A water level observation device and a method for manufacturing the same
By using concrete components to protect the steel frame in the water level observation device, the problem of corrosion and theft of the steel frame in humid environments is solved, and a stable and easy-to-replace water level observation device design is achieved.
Patent Information
- Application Number
- CN202311006730.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-10
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2043-08-10
AI Technical Summary
Among existing water level observation devices, the piles made of shaped steel or iron pipes are prone to corrosion in humid environments, and are prone to theft due to their buried nature.
Concrete components are used to form a protective layer on the steel frame to prevent the steel frame from being corroded by groundwater. At the same time, the combined design of concrete members and steel frame increases the stability of the pile and prevents theft. The design includes the steel frame embedded in the concrete component, the welded structure of the first fixing part and the second fixing part, and the detachable connection method between the water level gauge and the extended section to ensure that the water level gauge is fixed on the outer side of the pile.
It effectively avoids the risk of corrosion and theft of the steel frame, meets the stability requirements of the pile, and the detachable connection of the water level gauge is easy to replace and fixed more firmly.
Smart Images

Figure CN117146930B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy engineering, and in particular to a water level observation device and a manufacturing method thereof. Background Art
[0002] Water gauge is a traditional and effective direct observation device widely used to observe water level changes in rivers, lakes and groundwater. Water gauges are mainly divided into four types: upright water gauge, inclined water gauge, short pile water gauge and suspended water gauge. Among them, upright water gauge is more intuitive and convenient to read.
[0003] Although the vertical water gauge is easy to read and intuitive, its water gauge board needs to be fixed on a vertical pile. The material of the pile can be wood, steel or iron pipe. In areas with heavy rainfall, the air is relatively humid. In this environment, wooden piles are easily corroded by rain. Therefore, the water gauge piles installed in the field are mostly made of steel and iron pipe.
[0004] Although the piles made of steel or iron pipes are corrosion-resistant and stable, they are also faced with the problem of theft. Since the piles are stabilized by being driven and buried underground, in previous work, they were often dug up and stolen by humans. Summary of the invention
[0005] The present invention is based on the inventor's discovery and understanding of the following facts and problems:
[0006] In the related art, steel or iron pipes are used as piles for fixing the water gauge. Since the piles are stabilized by being driven and buried underground, in previous work, they are often dug up and stolen by humans.
[0007] The present invention aims to solve one of the technical problems in the related art to at least some extent. To this end, an embodiment of the present invention provides a water level observation device and a manufacturing method thereof, wherein a protective layer is formed on a steel frame by a concrete component to prevent the steel frame from being corroded by groundwater and prevent the steel from being stolen.
[0008] The water level observation device comprises: a support pile, the support pile comprises a steel frame and a concrete component, the steel frame is buried in the concrete component; a first fixing member, the first fixing member comprises a first embedded section and a first extended section connected to each other, the first embedded section is welded to the steel frame, the first embedded section is buried in the concrete component, and the first extended section extends transversely out of the concrete component; and a water level gauge, the water level gauge is detachably connected to the first extended section, and the water level gauge abuts against the outer side surface of the support pile.
[0009] In some embodiments, the water level observation device includes: a concrete base, a top of the concrete base is provided with a mounting groove, and the lower part of the support pile is fixed in the mounting groove.
[0010] In some embodiments, a cement bonding layer is poured into the gap between the concrete base and the mounting groove.
[0011] In some embodiments, the steel bar skeleton includes multiple vertical steel bars and at least one annular steel bar, the multiple vertical steel bars are distributed around the center of the pile, and the annular steel bars are welded to each of the vertical steel bars respectively; the first embedded section is welded at the welding point of the annular steel bars and the vertical steel bars.
[0012] In some embodiments, the water level gauge is provided with a mounting hole, and the first extension section passes through the mounting hole; the water level observation device includes a first nut, which is threadedly connected to the first extension section, and the water level gauge is clamped between the outer side surface of the pile and the first nut.
[0013] In some embodiments, the water level observation device also includes: a placement plate, which is arranged on the support pile and above the water level gauge, and the placement plate includes a card slot and a take-in and take-out port connected to the card slot; a recording card, which can be inserted into and removed from the card slot from the take-in and take-out port.
[0014] In some embodiments, the water level observation device includes: a second fixing member, the second fixing member includes a second embedded section and a second extending section, the second embedded section is embedded in the concrete component, the second extending section extends laterally outside the concrete component, the placement plate is provided with a through hole, the second extending section passes through the through hole, and the end of the second extending section away from the second embedded section is located in the slot; a second nut, the second nut is threadedly connected to the second extending section, the placement plate is clamped between the outer side surface of the pile and the second nut, and the second nut is located in the slot; the back of the recording card is against the end of the second extending section away from the second embedded section.
[0015] In some embodiments, the support post is in the shape of a cuboid.
