Corridor construction system and method
By using adjustment mechanisms and connectors in the corridor construction system to adjust the center of gravity of the steel frame decoration, the problem of difficulty in finding the center of gravity position during lifting of the steel frame decoration is solved, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202311112784.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-31
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2043-08-31
AI Technical Summary
It is difficult to find the center of gravity position when lifting steel frame decorations, resulting in low lifting construction efficiency.
The corridor construction system including lifting truck, installation plate and adjustment mechanism is adopted. The installation plate is connected to the decorative tree through connecting parts and wire ropes. The counterweight box and water tank adjustment mechanism are used to dynamically adjust the center of gravity of the decorative tree to keep it during the lifting process. balance.
Rapidly adjust the center of gravity of the decorative tree, improve the efficiency and safety of lifting construction, and ensure the stability and stability of the decorative tree during the lifting process.
Smart Images

Figure CN117163811B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of corridor construction equipment, and in particular to a corridor construction system and method. Background Art
[0002] In the definition of modern architecture, a corridor is a type of complex high-rise building structural system. It generally refers to two or more high-rise buildings connected by an overhead connector to meet the requirements of architectural shape and functional use. The connector is the corridor.
[0003] Some decorations will be installed on some corridors, such as Figure 1 and Figure 2 The steel frame decoration shown has a tree-like structure to improve the aesthetics of the corridor.
[0004] After connecting the corridor between the two buildings, the steel frame decorations can be installed on the corridor by using construction methods such as overall hoisting and high-altitude scattered assembly. Among them, the overall hoisting method is to assemble the steel frame decorations on the ground, and then use lifting equipment to lift the steel frame decorations as a whole to the installation position of the corridor, and the construction workers will fix them.
[0005] Depend on Figure 1 and Figure 2 It can be seen that the steel frame decoration is an irregular steel frame structure. When a single lifting device is used for lifting, it is difficult to find the center of gravity of the steel frame decoration, resulting in low lifting construction efficiency of the steel frame decoration. Summary of the invention
[0006] The purpose of the present invention is to provide a corridor construction system and method to solve the problem that it is difficult to find the center of gravity of the steel frame decoration during hoisting, resulting in low hoisting construction efficiency of the steel frame decoration.
[0007] In order to achieve the above-mentioned invention object, the technical solution adopted by the present invention is: a corridor construction system, the system comprising:
[0008] A hoisting vehicle is used to hoist the decorative tree onto the corridor;
[0009] A mounting plate, wherein a plurality of connecting pieces are provided on the mounting plate, wherein the connecting pieces are detachably connected to the decorative tree, and steel wire ropes are connected to the four corners of the mounting plate, and the steel wire ropes are suspended on the suspension part of the hoisting vehicle;
[0010] The mounting plate is provided with an adjusting mechanism for adjusting the center of gravity of the decorative tree.
[0011] Preferably, the adjustment mechanism comprises a counterweight box arranged on the four corners of the mounting plate, a plurality of slots are provided on the top of the counterweight box, counterweight blocks are placed in the slots, and the counterweight blocks form a magnetic fit with the bottom of the slots.
[0012] Preferably, the adjustment mechanism further comprises a balance self-adaptive adjustment component arranged in the middle of the mounting plate, the balance self-adaptive adjustment component comprises a water tank and a water injection pipe for injecting water into the water tank, the water tank is installed in the middle of the mounting plate, a partition is arranged inside the water tank, four water storage areas are arranged in the water tank below the partition, and each counterweight box is connected to the corresponding water storage area through a pipeline;
[0013] Four water inlet distribution boxes are provided on the upper surface of the partition, and an inclined inner cavity is provided inside the water inlet distribution box. The inclined inner cavity is inclined downward in a direction away from the center of the partition. A first hole connected to the inclined inner cavity is provided on the water inlet distribution box, and a first ball is provided in the inclined inner cavity. A water inlet hole connected to the corresponding water storage area is provided at the bottom of one end of the inclined inner cavity away from the center of the partition.
[0014] Preferably, the end of the inclined inner cavity away from the circular partition forms a magnetic fit with the first ball.
