Methods, devices and storage media for site selection assessment of wind turbine blade extension retrofitting in wind farms
By analyzing the wind resources and power curves of wind turbine units, calculating the micro wind resource index and the incremental power generation capacity, and selecting demonstration units for blade extension modification, the problem of low efficiency of wind turbine units was solved, and the power generation capacity and economy of wind farms were improved.
Patent Information
- Application Number
- CN202311382953.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-24
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2043-10-24
AI Technical Summary
In existing technologies, existing wind turbine units suffer from low power generation efficiency due to blade corrosion and design margin issues, and there is a lack of effective site selection assessment methods for blade extension retrofitting.
By acquiring wind turbine operating data, analyzing wind resource probability distribution and power curves, calculating micro wind resource index and power generation capacity index, selecting demonstration units for pilot site selection for blade extension modification, and combining the power generation capacity improvement ratio calculated by simulation, the site selection evaluation for wind turbine blade extension modification is carried out.
It improved the power generation capacity and wind energy utilization efficiency of wind turbine units, provided data-supported retrofit suggestions, and reduced the risks of large-scale technical upgrades of wind farms.
Smart Images

Figure CN117313415B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of wind farm site selection technology, and in particular to a site selection evaluation method and apparatus suitable for wind turbine blade extension retrofitting in wind farms. Background Technology
[0002] Against the backdrop of a global energy structure shift towards low-carbon development and continuous optimization of energy consumption patterns, wind energy, with its abundant resources, high degree of automation in operation and management, and continuously decreasing cost per kilowatt-hour, has gradually become one of the most widely developed and applied renewable energy sources. As early as 2012, my country's installed wind power capacity exceeded 60GW, making it the world's largest wind power nation, a position it has maintained ever since. In 2021, this figure reached 328.5GW.
[0003] With the continuous growth of installed capacity, upgrading existing wind turbines to maximize their power generation capacity and improve resource and equipment utilization efficiency is an indispensable task. Early wind power plants, limited by the design and manufacturing technology of wind turbines at the time, coupled with discrepancies between wind farm site selection and design, have seen older turbine models gradually reveal problems such as low annual available hours, high failure rates, and significant aging. As operating time increases, blade leading-edge corrosion significantly impacts blade aerodynamic efficiency, further reducing turbine blade power generation efficiency. Furthermore, older models often have substantial design margins; effectively utilizing these margins through blade extension upgrades can significantly increase wind energy utilization efficiency and improve the owner's rate of return.
[0004] In existing technologies, site selection-related technologies focus on selecting the construction location and wind turbine location before the construction of wind power stations, while technologies related to blade extension technology upgrades focus on the study of structure and equipment. There is no relevant research on how to select the first pilot unit when upgrading existing power stations. Summary of the Invention
[0005] The purpose of this invention is to overcome the defects of the prior art and provide a site selection evaluation method and apparatus suitable for wind turbine blade extension retrofitting in wind farms.
[0006] The objective of this invention can be achieved through the following technical solutions:
[0007] As a first aspect of the present invention, a method for site selection evaluation of wind turbine blade extension retrofitting in wind farms is provided, the method comprising the following steps:
[0008] Obtain the nominal power curve w of the wind turbine, and calculate the increase in power generation capacity η after blade extension through simulation.
[0009] After obtaining wind turbine operating data and cleaning up abnormal data, regression analysis was performed with wind speed as the independent variable and wind turbine output power as the dependent variable to obtain the wind turbine operating power curve p1.
[0010] The cleaned wind speed data is divided into wind speed intervals, and the probability of wind speed occurring in each interval is calculated to obtain the wind resource probability distribution f.
[0011] Based on the wind resource probability distribution f and the nominal power curve w of the wind turbine, the micro wind resource index of the location of each turbine is calculated.
[0012] Based on the wind turbine's operating power curve p1 and the power generation capacity improvement ratio η after blade extension, calculate the wind turbine's power curve p2 after blade extension, and calculate the power generation capacity index increment before and after blade extension.
