A suspension bridge cable strand adjustment method and a suspension bridge cable strand
By measuring and simulating temperature fields to adjust suspension bridge cable strands based on average temperatures and theoretical sags, the method addresses temperature-induced inaccuracies, improving construction efficiency and accuracy.
Patent Information
- Application Number
- CN202311115733.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-31
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2043-08-31
AI Technical Summary
The construction of suspension bridges is hindered by temperature-induced length and linear changes in cable strands due to uneven temperature distribution, leading to inaccuracies in cable adjustment, especially as bridge spans increase, necessitating adjustments at specific temperature conditions that may not always be met.
A method involving temperature measurement or simulation to determine average cable strand temperatures, calculating target linear theoretical sags, and adjusting cable strands based on these averages to account for temperature influences, followed by verification of adjustments using sensors or re-measurement.
Accurately adjusts cable strands despite temperature variations, allowing construction to proceed without timing constraints, enhancing efficiency and quality by minimizing errors from temperature-induced deformations.
Smart Images

Figure CN117390822B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of suspension bridge construction, and in particular relates to a suspension bridge cable strand adjustment method and a suspension bridge cable strand. Background Art
[0002] In the current construction process of suspension bridges, the erection and adjustment of the main cable is a key link. The main cable consists of a reference cable strand and a general cable strand. The reference cable strand is accurately positioned by absolute elevation, and the general cable strand is positioned by relative verticality with the reference cable strand. Due to heat transfer, the temperature field distribution of the main cable strand changes, affecting the length extension, linear change and internal force of the cable strand. When the reference cable strand and the general cable strand are in different temperature states, they will not be able to directly serve as the reference line, which will affect the control accuracy of the construction and erection. In order to reduce the impact of temperature, the current cable strand linear adjustment is often carried out at night when the temperature is relatively stable and the wind speed is relatively low, but the following problems still exist:
[0003] First, during the day when the solar radiation is strong, the temperature of the newly installed strands at the top is higher than that of the reference strands at the bottom in the shaded position. At night when the solar radiation is weak, as the ambient temperature decreases, the temperature of the inner strands will be higher than that of the outer strands due to the heat preservation effect of the outer strands. That is, under the influence of temperature, the temperature field of the main cable cross section will show a differential distribution, resulting in different expansion and contraction lengths and linear shapes of each strand. The "close and distant" principle between the strands under different temperature conditions will not reflect whether the strands are adjusted in place.
[0004] Secondly, the basic conditions for determining temperature stability during cable strand adjustment are: the temperature difference in the length direction of the cable strand is ≤2°C, and the temperature difference within the cable strand section is ≤1°C. However, as the span of suspension bridge construction continues to increase, the environmental factors within the length of the bridge may change significantly. Even at night when the ambient temperature is relatively stable, the temperature difference of the cable strand may still not meet the temperature difference determination conditions, and the cable strand adjustment has to be carried out in an environment with a larger temperature difference.
[0005] By analyzing the above problems, it is believed that the cable adjustment error caused by temperature effect is mainly due to the following reasons: the target linear shape is designed based on the same reference temperature, while the uneven distribution of cable temperature field in actual environment will lead to the difference in temperature state between the reference cable and the newly installed cable. If the linear shape of the newly installed cable is adjusted with reference to the reference cable under different temperature states, then when the temperature of the main cable returns to the reference temperature state, the linear shape of the cable will inevitably deviate from the target linear shape. Moreover, the greater the temperature difference during adjustment, the more obvious the linear shape deviation will be. Therefore, the temperature effect must be actively considered in the actual adjustment process. Summary of the invention
[0006] In view of this, an embodiment of the present invention provides a suspension bridge cable adjustment method and a suspension bridge cable, which accurately measures or simulates the temperature field of a single cable strand, converts it into an accurate average cable strand temperature, and fully considers the influence of temperature on the cable strand length, thereby eliminating the error caused by uneven temperature during the linear adjustment process, and will not be affected by the cable strand linear adjustment period, thereby improving construction efficiency and quality.
[0007] A first aspect of the present invention provides a suspension bridge cable strand adjustment method for adjusting the linear shape of a suspension bridge cable strand under the influence of temperature, comprising the following steps: S1: obtaining the temperature average of a reference cable strand and the temperature average of a newly erected cable strand respectively; S2: calculating the target linear theoretical sag of the reference cable strand and the target linear theoretical sag of the newly erected cable strand based on the temperature average of the reference cable strand and the temperature average of the newly erected cable strand; S3: adjusting the linear shape of the reference cable strand and / or the newly erected cable strand based on the target linear theoretical sag of the reference cable strand and the target linear theoretical sag of the newly erected cable strand; S4: verifying the result of the linear shape adjustment by re-measuring the actual absolute elevation or relative sag of the reference cable strand control section and / or the newly erected cable strand control section.