[0015] Preferably, a drainage distribution box is provided on the lower surface of the partition, and four inclined tubes are provided in the drainage distribution box, the axis of the inclined tube and the axis of the inclined inner cavity are located in the same vertical plane, the inclined tube is inclined upward in a direction away from the center of the partition, a second hole is provided on the inclined tube, a second ball is provided in the inclined tube, and one end of the inclined tube close to the center of the partition is connected to the corresponding water storage area;
[0016] The water tank is also provided with a drainage pipe, one end of which is communicated with the drainage distribution box.
[0017] Preferably, both the drainage pipe and the water injection pipe are provided with a one-way valve.
[0018] Preferably, an exhaust hole is provided on the side wall of the counterweight box, and an air-permeable and waterproof membrane is provided on the inner wall of the counterweight box located inside the exhaust hole.
[0019] Preferably, the connecting member comprises a plurality of connecting plates hingedly connected in sequence, wherein one connecting plate is connected to the mounting plate via a suspension belt, a slide rail is provided on one side surface of each connecting plate, a slider is slidably connected to the slide rail, an L-shaped plate is provided on the slider, the L-shaped plate and the slider form a U-shaped clamping area for clamping the steel pipe of the decorative tree, a limiting screw is hingedly connected to the slider on the opening side of the U-shaped clamping area, a notch is provided on the end surface of the L-shaped plate, and a nut for fixing the limiting screw in the notch is provided on the limiting screw;
[0020] A limiting tooth plate is provided in the slide rail, a locking tooth is provided on the inner side wall of the sliding block, a plurality of guide posts are provided on the inner side wall of the limiting tooth plate, a plurality of guide holes are provided on the slide rail, the guide posts are inserted into the guide holes, a plurality of springs are provided between the limiting tooth plate and the slide rail, and the teeth on the limiting tooth plate are inserted into the tooth grooves of the locking teeth under the elastic force of the springs.
[0021] Preferably, a layer of rubber pad is provided in the U-shaped clamping area.
[0022] On the other hand, the present invention also provides a corridor construction method, the method comprising:
[0023] Assemble the mounting plate on the top of the decorative tree using the connector;
[0024] The hoisting vehicle lowers the suspension part, and the steel wire ropes on the four corners of the mounting plate are hung on the suspension part;
[0025] Start the crane to lift the installation plate, and adjust the number of counterweights in the counterweight box to adjust the common center of gravity of the installation plate and the decorative tree so that the decorative tree remains balanced during the lifting process;
[0026] During the lifting process of the decorative tree, water is injected into the water tank through the water injection pipe to adaptively and dynamically adjust the common center of gravity of the decorative tree and the mounting plate.
[0027] The beneficial effects of the present invention are mainly embodied in:
[0028] The present invention uses a connecting piece to connect the installation plate and the decorative tree together, and the four steel wire ropes are hung on the hanging part of the lifting vehicle with the same length. Then, an adjusting mechanism is used to adjust the center of gravity of the decorative tree during the lifting process, so that the decorative tree can be quickly balanced during the lifting process, thereby improving the lifting construction efficiency of the steel frame decorations. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the layout of the existing corridor and steel frame decorations;
[0030] Figure 2 It is a top view structural diagram of the existing steel frame decoration;
[0031] Figure 3 It is a schematic diagram of hoisting of a corridor construction system provided by one embodiment of the present invention;
[0032] Figure 4 It is a schematic diagram of the assembly of a mounting plate and an adjustment mechanism provided in one embodiment of the present invention;
[0033] Figure 5 is a schematic axial cross-sectional view of a water tank provided in one embodiment of the present invention;
[0034] Figure 6 yes Figure 5 AA view of the structure shown;
[0035] Figure 7 yes Figure 5 The structure shown is a BB-direction view;
[0036] Figure 8 It is a schematic diagram of assembling a decorative tree and a connecting piece provided by one embodiment of the present invention;
[0037] Fig. 9 It is a schematic diagram of the overall structure of a connector provided by an embodiment of the present invention;
[0038] Fig.10 is a cross-sectional view of a connector provided in one embodiment of the present invention;
[0039] Fig.11 It is a flow chart of a corridor construction method provided by one embodiment of the present invention;
[0040] Legend: 1. Corridor; 2. Decorative tree; 3. Hoisting vehicle; 4. Mounting plate; 5. Wire rope; 6. Suspension part; 7. Counterweight box; 8. Slot; 9. Counterweight block; 10. Water tank; 11. Water filling pipe; 12. Partition; 13. Water storage area; 14. Pipeline; 15. Water inlet distribution box; 16. Inclined inner cavity; 17. First hole; 18. First ball; 19. Water inlet hole; 20. Drainage distribution box; 21. Inclined pipe; 22. Second hole; 23. Second ball; 24. Drainage pipe; 25. One-way valve; 26. Connecting plate; 27. Slide rail; 28. Slider; 29. L-shaped plate; 30. Limit screw; 31. Nut; 32. Limit tooth plate; 33. Gear; 34. Guide column; 35. Guide hole; 36. Spring; 37. Rubber pad. DETAILED DESCRIPTION
[0041] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. Embodiment 1
[0042] like Figure 1 and Figure 2 As shown, this embodiment is applied to the construction and installation of the corridor 1 and the steel frame decorations. The corridor 1 can also be lifted as a whole to the installation position between the two buildings by multiple lifting equipment. After the construction of the corridor 1 is completed, the steel frame decorations (i.e., the decorative trees 2) are lifted to the top of the corridor 1. Multiple decorative trees 2 can be set, for example Figure 1 Two decorative trees were installed in 2.
