Mechanized construction information annotation method based on three-dimensional design platform of power transmission lines

Through the implementation of mechanized construction information labeling methods on the 3D design platform of the transmission line, the problems that the existing technology cannot display construction information cannot be displayed on the three -dimensional drawing, and the intuitive display of construction information and the improvement of management efficiency.

CN117272674BActive Publication Date: 2025-01-28STATE GRID SHANDONG ELECTRIC POWER CO
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311324727.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-10-13
Publication Date
2025-01-28
Estimated Expiration
2043-10-13

AI Technical Summary

Technical Problem

The existing three-dimensional design software cannot display construction information such as the type of mechanized equipment required for power transmission line construction, the type and quantity of prefabricated parts, the width of temporary roads required for equipment entry, etc. on the three-dimensional drawings, resulting in inefficient construction.

Method used

Based on the mechanized construction information labeling method based on the 3D design platform of the transmission line, the information labeling system receives the click instruction, retrieves the tower information database, obtains and feeds back the tower display information, and displays the basic information and related information on the three -dimensional design platform.

Benefits of technology

The various types of equipment and prefabrication information required for mechanized construction are realized on the three -dimensional drawing, which improves the precision and standardization of construction, and improves management efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117272674B_ABST
    Figure CN117272674B_ABST
Patent Text Reader

Abstract

The present application provides a mechanized construction information annotation method based on a three-dimensional design platform for power transmission lines, based on an information annotation system that communicates with the three-dimensional design platform, specifically including the following steps: the information annotation system receives a click instruction from the three-dimensional design platform, retrieves the tower information database according to the click instruction to obtain the corresponding tower display information and feeds back to the three-dimensional design platform, and the three-dimensional design platform displays the tower information; the click instruction includes click position information, the tower display information includes display position information and display content information, and the display content information includes tower foundation information and tower related information. The present application can intuitively display the information of various types of equipment and prefabricated parts required for mechanized construction on three-dimensional drawings, so as to better meet the precision and standardization of mechanized construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power grid infrastructure technology, and in particular to a mechanized construction information labeling method based on a three-dimensional design platform for power transmission lines. Background Art

[0002] The statements in this section merely provide background technical information related to the present application and do not necessarily constitute prior art.

[0003] Traditionally, power transmission line construction is mainly carried out by manpower and supplemented by machinery. Promoting the whole process of mechanized construction in the field of power transmission line construction has realized the transformation of construction from traditional methods to mechanized methods, which is conducive to improving the safety quality and process level of power grid construction, and is an inevitable sign of the development of first-class power grid technology.

[0004] The mechanized construction of the entire transmission line means that mechanized construction equipment is fully used throughout the entire construction process of the transmission line to complete the construction tasks of each construction process. The mechanized construction of the entire process has higher requirements for the arrangements and deployment of the construction. The current 3D design software can only display basic information such as images and directions. It cannot display the type of mechanized equipment required for erecting a single tower, the type and quantity of prefabricated parts, the width of the temporary road required for the equipment to enter the site, and other construction information on the 3D drawings. It is also unable to count and display the information of equipment, routes, and prefabricated parts required for the construction of the entire line. Statistics can only be performed through the background, and various equipment can only be dispatched after comparison with the tower base under construction on site, which greatly affects the efficiency of construction. Summary of the invention

[0005] In order to solve the above problems, this application proposes a mechanized construction information labeling method based on a three-dimensional design platform for transmission lines, which can intuitively display the information of various equipment and prefabricated parts required for mechanized construction on three-dimensional drawings, so as to better meet the precision and standardization of mechanized construction.

[0006] The present application provides a mechanized construction information annotation method based on a three-dimensional design platform for power transmission lines, and an information annotation system based on communication with the three-dimensional design platform, which specifically includes the following steps:

[0007] The information annotation system receives a click instruction from the three-dimensional design platform, searches the tower information database according to the click instruction to obtain corresponding tower display information and feeds it back to the three-dimensional design platform, and the three-dimensional design platform displays the tower information;

[0008] The click instruction includes click position information, the tower display information includes display position information and display content information, and the display content information includes tower basic information and tower related information.

[0009] Preferably, the tower basic information at least includes the tower number, tower manager, commissioning date, location, and type;

[0010] The tower-related information at least includes the type and quantity of tower erection equipment, the type and quantity of prefabricated parts, and the width of the access road.

[0011] Preferably, the click position information contained in the click instruction includes line click information and tower click information. When the click position information is line click information, the three-dimensional design platform displays the tower information of all towers.

[0012] Preferably, the information annotation system includes a front-end and a back-end, the back-end adopts an SSM framework, the database adopts a MySql database, and the front-end framework includes Three.js and easy-jQuery.

[0013] Preferably, the tower display information includes display style information, and the display style information includes the size and display position of the display block, and the font style;

[0014] When the click location information is tower click information, the display style information is template one; when the click location information is line click information, the display style information is template two; the parameter values ​​of template one are fixed values, and the parameter values ​​of template two change dynamically according to the page display area of ​​the three-dimensional design platform.

[0015] Preferably, the specific method for dynamically changing the parameter values ​​of the template 2 according to the page display area of ​​the three-dimensional design platform is:

[0016] The tower number in the display block of the tower information of any tower is not obscured by other display blocks or other graphics. When the information annotation system receives the secondary tower click information transmitted by the three-dimensional design platform, the corresponding display block is adjusted to the top layer and the text therein is displayed according to the preset text style.

