A method for installing a topological PEC composite column node structure

By introducing curling design and special installation assistant into PEC composite columns, the problems of insufficient buckling and torsion resistance and installation complexity of PEC composite columns are solved, achieving more efficient construction and improving joint strength.

CN116971536BActive Publication Date: 2024-10-01JINGGONG IND BUILDING SYST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310989553.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-08
Publication Date
2024-10-01
Estimated Expiration
2043-08-08

Smart Images

  • Figure CN116971536B_ABST
    Figure CN116971536B_ABST
Patent Text Reader

Abstract

The invention discloses an installation method for a topological PEC composite column node structure, which specifically comprises the steps of installing a lower PEC composite column, hoisting an upper PEC composite column, installing a mid-web splint and bolts, welding connecting steel bars, installing a curling splint and bolts, and casting concrete at a joint between an upper PEC composite column and a lower PEC composite column, wherein an auxiliary device is used when installing the mid-web splint and welding connecting steel bars, and the auxiliary device comprises a transverse plate, a supporting plate and a fixing plate, wherein each of the two ends of the transverse plate is connected to a fixing plate, and the fixing plate is provided with an installation hole, and the installation holes on the two fixing plates are aligned with the connection holes on the two curling edges of the steel frame, and the transverse plate and the fixing plate are fixed to the curling edges by bolts; a plurality of horizontal supporting plates are provided on the transverse plate, and an upward tongue plate is provided at the end of the supporting plate; the auxiliary device temporarily fixes the mid-web splint, thereby reducing the number of auxiliary workers required in the aerial installation process of the mid-web splint, and improving the installation efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of construction, and in particular to a topological PEC composite column node structure and an installation method. Background Art

[0002] The PEC composite column is a partially filled steel-concrete composite structural column that uses I-beams as steel frames. Steel cages are set in the concrete on both sides of the steel frame web. The entire PEC composite column is superior to pure steel structures or reinforced concrete structures in terms of bearing capacity, stiffness and ductility. Compared with rectangular steel tube concrete components, the outer side of the flange of the PEC composite column is a free boundary. Even if structural tie bars are configured, the width-to-thickness ratio limit of the flange cannot be fully relaxed in the specification, resulting in a thicker steel frame. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a topological PEC composite column with curling and its corresponding node structure and installation method, improve the local anti-buckling performance of the wing plate of the PEC composite column and the overall anti-torsion performance of the composite column, and configure the corresponding installation method to improve the installation convenience of the prefabricated PEC composite column.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a topological PEC composite column node structure, including a PEC composite column, a mid-web splint and a rolled edge splint;

[0005] The PEC composite column comprises a steel frame, a steel cage and concrete. The cross section of the steel frame is I-shaped. The steel frame comprises a middle web and wing plates connected to both sides of the web. The edges of the wing plates are provided with curling edges, which are perpendicular to the main body of the wing plates. The steel cages are arranged on both sides of the web and concrete is poured. Connection areas without concrete are provided at both ends of the steel frame. The connection areas are used for node connection. The web and the curling edges of the connection areas are both provided with connection holes for installing bolts. The curling edges improve the anti-buckling capacity of the PEC composite column, so that the I-shaped steel frame of the PEC composite column can adopt a larger width-to-thickness ratio, thereby reducing the amount of steel used.

[0006] The steel frames of the upper PEC composite columns and the lower PEC composite columns are butted, the middle web plywood is connected to the web of the upper PEC composite columns and the web of the lower PEC composite columns by bolts, and the rolled edge plywood is connected to the rolled edge of the upper PEC composite columns and the rolled edge of the lower PEC composite columns by bolts; the rolled edge plywood strengthens the connection between the upper and lower PEC composite columns by the rolled edge, omitting the ear plates used in the connection of the PEC composite columns in the prior art, making the construction more convenient.

[0007] Furthermore, the web is provided with through holes with uniform intervals, and the through holes are regular hexagons. The through holes can reduce the amount of steel used and are conducive to the connection of the steel cages on both sides.

[0008] Specifically, the steel cage includes frame steel bars, structural stirrups and anti-cracking steel bars. The structural stirrups are rectangular and the four corners are connected to the frame steel bars. The anti-cracking steel bars are parallel to the frame steel bars and are connected to a long rectangular side of the structural stirrups.