[0043] A steel frame for assisting the installation of the decorative tree 2 is built near the installation position of each decorative tree 2 (the steel frame is not shown in the attached drawings), but the steel frame may not be used; after the decorative tree 2 is lifted to the top of the corridor 1, the decorative tree 2 is slowly lowered to the top of the installation position so that the decorative tree 2 maintains balance in the lifted state; after the decorative tree 2 is firmly installed in the corresponding installation position, the hoisting of the decorative tree 2 is canceled.
[0044] Based on the above construction and installation scenario, this embodiment provides a corridor construction system. Figure 3 is a schematic diagram of the hoisting of a corridor construction system provided by an embodiment of the present invention, such as Figure 3 As shown, the system includes: a lifting vehicle 3, a mounting plate 4 and an adjusting mechanism.
[0045] The hoisting vehicle 3 is used to hoist the decorative tree 2 onto the corridor 1 as a whole;
[0046] Among them, the mounting plate 4 is provided with multiple connecting parts, and the connecting parts can be detachably connected to the decorative tree 2. The four corners of the mounting plate 4 are connected with steel wire ropes 5, and the steel wire ropes 5 are suspended on the hanging part 6 of the lifting vehicle 3; the mounting plate 4 is provided with an adjustment mechanism for adjusting the center of gravity of the decorative tree 2.
[0047] In this embodiment, the mounting plate 4 and the decorative tree 2 are connected together by a connecting piece, and the lengths of the four steel ropes 5 are kept consistent and suspended on the suspension part 6 of the lifting vehicle 3. Then, an adjustment mechanism is used to adjust the center of gravity of the decorative tree 2 during the lifting process, so that the decorative tree 2 can be quickly balanced during the lifting process, thereby improving the lifting construction efficiency of the steel frame decorations.
[0048] As a further optimization of this embodiment, Figure 4 As shown, the adjustment mechanism includes a counterweight box 7 arranged on the four corners of the mounting plate 4, and a plurality of slots 8 are provided on the top of the counterweight box 7. Counterweight blocks 9 are placed in the slots 8, and the counterweight blocks 9 form a magnetic fit with the bottom of the slots 8.
[0049] When the decorative tree 2 is slowly lifted and tilted, a counterweight 9 is placed into the counterweight box 7 on the high side of the tilt to adjust the center of gravity of the decorative tree 2 so that the decorative tree 2 can be stably suspended on the suspension part 6 of the hoisting vehicle 3 after leaving the ground, and no large shaking will occur during the lifting process, thereby improving the stability of the decorative tree 2 during the hoisting process and improving the safety of the hoisting construction of the decorative tree 2.
[0050] Secondly, the counterweight block 9 forms a magnetic fit with the bottom of the slot 8, which can prevent the counterweight block 9 from falling out of the slot 8, further improving the safety of the construction.
[0051] As a further optimization of this embodiment, during the lifting process of the decorative tree 2, due to factors such as uneven road surface and shaking of the hoisting vehicle 3, the decorative tree 2 may shake during the lifting process; in order to avoid excessive shaking of the decorative tree 2; Figure 4-7 As shown, the adjustment mechanism also includes a balance adaptive adjustment component arranged in the middle of the mounting plate 4. During the lifting process, if the decorative tree 2 shakes too much, the balance adaptive adjustment component can reduce the amplitude of the shaking, so that the decorative tree 2 can quickly tend to a balanced and stable state.
