A smart grid one-button sequential control verification system and method
Through the smart grid one-click sequence calibration system, the closed and closed-loop automatic testing environment and simulation technology are used to solve the problem of low efficiency of one-click sequence calibration in the smart grid, and automatic calibration and dual confirmation auxiliary criterion are realized. Testing improves calibration efficiency and accuracy.
Patent Information
- Application Number
- CN202311063583.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-22
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2043-08-22
AI Technical Summary
The existing smart grid one-click sequence verification technology has the problems of long time period, low efficiency, and inability to automatically check. It lacks a complete calibration system and cannot meet the needs of one-click sequence verification of smart grid one-click sequence verification.
Design a smart grid one-click sequence calibration system, which forms a closed and closed-loop automatic testing environment through a centralized control main station, data communication gateway, monitoring host, anti-error host and one-click sequence calibration device to achieve one-click automatic testing environment Automatic test without power outage. The centralized control main station and the one-click sequence calibration device communicate through the extended protocol, the monitoring host and the anti-error host make anti-error judgments, and the simulation module simulates the substation environment for verification.
Achieve convenient, fast and complete functions of smart grid one-click sequence verification, automatically initiate test verification, generate verification reports, support dual confirmation auxiliary criterion testing, save verification time, improve efficiency, and meet the one-click smart grid Automatic testing requirements for sequence control.
Smart Images

Figure CN117277552B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of power system automation technology and substation operation and maintenance, and relates to a smart grid one-key sequential control verification system and method. Background Art
[0002] Substations are an important part of smart grids. With the development of smart grid construction, more and more existing substations are undergoing one-button sequential control transformation. Substation control operations involve substation operation safety. As a very important operating link of substations, all operations need to be tested and accepted before the substation is put into operation.
[0003] Conventional acceptance mode can only be tested manually one by one, and there are problems such as long test cycle, low efficiency and deep involvement of personnel in the joint debugging of smart grid one-key sequential control. At present, there are many problems in the verification technology of smart grid one-key sequential control. For example, when there is a lack of a fully functional verification system for smart grid one-key sequential control, the sequential control operation is initiated by the monitoring host in the station, and the correctness verification of the forwarding of the one-key sequential control instruction of the remote motor in the station is not considered, and the verification of the centralized control master station is not included, and the full link verification of the one-key sequential control is ignored; when the correctness verification of the double confirmation function of the one-key sequential control of the monitoring host is verified, the double confirmation information of the one-key sequential control is obtained from the video monitoring host, and the video monitoring host of the newly built substation also needs to be verified, which cannot be synchronized with the one-key sequential control verification of the monitoring host, and the actual verification workflow of the one-key sequential control in the station is not fully considered; the closed-loop test of the monitoring host of the smart substation requires IEC61850 protection measurement and control simulation device, monitoring host, station control layer switch, IEC61850 network message recorder analyzer and test workstation, which are not connected to the anti-error host in the station and the equipment required for the closed-loop test system. Therefore, there is currently a lack of a fully functional calibration system for the smart grid one-button sequential control and automatic calibration is impossible, which cannot meet the automatic testing needs of the smart grid one-button sequential control. Summary of the invention
[0004] In order to solve the deficiencies in the prior art, the present invention provides a smart grid one-key sequential control verification system and method, in which a centralized control main station and a one-key sequential control verification device communicate and interact through an extended protocol to form a closed, closed-loop automatic testing environment, and the substation one-key sequential control environment and the production operation environment are completely isolated, thereby realizing the smart grid one-key sequential control automatic testing without power outage.
[0005] The present invention adopts the following technical solution.
[0006] A one-key sequential control verification system for a smart grid includes a centralized control main station, a data communication gateway, a monitoring host, an anti-error host and a one-key sequential control verification device;
[0007] The centralized control master station communicates with the monitoring host through the data communication gateway and initiates a one-key sequential control instruction for the sequential control ticket;
[0008] The anti-error host communicates with the monitoring host and performs an anti-error judgment before the monitoring host issues a sequence control operation remote control command;
[0009] The one-key sequential control verification device simulates the test environment of the substation bay layer equipment, receives and responds to the sequential control operation remote control command issued by the monitoring host, and performs one-key sequential control verification through data interaction with the monitoring host and the centralized control master station;
[0010] The one-key sequential control verification environment formed by the centralized control main station, monitoring host, anti-error host, data communication gateway and one-key sequential control verification device is completely isolated from the production operation environment.
[0011] Preferably, the centralized control master station is configured with a one-button sequential control ticket acceptance form for the substation, and it communicates with the data communication gateway to issue a one-button sequential control instruction to the monitoring host through the data communication gateway and obtain the sequential control execution result information returned by the monitoring host; it also communicates with the one-button sequential control verification device to send the sequential control ticket to be verified and the test type as well as the sequential control execution result information message to the one-button sequential control verification device.
[0012] Preferably, the monitoring host has built-in sequence control ticket configuration information, which is used to send the sequence control operation remote control command to the one-key sequence control verification device according to the sequence control operation steps after receiving the one-key sequence control instruction and receive the response information of the one-key sequence control verification device to the remote control command, and return the sequence control execution result information message according to the response information.
[0013] Preferably, the one-key sequential control verification device is provided with a simulation module, which configures the control objects, operation prerequisites, and position main and auxiliary criterion information associated with the sequential control ticket interval, forms a simulation test configuration information library, and is used to simulate the substation interval layer equipment according to the substation SCD file, simulate the test environment, execute the sequential control operation remote control command and send the remote control command response information to the monitoring host;
[0014] The one-key sequence control verification device is also used to form a one-key sequence control verification test report according to the test type and the sequence control execution result information message.