[0009] Furthermore, the PEC composite column also includes tie bars, which are arranged at the through holes of the web. The tie bars pass through the through holes and hook the anti-cracking steel bars of the steel cages on both sides of the web. The tie bars can achieve the connection of the steel cages on both sides of the web and strengthen the integrity of the concrete on both sides of the web.

[0010] Furthermore, the PEC composite column node structure also includes a plurality of connecting steel bars. The erecting steel bars of the upper PEC composite column and the lower PEC composite column are welded by connecting steel bars. The anti-cracking steel bars of the upper PEC composite column and the lower PEC composite column are welded by connecting steel bars. The connecting steel bars can strengthen the connection between the steel cages of the upper and lower PEC composite columns and improve the node strength.

[0011] The present invention also provides a method for installing a topological PEC composite column node structure, comprising the following steps:

[0012] Step 1: Install the lower PEC composite column;

[0013] Step 2: Hoist the upper PEC composite column so that the upper PEC composite column and the lower PEC composite column are aligned;

[0014] Step 3: Install the mid-web splint and bolts, the mid-web splint clamps the webs of the upper PEC composite column and the lower PEC composite column;

[0015] Step 4: Weld the connecting steel bars, where the two ends of a portion of the connecting steel bars are respectively welded to the erecting steel bars of the upper PEC composite column and the lower PEC composite column, and the two ends of the other portion of the connecting steel bars are respectively welded to the anti-cracking steel bars of the upper PEC composite column and the lower PEC composite column;

[0016] Step 5: Install the crimping clamps and bolts, and the crimping clamps clamp the crimping of the upper PEC composite column and the lower PEC composite column;

[0017] Step 6: Cast concrete at the joints between the upper PEC composite columns and the lower PEC composite columns.

[0018] During the installation of the PEC composite column node structure, the most complicated operation is the installation of the mid-web splint and the welding of the connecting steel bars. The large size of the mid-web splint leads to its heavy weight. Generally, two workers are required to manually temporarily fix the web splint in the specified position and then perform the bolt fixing operation. The welding of the connecting steel bars also requires additional workers to temporarily fix the connecting steel bars. Since the installation of the mid-web splint and the welding of the connecting steel bars are both performed in the air, the complex multi-person aerial operation greatly limits the installation efficiency. In order to solve this problem, the present invention provides a special installation assistant in step 1, which is installed on the top of the lower PEC composite column.

[0019] The auxiliary device includes a transverse plate, a support plate and a fixed plate. A fixed plate is connected to each end of the transverse plate. The fixed plates are provided with mounting holes. The mounting holes on the two fixing plates are aligned with the connecting holes on the two rolled edges of the steel frame. The transverse plate and the fixed plates are fixed to the rolled edges by bolts. A plurality of horizontal support plates are provided on the transverse plate. An upward tongue plate is provided at the end of the support plate. When the auxiliary device is installed, the end of the support plate is against the web of the steel frame. The support plate is used to support the bottom edge of the mid-belly splint. The support plate and the tongue plate temporarily fix the mid-belly splint to the web of the steel frame. When installing the mid-belly splint, workers only need to insert the bottom edge of the mid-belly splint between the tongue plate and the web of the steel frame, without the need for additional workers to hold the heavy mid-belly splint.

[0020] Furthermore, the auxiliary device also includes a moving rod, a pressure plate and a spring. The moving rod passes through the cross plate. One end of the moving rod is provided with a baffle and the other end is fixedly connected to the pressure plate. The spring is sleeved on the moving rod, and the two ends of the spring respectively resist the baffle and the cross plate; the pressure plate is aligned with the erection steel bars or the anti-cracking steel bars, and the pressure plate temporarily presses the connecting steel bars onto the corresponding erection steel bars or the anti-cracking steel bars; the surface of the pressure plate in contact with the connecting steel bars is provided with an arc-shaped groove so as to be more adaptable to the circular connecting steel bars.