[0052] Specifically, the balance adaptive adjustment component includes a water tank 10 and a water injection pipe 11 for injecting water into the water tank 10. The water tank 10 is installed in the middle of the mounting plate 4. A partition 12 is provided inside the water tank 10, that is, the water tank 10 is divided into two upper and lower areas by the partition 12. Four water storage areas 13 are provided in the water tank 10 below the partition 12. The four water storage areas 13 are not connected to each other, and each counterweight box 7 is connected to the corresponding water storage area 13 through a pipe 14;
[0053] Four water inlet distribution boxes 15 are provided on the upper surface of the partition 12, and an inclined inner cavity 16 is provided inside the water inlet distribution box 15. The inclined inner cavity 16 is inclined downward in a direction away from the center of the partition 12. A first hole 17 connected to the inclined inner cavity 16 is provided on the water inlet distribution box 15, and a first ball 18 is provided in the inclined inner cavity 16. A water inlet hole 19 connected to the corresponding water storage area 13 is provided at the bottom of one end of the inclined inner cavity 16 away from the center of the partition 12. When the water tank 10 is in a horizontal state, the first ball 18 blocks the water inlet hole 19.
[0054] In this embodiment, the tilt angle of the tilt inner cavity 16 is smaller than the maximum safe tilt angle of the decorative tree 2 when the decorative tree 2 is tilted. When the decorative tree 2 is tilted, one or two water inlet distribution boxes 15 will be tilted. Figure 5 For example, assuming that the water tank 10 is tilted to the lower left, the first ball 18 on the right will roll to the left. At this time, the water storage area 13 on the right is connected to the inside of the water tank 10 above the partition 12. At this time, the water injection pipe 11 continues to inject water into the water tank 10, and the water will flow into the counterweight box 7 on the right, lifting the weight of the right side of the mounting plate 4, so that the center of gravity of the mounting plate 4 and the decorative tree 2 moves to the right, offsetting the amplitude of the shaking of the decorative tree 2, so that the decorative tree 2 will not shake at a large tilt angle during the lifting process, thereby improving the safety and stability of the decorative tree 2 during the lifting process.
[0055] As a further optimization of this embodiment, during the continuous adaptive adjustment process, some of the counterweight boxes 7 may be filled with water, which makes the balance adaptive adjustment component unable to adaptively adjust the shaking of the decorative tree 2; in order to solve the above problem, Figure 5 and Figure 6 As shown, a drainage distribution box 20 is provided on the lower surface of the partition 12, and four inclined tubes 21 are provided in the drainage distribution box 20. The axis of the inclined tube 21 and the axis of the inclined inner cavity 16 are located on the same vertical plane. The inclined tube 21 is inclined upward in a direction away from the center of the partition 12. The inclined directions of the inclined tube 21 and the inclined inner cavity 16 of this embodiment are symmetrical along the partition 12. A second hole 22 is provided on the inclined tube 21, and a second ball 23 is provided in the inclined tube 21. One end of the inclined tube 21 close to the center of the partition 12 is connected to the corresponding water storage area 13. When the water tank 10 is in a horizontal state, the second ball 23 blocks the passage between the water storage area 13 and the inclined tube 21.
[0056] The water tank 10 is also provided with a drain pipe 24 , one end of which is connected to the drain distribution box 20 .
[0057] by Figure 5 For example, assuming that the water tank 10 is tilted to the lower left (that is, the mounting plate 4 is tilted to the lower left), the first ball 18 on the right will roll to the left. At this time, the water storage area 13 on the right is connected to the inside of the water tank 10 above the partition 12. At this time, a water pump is used to continuously inject water into the water tank 10 through the water injection pipe 11. The water will flow into the counterweight box 7 on the right, lifting the weight of the right side of the mounting plate 4; but after the weight on the rear side of the mounting plate 4 is lifted, the mounting plate 4 will still tilt to the lower left. At this time, it means that the water in the counterweight box 7 on the left side of the mounting plate 4 has been filled, and the water injected into the counterweight box 7 on the right is not enough to move the center of gravity of the mounting plate 4 and the decorative tree 2 to the right.
