A type of engineering vehicle for tunnel construction.
By integrating the inner mold trolley and the outer mold frame onto the engineering vehicle, and utilizing the power and components of the engineering vehicle, the problems of cumbersome formwork connection and safety hazards in open-cut tunnel construction were solved, achieving efficient and safe open-cut tunnel construction.
Patent Information
- Application Number
- CN202311365752.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-20
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2043-10-20
AI Technical Summary
In tunnel construction, the traditional connection of inner and outer formwork is cumbersome, poses significant safety hazards, and is inefficient, making it difficult to achieve high-efficiency and precise construction.
The traditional inner formwork trolley and outer formwork frame are integrated into one engineering vehicle. The powerful motor of the engineering vehicle is used for tunnel open-cut construction. Components such as electric telescopic rods, semi-circular plate-shaped outer formwork, and vibrators are used to achieve rapid installation and removal of the formwork.
It enables precise and rapid construction of open-cut tunnels, improves construction safety and efficiency, has a simple and reasonable structure, and is highly integrated and efficient, breaking through the limitations of traditional construction methods.
Smart Images

Figure CN117287229B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to an engineering vehicle, and more particularly to an engineering vehicle for tunnel construction. Background Technology
[0002] In open-cut tunnel construction, formwork is crucial, as its selection directly impacts the construction schedule. Conventional formwork trolleys are typically used for the inner formwork of open-cut tunnel linings. A common construction method for the outer formwork of open-cut tunnel linings involves connecting the inner and outer formwork with tie rods. This type of outer formwork is constructed from small wooden molds or steel-wood splicing, reinforced with tie rods to hold the inner and outer formwork in place. During construction, the inner formwork trolley is first moved to the designated location. Then, reinforcing mesh is laid on the inner formwork on the trolley. Wooden planks are then transported to the reinforcing mesh using a crane, and manually secured to the mesh. Finally, concrete is poured. After the concrete hardens, the wooden planks are removed using another crane. Furthermore, the workers are suspended in mid-air during the installation of the planks, posing significant safety hazards. Summary of the Invention
[0003] To overcome the shortcomings of the prior art, this invention discloses an engineering vehicle for tunnel open-cut construction. By integrating the traditionally separately operated inner formwork trolley and outer formwork frame into one engineering vehicle, the powerful engine of the engineering vehicle itself enables precise and rapid construction of the tunnel open-cut, achieving a high-integration and high-efficiency construction effect similar to that of a tunnel boring machine.
[0004] To achieve the above objectives, the present invention adopts the following technical solution: A tunnel construction vehicle includes a vehicle body and a semi-cylinder. A semi-circular ring is provided at one end of the arc surface of the semi-cylinder, and a through groove is provided on the side plane of the semi-cylinder. The semi-cylinder covers the rear half of the vehicle body roof with the semi-circular ring in the direction of the front of the vehicle body, using the through groove. The arc surface of the semi-cylinder forms an inner membrane surface. An outer frame covers the outside of the semi-cylinder. Wheels A are provided on both sides of the bottom of the outer frame. A construction tread is provided inside the outer frame located outside the semi-cylinder. A semi-circular plate-shaped outer mold that fits with the semi-circular ring and can slide back and forth along the vehicle body is covered outside the semi-cylinder between the construction tread and the semi-cylinder. The inner arc surface of the semi-circular plate-shaped outer mold forms an outer membrane surface. Wheels B are provided on both sides of the bottom of the semi-circular plate-shaped outer mold. An electric telescopic rod extending backward is provided at the front of the vehicle body. The end of the electric telescopic rod is fixed to the outside of the semi-circular plate-shaped outer mold. A pouring hole is provided at the top of the semi-circular plate-shaped outer mold. A U-shaped support rod is provided between the front of the vehicle body and the outer frame.
[0005] The engineering vehicle used for tunnel construction has three electric telescopic poles at the front of the vehicle body, located on the top and sides of the vehicle body respectively.
[0006] The aforementioned tunnel construction vehicle has a support pillar between each electric telescopic pole and the front of the vehicle body.
[0007] The engineering vehicle used for tunnel construction has flanges on both sides of the semi-circular plate-shaped outer formwork, and connecting columns are spaced apart at the bottom of the two flanges. The same number of wheels B as the connecting columns are respectively set at the lower end of each connecting column.
[0008] The engineering vehicle used for tunnel construction has multiple sets of wheels C at the bottom of the vehicle body.
[0009] The engineering vehicle used for tunnel open-cut construction has a connecting block on the outside of the semi-circular plate-shaped outer formwork, and the end of the electric telescopic rod is fixedly connected to the connecting block.