[0013] Based on the micro-wind resource index of each unit's location and the increase in power generation capacity index before and after blade extension, pilot sites for wind turbine blade extension retrofitting are selected.
[0014] Furthermore, the micro-wind resource index is the inner product of the wind resource probability distribution f and the nominal power curve w of the wind turbine.
[0015] Furthermore, the power generation capacity index is defined as the inner product of the wind resource probability distribution vector f and the wind turbine power curve vector p1.
[0016] Furthermore, the exponential increase in power generation capacity ΔG before and after the blade extension... idx for:
[0017] ΔG idx =f·p2-f·p1
[0018] Where f is the probability distribution of wind resources, and p1 and p2 are the power curves of the wind turbine before and after blade extension, respectively.
[0019] Furthermore, the duration of the wind turbine operation data obtained is greater than or equal to one month.
[0020] Furthermore, when obtaining the wind resource probability distribution, the wind speed range is set according to the accuracy of the collected data.
[0021] Furthermore, when the amount of data is insufficient, the set wind speed range is greater than the accuracy of the collected data.
[0022] Furthermore, in the case of data reorganization, the set wind speed range has the same accuracy as the collected data.
[0023] As a second aspect of the present invention, a wind farm turbine blade extension retrofit site selection evaluation device is provided, including a memory, a processor, and a program stored in the memory, wherein the processor executes the program to implement the wind farm turbine blade extension retrofit site selection evaluation method as described above.
[0024] As a third aspect of the present invention, a storage medium is provided having a program stored thereon, which, when executed, implements the site selection evaluation method for wind turbine blade extension retrofitting in wind farms as described above.
[0025] Compared with the prior art, the present invention has the following beneficial effects:
[0026] Before implementing wind turbine blade extension modifications, this invention selects demonstration turbines for modification based on the power generation capacity of different wind turbines in the wind farm and the wind resource conditions at their locations. The site selection for the first pilot modification is based on the power curve, micro-wind resource index, and the increase in the power generation capacity index before and after blade extension. Considering the actual power curve and wind resource probability distribution, the power generation capacity index of each turbine is calculated. By analyzing the wind turbine operating data, its power generation capacity and wind resource conditions are evaluated, providing suggestions for selecting demonstration turbines. Large-scale modifications to the entire wind power station are then carried out after obtaining data support and verifying economic viability. This invention provides suggestions for selecting pilot modification projects and has significant application prospects. Attached Figure Description
[0027] Figure 1 This is a flowchart illustrating the site selection evaluation method of the present invention applicable to the wind turbine blade extension retrofit of wind farms;
[0028] Figure 2 The nominal power curve provided to the generator set manufacturer;
[0029] Figure 3 A comparison chart of the power curves of the 24 units in the wind power station with their nominal power curves;
[0030] Figure 4 A chart showing the unit ranking by micro-wind resource index;
[0031] Figure 5 This is a chart showing the units sorted by the incremental power generation capacity index. Detailed Implementation
[0032] The present invention will now be described in detail with reference to the accompanying drawings and specific embodiments. These embodiments are based on the technical solution of the present invention and provide detailed implementation methods and specific operating procedures. However, the scope of protection of the present invention is not limited to the following embodiments.
[0033] Example 1:
[0034] This invention provides a site selection assessment method. By analyzing the operating data of wind turbine units, it assesses their power generation capacity and wind resource conditions. Before implementing wind turbine blade extension modifications, it selects demonstration units for modification based on the power generation capacity of different wind turbines in the wind farm and the wind resource conditions of their locations. After obtaining data support and verifying economic viability, large-scale modifications to the entire wind power station are then carried out. This method provides suggestions for selecting demonstration units for modification and has significant application prospects. Figure 1 As shown, the specific steps of the method are as follows:
[0035] Step 1: The wind turbine manufacturer provides the nominal power curve (vector w) of the wind turbine, and the preliminary research provides the percentage increase in power generation capacity η after blade extension through simulation calculation;
[0036] Step 2: Obtain wind turbine operating data, clean up abnormal data, and perform regression analysis with wind speed as the independent variable and wind turbine output power as the dependent variable to obtain the power curve (vector p1).