[0021] Beneficial effects: (1) The topological PEC composite column node structure of the present invention is provided with a curling edge in the steel frame of the PEC composite column, which improves the anti-buckling capacity of the PEC composite column, so that the I-shaped steel frame of the PEC composite column can adopt a larger width-to-thickness ratio and reduce the amount of steel used. (2) The topological PEC composite column node structure of the present invention adopts a curling edge plywood to strengthen the node connection between the upper and lower PEC composite columns, eliminating the ear plate used in the connection of the PEC composite columns in the prior art, making the construction more convenient. (3) In the topological PEC composite column node structure of the present invention, the anti-cracking steel bars of the upper and lower PEC composite columns are welded by connecting steel bars to strengthen the connection of the steel cages of the upper and lower PEC composite columns and improve the node strength. (4) The installation method of the topological PEC composite column node structure of the present invention adopts an auxiliary device with a support plate to temporarily fix the mid-web plywood, which reduces the number of auxiliary workers required in the aerial installation process of the mid-web plywood and improves the installation efficiency. (5) The installation method of the topological PEC composite column node structure of the present invention sets a movable rod and a pressure plate in the auxiliary device, and uses the pressure plate to temporarily fix the connecting steel bars, thereby reducing the number of auxiliary workers required for aerial welding of the connecting steel bars, making the welding operation of the connecting steel bars more convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a stereoscopic diagram of the PEC composite column in Example 1.

[0023] Figure 2 This is a three-dimensional diagram of the steel frame in Example 1.

[0024] Figure 3 It is a partial view of the steel frame and steel cage in Example 1.

[0025] Figure 4 yes Figure 3 Top view of the .

[0026] Figure 5 It is a three-dimensional diagram of the topological PEC composite column node structure of Example 1.

[0027] Figure 6 It is a three-dimensional diagram of the auxiliary device in Example 1.

[0028] Figure 7 This is the installation diagram of the auxiliary device in Example 1 (part 1).

[0029] Figure 8 This is the installation diagram of the auxiliary device in Example 1 (part 2).

[0030] Fig. 9 This is a schematic diagram of the working principle of the auxiliary device in Example 1 (part 1).

[0031] Fig.10 This is the working principle diagram of the auxiliary device in Example 1 (part 2).

[0032] Fig.11 yes Fig.10 Top view of the .

[0033] Among them: 100, PEC composite column; 110, steel frame; 111, web; 111-1, through hole; 112, wing plate; 112-1, curling; 120, steel cage; 121, frame steel bars; 122, structural stirrups; 123, anti-cracking steel bars; 124, tie bars; 130, concrete; 200, mid-web splint; 300, curling splint; 400, connecting steel bars; 500, auxiliary device; 510, cross plate; 520, support plate; 521, tongue plate; 530, fixed plate; 540, moving rod; 541, baffle; 550, pressure plate; 560, spring. DETAILED DESCRIPTION

[0034] The present invention is further described in detail below in conjunction with specific implementation modes. Example 1

[0035] like Figure 5 As shown, the topological PEC composite column node structure of this embodiment includes a PEC composite column 100, a mid-web splint 200, a rolled splint 300 and connecting steel bars 400.

[0036] like Figure 1 As shown, the PEC composite column 100 includes a steel frame 110, a steel cage 120 and concrete 130. Figure 2 As shown, the cross section of the steel frame 110 is I-shaped, and the steel frame 110 includes a middle web 111 and flanges 112 connected to both sides of the web 111. The edge of the flange 112 is provided with a curling edge 112-1, and the curling edge 112-1 is perpendicular to the main body of the flange 112; the web 111 is provided with evenly spaced through holes 111-1, and the through holes 111-1 are regular hexagons; steel cages 120 are arranged on both sides of the web 111 and concrete 130 is poured, and connection areas without concrete 130 are provided at both ends of the steel frame 110, and the connection areas are used for node connection, and the web 111 and the curling edge 112-1 in the connection area are provided with connection holes for installing bolts.

[0037] like Figure 3 and Figure 4As shown, the steel cage 120 includes upright steel bars 121, structural stirrups 122, anti-cracking steel bars 123 and tie bars 124. The structural stirrups 122 are rectangular and the four corners are connected to the upright steel bars 121. The anti-cracking steel bars 123 are parallel to the upright steel bars 121 and the anti-cracking steel bars 123 are connected to a long rectangular side of the structural stirrups 122. The tie bars 124 are arranged at the through hole 111-1 of the web 111. The tie bars 124 pass through the through hole 111-1. The tie bars 124 hook the anti-cracking steel bars 123 of the steel cage 120 on both sides of the web 111. The tie bars 124 can realize the connection of the steel cage 120 on both sides of the web 111, and strengthen the integrity of the concrete on both sides of the web 111.