[0015] Preferably, the anti-error host includes a microcomputer simulation screen and an industrial control host. Before the monitoring host issues a remote control command, the operation is rehearsed on the microcomputer simulation screen according to the content of the operation ticket, and the industrial control host performs anti-error judgment on each sequence operation remote control command according to the pre-stored sequence operation step rules.
[0016] Preferably, the centralized control master station and the one-button sequential control verification device communicate and interact using the IEC60870-5-104 extended protocol, and an ASDU is provided on the IEC60870-5-104.
[0017] A smart grid one-key sequential control verification method comprises the following steps:
[0018] Step 1: The centralized control master station sends the name of the sequence control ticket to be checked and the test type to the one-key sequence control verification device according to the acceptance form of the one-key sequence control ticket of the substation, and the one-key sequence control verification device simulates the corresponding test environment; the centralized control master station sends the one-key sequence control instruction to the data communication gateway;
[0019] Step 2: The data communication gateway forwards the one-key sequence control command to the monitoring host. The monitoring host communicates with the error prevention host before issuing the remote control command. The error prevention host makes an error prevention judgment on each sequence control remote control command according to the pre-stored sequence control operation step rules. If the judgment is passed, it goes to step 3.
[0020] Step 3: The monitoring host sends the sequence control operation remote control command to the one-key sequence control verification device according to the built-in sequence control ticket configuration information and the sequence control operation steps. The interval layer device simulated by the simulation module responds to execute the monitoring host remote control command and sends the remote control command response information to the monitoring host.
[0021] Step 4: The monitoring host receives the response information of the one-key sequential control verification device to the remote control command, generates a sequential control execution result information message according to the response information, and sends it to the centralized control master station through the data communication gateway;
[0022] Step 5: The centralized control master station sends the sequence control execution result information message to the one-key sequence control verification device, and the one-key sequence control verification device forms a one-key sequence control verification test report according to the test type and the received sequence control execution result information message.
[0023] Preferably, the test types include forward test, reverse test of pre-operation conditions and reverse test of double confirmation integrity, so as to respectively verify the correctness of the control object of the sequential control operation ticket, the monitoring host not executing the sequential control operation when the pre-operation conditions of the sequential control ticket are not met, and the function of stopping the execution of the sequential control operation when the monitoring host receives abnormal position auxiliary judgment information.
[0024] Preferably, in step 1, when the test type is a forward test, the one-key sequence control verification device simulates the sequence control execution environment according to the sequence control ticket configuration information;
[0025] When the test type is a reverse test of pre-operation conditions, the one-button sequential control verification device simulates the abnormal pre-operation condition environment according to the sequential control ticket configuration information;
[0026] When the test type is a double confirmation integrity reverse test, the one-button sequential control verification device simulates the abnormal position auxiliary judgment status according to the sequential control ticket configuration information.
[0027] Preferably, in step 5, when the test type is a forward test, the one-button sequential control verification device comprehensively compares the control object identifier in the sequential control ticket and the control object identifier in the remote control command, combines the control object identifier of the sequential control execution result information message, and comprehensively judges to form a sequential control operation ticket control object correctness test message;
[0028] When the test type is a reverse test of the pre-operation condition, the one-button sequential control verification device combines the simulated abnormal pre-operation condition and whether the sequential control execution result information message carries the "pre-operation condition abnormality" information, and comprehensively judges to form a pre-operation condition logic validity test message;
[0029] When the test type is a double confirmation integrity reverse test, the one-button sequential control verification device combines the auxiliary criterion status of the simulated abnormal position and whether the sequential control execution result information message carries the "primary and auxiliary criterion double confirmation abnormality" information, and comprehensively judges to form a one-button sequential control main and auxiliary criterion logic validity test report of the sequential control host.
[0030] Preferably, the basis for the comprehensive judgment to form the pre-operation condition logic validity test message is:
[0031] The monitoring host receives the response information of the situation that the pre-operation condition of the sequence ticket is not met, that is, when the one-key sequence check device simulates the abnormal pre-operation condition, the sequence operation is not executed, and the generated sequence execution result information message carries the "pre-operation condition abnormal" information. When the sequence execution result information message carries the "pre-operation condition abnormal" information, its conclusion is consistent with the one-key sequence check device simulating the abnormal pre-operation condition, indicating that the pre-operation condition logic is valid;
[0032] The basis for the comprehensive judgment to form the logic validity test report of the one-key sequence control main and auxiliary judgment criteria of the sequence control host is:
[0033] When the monitoring host receives the abnormal position auxiliary criterion response information, that is, when the one-key sequential control verification device simulates the abnormal position auxiliary criterion state, the sequential control operation is stopped, and the generated sequential control execution result information message carries the "primary and auxiliary criterion double confirmation abnormality" information. When the sequential control execution result information message carries the "primary and auxiliary criterion double confirmation abnormality" information, its conclusion is consistent with the one-key sequential control verification device simulating the abnormal position auxiliary criterion state, indicating that the one-key sequential control main and auxiliary criterion logic of the sequential control host is valid.
[0034] A terminal comprises a processor and a storage medium; the storage medium is used to store instructions;
[0035] The processor is configured to operate according to the instructions to execute the steps of the method.
[0036] A computer-readable storage medium stores a computer program, which implements the steps of the method when executed by a processor.