[0016] In some embodiments, the pile has a hollow weight-reducing cavity, which is located inside the steel skeleton; the thickness of the concrete component in the transverse direction is D1, and the thickness of the concrete component in the longitudinal direction is D1, wherein D1:D2=1:1.5~1:2.
[0017] The present invention also discloses a method for manufacturing a water level observation device, which is applied to the water level observation device of any of the above embodiments, and the method for manufacturing the water level observation device includes: providing the steel skeleton; welding the first embedded section of the first fixing member to the steel skeleton; placing the steel skeleton in a casting template, and making the first extending section extend out of the casting template; pouring concrete into the casting template to form the support pile; fixing the water level gauge on the first extending section, and making the water level gauge rest against the outer side of the support pile.
[0018] The water level observation device and the manufacturing method thereof according to the embodiment of the present invention have the following technical effects:
[0019] By burying the steel skeleton in the concrete component, the concrete component forms a protective layer for the steel skeleton, which prevents the steel skeleton from being corroded by groundwater and prevents the steel from being stolen. Compared with the previous steel structure as the pile, the present invention uses steel bars as the internal skeleton to meet the stability requirements of the pile and is not easy to deform. The water level gauge is detachably connected to the first extension section for easy replacement. The water level gauge is against the outer side of the pile for a more secure fixation. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 is a schematic diagram of a water level observation device provided according to some embodiments of the present invention;
[0021] Figure 2 is a schematic diagram of the interior of a water level observation device provided according to some embodiments of the present invention;
[0022] Figure 3 According to some embodiments of the present invention, Figure 1 Middle AA section;
[0023] Figure 4 According to some embodiments of the present invention, Figure 1 Middle BB section;
[0024] Figure 5 is a schematic diagram of a storage plate of a water level observation device provided in some embodiments of the present invention;
[0025] Figure 6 is a top view of a concrete base of a water level observation device provided according to some embodiments of the present invention;
[0026] Figure 7 A flow chart of a method for manufacturing a water level observation device is provided according to some embodiments of the present invention.
[0027] Reference numerals:
[0028] Water level observation device 100;
[0029] Piles 10; steel bar skeleton 11; concrete member 12; weight-reducing cavity 13; vertical steel bars 111; annular steel bars 112;
[0030] A first fixing member 20; a first embedded section 21; a first extended section 22;
[0031] Concrete base 30; mounting groove 31;
[0032] Water level gauge 40; mounting hole 41;
[0033] A second fixing member 50; a second embedded section 51; a second extended section 52;
[0034] Storage plate 60; slot 61; through hole 62;
[0035] A first nut 70;
[0036] The second nut 80 . DETAILED DESCRIPTION
[0037] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.
[0038] Reference Figure 1 , Figure 2 and Figure 3 The present invention discloses a water level observation device 100, including a support pile 10, a first fixing member 20 and a water level gauge 40.
[0039] The pile 10 includes a steel frame 11 and a concrete member 12, wherein the steel frame 11 is embedded in the concrete member 12. The first fixing member 20 includes a first embedded section 21 and a first extended section 22 connected to each other, wherein the first embedded section 21 is welded to the steel frame 11 and embedded in the concrete member 12, and the first extended section 22 extends laterally out of the concrete member 12. The water gauge 40 is detachably connected to the first extended section 22, and the water gauge 40 abuts against the outer side of the pile 10.
[0040] During manufacturing, the first embedded section 21 of the first fixing member 20 is first welded to the steel skeleton 11, then the steel skeleton 11 is placed in the casting template, and the first extended section 22 is extended outside the casting template, and then concrete is poured into the casting template. After the concrete is solidified, the concrete component 12 is formed, and the concrete component 12 wraps the steel skeleton 11 to form the pile 10 of the reinforced concrete structure. After that, the water level gauge 40 is fixed on the first extended section 22, and the water level gauge 40 is placed against the outer side of the pile 10.
[0041] The present invention embeds the steel skeleton 11 in the concrete component 12, and the concrete component 12 protects the steel skeleton 11 to avoid corrosion of the steel skeleton and prevent the steel from being stolen. Compared with the previous steel structure as the pile, the present invention uses steel bars as the internal skeleton to meet the stability requirements of the pile 10 and is not easy to deform. The water level gauge 40 is detachably connected to the first extension section 22, which is convenient for replacing the water level gauge 40. The water level gauge 40 is against the outer side of the pile 10, and is fixed more firmly.
[0042] In some embodiments, reference Figure 2 and Figure 6 The water level observation device 100 includes a concrete base 30 , a mounting groove 31 is provided on the top of the concrete base 30 , and the lower part of the pile 10 is fixed in the mounting groove 31 .