[0058] At this time, the second ball 23 in the left inclined tube 21 will move to the left, and the water storage area 13 on the left is connected to the inside of the drainage distribution box 20. At this time, the water in the drainage distribution box 20 is sucked out through the drainage pipe 24 by a water pump or other equipment, and the water in the counterweight box 7 on the left can be pumped out, so that the weight of the counterweight box 7 on the left is reduced, and the center of gravity of the mounting plate 4 and the decorative tree 2 is moved to the right, thereby offsetting the amplitude of the shaking of the decorative tree 2, so that the decorative tree 2 will not shake at a large tilt angle during the lifting process, thereby improving the safety and stability of the decorative tree 2 during the lifting process.
[0059] As a further optimization of this embodiment, the end of the inclined inner cavity 16 away from the circular partition 12 forms a magnetic fit with the first ball 18, and the end of the inclined tube 21 close to the center of the partition 12 forms a magnetic fit with the second ball 23. The two are weakly magnetically adsorbed to avoid movement of the first ball 18 and the second ball 23 due to inertia.
[0060] As a further optimization of this embodiment, the water pump can be installed on the lifting vehicle 3, and the drain pipe 24 and the water inlet pipe are both long hoses and are arranged on the boom of the lifting vehicle 3; and a one-way valve 25 is provided on the drain pipe 24 and the water injection pipe 11 to prevent the water in the water tank 10 from flowing back and affecting the adjustment of the balance of the mounting plate 4.
[0061] As a further optimization of this embodiment, an exhaust hole is provided on the side wall of the counterweight box 7, and a breathable and waterproof membrane is provided on the inner wall of the counterweight box 7 located inside the exhaust hole. The setting of the exhaust hole can allow water to be injected into the counterweight box 7 to maintain the air pressure balance of the counterweight box 7. The breathable and waterproof membrane can prevent the water in the counterweight box 7 from overflowing. The specific structure of the exhaust hole and the waterproof and breathable membrane on the counterweight box 7 is not drawn in the accompanying drawings, and those skilled in the art can clearly understand the setting method of the exhaust hole and the waterproof and breathable membrane.
[0062] As a further optimization of this embodiment, since the decorative tree 2 is welded from multiple steel pipes, if only one of the steel pipes is used as a lifting installation point during hoisting, the steel pipe at the installation point will bend and deform due to excessive force; in order to prevent a single steel pipe from being stressed, such as Figure 8-10 As shown, the connecting member includes a plurality of connecting plates 26 which are hingedly connected in sequence, wherein one connecting plate 26 is connected to the mounting plate 4 via a suspension belt, a slide rail 27 is provided on one side surface of each connecting plate 26, a slider 28 is slidably connected to the slide rail 27, an L-shaped plate 29 is provided on the slider 28, the L-shaped plate 29 and the slider 28 form a U-shaped clamping area for clamping the steel pipe of the decorative tree 2, a limiting screw 30 is hingedly connected to the slider 28 on the opening side of the U-shaped clamping area, a notch is provided on the end face of the L-shaped plate 29, and a nut 31 for fixing the limiting screw 30 in the notch is provided on the limiting screw 30.
[0063] In this embodiment, three connecting plates 26 are preferably provided, which have three U-shaped clamping areas. The three U-shaped clamping areas are clamped on the three steel pipes of the decorative tree 2, and then the steel pipes are limited by the limiting screw 30. The slider 28 slides off the steel pipe. At this time, three steel pipes are subjected to force at the same time, which can avoid bending deformation caused by a single steel pipe being subjected to force.
[0064] Secondly, a limiting tooth plate 32 is provided in the slide rail 27, a locking tooth 33 is provided on the inner side wall of the slider 28, a plurality of guide posts 34 are provided on the inner side wall of the limiting tooth plate 32, a plurality of guide holes 35 are provided on the slide rail 27, the guide posts 34 are inserted into the guide holes 35, a plurality of springs 36 are provided between the limiting tooth plate 32 and the slide rail 27, and the teeth on the limiting tooth plate 32 are inserted into the tooth grooves of the locking teeth 33 under the elastic force of the springs 36.