[0017] Compared with the prior art, the beneficial effects of this application are:

[0018] This application can quickly display relevant information of equipment such as power towers and count information such as all towers and wires of the entire transmission line and construction site, improve management efficiency and accuracy, and reduce the workload of manual recording and management by automatically displaying tower information, thereby improving management efficiency and accuracy; presenting information on power towers and construction sites in a three-dimensional model allows power operators to understand the status of transmission lines more intuitively and make decisions more quickly; combining data visualization and human-computer interaction technology with three-dimensional models makes data more intuitive and easy to understand. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The drawings in the specification, which constitute a part of the present application, are used to provide further understanding of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute improper limitations on the present application.

[0020] Figure 1 This is a system principle block diagram of this application. DETAILED DESCRIPTION

[0021] The present application is further described below in conjunction with the accompanying drawings and embodiments.

[0022] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present disclosure. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0023] In the present disclosure, terms such as "upper", "lower", "left", "right", "front", "back", "vertical", "horizontal", "side", "bottom" and the like indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings. They are relational words determined only for the convenience of describing the structural relationships of the various parts or elements of the present disclosure, and do not specifically refer to any part or element in the present disclosure and should not be understood as limitations on the present disclosure.

[0024] Example 1

[0025] like Figure 1 As shown, the present application provides a mechanized construction information annotation method based on a three-dimensional design platform for power transmission lines, and an information annotation system based on communication with the three-dimensional design platform, which specifically includes the following steps:

[0026] The information annotation system receives a click instruction from the three-dimensional design platform, searches the tower information database according to the click instruction to obtain corresponding tower display information and feeds it back to the three-dimensional design platform, and the three-dimensional design platform displays the tower information;

[0027] The click instruction includes click position information, the tower display information includes display position information and display content information, and the display content information includes tower basic information and tower related information.

[0028] Specifically, the tower basic information includes at least the tower number, tower manager, commissioning date, location, and type;

[0029] The tower-related information at least includes the type and quantity of tower erection equipment, the type and quantity of prefabricated parts, and the width of the access road.

[0030] Specifically, the click position information contained in the click instruction includes line click information and tower click information. When the click position information is line click information, the three-dimensional design platform displays the tower information of all towers.

[0031] Specifically, the information annotation system includes a front-end and a back-end, the back-end adopts an SSM framework, the database adopts a MySql database, and the front-end framework includes Three.js and easy-jQuery.

[0032] Specifically, the tower display information includes display style information, and the display style information includes the size and display position of the display block and the font style;

[0033] When the click location information is tower click information, the display style information is template one; when the click location information is line click information, the display style information is template two; the parameter values ​​of template one are fixed values, and the parameter values ​​of template two change dynamically according to the page display area of ​​the three-dimensional design platform.

[0034] Specifically, the specific method for dynamically changing the parameter values ​​of the template 2 according to the page display area of ​​the three-dimensional design platform is:

[0035] The tower number in the display block of the tower information of any tower is not obscured by other display blocks or other graphics. When the information annotation system receives the secondary tower click information transmitted by the three-dimensional design platform, the corresponding display block is adjusted to the top layer and the text therein is displayed according to the preset text style.

[0036] This application can improve management efficiency and accuracy, facilitate decision-making, improve the reliability and stability of transmission lines, and reduce maintenance costs. At the same time, through data visualization technology, it makes data more intuitive and easy to understand, which is a very practical and innovative function.

[0037] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

[0038] Although the above describes the specific implementation methods of the present application in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present application. Technical personnel in the relevant field should understand that on the basis of the technical solution of the present application, various modifications or deformations that can be made by technical personnel in this field without creative work are still within the scope of protection of the present application.

Claims

1. A mechanized construction information annotation method based on a three-dimensional design platform for power transmission lines, characterized in that: The information annotation system based on communication with the 3D design platform specifically includes the following steps: The information annotation system receives a click instruction from the three-dimensional design platform, searches the tower information database according to the click instruction to obtain corresponding tower display information and feeds it back to the three-dimensional design platform, and the three-dimensional design platform displays the tower information; The click instruction includes click position information, the tower display information includes display position information and display content information, and the display content information includes tower basic information and tower related information; The basic information of the tower includes at least the tower number, tower manager, commissioning date, location, and type; The tower related information at least includes the type and quantity of tower erection equipment, the type and quantity of prefabricated parts, and the width of the access road; The click position information contained in the click instruction includes line click information and tower click information. When the click position information is line click information, the three-dimensional design platform displays the tower information of all towers. The tower display information includes display style information, and the display style information includes the size and display position of the display block and the font style; When the click position information is tower click information, the display style information is template one, and when the click position information is line click information, the display style information is template two, each parameter value of template one is a fixed value, and each parameter value of template two changes dynamically according to the page display area of ​​the three-dimensional design platform; The specific method for dynamically changing the parameter values ​​of the template 2 according to the page display area of ​​the three-dimensional design platform is: The tower number in the display block of the tower information of any tower is not obscured by other display blocks or other graphics. When the information annotation system receives the secondary tower click information transmitted by the three-dimensional design platform, the corresponding display block is adjusted to the top layer and the text therein is displayed according to the preset text style.

2. The mechanized construction information annotation method based on the power transmission line three-dimensional design platform according to claim 1 is characterized in that: The information annotation system includes a front end and a back end, the back end adopts an SSM framework, the database adopts a MySql database, and the front end framework includes Three.js and easy-jQuery.

Citation Information

Patent Citations

  • Tekla platform-based power transmission iron tower BIM building method

    CN107679332A

  • Power transmission and transformation project acceptance result visualization method and system based on south network intelligent aerial view

    CN116091039A