[0037] The beneficial effects of the present invention are as follows:
[0038] The present invention provides a convenient, fast and fully functional one-key sequential control verification system and method for smart grids. The verification system is completely separated from the production and operation environment, and the one-key sequential control verification device and the centralized control main station are connected end to end to form a closed-loop verification environment. The test verification can be automatically initiated in a programmed manner. The test verification content and the monitoring host result returned by the centralized control main station are comprehensively compared through the one-key sequential control verification device, and a verification report is output according to the comparison result, thereby realizing the verification test of the sequential control ticket configuration and functional correctness of the centralized control main station and the monitoring host, and completing the automatic test of the one-key sequential control of the smart grid without power outage.
[0039] The verification process of the present invention includes a centralized control master station, which can synchronously verify the correctness of the forwarding of the one-key sequential control instructions of the remote motors in the station. The one-key sequential control verification is closer to the actual application environment and the verification is more comprehensive;
[0040] The present invention supports the test of the video signal as the auxiliary criterion of the double confirmation in the station. According to the video text provided by the video host manufacturer, the one-key sequential control verification device automatically generates a video confirmation information file and transmits it to the monitoring host to complete the one-key sequential control test, so that when the video monitoring host is verified in the station, the correctness of the one-key sequential control operation logic of the monitoring host can be verified synchronously. Multiple tasks are carried out simultaneously, which effectively saves verification time and improves verification efficiency.
[0041] The present invention adds an anti-error host in the station to the verification environment, and the one-key sequential control verification device can simulate the protection and control equipment in the station and analyze the interactive messages. The one-key sequential control verification is more comprehensive; and the verification environment is simpler to build. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 The present invention is a schematic diagram of the structure of a smart grid one-key sequential control verification system.
[0043] Figure 2 The present invention is a complete implementation flow chart of a smart grid one-key sequential control verification method. DETAILED DESCRIPTION
[0044] In order to make the purpose, technical scheme and advantages of the present invention clearer, the technical scheme of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The embodiments described in this application are only part of the embodiments of the present invention, not all of them. Based on the spirit of the present invention, other embodiments obtained by ordinary technicians in this field without creative work are all within the scope of protection of the present invention.
[0045] like Figure 1As shown, Embodiment 1 of the present invention provides a smart grid one-key sequential control verification system, including a centralized control main station, a data communication gateway, a monitoring host, an anti-error host and a one-key sequential control verification device, wherein the centralized control main station is connected to the monitoring host through the data communication gateway, the monitoring host is connected to the anti-error host and the one-key sequential control verification device respectively, and the one-key sequential control verification device is also connected to the centralized control main station;
[0046] In a preferred but non-restrictive embodiment of the present invention, the centralized control master station communicates with the monitoring host through the data communication gateway to initiate a one-key sequential control instruction for the sequential control ticket; the anti-error host communicates with the monitoring host to perform an anti-error judgment before the monitoring host issues a sequential control operation remote control command; the one-key sequential control verification device simulates the test environment by simulating the substation interval layer equipment, receives and responds to the sequential control operation remote control command issued by the monitoring host, and performs one-key sequential control verification through data interaction with the monitoring host and the centralized control master station; the one-key sequential control verification environment formed by the centralized control master station, monitoring host, anti-error host, data communication gateway and one-key sequential control verification device is completely isolated from the production operation environment.
[0047] Further preferably, the centralized control master station is the tested object, and is configured with a sequential control ticket acceptance form for the one-key sequential control of the substation. It communicates with the data communication gateway machine to send a one-key sequential control instruction to the monitoring host through the data communication gateway machine and obtain the sequential control execution result information message returned by the monitoring host; it also communicates with the one-key sequential control verification device to send the sequential control ticket to be verified and the test type and the sequential control execution result information message to the one-key sequential control verification device, and can exchange test case information and test return information;
[0048] The monitoring host has built-in sequence control ticket configuration information, which is used to send the sequence control operation remote control command to the one-key sequence control verification device according to the sequence control operation steps after receiving the one-key sequence control instruction and receive the response information of the one-key sequence control verification device to the remote control command, and return the sequence control execution result information message according to the response information;
[0049] The monitoring host is also a tested object, which forms a test environment for the substation one-key sequential control instruction with the data communication gateway, the anti-error host and the one-key sequential control verification device. The test environment is completely isolated from the production operation environment;
[0050] The anti-error host is used to make an anti-error judgment on each remote control command of a sequential control operation according to the pre-stored sequential control operation step rules before the monitoring host issues a remote control command; specifically, the anti-error host includes a microcomputer simulation screen and an industrial control host. Before the monitoring host issues a remote control command, the operation is rehearsed on the microcomputer simulation screen according to the content of the operation ticket, and the industrial control host makes an anti-error judgment on each remote control command of a sequential control operation according to the pre-stored sequential control operation step rules. The anti-error host also checks the consistency between the simulation diagram and the on-site equipment and devices through switch alignment. That is, the anti-error host has a switch alignment function, which is used to check whether the simulation diagram is consistent with the on-site equipment and devices; it has an operation ticket inspection function, which rehearses the operation on the microcomputer simulation screen according to the content of the operation ticket, and the industrial control host judges each operation according to the pre-stored rules;
[0051] The one-key sequential control verification device is provided with a simulation module, and is configured with control objects, operation prerequisites, and location main and auxiliary criterion information associated with typical intervals of sequential control tickets, forming a simulation test configuration information library for simulating substation interval layer equipment according to the substation SCD file, simulating the test environment, executing sequential control operation remote control commands and sending remote control command response information to the monitoring host;
[0052] The one-key sequence control verification device is also used to form a one-key sequence control verification test report according to the test type and the sequence control execution result information message.