[0008] Optionally, in step S1, the temperature average of the reference cable strand and the temperature average of the newly erected cable strand are obtained by measuring the temperature with a sensor.
[0009] Optionally, obtaining the average temperature of the reference strand and the average temperature of the newly erected strand by means of temperature measurement by sensors in step S1 specifically includes: laying out temperature sensors on the reference strand after the erection is completed, and reading the measured temperature throughout the entire process; and laying out temperature sensors on each of the newly erected strands only during the period of linear adjustment, and reading the measured temperature.
[0010] Optionally, obtaining the average temperature of the reference strand and the average temperature of the newly erected strand by means of temperature measurement by sensors in step S1 specifically comprises: arranging temperature sensors in layers on the inner and outer sides of the cross sections to be measured of the reference strand and / or the newly erected strand; a plurality of the cross sections to be measured are evenly distributed along the span direction of the reference strand and / or the newly erected strand, and the density of measuring points is adjusted according to the actual ambient temperature difference; and obtaining the average temperature of the reference strand and / or the average temperature of the newly erected strand according to the average temperature of each temperature sensor arranged in each cross section to be measured.
[0011] Optionally, in step S1, the temperature average of the reference cable strand and the temperature average of the newly erected cable strand are obtained by temperature field simulation.
[0012] Optionally, in step S1, obtaining the temperature average of the reference strand and the temperature average of the newly installed strand by means of temperature field simulation specifically comprises: establishing a temperature field of the reference strand and / or the newly installed strand in a temperature field simulation system, and obtaining the temperature average of the reference strand and / or the newly installed strand by means of integral calculation; the integral calculation formula is as follows:
[0013]
[0014] Where T(τ0) represents the mean temperature of a single cable strand, V represents the volume of a single cable strand, τ0 represents the time variable, and x, y, and z represent the three-dimensional coordinate positions of the cable strand along the horizontal, vertical, and longitudinal directions of the cross section, respectively.
[0015] Optionally, in step S2, calculating the target linear theoretical sag of the reference strand and / or the target linear theoretical sag of the newly erected strand based on the temperature average of the reference strand and the temperature average of the newly erected strand specifically includes: calculating the target linear theoretical cable length of the reference strand based on the temperature average of the reference strand; and / or calculating the target linear theoretical cable length of the newly erected strand based on the temperature average of the newly erected strand. The specific calculation formula is as follows:
[0016] Δl=α(T-T0)L0
[0017] L L0+Δl
[0018] Wherein Δl represents the average expansion and contraction of the cable strand, α represents the linear expansion coefficient of the reference cable strand or the material of the newly installed cable strand, T represents the average temperature of the cable strand, T0 represents the design reference temperature of the cable strand, and L0 represents the main cable length of the cable strand at the design reference temperature. The relationship between the cable length and the sag is derived according to the cable strand linear shape formula, and the target linear shape theoretical sag of the reference cable strand and / or the target linear shape theoretical sag of the newly installed cable strand are calculated.
[0019] The catenary line shape formula is as follows:
[0020]
[0021] The sag of the catenary is:
[0022]
[0023] In the formula, c=y1-y2; l=x2-x1; (x1, y1) and (x2, y2) represent the longitudinal coordinates and elevation coordinates of the two end points of the catenary respectively.
[0024] Optionally, the adjusting the linearity of the reference strand and / or the newly erected strand based on the target linearity theoretical sag of the reference strand and the target linearity theoretical sag of the newly erected strand in step S3 specifically comprises: taking the absolute elevation converted from the target linearity theoretical sag of the reference strand as a control parameter, and adjusting the linearity of the reference strand; and / or, taking the target linearity relative sag obtained by subtracting the target linearity theoretical sag of the newly erected strand from the target linearity theoretical sag of the reference strand, and taking the target linearity relative sag as a control parameter, and adjusting the linearity of the newly erected strand.