[0038] like Figure 5 As shown, in the topological PEC composite column node structure of this embodiment, the upper PEC composite column 100 is aligned with the lower PEC composite column 100, the web 111 of the upper PEC composite column 100 and the web 111 of the lower PEC composite column 100 are connected by a mid-web splint 200 and bolts, the curling 112-1 of the upper PEC composite column 100 and the curling 112-1 of the lower PEC composite column 100 are connected by a curling splint 300 and bolts, the erection steel bars 121 of the upper PEC composite column 100 and the lower PEC composite column 100 are welded by connecting steel bars 400, and the anti-cracking steel bars 123 of the upper PEC composite column 100 and the lower PEC composite column 100 are welded by connecting steel bars 400.

[0039] Figure 6 What is shown is an auxiliary device 500 used for installing the topological PEC combined column node structure of this embodiment. The auxiliary device 500 includes a transverse plate 510, a support plate 520, a fixed plate 530, a movable rod 540, a pressure plate 550 and a spring 560. The two ends of the transverse plate 510 are respectively connected to a fixed plate 530, and the fixed plates 530 are provided with mounting holes. The mounting holes on the two fixed plates 530 are aligned with the connection holes on the two curling edges 112-1 of the steel frame 110. The transverse plate 510 and the fixed plates 530 are fixed to the curling edges 112-1 by bolts; a plurality of horizontal support plates 520 are provided on the transverse plate 510, and an upward tongue plate 521 is provided at the end of the support plate 520; a baffle 541 is provided at one end of the movable rod 540, and the other end is fixedly connected to the pressure plate 550, and the spring 560 is sleeved on the movable rod 540, and the two ends of the spring 560 respectively resist the baffle 541 and the transverse plate 510.

[0040] The specific installation steps of the topological PEC composite column node structure of this embodiment are:

[0041] Step 1: Install the lower PEC composite column 100;

[0042] Step 2: If Figure 7As shown, the fixing plate 530 of the auxiliary device 500 is fixed to the curling edge 112-1 of the lower PEC composite column 100 by bolts, and the end of the support plate 520 is against the web 111 of the steel frame 110, and the pressing plate 550 is pressed on the erection steel bars 121 or the anti-cracking steel bars 123 of the lower PEC composite column 100;

[0043] Step 3: If Figure 8 As shown, the upper PEC composite column 100 is hoisted so that the upper PEC composite column 100 is aligned with the lower PEC composite column 100;

[0044] Step 4: Figure 8 and Fig. 9 As shown, the bottom edge of the middle web splint 200 is inserted between the tongue plate 521 and the web 111 of the steel frame 110, and the support plate 520 and the tongue plate 521 temporarily fix the middle web splint 200; then the bolts on the middle web splint 200 are installed, so that the middle web splint 200 clamps the webs 111 of the upper PEC composite column 100 and the lower PEC composite column 100;

[0045] Step 5: Figure 8 , Fig.10 and Fig.11 As shown, the baffle plate 541 of the moving rod 540 is pressed, so that the spring 560 is compressed and a gap is left between the pressing plate 550 and the erecting steel bar 121 or the anti-cracking steel bar 123, and then the connecting steel bar 400 is inserted into the gap, and finally the baffle plate 541 is released, the moving rod 540 is reset under the action of the spring 560, and the pressing plate 550 presses the connecting steel bar 400 on the surface of the erecting steel bar 121 or the anti-cracking steel bar 123;

[0046] Step 6: Welding the connecting steel bars 400, where two ends of a portion of the connecting steel bars 400 are respectively welded to the erection steel bars 121 of the upper PEC composite column 100 and the lower PEC composite column 100, and two ends of another portion of the connecting steel bars 400 are respectively welded to the anti-cracking steel bars 123 of the upper PEC composite column 100 and the lower PEC composite column 100;

[0047] Step 7: Remove the auxiliary device 500 and then install it as follows: Figure 5 The crimping clamp 300 and the bolts shown, the crimping clamp 300 clamps the crimping 112 - 1 of the upper PEC composite column 100 and the lower PEC composite column 100 ;

[0048] Step 8: Cast concrete at the joint between the upper PEC composite column 100 and the lower PEC composite column 100.

