An ecological safety barrier system based on ecological risk prevention and control and construction method

By designing water collection seepage irrigation units and soil and water conservation units in the ecological security barrier system, combined with vegetation planting units, the problems of vegetation conservation and soil erosion in arid climates are solved, and a systematic ecological restoration effect is achieved.

CN117005430BActive Publication Date: 2024-12-03RES CENT FOR ECO ENVIRONMENTAL SCI THE CHINESE ACAD OF SCI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310828530.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-07-07
Publication Date
2024-12-03
Estimated Expiration
2043-07-07

AI Technical Summary

Technical Problem

The existing ecological security barrier system is difficult to effectively maintain vegetation in arid climates, and the soil and water conservation structure design is unreasonable, resulting in rainwater erosion and soil erosion, affecting vegetation growth and ecological environment.

Method used

A basic structure including stone layer, sand and soil layer and planting soil layer was designed, a water collection seepage irrigation unit and a soil water conservation unit were set up, and a vegetation planting unit was set up between adjacent soil and water conservation units, through buffer channels and intercepting flow The fixed seat realizes rainwater interception and soil and water conservation. The water-collection seepage irrigation unit is used for rainwater collection and water supply. The seepage irrigation unit is arranged horizontally along the middle of the buffer channel. The seepage irrigation branches run through the vegetation planting unit to ensure the effective use of rainwater.

Benefits of technology

It has achieved effective maintenance of vegetation in arid climate, and simultaneously completed the soil and water conservation and water collection seepage and irrigation functions. It has low construction difficulty and significant application effect, which can effectively repair vegetation and improve the ecological environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117005430B_ABST
    Figure CN117005430B_ABST
Patent Text Reader

Abstract

The present invention relates to an ecological safety barrier system and construction method based on ecological risk prevention and control, and relates to the field of ecological restoration technology, including a basic structure, the basic structure includes a stone layer, a gravel layer and a planting soil layer, and also includes a water collection and infiltration irrigation unit and a plurality of soil and water conservation units arranged on the basic structure; and a vegetation planting unit arranged between adjacent soil and water conservation units; the soil and water conservation unit includes a plurality of buffer channels arranged transversely between the stone layer and the gravel layer, and a flow interception fixing seat connecting two adjacent buffer channels and vertically penetrating the stone layer and the gravel layer, and the flow interception fixing seat is used for rainwater interception and soil and water conservation. The ecological safety barrier system provided by the present invention has low construction difficulty, and after the construction is completed, a systematic ecological restoration process with vegetation restoration, soil and water conservation and water collection and infiltration irrigation functions can be realized simultaneously, and the application effect is good.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of ecological restoration, and specifically relates to an ecological safety barrier system based on ecological risk prevention and control and a construction method. Background Art

[0002] With the further development of hydropower projects, local ecosystems will be extremely degraded, which is manifested in vegetation destruction, soil erosion, and fragmentation of mountain landscapes. For areas with high ecological risks, we must carry out targeted ecological prevention and control, establish an ecological safety barrier system, form a safety barrier support system for areas with high ecological risks, and achieve sustainable development of ecological civilization construction;

[0003] At present, there are the following technical problems in the establishment of an ecological security barrier system. First, it needs to be coordinated with the irrigation system so that vegetation can be maintained even in arid climates. Second, the design of the soil and water conservation structure is unreasonable, and rainwater erosion will occur on the slope surface, affecting the growth of vegetation and causing slow loss of water and soil, resulting in poor application effect. In this regard, we propose an ecological security barrier system and construction method based on ecological risk prevention and control. Summary of the invention

[0004] The purpose of the present invention is to provide an ecological safety barrier system and construction method based on ecological risk prevention and control in order to solve the above problems.

[0005] The present invention achieves the above-mentioned purpose through the following technical solutions:

[0006] The present invention provides an ecological safety barrier system based on ecological risk prevention and control, comprising a foundation structure, wherein the foundation structure comprises a stone layer, a sand and gravel layer, and a planting soil layer, and further comprises a water collection and infiltration irrigation unit and a plurality of soil and water conservation units arranged on the foundation structure; and a vegetation planting unit arranged between adjacent soil and water conservation units;

[0007] The soil and water conservation unit includes a plurality of buffer channels arranged transversely between the stone layer and the gravel layer, and an interception fixing seat connecting two adjacent buffer channels and vertically penetrating the stone layer and the gravel layer, wherein the interception fixing seat is used for rainwater interception and soil and water conservation;

[0008] The water collection and infiltration irrigation unit includes a water collection unit and an infiltration irrigation unit connected to the water collection unit. The water collection unit is used to collect rainwater and supply water to the infiltration irrigation unit. The infiltration irrigation unit is laterally arranged along the middle of the buffer channel, and multiple infiltration irrigation branches of the infiltration irrigation unit respectively penetrate through the basic structure and extend along the upper end surface of the vegetation planting unit.