[0010] The engineering vehicle used for tunnel construction has a vibrator installed inside the semi-cylinder.
[0011] The engineering vehicle used for tunnel construction has oil and electrical circuits inside its body.
[0012] The engineering vehicle used for tunnel construction has a controller in the driver's cab to drive the extension and retraction of the electric telescopic pole.
[0013] Due to the adoption of the above technical solution, the present invention has the following beneficial effects: The tunnel excavation construction vehicle of this invention integrates the traditionally separately operated inner formwork trolley and outer formwork frame onto a single vehicle. This solves the problems of traditional tunnel excavation construction where multiple fragmented inner and outer formwork pieces are connected and tightened by tie rods, resulting in an uneven surface after the tunnel excavation is formed, making formwork removal difficult and cumbersome. Furthermore, construction workers lack suitable support structures, leading to low safety. By utilizing the powerful motor of the construction vehicle, precise and rapid tunnel excavation construction is achieved, similar to the high integration and high efficiency of tunnel boring machines. This invention features a simple and reasonable structure, good performance, high precision, time and labor savings, and breaks through traditional methods, making it highly valuable for widespread application. Attached Figure Description
[0014] Figure 1 This is a schematic diagram of the structure of the present invention; Figure 2 This is a structural schematic diagram from another perspective of the present invention; Figure 3 This is a schematic diagram of the structure of the present invention when the semi-circular outer mold covers the top of the semi-cylinder; Figure 4 This is a schematic diagram of the structure of the semi-cylinder and the vehicle body of the present invention. Figure 5 This is a schematic diagram of the semi-cylinder structure of the present invention; Figure 6 This is a schematic diagram of the semi-circular outer mold of the present invention; Figure 7This is a schematic diagram of the structure when the present invention is in use; Figure 8 This is a structural schematic diagram from another perspective when the present invention is in use; Figure 9 This is a schematic diagram of the structure when the semi-circular outer mold covers the top of the semi-cylinder during the use of this invention.
[0015] The following are the labeling elements in the diagram: 1. Outer frame; 2. Construction tread; 3. Semi-circular plate-shaped outer mold; 4. Electric telescopic rod; 5. Support column; 6. Semi-circular ring; 7. Through groove; 8. Wheel A; 9. Wheel B; 10. Flanged edge; 11. Wheel C; 12. Vehicle body; 13. U-shaped support rod; 14. Semi-circular cylinder; 15. Pouring hole; 16. Connecting block; 17. Connecting column; 18. Ground surface; 19. U-shaped seat. Detailed Implementation
[0016] The present invention can be explained in more detail through the following embodiments. The present invention is not limited to the following embodiments. The purpose of disclosing the present invention is to protect all changes and modifications within the scope of the present invention. Combined with appendix Figures 1-6 The tunnel construction vehicle includes a vehicle body 12 and a semi-cylinder 14. A semi-circular ring 6 is provided at one end of the arc surface of the semi-cylinder 14. A through groove 7 is provided on the side plane of the semi-cylinder 14. The semi-cylinder 14, using its through groove 7, covers the rear half of the roof of the vehicle body 12 with the semi-circular ring 6 in the direction of the front of the vehicle. Multiple sets of wheels C11 are provided at the bottom of the vehicle body 12. The arc surface of the semi-cylinder 14 forms an inner membrane surface. An outer frame 1 covers the outside of the semi-cylinder 14. Wheels A8 are provided on both sides of the bottom of the outer frame 1. A construction tread 2 is provided inside the outer frame 1 located outside the semi-cylinder 14. A semi-circular plate-shaped outer mold 3 is covered on the outside of the semi-cylinder 14 between the construction tread 2 and the semi-cylinder 14. It fits the semi-circular ring 6 with a clearance and can slide back and forth along the vehicle body 12. The inner arc surface of the semi-circular plate-shaped outer mold 3 forms an outer membrane surface. Wheels A8 are provided on both sides of the semi-circular plate-shaped outer mold 3. The vehicle body 12 is provided with flanges 10, and connecting posts 17 are provided at intervals at the bottom of the two flanges 10. Wheels B9, which are the same number as the connecting posts 17, are respectively provided at the lower end of each connecting post 17. There are three electric telescopic rods 4 extending backward at the front of the vehicle body 12, located at the top and sides of the vehicle body 12. A support column 5 is provided between each electric telescopic rod 4 and the front of the vehicle body 12. A connecting block 16 is provided on the outside of the semi-circular outer mold 3. The end of the electric telescopic rod 4 is fixed to the connecting block 16. A casting hole 15 is provided at the top of the semi-circular outer mold 3. A U-shaped support rod 13 is provided between the front of the vehicle body 12 and the outer frame 1. A vibrator is provided inside the semi-circular cylinder 14. An oil circuit and an electrical circuit are provided inside the vehicle body 12. A control switch for driving the extension and retraction of the electric telescopic rod 4 is provided in the driver's cab.