[0053] The one-key sequential control verification device can simulate substation signals, that is, the simulation module can simulate the substation interval layer equipment according to the substation SCD file (interval model file) combined with the station control layer communication protocol, simulate the sending of three remote information, and complete the substation one-key sequential control instruction test simulation through data communication interaction with the monitoring host. The pre-operation conditions can be simulated arbitrarily, and the main position information and auxiliary position information of the control objects associated with the tested interval switches, knife switches and other typical intervals can be simulated; the auxiliary position information includes micro switch remote signal information or video image remote signal information. That is, it supports the test of the video signal as the auxiliary criterion for double confirmation within the station.
[0054] During specific implementation, the centralized control master station is connected to communicate with the one-button sequential control verification device through an extended protocol, and the centralized control master station is connected to the data communication gateway, the monitoring host and the one-button sequential control verification device to form a closed-loop test environment; the centralized control master station and the monitoring host are the objects to be tested, and the centralized control master station, the monitoring host and the intelligent anti-error host, the data communication gateway and the one-button sequential control verification device form a closed-loop test environment that is completely isolated from the production and operation environment; the centralized control master station and the one-button sequential control verification device configure the test verification strategy, the one-button sequential control verification device simulates the three remote signals of the substation, the centralized control master station initiates a sequential control command to the data communication gateway, and drives the monitoring host to send the serialized control command to the one-button sequential control verification device simulation module, the simulation module returns the sequential control response to the data communication gateway, the data communication gateway sends the sequential control response to the centralized control master station, the centralized control master station sends it to the one-button sequential control verification device, the one-button sequential control verification device combines the sequential control response sent by the centralized control master station and the configured verification strategy to form a test conclusion.
[0055] Further preferably, the centralized control master station communicates with the one-button sequential control verification device using the IEC60870-5-104 extended protocol.
[0056] A closed-loop test is formed by the centralized control master station and the one-key sequential control verification device. The communication interaction between the centralized control master station and the one-key sequential control verification device adopts the IEC60870-5-104 protocol extension, which is used to interact with the test operation ticket name, test items, test conclusions and other information. The one-key sequential control verification device acts as a client to control the sequential control service module of the centralized control master station, and initiates sequential control instructions to the data communication gateway and monitoring host through the sequential control service interface. The centralized control master station forwards the parsed sequential control service message returned by the monitoring host to the one-key sequential control verification device through the extended protocol. Furthermore, the one-button sequential control verification device combines the test content and the sequential control response to form a test conclusion; that is, the one-button sequential control verification device drives the centralized control master station to initiate a sequential control command to the data communication gateway through the extended protocol, and drives the monitoring host to send the serialized control command to the simulation module of the one-button sequential control verification device. The centralized control master station receives the sequential control response returned by the monitoring host, and forwards it to the one-button sequential control verification device through the extended protocol. Finally, the one-button sequential control verification device combines the sequential control response returned by the centralized control master station and the configured verification strategy to form a test conclusion.
[0057] The central control master station and the one-button sequential control verification device use the IEC60870-5-104 extended protocol for communication interaction, and a new ASDU (Application Service Data Unit) is added to IEC60870-5-104 for data message transmission. The content is shown in Table 1:
[0058] Table 1
[0059]
[0060]
[0061] Further preferably, the data that can be transmitted by the IEC60870-5-104 extended protocol includes control objects and double confirmation information, interval information, and error prevention rule information;
[0062] The control object and double confirmation information include a control object description, a control object unique identifier, a main criterion description and unique identifier, an auxiliary criterion description and unique identifier, and an auxiliary criterion type (micro switch or video file);
[0063] The interval information includes the interval name, the description and unique identifier of the associated control object, and the status of the associated control object in various interval states;
[0064] The error prevention rule information includes a control object description, a control object unique identifier, and an associated control object separation and combination state;
[0065] The standard acceptance form for sequential control in the present invention includes the name of the sequential control ticket, the description of the operation item and the associated control object information, the description of the pre-operation condition and the associated telesignaling and telemetry information.
[0066] Further preferably, the simulation module of the one-button sequential control verification device can simulate the three-remote information according to the substation SCD file (interval model file) in combination with the station control layer communication protocol, can arbitrarily simulate the pre-operation conditions, and can simulate the main position information and auxiliary position information of the control objects associated with the typical intervals such as the measured interval switches and knife switches;
[0067] The auxiliary position information includes micro switch remote signal information or video image remote signal information.
[0068] Embodiment 2 of the present invention provides a smart grid one-key sequential control verification method, comprising the following steps:
[0069] Step 1: The centralized control master station sends the test strategy to the one-key sequential control verification device according to the acceptance form of the one-key sequential control ticket of the substation, informs the name of the sequential control ticket to be verified and the test type, and the one-key sequential control verification device simulates the corresponding test environment; then sends the one-key sequential control instruction to the data communication gateway;
[0070] Step 2, the data communication gateway forwards the one-key sequence control command to the monitoring host. The monitoring host communicates with the anti-error host before issuing the remote control command according to the sequence control operation steps based on the built-in sequence control ticket configuration information. The anti-error host makes an anti-error judgment on each sequence control operation remote control command according to the pre-stored sequence control operation step rules. If the judgment passes, it goes to step 3; that is, the monitoring host communicates with the anti-error host before executing the remote control operation, and the anti-error host returns the anti-error judgment information to the monitoring host according to the configuration information;
[0071] Step 3: The monitoring host sends the sequence control operation remote control command to the bay layer device simulated by the one-key sequence control verification device according to the built-in sequence control ticket configuration information and the sequence control operation steps. The bay layer device simulated by the simulation module responds to execute the monitoring host remote control command and sends the remote control command response information to the monitoring host.