[0065] The limiting tooth plate 32 can be pressed to separate the limiting tooth plate 32 from the latch teeth 33. At this time, the position of the slider 28 on the slide rail 27 is adjusted to adapt to steel pipes in different positions. After the adjustment is completed, the limiting tooth plate 32 is released. The limiting tooth plate 32 is automatically reset under the action of the spring 36, so that the limiting tooth plate 32 and the latch teeth 33 are engaged together, and the slider 28 remains stationary. This method improves the practicality of the connecting piece.
[0066] As a further optimization of this embodiment, a layer of rubber pad 37 is provided in the U-shaped clamping area. The rubber pad 37 can increase the friction between the U-shaped clamping area and the steel pipe, thereby preventing the connecting parts from sliding during the lifting of the decorative tree 2 and changing the connection position, thereby causing the center of gravity of the decorative tree 2 to shift and affecting the stability of the lifting. Embodiment 2
[0067] Fig.11 is a flow chart of a corridor construction method provided by one embodiment of the present invention, such as Fig.11 As shown, this embodiment provides a corridor construction method, the method comprising:
[0068] Step S101: assembling the mounting plate 4 on the top of the decorative tree 2 using a connecting piece;
[0069] Step S102: The hoisting vehicle 3 lowers the hanging part 6, and the steel wire ropes 5 on the four corners of the mounting plate 4 are hung on the hanging part 6;
[0070] Step S103: Start the hoisting vehicle 3 to lift the mounting plate 4, and adjust the number of counterweights 9 in the counterweight box 7 to adjust the common center of gravity of the mounting plate 4 and the decorative tree 2 so that the decorative tree 2 remains balanced during the lifting process;
[0071] Step S104 : during the lifting process of the decorative tree 2 , water is injected into the water tank 10 through the water injection pipe 11 to adaptively and dynamically adjust the common center of gravity of the decorative tree 2 and the mounting plate 4 .
[0072] As a further optimization of this embodiment, when water is injected into the water tank 10 through the water injection pipe 11 and is not enough to adjust the common center of gravity of the decorative tree 2 and the mounting plate 4, the water in the corresponding counterweight box 7 is pumped out through the drainage pipe 24 to adjust the common center of gravity of the decorative tree 2 and the mounting plate 4.
[0073] The specific structure of the connecting piece and the adaptive dynamic adjustment of the common center of gravity of the decorative tree 2 and the mounting plate 4 in this embodiment is the same as that in the first embodiment, and the specific structure is not repeated one by one in this embodiment.
[0074] The present invention uses a connecting piece to connect the mounting plate 4 and the decorative tree 2 together, and the lengths of the four steel wire ropes 5 are kept consistent and suspended on the suspension part 6 of the lifting vehicle 3. Then, an adjustment mechanism is used to adjust the center of gravity position of the decorative tree 2 during the lifting process, so that the decorative tree 2 can be quickly balanced during the lifting process, thereby improving the lifting construction efficiency of the steel frame decorations.
[0075] It should be noted that, for the above-mentioned various method embodiments, for the sake of simplicity of description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that this application is not limited by the order of the actions described, because according to this application, some steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and units involved are not necessarily required by this application.
Claims
1. A corridor construction system, characterized in that: The system comprises: A hoisting vehicle (3) is used to hoist the decorative tree (2) onto the corridor (1) as a whole; A mounting plate (4), wherein a plurality of connecting members are provided on the mounting plate (4), wherein the connecting members are detachably connected to the decorative tree (2), and wherein four corners of the mounting plate (4) are connected to steel wire ropes (5), and wherein the steel wire ropes (5) are suspended on a suspension portion (6) of the lifting vehicle (3); The mounting plate (4) is provided with an adjustment mechanism for adjusting the center of gravity of the decorative tree (2); The adjustment mechanism comprises a counterweight box (7) arranged at four corners of the mounting plate (4), a plurality of slots (8) being provided on the top of the counterweight box (7), counterweight blocks (9) being placed in the slots (8), and the counterweight blocks (9) forming a magnetic fit with the bottoms of the slots (8); The regulating mechanism further comprises a balance self-adapting regulating component arranged in the middle of the mounting plate (4), the balance self-adapting regulating component comprising a water tank (10) and a water injection pipe (11) for injecting water into the water tank (10), the water tank (10) being installed in the middle of the mounting plate (4), a partition (12) being provided inside the water tank (10), four water storage areas (13) being provided in the water tank (10) located below the partition (12), and each counterweight box (7) being connected to a corresponding water storage area (13) via a pipe (14); Four water inlet distribution boxes (15) are provided on the upper surface of the partition (12), and an inclined inner cavity (16) is provided inside the water inlet distribution box (15). The inclined inner cavity (16) is arranged to be inclined downward in a direction away from the center of the partition (12). A first hole (17) connected to the inclined inner cavity (16) is provided on the water inlet distribution box (15), and a first ball (18) is provided in the inclined inner cavity (16). A water inlet hole (19) connected to a corresponding water storage area (13) is provided at the bottom of one end of the inclined inner cavity (16) away from the center of the partition (12).