[0017] Implement the tunnel construction vehicle described in this invention, combined with the attached... Figures 7-9 At the foundation of the tunnel opening, a U-shaped base 19 of the required length is constructed using reinforced concrete, ensuring that the inner bottom of the U-shaped base 19 is at the same height as the ground level 18 on both sides of the U-shaped base 19. The vehicle body 12 is reversed to the foundation of the tunnel opening, with the semi-cylinder 14 positioned inside the pre-laid tunnel opening. The rear end of the semi-cylinder 14 is flush with the tunnel opening foundation, and the two sides of the side arc surface of the semi-cylinder 14 are tightly against the two inner walls of the U-shaped base 19. At this time, the electric telescopic rod 4 is in the retracted state, the semi-circular plate-shaped outer mold 3 is located at the front of the vehicle body 12, and the vehicle body 12 is located inside the U-shaped base 19. The semi-circular ring 6 corresponds to the tunnel opening foundation, and the outer frame 1 and the semi-circular plate-shaped outer mold 3 are located outside the pre-constructed tunnel opening. Wheels A8 and B9 are both located on the ground level 18. Construction workers erect steel bars on the arc surface of the semi-cylinder 14 on the construction treadle 2, ensuring that the erected steel bars... The steel frame is formed into a semi-circular tube shape. The rear end of the semi-circular tube-shaped steel frame is fixed to the tunnel foundation. The two sides of the lower end of the semi-circular tube-shaped steel frame are fixed to the two sides of the upper end of the U-shaped seat 19. After the semi-circular tube-shaped steel frame is erected, release agent is applied to the arc surface of the semi-circular column 14 and the inner arc surface of the semi-circular plate-shaped outer mold 3. The extension electric telescopic rod 4 is activated, so that the semi-circular plate-shaped outer mold 3 moves to the rear of the vehicle body 12 under the support of the wheel body B9 until it covers the outside of the semi-circular column 14. The outer arc surface of the semi-circular column 14, the inner arc surface of the semi-circular plate-shaped outer mold 3, and the two sides of the upper end of the U-shaped seat 19 between the tunnel foundation and the semi-circular ring 6 form a closed space. Concrete is poured into this closed space along the pouring hole 15 using a concrete pump truck. The vibrator is turned on to make the concrete pour solid. After the pouring is completed, curing begins. After the poured concrete has dried, the electric telescopic rod 4 is activated to shorten it, allowing the semi-circular outer mold 3 to move towards the front of the vehicle body 12 under the support of wheel B9 until it is completely separated from the poured concrete. The vehicle body 12 is then slowly moved forward, and the semi-circular cylinder 14 gradually separates from the poured concrete until the rear end of the semi-circular cylinder 14 is flush with the poured concrete. The two sides of the side arc surface of the semi-circular cylinder 14 are in close contact with the two inner walls of the U-shaped seat 19 without poured concrete. At this time, the electric telescopic rod 4 is in the retracted state, the semi-circular outer mold 3 is located at the front of the vehicle body 12, the vehicle body 12 is located inside the U-shaped seat 19 without poured concrete, the semi-circular ring 6 corresponds to the poured concrete, the outer frame 1 and the semi-circular outer mold 3 are located outside the pre-constructed tunnel opening, and both wheel A8 and wheel B9 are located on the ground 18. The above operation is repeated to construct the tunnel opening of the next node until the tunnel opening construction is completed.
[0018] The parts of this invention not described in detail are prior art.