[0009] As a further optimization scheme of the present invention, the soil and water conservation unit includes two side frames arranged opposite to each other, which are used to limit the position of the interception fixing seat; the interception fixing seat includes an interception pool and a reinforcement seat that are relatively intermittently matched; the buffer channel includes a seepage support plate arranged along the lower end of the interception pool and a guide plate arranged parallel to the seepage support plate, and both ends of the seepage support plate and the guide plate are fixed to the two side frames, and a plurality of support springs are provided between the seepage support plate and the guide plate.

[0010] As a further optimization solution of the present invention, one end of the guide plate extends into the reinforcement seat, and a plurality of geotextiles are penetrated through the seepage support plate.

[0011] As a further optimization scheme of the present invention, the water collection unit is a water collection tank, a delivery pipe is provided inside the water collection tank, and a delivery pump and a suction pump are symmetrically provided at both ends of the delivery pipe.

[0012] As a further optimization solution of the present invention, the infiltration irrigation unit includes a diversion structure and an anchor rod connected to the water collection unit, and the diversion structure includes a diversion main pipe arranged in each of the interception fixing seats and a plurality of diversion branches arranged on the diversion main pipe;

[0013] The anchor rod includes a main rod connected to the branch pipe, a sprinkler head arranged at the top of the main rod, and an outer tube arranged on one end of the outer side of the main rod located in the planting soil layer, and the outer tube is provided with a plurality of capillary grooves connected to the main rod.

[0014] As a further optimization solution of the present invention, the vegetation planting unit includes a plurality of arc-shaped plates and a connecting plate connecting two adjacent arc-shaped plates, and the lower end surfaces of the arc-shaped plates are symmetrically provided with clamping pieces.

[0015] The present invention also provides a method for constructing an ecological safety barrier system based on ecological risk prevention and control as described above, comprising the following steps:

[0016] Step 1: Identify high ecological risk areas of vegetation destruction, soil erosion or landscape damage in the project impact area, and lay water collection units downslope along the high ecological risk areas;

[0017] Step 2: laying interception fixed seats at equal intervals along the slope of the high ecological risk area, laying a stone layer along the lower half of the interception fixed seats, laying a buffer channel between two adjacent interception fixed seats, laying an infiltration irrigation unit in the buffer channel, and connecting the infiltration irrigation unit with the water collection unit;

[0018] Step 3: Lay a gravel layer along the upper end surface of the buffer channel and the upper half of two adjacent interception fixing seats, so that the laying height of the gravel layer is level with the upper end surface of the interception fixing seat;

[0019] Step 4: Lay a planting soil layer along the upper end surface of the gravel layer, and lay the vegetation planting unit along the upper end surface of the planting soil layer between two adjacent interception fixed seats. At the same time, the infiltration branch of the infiltration unit extends through the upper end surface of the vegetation planting unit, thereby completing the construction of an ecological safety barrier system for high ecological risk areas with vegetation destruction, soil erosion or landscape destruction in the project impact area.

[0020] The beneficial effects of the present invention are:

[0021] The ecological safety barrier system provided by the present invention has low construction difficulty. After construction is completed, a systematic ecological restoration process with vegetation restoration, soil and water conservation, and water collection and infiltration irrigation functions can be simultaneously realized, and the application effect is good. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 A top view of the overall structure provided by the present invention;

[0023] Figure 2 A schematic diagram of a local structure provided by the present invention;

[0024] Figure 3 A schematic diagram of the structure of the anchor rod provided by the present invention;

[0025] Figure 4 A structural stereogram of the seepage support plate provided by the present invention;

[0026] Figure 5 A schematic diagram of the structure of a vegetation planting unit provided by the present invention;

[0027] In the figure: 1. foundation structure; 11. stone layer; 12. gravel layer; 13. planting soil layer; 2. water collection tank; 21. delivery pipe; 22. delivery pump; 23. suction pump; 3. soil and water conservation unit; 31. side frame; 32. interception tank; 33. reinforcement seat; 34. seepage support plate; 35. guide plate; 36. support spring; 37. geotextile; 4. diversion structure; 41. diversion main pipe; 42. diversion branch pipe; 5. vegetation planting unit; 51. arc plate; 52. connecting plate; 53. clamp; 6. anchor rod; 61. main rod; 62. sprinkler head; 63. outer pipe; 64. capillary groove. DETAILED DESCRIPTION

[0028] The present application is further described in detail below in conjunction with the accompanying drawings. It is necessary to point out here that the following specific implementation methods are only used to further illustrate the present application and cannot be understood as limiting the scope of protection of the present application. Technical personnel in this field can make some non-essential improvements and adjustments to the present application based on the above application content.