[0043] Concrete is poured at the selected installation location to form a concrete base 30 with an installation groove 31 on the top, and the support pile 10 is vertically installed in the groove 31. Finally, cement is used to fill the gaps and fill it to form a cement bonding layer to complete the installation of the support pile 10. The concrete base 30 can support the support pile 10 more stably, and in some special installation sites, such as sites with limited working space, it is only necessary to complete the pouring of the concrete base 30. The support pile 10 can be used as a prefabricated part and installed after arriving at the site by transportation, thereby improving the manufacturing and installation efficiency of the water level observation device 100.
[0044] In some embodiments, reference Figure 3 The pile 10 has a hollow weight-reducing cavity 13, which is located inside the steel skeleton 11; the thickness of the concrete member 12 in the transverse direction is D1, and the thickness of the concrete member 12 in the longitudinal direction is D2, wherein D1:D2=1:1.5-1:2. The thickness ratio of the concrete member 12 within this range can reduce weight while ensuring the supporting strength and stability of the pile 10.
[0045] In some embodiments, reference Figures 1 to 3 The steel bar skeleton 11 includes a plurality of vertical steel bars 111 and at least one annular steel bar 112. The plurality of vertical steel bars 111 are distributed around the center of the pile 10. The annular steel bars 112 are welded to each vertical steel bar 111 respectively. The first embedded section 21 is welded at the welding point between the annular steel bars 112 and the vertical steel bars 111.
[0046] The first embedded section 21 is welded at the welding point of the annular reinforcement 112 and the vertical reinforcement 111, that is, the first embedded section 21 is welded together with the annular reinforcement 112 and the vertical reinforcement 111, which not only improves the structural strength of the reinforcement skeleton 11, but also improves the stability of the first fixing member 20, preventing the first fixing member 20 from bending and deforming during the concrete pouring process. The first fixing member 20 can be a threaded rod. The total length of the threaded rod can be 10 cm, and the extended length (the length of the first extended section 22) can be 5 cm.
[0047] In some embodiments, see Figure 1 , Figure 3 and Figure 5 The water level gauge 40 is provided with a mounting hole 41, and the first extension section 22 passes through the mounting hole 41; the water level observation device includes a first nut 70, which is threadedly connected to the first extension section 22, and the water level gauge 40 is clamped between the outer side surface of the pile 10 and the first nut 70.
[0048] When the water level gauge 40 needs to be replaced, the first nut 70 is unscrewed, the water level gauge 40 is removed from the first extension section 22, and then a new water level gauge 40 is replaced, and then the new water level gauge 40 is threadedly connected to the first extension section 22 through the first nut 70, and the new water level gauge 40 is clamped and fixed between the outer side of the pile 10 and the first nut 70.
[0049] In some embodiments, reference Figure 1 and Figure 5 The water level observation device 100 also includes a placement plate 60 and a recording card 90. The placement plate 60 is arranged on the pile 10 and is located above the water level gauge 40. The placement plate 60 includes a card slot 61 and a take-in and take-out port 63 connected to the card slot 61; the recording card 90 can be inserted into the card slot 61 from the take-in and take-out port 63 and detached from the card slot 61. When in use, the recording card 90 can be inserted into the card slot 61 from the take-in and take-out port 63 or removed from the card slot 61. The placement plate 60 for taking and placing the recording card 90 is arranged on the pile 10. The information on the recording card 90 can facilitate field surveyors to grasp water level changes and update water level information in a timely manner.
[0050] Further, refer to Figure 4 and Figure 5The water level observation device 100 includes a second fixing member 50 and a second nut 80. The second fixing member 50 includes a second embedded section 51 and a second extended section 52. The second embedded section 51 is embedded in the concrete member 12, and the second extended section 52 extends out of the concrete member 12 laterally. The placement plate 60 is provided with a through hole 62. The second extended section 52 passes through the through hole 62, and the end of the second extended section 52 away from the second embedded section 51 is located in the slot 61; the second nut 80 is threadedly connected to the second extended section 52, the placement plate 60 is clamped between the outer side surface of the pile 10 and the second nut 80, and the second nut 80 is located in the slot; the back of the recording card 90 is against the end 53 of the second extended section 52 away from the second embedded section 51.
[0051] The storage plate 60 is fixed to the support pile 10 by the second fixing member 50 and the second nut 80 for easy installation; the back of the recording card 90 abuts against the end of the second extension section 52, so that the recording card 90 can be more firmly stuck in the card slot 61.
[0052] The present invention also discloses a method for manufacturing a water level observation device, which is applied to the water level observation device 100 of any of the above embodiments, referring to Figure 7 The method for manufacturing a water level observation device includes: step S11, step S12, step S13, step S14 and step S15.
[0053] In step S11, a steel reinforcement skeleton is provided.
[0054] In step S12, the first embedded section of the first fixing member is welded to the steel frame.