[0025] Optionally, verifying the result of the alignment adjustment by re-measuring the actual absolute elevation or relative verticality of the reference strand control section and / or the newly erected strand control section in step S4 specifically comprises: measuring the measured verticality of the reference strand control section and / or the newly erected strand control section by using a verticality measuring caliper; calculating the length offset adjustment value of the reference strand and / or the newly erected strand by using the difference between the measured verticality of the reference strand control section and / or the newly erected strand control section and the target linearity theoretical verticality of the reference strand control section and / or the newly erected strand control section, and adjusting the erected strand according to the length offset adjustment value; and determining whether to re-adjust the alignment of the reference strand and / or the newly erected strand according to the difference between the measured verticality of the reference strand control section and / or the newly erected strand control section and the target linearity theoretical verticality of the reference strand control section and / or the newly erected strand control section.
[0026] A second aspect of the present invention provides a suspension bridge strand, which is adjusted linearly using a suspension bridge strand adjustment method, wherein the suspension bridge strand comprises a plurality of prefabricated parallel steel wire strands.
[0027] The beneficial effects of the present invention are:
[0028] 1. By arranging temperature measurement points on a single cable strand, relatively accurate measured temperature information can be obtained, or by simulating the real-time temperature field under the influence of sunlight through finite element and program module analysis, the deformation of the cable strand under the influence of temperature can be inferred.
[0029] 2. Through the distribution of multiple measuring points or real-time simulation of the temperature field, the uneven distribution of temperature can be fully considered, making the consideration of the linear shape changes of the cable strands more detailed and accurate.
[0030] 3. Fully considering the influence of temperature on cable deformation, there is no need to impose strict requirements on the timing of linear adjustment. Cable adjustment can be carried out without waiting until night, which increases the convenience of main cable construction and speeds up the construction progress.
[0031] Additional advantages, objects, and features of the present invention will be described in part in the following description, and will become apparent to those skilled in the art after studying the following, or may be learned from the practice of the present invention. The objects and other advantages of the present invention may be realized and obtained by the structures and method steps specifically pointed out in the written description and claims and the accompanying drawings.
[0032] Those skilled in the art will appreciate that the objectives and advantages that can be achieved with the present invention are not limited to the above specific description, and the above and other objectives that can be achieved by the present invention will be more clearly understood from the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The drawings described herein are used to provide a further understanding of the present invention, constitute a part of this application, and do not constitute a limitation of the present invention.
[0034] Figure 1 Schematic diagram of the relative positions of the reference cable strand and the newly erected cable strand in an embodiment of the present invention;
[0035] Figure 2 It is a diagram showing the arrangement of transverse temperature measuring points of the cable strand adjustment method of a suspension bridge in an embodiment of the present invention;
[0036] Figure 3 It is a longitudinal temperature measurement point arrangement diagram of the suspension bridge cable strand adjustment method in an embodiment of the present invention;
[0037] Figure 4 A schematic diagram of relative sag of a cable strand adjustment method for a suspension bridge in an embodiment of the present invention;
[0038] Figure numerals: 1 - reference strand; 2 - newly erected strand; 3 - temperature sensor; 3-1 - inner temperature sensor; 3-2 - outer temperature sensor; 4 - sag measuring caliper. DETAILED DESCRIPTION
[0039] In order to make the purpose, technical scheme and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments and the accompanying drawings. The schematic embodiments of the present invention and their descriptions are used to explain the present invention, but are not intended to limit the present invention. It should also be noted that, in order to avoid blurring the present invention due to unnecessary details, only structures and / or processing steps closely related to the solutions according to the present invention are shown in the accompanying drawings, while other details that are not closely related to the present invention are omitted.
[0040] It should be emphasized that the term “include / comprises” when used herein refers to the presence of features, elements, steps or components, but does not exclude the presence or addition of one or more other features, elements, steps or components.
[0041] The embodiments of the present invention are described in detail and clearly below in conjunction with the accompanying drawings.
[0042] The present invention provides a suspension bridge cable strand adjustment method, which is used for adjusting the linear shape of suspension bridge cables under the influence of temperature, and includes the following steps: S1: respectively obtaining the temperature average of the reference cable strand and the temperature average of the newly erected cable strand; S2: calculating the target linear theoretical sag of the reference cable strand and the target linear theoretical sag of the newly erected cable strand based on the temperature average of the reference cable strand and the temperature average of the newly erected cable strand; S3: adjusting the linear shape of the reference cable strand and / or the newly erected cable strand based on the target linear theoretical sag of the reference cable strand and the target linear theoretical sag of the newly erected cable strand; S4: verifying the result of the linear shape adjustment by re-measuring the actual absolute elevation or relative sag of the reference cable strand control section and / or the newly erected cable strand control section. Specifically, as Figure 1 As shown, the cables of the suspension bridge include a reference cable 1 and a newly erected cable 2. The specific construction process of the cables can be determined according to needs. For example, the prefabricated parallel wire strand method (PPWS) can be used for construction to form cable strands that are roughly parallel to each other in space.