[0037] Step 3: Divide the wind speed data after cleaning in Step 2 into wind speed intervals, and calculate the probability of wind speed occurrence in each interval to obtain the wind resource probability distribution (vector f).
[0038] Step 4: Calculate the micro wind resource index f·w for the location of each unit;
[0039] Step 5: Calculate the power curve p2 of the wind turbine after blade extension;
[0040] Step 6: Define the power generation capacity index as the inner product of the wind resource probability distribution vector and the wind turbine power curve vector, i.e., G. idx =f·p, then the exponential increase in power generation capacity ΔG before and after blade extension is... idx =f·p2-f·p1;
[0041] Step 7: Based on the micro wind resource index of the unit's location and the increase in power generation capacity index before and after blade extension, make a site selection decision for the wind turbine blade extension pilot project.
[0042] Preferably, in step 2, the wind turbine operating data should be for at least one month, and a quarter is preferable;
[0043] Prioritize that, in step 3, the wind speed range is determined based on the accuracy of the collected data. This range should be as small as possible. For example, if the data accuracy is 0.1 m / s, the wind speed range can be set to 0.5 m / s when the amount of data is insufficient, and it can be set to 0.1 m / s when the amount of data is recombined.
[0044] Example 2
[0045] This example uses a wind power station to illustrate the process of site selection for the pilot units, mainly including:
[0046] Step 1: Obtain the nominal power curve provided by the generator set manufacturer, specifically as follows: Figure 2 As shown, the wind turbine model is W2000-105 / 80. According to the simulation calculation results, the power generation capacity improvement rate η after the blade tip of each wind turbine is extended by 2.5-3m is obtained.
[0047] Step 2: Obtain the included wind turbine operating data. The operating data should be no less than one month, preferably one quarter. In this embodiment, wind speed and power output data of the wind turbines during one quarter are obtained. The wind speed is divided into intervals, and an anomaly detection algorithm is used to remove sample points with abnormal power output data within the wind speed intervals. Regression analysis is performed on the remaining sample points to obtain the power curve p1, as detailed below. Figure 3 As shown.
[0048] Step 3: After cleaning, the wind speed intervals are re-divided. The accuracy of the wind speed data acquisition is 0.1 m / s. Given sufficient data, each wind speed interval is also set to 0.1 m / s. The wind resource probability distribution f is shown in the table below:
[0049] Table 1 Probability Distribution of Wind Resources
[0050]
[0051] Step 4: Calculate and sort the micro wind resource index f·w at the location of each unit, such as... Figure 4 As shown.
[0052] Step 5: Calculate the power curve of the wind turbine after blade extension: p2 = (1 + η)·p1;
[0053] Step 6: Calculate the power generation capacity index increment ΔG idx =f·p2-f·p1 and sort them, such as Figure 5 As shown.
[0054] Step 7: Pilot site selection decision. Based on the analysis results, the owner selects the unit with the largest increase in power generation capacity index as the pilot unit, i.e., Unit #10, considering economic factors. From the perspective of unit power generation curves, the power curves of Units #17, #8, and #20 are located at high, middle, and low levels, respectively, all of which have typical demonstration value.
[0055] Example 3
[0056] As a second aspect of the present invention, the present invention also provides a wind farm site selection assessment device suitable for wind turbine blade extension retrofitting, comprising: one or more processors; a memory for storing one or more programs; when the one or more programs are executed by the one or more processors, the one or more processors implement the wind farm site selection assessment method suitable for wind turbine blade extension retrofitting as described above. In addition to the processors, memory, and interfaces described above, any data processing device in the embodiments may also include other hardware depending on the actual function of the data processing device, which will not be elaborated further.