[0029] Example 1

[0030] like Figure 1-2As shown, this embodiment provides an ecological safety barrier system based on ecological risk prevention and control, including a basic structure 1, wherein the basic structure 1 includes a stone layer 11, a gravel layer 12 and a planting soil layer 13, wherein the stone layer 11, the gravel layer 12 and the planting soil layer 13 are arranged in sequence along the high ecological risk area, wherein the stone layer 11 and the gravel layer 12 can strengthen the structure while preventing slope landslides, wherein grass seeds are pre-mixed into the planting soil layer 13 during paving, and further comprising a water collection and infiltration irrigation unit and a plurality of soil and water conservation units 3 arranged on the basic structure 1; and a vegetation planting unit 5 arranged between adjacent soil and water conservation units 3;

[0031] The soil and water conservation unit 3 includes a plurality of buffer channels arranged transversely between the stone layer 11 and the gravel layer 12, and a flow interception fixing seat connecting two adjacent buffer channels and vertically penetrating the stone layer 11 and the gravel layer 12, wherein the flow interception fixing seat is used for rainwater interception and soil and water conservation;

[0032] The water collection and infiltration irrigation unit includes a water collection unit and an infiltration irrigation unit connected to the water collection unit. The water collection unit is used to collect rainwater and supply water to the infiltration irrigation unit. The infiltration irrigation unit is laterally arranged along the middle of the buffer channel, and multiple infiltration irrigation branches of the infiltration irrigation unit respectively penetrate through the basic structure 1 and extend along the upper end surface of the vegetation planting unit 5.

[0033] When constructing the ecological safety barrier system, water collection units are laid downhill in high ecological risk areas, and then interception fixed seats are laid at equal intervals along the slope of the high ecological risk areas, and a stone layer 11 is laid along the lower half of the interception fixed seats. The interception fixed seats are set to enhance soil and water conservation in the area on the one hand, and to intercept rainwater on the other hand. A buffer channel is then laid between two adjacent interception fixed seats, and an infiltration irrigation unit is laid in the buffer channel. At the same time, the infiltration irrigation unit is connected to the water collection unit; the buffer channel provides structural support, which is used to enhance soil and water conservation while intercepting rainwater and vegetation planting. The rainwater infiltrated from unit 5 is diverted to the water collection unit, and a gravel layer 12 is laid along the upper end surface of the buffer channel and the upper half of two adjacent interception fixing seats, so that the laying height of the gravel layer 12 is level with the upper end surface of the interception fixing seat; a planting soil layer 13 is laid along the upper end surface of the gravel layer 12, and the vegetation planting unit 5 is laid between the two adjacent interception fixing seats along the upper end surface of the planting soil layer 13, and at the same time, the infiltration irrigation branch of the infiltration irrigation unit is extended from the upper end surface of the vegetation planting unit 5, so as to complete the construction of an ecological safety barrier system for high ecological risk areas with vegetation destruction, soil erosion or landscape destruction in the project impact area.

[0034] When in use, when it rains, rainwater irrigates the vegetation planting unit 5, which is beneficial to the growth of grass seeds in the planting soil layer 13. The rainwater irrigates the vegetation planting unit 5 to make the planting soil layer 13 fully soaked, and the rainwater penetrates toward the gravel layer 12 and penetrates into the buffer channel. This can prevent rainwater from accumulating in the planting soil layer 13 for a long time to soak the roots of plants when the rainfall is heavy, thereby affecting the growth of vegetation. In addition, the interception fixed seat intercepts the rainwater, and part of the rainwater enters the interception fixed seat and flows along the buffer channel to the water collection unit for collection. When it is necessary to manually irrigate the vegetation planting unit 5, the water collection unit is used to supply water to the vegetation planting unit 5 through the infiltration irrigation unit to complete the irrigation and infiltration irrigation of the rainwater collected on rainy days.