[0043] Optionally, in step S1, the temperature average of the reference strand and the temperature average of the newly erected strand are obtained by temperature measurement using a sensor. Figure 1 As shown, the reference cable strand 1 is provided with a temperature sensor after the installation is completed, and the actual temperature is read during the whole process; the newly installed cables 2 are several, and each of the newly installed cables 2 is provided with a temperature sensor and the actual temperature is read only during the period of linear adjustment. The temperature measurement at the measuring point should be fast and accurate to reduce the error caused by asynchronous temperature measurement.
[0044] Optionally, temperature sensors are arranged in layers inside and outside the cross-section to be measured of the reference cable strand and / or the newly installed cable strand; a plurality of cross-sections to be measured are evenly distributed along the span direction of the reference cable strand and / or the newly installed cable strand, and the density of measuring points is adjusted according to the actual ambient temperature difference; the temperature average of the reference cable strand and / or the temperature average of the newly installed cable strand is obtained according to the temperature average of each temperature sensor arranged in each cross-section to be measured.
[0045] like Figure 2 As shown, on a single cross section to be measured, the temperature sensor 3 can be arranged on the inner side (inner temperature sensor 3-1) and the outer side (outer temperature sensor 3-2) of the cable strand as required, and the temperature measurement values on both sides are comprehensively considered to calculate the average value of the temperature measurement. Figure 3 As shown in Figure 2, when considering arranging temperature sensors along the cable length (see Figure 3The arrangement points (P1-P8) in the diagram should be evenly distributed as much as possible, that is, the interval distance between any two adjacent temperature sensors is the same. At the same time, the density of the temperature sensor arrangement points changes with the actual ambient temperature difference. The greater the temperature difference along the span direction, the denser the measurement points are arranged, and the smaller the temperature difference along the span direction, the sparser the measurement points are arranged. The cable strand temperature mean T is obtained based on the cross-sectional temperature mean of each measuring point.
[0046] Optionally, in step S1, the temperature average of the reference strand and the temperature average of the newly erected strand are obtained by temperature field simulation. Specifically, it includes: establishing the temperature field of the reference strand and / or the newly erected strand in the temperature field simulation system, and obtaining the temperature average of the reference strand and / or the newly erected strand by integral operation; for example, based on finite element analysis and setting corresponding program modules to simulate the real-time temperature field of the reference strand and / or the newly erected strand under the influence of sunlight, and on this basis, further inferring the deformation of the strand under the influence of temperature. The integral operation formula is as follows:
[0047]
[0048] Where T(τ0) represents the mean temperature of a single cable strand, V represents the volume of a single cable strand, τ0 represents the time variable, and x, y, and z represent the three-dimensional coordinate positions of the cable strand along the horizontal, vertical, and longitudinal directions of the cross section, respectively.
[0049] Optionally, in step S2, calculating the target linear theoretical sag of the reference strand and / or the target linear theoretical sag of the newly erected strand based on the temperature mean of the reference strand and the temperature mean of the newly erected strand specifically includes: calculating the target linear theoretical cable length of the reference strand based on the temperature mean of the reference strand; and / or calculating the target linear theoretical cable length of the newly erected strand based on the temperature mean of the newly erected strand. Specifically, the target linear theoretical cable length L1 of the reference strand 1 and the target linear theoretical cable length L2 of the newly erected strand 2 under the condition of the strand temperature mean T may be calculated according to the following formula:
[0050] Δl=α(T-T0)L0
[0051] L=L0+Δl
[0052] Where Δl represents the average expansion of the cable strand, α represents the linear expansion coefficient of the reference cable strand or the newly installed cable strand material, T represents the average temperature of the cable strand, T0 represents the design reference temperature of the cable strand, and L0 represents the main cable length of the cable strand at the design reference temperature. The relationship between cable length and sag can be derived from the cable strand linear shape formula to calculate the target linear shape theoretical sag h1 of the reference cable strand and / or the target linear shape theoretical sag h2 of the newly installed cable strand.