[0057] Example 4
[0058] As a third aspect of the present invention, this application also provides a computer-readable storage medium storing computer instructions thereon, which, when executed by a processor, implement the wind farm site selection evaluation method applicable to wind turbine blade extension retrofit as described above. The computer-readable storage medium can be an internal storage unit of any data processing device as described in any of the foregoing embodiments, such as a hard disk or memory. The computer-readable storage medium can also be an external storage device, such as a plug-in hard disk, smart media card (SMC), SD card, flash card, etc., equipped on the device. Furthermore, the computer-readable storage medium can include both internal storage units of any data processing device and external storage devices. The computer-readable storage medium is used to store the computer program and other programs and data required by the data processing device, and can also be used to temporarily store data that has been output or will be output.
[0059] The preferred embodiments of the present invention have been described in detail above. It should be understood that those skilled in the art can make numerous modifications and variations based on the concept of the present invention without creative effort. Therefore, all technical solutions that can be obtained by those skilled in the art based on the concept of the present invention through logical analysis, reasoning, or limited experimentation on the basis of existing technology should be within the scope of protection defined by the claims.
Claims
1. A method for site selection evaluation of wind turbine blade extension retrofitting in wind farms, characterized in that, The method steps include: Obtain the nominal power curve of the wind turbine The percentage increase in power generation capacity after blade extension was obtained through simulation calculations. ; After acquiring wind turbine operating data and cleaning out abnormal data, regression analysis was performed with wind speed as the independent variable and wind turbine output power as the dependent variable to obtain the wind turbine operating power curve. ; The cleaned wind speed data is divided into wind speed intervals, and the probability of wind speed occurring in each interval is calculated to obtain the wind resource probability distribution. ; Based on wind resource probability distribution and the nominal power curve of the wind turbine. Calculate the micro wind resource index for the location of each unit, where the micro wind resource index is a wind resource probability distribution. Nominal power curve of wind turbine The inner product; Based on the operating power curve of wind turbine The increase in power generation capacity after blade extension Calculate the power curve of the wind turbine after blade extension. The increase in the power generation capacity index before and after blade extension was calculated, and the power generation capacity index was defined as the wind resource probability distribution vector. And wind turbine power curve vector The inner product; Based on the micro-wind resource index of each unit's location and the increase in power generation capacity index before and after blade extension, pilot site selection for wind turbine blade extension retrofitting is conducted, with the increase in power generation capacity index before and after blade extension being recorded. for: in, For wind resource probability distribution, and The figures show the power curves of the wind turbine before and after blade extension.
2. The method for site selection evaluation of wind turbine blade extension retrofitting in wind farms according to claim 1, characterized in that, The duration of the wind turbine operation data obtained is greater than or equal to one month.
3. The method for site selection evaluation of wind turbine blade extension retrofitting in wind farms according to claim 1, characterized in that, When obtaining the wind resource probability distribution, the wind speed range is set according to the accuracy of the collected data.
4. The method for site selection evaluation of wind turbine blade extension retrofitting in wind farms according to claim 3, characterized in that, When the amount of data is insufficient, the set wind speed range is greater than the accuracy of the collected data.
5. The method for site selection evaluation of wind turbine blade extension retrofitting in wind farms according to claim 3, characterized in that, When there is sufficient data, the set wind speed range has the same accuracy as the collected data.
6. A site selection evaluation device for wind turbine blade extension retrofitting in a wind farm, comprising a memory, a processor, and a program stored in the memory, characterized in that, When the processor executes the program, it implements the site selection evaluation method for wind turbine blade extension retrofitting in wind farms as described in any one of claims 1-5.
7. A storage medium having a program stored thereon, characterized in that, When the program is executed, it implements the site selection evaluation method for wind turbine blade extension retrofitting in wind farms as described in any one of claims 1-5.
Citation Information
Patent Citations
Blade synergy method based on safety margin customization for low-speed wind power plant
CN116029121A
Method for prolonging blades of wind generating set
CN116305660A