[0035] Example 2

[0036] like Figure 2 , 4 As shown, the soil and water conservation unit 3 includes two side frames 31 arranged opposite to each other, which are used to limit the position of the interception fixing seat; the interception fixing seat includes an interception pool 32 and a reinforcement seat 33 that are relatively intermittently matched; the buffer channel includes a seepage support plate 34 arranged along the lower end of the interception pool 32 and a guide plate 35 arranged parallel to the seepage support plate 34, both ends of the seepage support plate 34 and the guide plate 35 are fixed to the two side frames 31, and a plurality of support springs 36 are provided between the seepage support plate 34 and the guide plate 35.

[0037] One end of the guide plate 35 extends into the reinforcement seat 33 , and a plurality of geotextiles 37 are penetrated through the seepage support plate 34 .

[0038] The water collection unit is a water collection tank 2, and a delivery pipe 21 is provided inside the water collection tank 2. A delivery pump 22 and a suction pump 23 are symmetrically provided at both ends of the delivery pipe 21. When the water collection unit collects rainwater, on the one hand, the rainwater is intercepted by the interception fixing seat and guided to the water collection unit through the buffer channel. On the other hand, the suction pump 23 is started to reversely extract the rainwater on the vegetation planting unit 5 through the delivery pipe 21 using the infiltration irrigation unit, thereby completing the rainwater collection process on rainy days.

[0039] In addition, if Figure 2-3As shown, the infiltration irrigation unit includes a diversion structure 4 and an anchor rod 6 connected to the water collection unit, and the diversion structure 4 includes a diversion main pipe 41 arranged in each of the interception fixing seats and a plurality of diversion branches 42 arranged on the diversion main pipe 41; the anchor rod 6 includes a main rod 61 connected to the diversion branch pipe 42, a sprinkler head 62 arranged at the top of the main rod 61, and an outer tube 63 arranged on the outer side of the main rod 61 and located at one end in the planting soil layer 13, and a plurality of capillary grooves 64 connected to the main rod 61 are opened on the outer tube 63. In specific application, the water collection When the unit supplies water to the infiltration irrigation unit, the delivery pump 22 is used to deliver rainwater to the diversion main pipe 41 through the delivery pipe 21. The rainwater is supplied to each diversion branch pipe 42 through the diversion main pipe 41, and the anchor rod 6 is connected to the diversion branch pipe 42. The diversion branch pipe 42 delivers rainwater to the main rod 61. The main rod 61 is provided with an outer tube 63 at the planting soil layer 13. The rainwater penetrates into the planting soil layer 13 through the capillary grooves 64 on the outer tube 63. In addition, the rainwater is delivered to the sprinkler head 62 at the upper end through the main rod 61 to complete the sprinkler irrigation, thereby realizing a comprehensive irrigation process.

[0040] like Figure 1 , 5 As shown, the vegetation planting unit 5 includes a plurality of arc plates 51 and a connecting plate 52 connecting two adjacent arc plates 51. The arc plates 51 arranged in an arc-shaped structure can well contain the planting soil layer 13. In addition, a reasonable layout of vegetation planting can be achieved, and it is also beneficial to guide rainwater toward the interception fixing seat. The lower end surface of the arc plate 51 is symmetrically provided with a clamp 53, and the arc plate 51 is installed between the two interception fixing seats through the clamp 53, which is convenient for installation and disassembly.

[0041] Example 3

[0042] This embodiment also provides a method for constructing an ecological safety barrier system based on ecological risk prevention and control as described above, comprising the following steps:

[0043] Step 1: Identify high ecological risk areas of vegetation destruction, soil erosion or landscape damage in the project impact area, and lay water collection units downslope along the high ecological risk areas;

[0044] Step 2: lay interception fixed seats at equal intervals along the slope of the high ecological risk area, and lay a stone layer 11 along the lower half of the interception fixed seats, then lay a buffer channel between two adjacent interception fixed seats, and lay an infiltration irrigation unit in the buffer channel, and connect the infiltration irrigation unit to the water collection unit;

[0045] Step 3: Lay a gravel layer 12 along the upper end surface of the buffer channel and the upper half of two adjacent interception fixing seats, so that the laying height of the gravel layer 12 is level with the upper end surface of the interception fixing seat;

[0046] Step 4: Lay the planting soil layer 13 along the upper end surface of the gravel layer 12, and lay the vegetation planting unit 5 between two adjacent interception fixing seats along the upper end surface of the planting soil layer 13, and at the same time make the infiltration branch of the infiltration unit extend through the upper end surface of the vegetation planting unit 5, so as to complete the construction of the ecological safety barrier system for the high ecological risk areas of vegetation destruction, soil erosion or landscape destruction in the project impact area.

[0047] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.