[0072] Step 4: The monitoring host receives the response information of the one-key sequential control verification device to the remote control command, generates a sequential control execution result information message according to the response information, and sends it to the centralized control master station through the data communication gateway; specifically, the monitoring host returns the sequential control execution conclusion to the data communication gateway according to the remote control object location information and double confirmation integrity information returned by the one-key sequential control verification device, combined with the sequential control ticket configuration information, and the data communication gateway forwards the sequential control execution conclusion to the centralized control master station;
[0073] Step 5: The centralized control master station sends the sequence control execution result information message to the one-key sequence control verification device, which generates a one-key sequence control verification test report based on the test type and the received sequence control execution result information message. That is, the centralized control master station sends the sequence control execution conclusion to the one-key sequence control verification device, which automatically determines the correctness of the verification test result based on the sequence control operation ticket information, generates a one-key sequence control verification test report, and completes the verification work.
[0074] Further preferably, the test strategy can independently select a forward test strategy, a pre-operation condition reverse test strategy or a double confirmation integrity reverse test strategy. The centralized control master station sends the ticket name and test items of the sequential control ticket to be verified and tested corresponding to each verification test strategy to the one-key sequential control verification device according to the sequential control ticket acceptance form.
[0075] Further preferably, when performing a forward test, the centralized control master station communicates with the data communication gateway according to the sequential control ticket acceptance form, so as to inform the one-key sequential control verification device of the ticket name of the sequential control ticket to be verified and the selected forward test strategy type through the data communication gateway. The one-key sequential control verification device simulates the sequential control execution environment according to the sequential control ticket configuration information.
[0076] The centralized control master station sends a one-button sequential control instruction to the data communication gateway, which is forwarded to the monitoring host by the data communication gateway. The monitoring host initiates the sequential control process according to the built-in sequential control ticket configuration information. Before the monitoring host initiates a remote control command, it must choose to stop the sequential control operation or initiate a remote control command based on the anti-error logic judgment result transmitted by the anti-error host. The one-button sequential control verification device receives and responds to the remote control command of the monitoring host, analyzes the control object identifier in the remote control command of the monitoring host, compares it with the control object identifier in the simulation test configuration information library, and combines the execution result finally returned by the monitoring host to the centralized control master station. The one-button sequential control verification device judges the correctness of the forward test result according to the test strategy and the sequential control execution conclusion, generates a forward test verification test report, and completes the verification work.
[0077] Further preferably, when performing a reverse test of the pre-operation condition, the centralized control master station communicates with the data communication gateway according to the acceptance form of the sequential control ticket, so as to inform the one-key sequential control verification device of the ticket name of the sequential control ticket to be verified and the reverse test strategy of the pre-operation condition through the data communication gateway, and the one-key sequential control verification device simulates the abnormal pre-operation condition environment according to the sequential control ticket configuration information;
[0078] The centralized control master station sends a one-button sequential control command to the data communication gateway, which is forwarded to the monitoring host by the data communication gateway. The monitoring host initiates the sequential control process according to the built-in sequential control ticket configuration information. Before the monitoring host initiates the remote control command, it must choose to stop the sequential control operation or initiate the remote control command based on the anti-error logic judgment result transmitted by the anti-error host. The one-button sequential control acceptance device analyzes whether the response information of the monitoring host is a negative response according to the test strategy, and whether the negative response code is "abnormal pre-operation conditions", and forms a reverse test report of the pre-operation conditions to complete the verification work.
[0079] Further preferably, when performing the double confirmation logic reverse test, the centralized control master station first informs the one-key sequential control verification device of the ticket name of the sequential control ticket to be verified and the double confirmation logic reverse test strategy according to the sequential control ticket acceptance form, and the one-key sequential control verification device simulates the abnormal position auxiliary judgment state according to the sequential control ticket configuration information;
[0080] The centralized control master station sends a one-key sequential control command to the data communication gateway, which is forwarded to the monitoring host by the data communication gateway. The monitoring host initiates the sequential control process according to the built-in sequential control ticket configuration information. Before the monitoring host initiates the remote control command, it must choose to stop the sequential control operation or initiate the remote control command according to the error prevention logic judgment result transmitted by the error prevention host. The one-key sequential control verification device receives and responds to the remote control command of the monitoring host, and sends the error double confirmation auxiliary judgment information to the monitoring host.
[0081] The monitoring host obtains the response information of the one-button sequential control verification device and returns it to the centralized control main station through the data communication gateway. The centralized control main station sends the response information to the one-button sequential control verification device. The one-button sequential control verification device analyzes whether the response information of the monitoring host is a negative response according to the test strategy, and whether the negative response code is "double confirmation abnormality of primary and auxiliary criteria", and forms a double confirmation logic reverse test report to complete the verification work.
[0082] In summary, if Figure 2 As shown, the complete process of the method for performing three tests, namely, a forward test, a pre-operation condition reverse test, and a double confirmation logic reverse test, includes the following steps:
[0083] Step 1: The centralized control master station configures the sequential control ticket acceptance form, and the one-key sequential control verification device configures the control objects associated with the typical intervals and the main judgment criteria of the position information (telesignaling signal) and the auxiliary judgment criteria information (corresponding telesignaling, telemetry or video confirmation signal) to form a simulation test configuration information library;
[0084] The centralized control master station sends a sequence control ticket acceptance form to the one-key sequence control verification device, informing the name of the sequence control ticket to be verified as well as the forward test, pre-operation condition reverse test and double confirmation logic reverse test;
[0085] Step 2: The one-key sequential control verification device obtains the sequential control ticket acceptance form, parses the sequential control ticket, obtains the control object and location information main criterion (telesignal signal) and auxiliary criterion information (corresponding telesignal, telemetry or video confirmation signal) associated with the interval name from the test configuration information library through the interval name, source state and target state in the sequential control ticket, simulates the initial telesignal and telemetry signal values of the control object through the one-key sequential control verification device, and simulates the source state of the sequential control ticket execution interval;
[0086] Step 3: The one-button sequential control verification device initializes the state of the control object and the state of the interval source according to the sequential control acceptance form, simulates the sequential control operation environment, and simulates the centralized control master station to send a one-button sequential control command, driving the data communication gateway to forward the sequential control command to the monitoring host to initiate a positive test. Before the monitoring host initiates a remote control command, it must choose to stop the sequential control operation or initiate a remote control command based on the anti-error logic judgment result transmitted by the anti-error host.