[0049] Although the embodiments of the present invention are described in the specification, these embodiments are only for reference and should not limit the protection scope of the present invention. Various omissions, substitutions and changes within the scope of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for installing a topological PEC composite column node structure, characterized in that: The topological PEC composite column node structure includes a PEC composite column, a mid-web splint, a rolled splint and a plurality of connecting steel bars; The PEC composite column comprises a steel frame, a steel cage and concrete. The cross section of the steel frame is I-shaped. The steel frame comprises a middle web and wing plates connected to both sides of the web. The edges of the wing plates are provided with curling edges. The steel cages are arranged on both sides of the web and concrete is poured. Connection areas without concrete are provided at both ends of the steel frame. The connection areas are used for node connection. The web and the curling edges of the connection areas are provided with connection holes for installing bolts. The steel frames of the upper PEC composite columns and the lower PEC composite columns are butt-jointed, the middle web splints are connected to the webs of the upper PEC composite columns and the webs of the lower PEC composite columns by bolts, and the hem splints are connected to the hems of the upper PEC composite columns and the hems of the lower PEC composite columns by bolts; The web is provided with through holes at even intervals, and the through holes are regular hexagons; The steel cage includes erecting steel bars, structural stirrups and anti-cracking steel bars, wherein the structural stirrups are rectangular and the four corners are connected to the erecting steel bars, and the anti-cracking steel bars are parallel to the erecting steel bars and are connected to a long rectangular side of the structural stirrups; The PEC composite column further includes tie bars, which are arranged at the through holes of the web, pass through the through holes, and hook the anti-cracking steel bars of the steel cage on both sides of the web; The erection steel bars of the upper PEC composite column and the lower PEC composite column are welded by connecting steel bars, and the anti-cracking steel bars of the upper PEC composite column and the lower PEC composite column are welded by connecting steel bars; The installation method of the topological PEC composite column node structure comprises the following steps: Step 1: Install the lower PEC composite column; Step 2: Hoist the upper PEC composite column so that the upper PEC composite column and the lower PEC composite column are aligned; Step 3: Install the mid-web splint and bolts, the mid-web splint clamps the webs of the upper PEC composite column and the lower PEC composite column; Step 4: Weld the connecting steel bars, where the two ends of a portion of the connecting steel bars are respectively welded to the erecting steel bars of the upper PEC composite column and the lower PEC composite column, and the two ends of the other portion of the connecting steel bars are respectively welded to the anti-cracking steel bars of the upper PEC composite column and the lower PEC composite column; Step 5: Install the crimping clamps and bolts, and the crimping clamps clamp the crimping of the upper PEC composite column and the lower PEC composite column; Step 6: Cast concrete at the joints between the upper PEC composite columns and the lower PEC composite columns; In the step 1, an auxiliary device is installed on the top of the lower PEC composite column; The auxiliary device comprises a transverse plate, a support plate and a fixing plate, each of the two ends of the transverse plate is connected to a fixing plate, and the fixing plates are provided with mounting holes, and the mounting holes on the two fixing plates are aligned with the connection holes on the two curling edges of the steel frame, and the transverse plate and the fixing plates are fixed to the curling edges by bolts; a plurality of horizontal support plates are provided on the transverse plate, and an upward tongue plate is provided at the end of the support plate; when the auxiliary device is installed, the end of the support plate is against the web of the steel frame, and the support plate is used to bear the bottom edge of the middle web splint, and the support plate and the tongue plate temporarily fix the middle web splint to fit on the web of the steel frame; The auxiliary device also includes a moving rod, a pressure plate and a spring. The moving rod passes through the cross plate. One end of the moving rod is provided with a baffle and the other end is fixedly connected to the pressure plate. The spring is sleeved on the moving rod, and the two ends of the spring respectively resist the baffle and the cross plate; the pressure plate is aligned with the erection steel bars or the anti-cracking steel bars, and the pressure plate temporarily presses the connecting steel bars onto the corresponding erection steel bars or the anti-cracking steel bars.

2. The installation method of the topological PEC composite column node structure according to claim 1 is characterized in that: The surface of the pressing plate is provided with an arc-shaped groove.