery of the mooring columns (1) is provided with an anti-corrosion coating.

5. The self-buffering berthing structure according to claim 1, characterized in that: One of the mooring columns (1) is fixed on the wind turbine foundation (6) via three to four mooring connecting rods.

6. A method for using a self-buffering mooring structure, using the self-buffering mooring structure according to any one of claims 1 to 5, characterized in that: Here are the steps: S1: Installing the berthing column (1), the wind turbine foundation (6), the horizontal pipe, the L-shaped pipe (11), the berthing connecting rod, the buffer assembly, and the connecting assembly; S2: When the ship berths toward the wind turbine foundation (6), the ship impacts the berthing column (1), and the impact force is offset by the buffer assembly between the long connecting rod (2) and the L-shaped pipe (11), and the buffer assembly between the short connecting rod (5) and the horizontal pipe, thereby reducing the load on the wind turbine foundation (6); S3: When the berthing column (1) needs to be replaced, the connection assembly between the short connecting rod (5) and the horizontal pipe is first removed, and then the berthing column (1) is removed from the connection assembly between the long connecting rod (2) and the L-shaped pipe (11) by lifting and lifted onto the operation and maintenance vessel, so as to facilitate the onshore maintenance of the berthing column (1).