2. A corridor construction system according to claim 1, characterized in that: The circular end of the inclined inner cavity (16) away from the partition (12) forms a magnetic attraction fit with the first rolling ball (18).
3. A corridor construction system according to claim 1, characterized in that: A drainage distribution box (20) is provided on the lower surface of the partition (12), and four inclined tubes (21) are provided in the drainage distribution box (20), the axis of the inclined tube (21) and the axis of the inclined inner cavity (16) are located on the same vertical plane, the inclined tube (21) is arranged to be inclined upward in a direction away from the center of the partition (12), a second hole (22) is provided on the inclined tube (21), a second ball (23) is provided in the inclined tube (21), and one end of the inclined tube (21) close to the center of the partition (12) is connected to the corresponding water storage area (13); The water tank (10) is also provided with a drainage pipe (24), one end of which is in communication with the drainage distribution box (20).
4. A corridor construction system according to claim 3, characterized in that: Both the drainage pipe (24) and the water injection pipe (11) are provided with a one-way valve (25).
5. The corridor construction system according to claim 1, characterized in that: An exhaust hole is provided on the side wall of the counterweight box (7), and an air-permeable and water-proof membrane is provided on the inner wall of the counterweight box (7) located inside the exhaust hole.
6. A corridor construction system according to claim 1, characterized in that: The connecting member comprises a plurality of connecting plates (26) which are hingedly connected in sequence, wherein one of the connecting plates (26) is connected to the mounting plate (4) via a suspension belt, a slide rail (27) is provided on one side surface of each connecting plate (26), a slider (28) is slidably connected to the slide rail (27), an L-shaped plate (29) is provided on the slider (28), the L-shaped plate (29) and the slider (28) form a U-shaped clamping area for clamping a steel pipe of the decorative tree (2), a limiting screw (30) is hingedly connected to the slider (28) on the opening side of the U-shaped clamping area, a notch is provided on the end surface of the L-shaped plate (29), and a nut (31) for fixing the limiting screw (30) in the notch is provided on the limiting screw (30); A limit tooth plate (32) is provided inside the slide rail (27), a latching tooth (33) is provided on the inner side wall of the slide block (28), a plurality of guide posts (34) are provided on the inner side wall of the limit tooth plate (32), a plurality of guide holes (35) are provided on the slide rail (27), the guide posts (34) are inserted into the guide holes (35), a plurality of springs (36) are provided between the limit tooth plate (32) and the slide rail (27), and the teeth on the limit tooth plate (32) are inserted into the tooth grooves of the latching teeth (33) under the elastic force of the springs (36).
7. A corridor construction system according to claim 6, characterized in that: A layer of rubber pad (37) is provided in the U-shaped clamping area.
8. A corridor construction method, the method is implemented based on the corridor construction system according to any one of claims 1 to 7, characterized in that: The method comprises: Using a connecting piece to assemble the mounting plate (4) on the top of the decorative tree (2); The hoisting vehicle (3) lowers the hanging part (6), and the steel wire ropes (5) on the four corners of the mounting plate (4) are hung on the hanging part (6); Starting the lifting vehicle (3) to lift the mounting plate (4), and adjusting the number of counterweight blocks (9) in the counterweight box (7) to adjust the common center of gravity of the mounting plate (4) and the decorative tree (2) so that the decorative tree (2) remains balanced during the lifting process; During the lifting process of the decorative tree (2), water is injected into the water tank (10) through the water injection pipe (11) to adaptively and dynamically adjust the common center of gravity of the decorative tree (2) and the mounting plate (4).