Claims
1. A method for using an engineering vehicle for tunnel construction, characterized by: Its structure includes a vehicle body and a semi-cylinder. A semi-circular ring is provided at one end of the arc surface of the semi-cylinder. A through groove is provided on the side plane of the semi-cylinder. The semi-cylinder covers the rear half of the vehicle body roof with the semi-circular ring in the direction of the front of the vehicle body using the through groove. The arc surface of the semi-cylinder forms an inner membrane surface. An outer frame is covered on the outside of the semi-cylinder. Wheels A are provided on both sides of the bottom of the outer frame. A construction tread is provided inside the outer frame located outside the semi-cylinder. A semi-circular plate-shaped outer mold is covered on the outside of the semi-cylinder between the construction tread and the semi-cylinder. It fits the semi-circular ring with a gap and can slide along the front and rear of the vehicle body. The inner arc surface of the semi-circular plate-shaped outer mold forms an outer membrane surface. Wheels B are provided on both sides of the bottom of the semi-circular plate-shaped outer mold. An electric telescopic rod extending backward is provided at the front of the vehicle body. The end of the electric telescopic rod is fixed to the outside of the semi-circular plate-shaped outer mold. A casting hole is provided at the top of the semi-circular plate-shaped outer mold. A U-shaped support rod is provided between the front of the vehicle body and the outer frame. In use, a U-shaped base of the required length is constructed using reinforced concrete at the tunnel foundation, ensuring that the inner bottom of the U-shaped base is level with the ground level on both sides. The vehicle is then reversed to the tunnel foundation, positioning the semi-cylinder inside the pre-laid tunnel opening, with the rear end of the semi-cylinder flush with the tunnel foundation. The two sides of the semi-cylinder's curved surface are tightly against the two inner walls of the U-shaped base. At this point, the electric telescopic rod is in the retracted state, the semi-circular plate-shaped outer mold is located at the front of the vehicle, and the vehicle is positioned inside the U-shaped base. The semi-circular ring corresponds to the tunnel foundation, while the outer frame and the semi-circular plate-shaped outer mold are located outside the pre-constructed tunnel opening. Wheels A and B are both on the ground level. Construction workers then erect steel reinforcement on the curved surface of the semi-cylinder using the construction platform, forming a semi-circular tube. The semi-circular tubular steel reinforcement frame is fixed to the rear end of the tunnel foundation. The two sides of the lower end of the semi-circular tubular steel reinforcement frame are fixed to the two sides of the upper end of the U-shaped seat. After the semi-circular tubular steel reinforcement frame is erected, release agent is applied to the arc surface of the semi-circular column and the inner arc surface of the semi-circular plate-shaped outer mold. The extension electric telescopic rod is activated, so that the semi-circular plate-shaped outer mold moves to the rear of the vehicle body under the support of wheel B until it covers the outside of the semi-circular column. This creates a closed space between the outer arc surface of the semi-circular column, the inner arc surface of the semi-circular plate-shaped outer mold, and the two sides of the upper end of the U-shaped seat. Concrete is poured into this closed space through the pouring hole using a concrete pump truck. The vibrator is turned on to make the concrete pour solid. After pouring, curing begins. After the poured concrete has dried, the electric telescopic rod is shortened, allowing the semi-circular outer formwork, supported by wheel B, to move towards the front of the vehicle until it is completely separated from the poured concrete. The vehicle is then slowly moved forward, gradually separating the semi-cylinder from the poured concrete until the rear end of the semi-cylinder is flush with the poured concrete. The two sides of the semi-cylinder's arc surface are pressed against the two inner walls of the unpoured U-shaped seat. At this point, the electric telescopic rod is in the retracted state, the semi-circular outer formwork is located at the front of the vehicle, and the vehicle is located inside the unpoured U-shaped seat. The semi-circular ring corresponds to the poured concrete, and the outer frame and the semi-circular outer formwork are located outside the pre-constructed tunnel opening. Wheels A and B are both located on the ground. The above operation is repeated to construct the next section of the tunnel opening until the tunnel opening construction is completed.
2. The method of using the engineering vehicle for tunnel open-cut construction according to claim 1, characterized in that: There are three electrically operated telescopic poles at the front of the vehicle, located on the top and sides of the vehicle.
3. The method of using the engineering vehicle for tunnel open-cut construction according to claim 2, characterized in that: A support column is installed between each electric telescopic pole and the front of the vehicle body.
4. The method of using the engineering vehicle for tunnel open-cut construction according to claim 1, characterized in that: Both sides of the semi-circular outer mold are provided with flanges, and connecting posts are provided at intervals at the bottom of the two flanges. The same number of wheel bodies B as the connecting posts are respectively provided at the lower end of each connecting post.
5. The method of using the engineering vehicle for tunnel open-cut construction according to claim 1, characterized in that: Multiple sets of wheels C are installed at the bottom of the vehicle body.
6. The method of using the engineering vehicle for tunnel open-cut construction according to claim 1, characterized in that: A connecting block is provided on the outside of the semi-circular plate-shaped outer mold, and the end of the electric telescopic rod is fixedly connected to the connecting block.
7. The method of using the engineering vehicle for tunnel open-cut construction according to claim 1, characterized in that: A vibrator is installed inside the semi-cylinder.
8. The method of using the engineering vehicle for tunnel open-cut construction according to claim 1, characterized in that: The vehicle body contains oil and electrical circuits.
9. The method of using the engineering vehicle for tunnel open-cut construction according to claim 1, characterized in that: A control switch for extending and retracting the electric telescopic rod is installed in the driver's cab.
Citation Information
Patent Citations
Tunnel open cut tunnel concrete pouring formwork device
CN115821981A