[0055] In step S13, the steel bar skeleton is placed in the casting formwork, and the first extending section is extended out of the casting formwork.
[0056] In step S14, concrete is poured into the casting formwork to form piles.
[0057] In step S15, the water level gauge is fixed on the first extension section, and the water level gauge is placed against the outer side of the pile.
[0058] The manufacturing method of the water level observation device of the present invention buries a steel skeleton in a concrete component, and the concrete component forms a protective layer for the steel skeleton, thereby preventing the steel skeleton from being corroded by groundwater and preventing the risk of the steel being stolen. Compared with the previous steel structure as a pile, the present invention uses steel bars as an internal skeleton to meet the stability requirements of the pile and is not easy to deform. The water level gauge is detachably connected to the first extension section for easy replacement. The water level gauge is against the outer side of the pile and is fixed more firmly.
[0059] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0060] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0061] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0062] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0063] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0064] Although the above embodiments have been shown and described, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations on the present invention. Changes, modifications, substitutions and variations of the above embodiments by those of ordinary skill in the art are all within the scope of protection of the present invention.
Claims
1. A method for manufacturing a water level observation device, It is characterized in that The water level observation device comprises: A support pile (10), the support pile (10) comprising a steel frame (11) and a concrete component (12), the steel frame (11) being buried in the concrete component (12); a first fixing member (20), the first fixing member (20) comprising a first embedded section (21) and a first extended section (22) connected to each other, the first embedded section (21) being welded to the steel frame (11), and the first embedded section (21) being embedded in the concrete component (12), and the first extended section (22) extending transversely outside the concrete component (12); and a water level gauge (40), the water level gauge (40) being detachably connected to the first extension section (22), the water level gauge being against the outer side surface of the support pile (10), the water level gauge (40) being provided with a mounting hole (41), the first extension section (22) passing through the mounting hole (41); a first nut (70), the first nut (70) being threadedly connected to the first extension section (22), the water level gauge being clamped between the outer side surface of the pile (10) and the first nut (70); a storage plate (60), the storage plate being arranged on the support pile (10) and located above the water level gauge (40), the storage plate comprising a slot (61) and a take-in / put-out port (63) communicating with the slot; A recording card (90), wherein the recording card can be inserted into the card slot (61) from the access opening (63) and removed from the card slot (61) a second fixing member (50), the second fixing member (50) comprising a second embedded section (51) and a second extended section (52), the second embedded section being embedded in the concrete component (12), the second extended section extending transversely outside the concrete component (12), the storage plate (60) being provided with a through hole (62), the second extended section passing through the through hole (62), and an end (53) of the second extended section (52) away from the second embedded section (51) being located in the clamping groove (61); a second nut (80), the second nut being threadedly connected to the second extension section, the storage plate being clamped between the outer side surface of the support pile (10) and the second nut, the second nut being located in the clamping groove; The back side of the recording card (90) abuts against the end of the second extending section away from the second embedded section (51); The water level observation device manufacturing method comprises: Providing the steel bar skeleton, wherein the steel bar skeleton is buried in the concrete component, and the concrete component forms a protective layer for the steel bar skeleton; Welding the first embedded section of the first fixing member to the steel bar skeleton, and embedding the first embedded section in the concrete member; Placing the steel bar skeleton in a casting template, and making the first extension section extend out of the casting template; Concrete is poured into the casting template, and the concrete is solidified to form the concrete component, and the concrete component wraps the steel skeleton to form the supporting pile of the reinforced concrete structure.
2. The method for manufacturing a water level observation device according to claim 1, It is characterized in that The water level observation device comprises: a concrete base (30), the top of the concrete base (30) is provided with a mounting groove (31), and the lower part of the support pile (10) is fixed in the mounting groove (31).
3. The method for manufacturing a water level observation device according to claim 2, It is characterized in that A cement bonding layer is cast in the gap between the concrete base (30) and the installation groove (31).
4. The method for manufacturing a water level observation device according to claim 1, It is characterized in that The steel bar skeleton (11) comprises a plurality of vertical steel bars (111) and at least one annular steel bar (112), wherein the plurality of vertical steel bars (111) are distributed around the center of the support pile (10), and the annular steel bar (112) is welded to each of the vertical steel bars respectively; The first embedded section (21) is welded at the welding point between the annular steel bar and the vertical steel bar.
5. The method for manufacturing a water level observation device according to claim 1, It is characterized in that The support pile (10) is in the shape of a rectangular parallelepiped.
6. The method for manufacturing a water level observation device according to claim 5, It is characterized in that The supporting pile (10) has a hollow weight-reducing cavity (13), and the weight-reducing cavity (13) is located inside the steel frame (11); the thickness of the concrete component (12) in the transverse direction is D1, and the thickness of the concrete component (12) in the longitudinal direction is D2, wherein D1:D2=1:1.5~1:2.