Claims

1. An ecological safety barrier system based on ecological risk prevention and control, comprising a basic structure (1), wherein the basic structure (1) comprises a stone layer (11), a sand and gravel layer (12) and a planting soil layer (13), and is characterized in that: It also includes a water collection and infiltration irrigation unit and a plurality of water and soil conservation units (3) arranged on the basic structure (1); and a vegetation planting unit (5) arranged between adjacent water and soil conservation units (3); The soil and water conservation unit (3) comprises a plurality of buffer channels arranged transversely between the stone layer (11) and the gravel layer (12), and an interception fixing seat connecting two adjacent buffer channels and vertically penetrating the stone layer (11) and the gravel layer (12), wherein the interception fixing seat is used for rainwater interception and soil and water conservation; the interception fixing seat comprises an interception pool (32) and a reinforcement seat (33) which are relatively intermittently matched; the buffer channel comprises a plurality of buffer channels arranged along the lower end of the interception pool (32); A seepage support plate (34) and a guide plate (35) arranged parallel to the seepage support plate (34), both ends of the seepage support plate (34) and the guide plate (35) are fixed to two side frames (31), a plurality of support springs (36) are arranged between the seepage support plate (34) and the guide plate (35), one end of the guide plate (35) extends into the reinforcement seat (33), and a plurality of geotextiles (37) are arranged through the seepage support plate (34); The water collection and infiltration irrigation unit comprises a water collection unit and an infiltration irrigation unit connected to the water collection unit, the water collection unit is used to collect rainwater and supply water to the infiltration irrigation unit, the infiltration irrigation unit is arranged transversely along the middle of the buffer channel, and a plurality of infiltration irrigation branches of the infiltration irrigation unit respectively penetrate through the basic structure (1) and extend along the upper end surface of the vegetation planting unit (5); The infiltration irrigation unit comprises a flow diversion structure (4) and an anchor rod (6) connected to the water collection unit, and the flow diversion structure (4) comprises a flow diversion main pipe (41) arranged in each of the interception fixing seats and a plurality of flow diversion branch pipes (42) arranged on the flow diversion main pipe (41); The anchor rod (6) comprises a main rod (61) connected to the branch pipe (42), a sprinkler head (62) arranged at the top of the main rod (61), and an outer tube (63) arranged on the outside of the main rod (61) at one end located in the planting soil layer (13), wherein the outer tube (63) is provided with a plurality of capillary grooves (64) connected to the main rod (61).

2. The ecological safety barrier system based on ecological risk prevention and control according to claim 1 is characterized by: The soil and water conservation unit (3) comprises two side frames (31) arranged opposite to each other and used for defining the position of the interception fixing seat.

3. The ecological safety barrier system based on ecological risk prevention and control according to claim 1 is characterized by: The water collection unit is a water collection tank (2), a delivery pipe (21) is provided inside the water collection tank (2), and a delivery pump (22) and a suction pump (23) are symmetrically provided at both ends of the delivery pipe (21).

4. The ecological safety barrier system based on ecological risk prevention and control according to claim 1 is characterized by: The vegetation planting unit (5) comprises a plurality of arc-shaped plates (51) and a connecting plate (52) connecting two adjacent arc-shaped plates (51), and the lower end surfaces of the arc-shaped plates (51) are symmetrically provided with clamping pieces (53).

5. A method for constructing an ecological safety barrier system based on ecological risk prevention and control as claimed in any one of claims 1 to 4, characterized in that: The following steps are included: Step 1: Identify high ecological risk areas of vegetation destruction, soil erosion or landscape damage in the project impact area, and lay water collection units downslope along the high ecological risk areas; Step 2: laying interception fixing seats at equal intervals along the slope of the high ecological risk area, and laying a stone layer (11) along the lower half of the interception fixing seats, and then laying a buffer channel between two adjacent interception fixing seats, and laying an infiltration irrigation unit in the buffer channel, and connecting the infiltration irrigation unit with the water collection unit; Step 3: laying a gravel layer (12) along the upper end surface of the buffer channel and the upper half of two adjacent interception fixing seats, so that the laying height of the gravel layer (12) is level with the upper end surface of the interception fixing seat; Step 4: A planting soil layer (13) is laid along the upper end surface of the gravel layer (12), and a vegetation planting unit (5) is laid along the upper end surface of the planting soil layer (13) between two adjacent interception fixing seats, and at the same time, the infiltration irrigation branch of the infiltration irrigation unit extends through the upper end surface of the vegetation planting unit (5), thereby completing the construction of an ecological safety barrier system for high ecological risk areas with vegetation destruction, soil erosion or landscape destruction in the project impact area.