[0087] The monitoring host initiates a remote control command to the simulation module simulated by the one-key sequential control verification device according to the built-in sequential control ticket configuration information. The one-key sequential control verification device receives and responds to the remote control command of the monitoring host and returns the corresponding auxiliary judgment information to the monitoring host according to the sequential control ticket configuration.
[0088] The one-button sequential control verification device comprehensively compares the control object identification in the sequential control ticket acceptance form and the control object identification in the monitoring host control command, and combines the monitoring host response information returned by the centralized control master station to form a comprehensive judgment to form a test conclusion on the correctness of the control object in the sequential control operation ticket;
[0089] Step 4: The one-button sequential control verification device initializes the state of the control object and the state of the interval source according to the sequential control acceptance form, and simulates the pre-operation conditions of the abnormal sequential control operation. The one-button sequential control verification device simulates the centralized control master station to send a one-button sequential control command, initiates a reverse test, and drives the data communication gateway to forward the sequential control command to the monitoring host. Before the monitoring host initiates a remote control command, it must choose to stop the sequential control operation or initiate a remote control command based on the anti-error logic judgment result transmitted by the anti-error host.
[0090] The monitoring host judges the interval environment simulated by the one-key sequential control verification device according to the pre-operation conditions of the current sequential control ticket to be verified, and does not perform the sequential control operation if the pre-operation conditions of the sequential control ticket are not met.
[0091] The one-button sequential control verification device combines the simulated abnormal pre-operation conditions and whether the message sent by the monitoring host from the centralized control master station contains the "abnormal pre-operation conditions" information, and comprehensively judges to form the pre-operation condition logic validity test conclusion;
[0092] Step 5: The one-button sequential control verification device initializes the state of the control object, initializes the state of the interval source, and simulates the state of the auxiliary judgment criteria for abnormal position according to the sequential control acceptance form. The centralized control master station sends a one-button sequential control instruction, initiates a reverse test, and drives the data communication gateway to forward the sequential control command to the monitoring host. The monitoring host initiates a remote control command to the simulation module simulated by the one-button sequential control verification device based on the built-in sequential control ticket configuration information. The anti-error host performs an anti-error logic judgment on each operation of the monitoring host according to the pre-stored rules; the one-button sequential control verification device receives and responds to the remote control command of the monitoring host, and returns the auxiliary judgment criteria information of the error position of the remote control object of the monitoring host, and verifies that the monitoring host stops executing the sequential control operation when receiving the auxiliary judgment criteria information for the abnormal position.
[0093] The one-button sequential control verification device combines the auxiliary judgment criterion status of the simulated abnormal position and whether the message sent by the monitoring host returned by the centralized control main station carries the "double confirmation abnormality of the main and auxiliary judgment criteria" information, and comprehensively judges to form the logical validity test conclusion of the one-button sequential control main and auxiliary judgment criteria of the sequential control host.
[0094] A terminal comprises a processor and a storage medium; the storage medium is used to store instructions;
[0095] The processor is configured to operate according to the instructions to execute the steps of the method.
[0096] A computer-readable storage medium stores a computer program, which implements the steps of the method when executed by a processor.
[0097] The beneficial effects of the present invention are as follows:
[0098] The present invention provides a convenient, fast and fully functional one-key sequential control verification system and method for smart grids. The verification system is completely separated from the production and operation environment, and the one-key sequential control verification device and the centralized control main station are connected end to end to form a closed-loop verification environment. The test verification can be automatically initiated in a programmed manner. The test verification content and the monitoring host result returned by the centralized control main station are comprehensively compared through the one-key sequential control verification device, and a verification report is output according to the comparison result, thereby realizing the verification test of the sequential control ticket configuration and functional correctness of the centralized control main station and the monitoring host, and completing the automatic test of the one-key sequential control of the smart grid without power outage.
[0099] The verification process of the present invention includes a centralized control master station, which can synchronously verify the correctness of the forwarding of the one-key sequential control instructions of the remote motors in the station. The one-key sequential control verification is closer to the actual application environment and the verification is more comprehensive;
[0100] According to the video text provided by the video host manufacturer, the one-key sequential control verification device of the present invention automatically generates a video confirmation information file and transmits it to the monitoring host to complete the one-key sequential control test, so that when the video monitoring host is verified in the station, the correctness of the one-key sequential control operation logic of the monitoring host can be synchronously verified, and multiple tasks are performed simultaneously, which effectively saves verification time and improves verification efficiency;
[0101] The present invention adds an anti-error host in the station to the verification environment, and the one-key sequential control verification device can simulate the protection and control equipment in the station and analyze the interactive messages. The one-key sequential control verification is more comprehensive; and the verification environment is simpler to build.
[0102] The present disclosure may be a system, a method and / or a computer program product. The computer program product may include a computer-readable storage medium carrying computer-readable program instructions for causing a processor to implement various aspects of the present disclosure.
[0103] A computer-readable storage medium may be a tangible device that can hold and store instructions used by an instruction execution device. A computer-readable storage medium may be, for example, but not limited to, an electrical storage device, a magnetic storage device, an optical storage device, an electromagnetic storage device, a semiconductor storage device, or any suitable combination of the foregoing. More specific examples of computer-readable storage media (a non-exhaustive list) include: a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a static random access memory (SRAM), a portable compact disk read-only memory (CD-ROM), a digital versatile disk (DVD), a memory stick, a floppy disk, a mechanical encoding device, such as a punch card or a raised structure in a groove on which instructions are stored, and any suitable combination of the foregoing. As used herein, a computer-readable storage medium is not to be interpreted as a transient signal per se, such as a radio wave or other freely propagating electromagnetic wave, an electromagnetic wave propagating through a waveguide or other transmission medium (e.g., a light pulse through a fiber optic cable), or an electrical signal transmitted through a wire.
[0104] The computer-readable program instructions described herein can be downloaded from a computer-readable storage medium to each computing / processing device, or downloaded to an external computer or external storage device via a network, such as the Internet, a local area network, a wide area network, and / or a wireless network. The network can include copper transmission cables, optical fiber transmissions, wireless transmissions, routers, firewalls, switches, gateway computers, and / or edge servers. The network adapter card or network interface in each computing / processing device receives the computer-readable program instructions from the network and forwards the computer-readable program instructions for storage in the computer-readable storage medium in each computing / processing device.
[0105] The computer program instructions for performing the operation of the present disclosure may be assembly instructions, instruction set architecture (ISA) instructions, machine instructions, machine-related instructions, microcode, firmware instructions, state setting data, or source code or object code written in any combination of one or more programming languages, including object-oriented programming languages, such as Smalltalk, C++, etc., and conventional procedural programming languages, such as "C" language or similar programming languages. Computer-readable program instructions may be executed completely on a user's computer, partially on a user's computer, as an independent software package, partially on a user's computer, partially on a remote computer, or completely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., using an Internet service provider to connect via the Internet). In some embodiments, an electronic circuit, such as a programmable logic circuit, a field programmable gate array (FPGA), or a programmable logic array (PLA), may be customized by utilizing the state information of the computer-readable program instructions, and the electronic circuit may execute the computer-readable program instructions, thereby realizing various aspects of the present disclosure.
[0106] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents, and any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A one-key sequential control verification system for a smart grid, comprising a centralized control master station, a data communication gateway, a monitoring host, an anti-error host and a one-key sequential control verification device, characterized in that: The centralized control master station communicates with the monitoring host through the data communication gateway and initiates a one-key sequential control instruction for the sequential control ticket; The anti-error host communicates with the monitoring host and performs an anti-error judgment before the monitoring host issues a sequence control operation remote control command; The one-key sequential control verification device simulates the test environment of the substation bay layer equipment, receives and responds to the sequential control operation remote control command issued by the monitoring host, and performs one-key sequential control verification through data interaction with the monitoring host and the centralized control master station; The one-key sequential control verification environment formed by the centralized control master station, monitoring host, anti-error host, data communication gateway and one-key sequential control verification device is completely isolated from the production operation environment; The process of realizing one-key sequential control verification of smart grid based on the system is as follows: The centralized control master station sends the name of the sequence control ticket to be checked and the test type to the one-key sequence control verification device according to the acceptance form of the one-key sequence control ticket of the substation. The one-key sequence control verification device simulates the corresponding test environment; the centralized control master station sends the one-key sequence control command to the data communication gateway; The data communication gateway forwards the one-key sequence control command to the monitoring host. Before the monitoring host issues a remote control command, it communicates with the anti-error host. The anti-error host makes an anti-error judgment on each sequence control remote control command according to the pre-stored sequence control operation step rules. If the judgment is passed, it goes to step 3. The monitoring host sends the sequence control operation remote control command to the one-key sequence control verification device according to the built-in sequence control ticket configuration information and the sequence control operation steps. The interval layer device simulated by the simulation module responds to execute the monitoring host remote control command and sends the remote control command response information to the monitoring host. The monitoring host receives the response information of the one-button sequential control verification device to the remote control command, generates a sequential control execution result information message according to the response information, and sends it to the centralized control master station through the data communication gateway; The centralized control master station sends the sequence control execution result information message to the one-key sequence control verification device, and the one-key sequence control verification device forms a one-key sequence control verification test report according to the test type and the received sequence control execution result information message.
2. According to claim 1, a smart grid one-key sequential control verification system is characterized by: The centralized control master station is configured with a one-key sequential control ticket acceptance form for the substation. It communicates with the data communication gateway to send a one-key sequential control instruction to the monitoring host through the data communication gateway and obtain the sequential control execution result information returned by the monitoring host; it also communicates with the one-key sequential control verification device to send the sequential control ticket to be verified and the test type as well as the sequential control execution result information message to the one-key sequential control verification device.
3. According to claim 1, a smart grid one-key sequential control verification system is characterized in that: The monitoring host has built-in sequence control ticket configuration information, which is used to send the sequence control operation remote control command to the one-key sequence control verification device according to the sequence control operation steps after receiving the one-key sequence control instruction and receive the response information of the one-key sequence control verification device to the remote control command, and return the sequence control execution result information message according to the response information.
4. The one-key sequential control verification system for smart grid according to claim 1 is characterized in that: The one-key sequential control verification device is provided with a simulation module, which configures the control objects, operation prerequisites, and position main and auxiliary criterion information associated with the sequential control ticket interval, forms a simulation test configuration information library, and is used to simulate the substation interval layer equipment according to the substation SCD file, simulate the test environment, execute the sequential control operation remote control command and send the remote control command response information to the monitoring host; The one-key sequence control verification device is also used to form a one-key sequence control verification test report according to the test type and the sequence control execution result information message.
5. The one-key sequential control verification system for smart grid according to claim 1 is characterized in that: The anti-error host includes a microcomputer simulation screen and an industrial control host. Before the monitoring host issues a remote control command, the operation is rehearsed on the microcomputer simulation screen according to the content of the operation ticket, and the industrial control host performs anti-error judgment on each sequence operation remote control command according to the pre-stored sequence operation step rules.
6. The smart grid one-key sequential control verification system according to claim 1 is characterized by: The centralized control master station and the one-button sequential control verification device use the IEC60870-5-104 extended protocol for communication and interaction, and an ASDU is provided on the IEC60870-5-104.
7. A smart grid one-button sequential control verification method, implemented based on the system according to any one of claims 1 to 6, characterized in that: The method comprises the following steps: Step 1: The centralized control master station sends the name of the sequence control ticket to be checked and the test type to the one-key sequence control verification device according to the acceptance form of the one-key sequence control ticket of the substation, and the one-key sequence control verification device simulates the corresponding test environment; the centralized control master station sends the one-key sequence control instruction to the data communication gateway; Step 2: The data communication gateway forwards the one-key sequence control command to the monitoring host. The monitoring host communicates with the error prevention host before issuing the remote control command. The error prevention host makes an error prevention judgment on each sequence control remote control command according to the pre-stored sequence control operation step rules. If the judgment is passed, it goes to step 3. Step 3: The monitoring host sends the sequence control operation remote control command to the one-key sequence control verification device according to the built-in sequence control ticket configuration information and the sequence control operation steps. The interval layer device simulated by the simulation module responds to execute the monitoring host remote control command and sends the remote control command response information to the monitoring host. Step 4: The monitoring host receives the response information of the one-key sequential control verification device to the remote control command, generates a sequential control execution result information message according to the response information, and sends it to the centralized control master station through the data communication gateway; Step 5: The centralized control master station sends the sequence control execution result information message to the one-key sequence control verification device, and the one-key sequence control verification device forms a one-key sequence control verification test report according to the test type and the received sequence control execution result information message.
8. A smart grid one-button sequential control verification method according to claim 7, characterized in that: The test types include forward test, reverse test of pre-operation conditions and reverse test of double confirmation integrity, so as to respectively verify the correctness of the control object of the sequential control operation ticket, the monitoring host not executing the sequential control operation when the pre-operation conditions of the sequential control ticket are not met, and the function of stopping the execution of the sequential control operation when the monitoring host receives abnormal position auxiliary judgment information.
9. A smart grid one-button sequential control verification method according to claim 8, characterized in that: In step 1, when the test type is a forward test, the one-key sequence control verification device simulates the sequence control execution environment according to the sequence control ticket configuration information; When the test type is a reverse test of pre-operation conditions, the one-button sequential control verification device simulates the abnormal pre-operation condition environment according to the sequential control ticket configuration information; When the test type is a double confirmation integrity reverse test, the one-button sequential control verification device simulates the abnormal position auxiliary judgment status according to the sequential control ticket configuration information.
10. A smart grid one-key sequential control verification method according to claim 9, characterized in that: In step 5, when the test type is a forward test, the one-button sequential control verification device comprehensively compares the control object identifier in the sequential control ticket and the control object identifier in the remote control command, and combines the control object identifier of the sequential control execution result information message to comprehensively judge and form a sequential control operation ticket control object correctness test message; When the test type is the reverse test of the pre-operation condition, the one-button sequential control verification device combines the simulated abnormal pre-operation condition and whether the sequential control execution result information message carries the "pre-operation condition abnormality" information, and comprehensively judges to form the pre-operation condition logic validity test message; When the test type is a double confirmation integrity reverse test, the one-button sequential control verification device combines the auxiliary criterion status of the simulated abnormal position and whether the sequential control execution result information message carries the "primary and auxiliary criterion double confirmation abnormality" information, and comprehensively judges to form a one-button sequential control main and auxiliary criterion logic validity test report of the sequential control host.
11. A smart grid one-button sequential control verification method according to claim 10, characterized in that: The basis for the comprehensive judgment to form the pre-operation condition logic validity test message is: The monitoring host receives the response information that the pre-operation conditions of the sequence ticket are not met, that is, when the one-key sequence check device simulates the abnormal pre-operation conditions, the sequence operation is not executed, and the generated sequence execution result information message carries the "pre-operation condition abnormal" information. When the sequence execution result information message carries the "pre-operation condition abnormal" information, its conclusion is consistent with the one-key sequence check device simulating the abnormal pre-operation conditions, indicating that the pre-operation condition logic is valid; The basis for the comprehensive judgment to form the logic validity test report of the one-key sequence control main and auxiliary judgment criteria of the sequence control host is: When the monitoring host receives the abnormal position auxiliary criterion response information, that is, when the one-key sequential control verification device simulates the abnormal position auxiliary criterion state, the sequential control operation is stopped, and the generated sequential control execution result information message carries the "primary and auxiliary criterion double confirmation abnormality" information. When the sequential control execution result information message carries the "primary and auxiliary criterion double confirmation abnormality" information, its conclusion is consistent with the one-key sequential control verification device simulating the abnormal position auxiliary criterion state, indicating that the one-key sequential control main and auxiliary criterion logic of the sequential control host is valid.
12. A terminal comprising a processor and a storage medium; characterized in that: The storage medium is used to store instructions; The processor is configured to operate according to the instructions to execute the steps of the method according to any one of claims 7 to 11.
13. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the method described in any one of claims 7 to 11 are implemented.