[0053] The catenary line shape formula is as follows:
[0054]
[0055] The length of the catenary line is:
[0056]
[0057] The sag of the catenary is:
[0058]
[0059] In the formula, c=y1-y2; l=x2-x1; (x1, y1) and (x2, y2) represent the longitudinal coordinates and elevation coordinates of the two end points of the catenary respectively.
[0060] Optionally, the adjusting the alignment of the reference strand and / or the newly erected strand based on the target linear theoretical sag of the reference strand and the target linear theoretical sag of the newly erected strand in step S3 specifically comprises: taking the absolute elevation converted from the target linear theoretical sag of the reference strand as a control parameter, and adjusting the alignment of the reference strand; and / or, taking the target linear relative sag as a control parameter, by subtracting the target linear theoretical sag of the newly erected strand from the target linear theoretical sag of the reference strand.
[0061] Specifically, according to the calculated target linear theoretical sag h1 of the reference strand and / or the target linear theoretical sag h2 of the newly erected strand, in the linear adjustment process of the reference strand 1, the linear adjustment is performed with the absolute elevation converted from h1 as the target; in the linear adjustment process of the newly erected strand 2, the relative sag control parameter Δh is calculated, and the linear adjustment is performed with Δh as the reference.
[0062] Δh=h2-h1
[0063] Where Δh represents the relative sag control parameter, h1 represents the target linear theoretical sag of the reference cable strand 1, and h2 represents the target linear theoretical sag of the newly erected cable strand 2.
[0064] Optionally, verifying the result of the alignment adjustment by re-measuring the actual absolute elevation or relative verticality of the reference strand control section and / or the newly erected strand control section in step S4 specifically comprises: measuring the measured verticality of the reference strand control section and / or the newly erected strand control section by using a verticality measuring caliper; calculating the length offset adjustment value of the reference strand and / or the newly erected strand by using the difference between the measured verticality of the reference strand control section and / or the newly erected strand control section and the target linearity theoretical verticality of the reference strand control section and / or the newly erected strand control section, and adjusting the erected strand according to the length offset adjustment value; and determining whether to re-adjust the alignment of the reference strand and / or the newly erected strand according to the difference between the measured verticality of the reference strand control section and / or the newly erected strand control section and the target linearity theoretical verticality of the reference strand control section and / or the newly erected strand control section.
[0065] Specifically, when re-measuring the absolute elevation of the cable control section, the cable length offset adjustment value L is directly calculated using the difference between the measured elevation and the target linear elevation. 调 , readjust the cable length; when re-measuring the relative sag of the cable strand control section, if Figure 4 As shown, the relative parameter of the actual cable strand is measured by the sag measuring caliper 4 as Δh1, and the sag deviation value Δh-Δh1 is substituted into the relationship between the cable strand length and the sag to calculate the cable strand length offset adjustment value L 调 , readjust the cable length.
[0066] A second embodiment of the present invention provides a suspension bridge strand, which is adjusted linearly using a suspension bridge strand adjustment method, wherein the suspension bridge strand comprises a plurality of prefabricated parallel steel wire strands. The strand adjustment method is particularly suitable for adjusting the strand linearity of a prefabricated parallel steel wire strand method (PPWS).
[0067] The present invention considers the influence of temperature on the cable strand line shape, uses sensor measurement or temperature field to obtain the average temperature value on a single cable strand, and adjusts the cable strand line shape based on the temperature data. At the same time, in order to ensure the accuracy of the line shape adjustment, the result of the line shape adjustment is further verified by re-measuring the actual absolute elevation or relative verticality of the cable strand cross section.
[0068] It should be clear that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the embodiments of the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A suspension bridge cable strand adjustment method for adjusting the linear shape of a suspension bridge cable strand under the influence of temperature. It is characterized in that The following steps are involved: S1: Obtain the mean temperature of the reference cable strand and the mean temperature of the newly erected cable strand respectively; S2: calculating a target linear theoretical sag of the reference strand and a target linear theoretical sag of the newly erected strand based on the average temperature of the reference strand and the average temperature of the newly erected strand; S3: adjusting the linearity of the reference cable strand and / or the newly erected cable strand based on the target linearity theoretical sag of the reference cable strand and the target linearity theoretical sag of the newly erected cable strand; S4: Verify the result of alignment adjustment by re-measuring the actual absolute elevation or relative verticality of the reference cable control section and / or the newly erected cable control section; The absolute elevation converted from the theoretical vertical of the target linear shape of the reference cable strand is used as the control parameter to adjust the linear shape of the reference cable strand. In step S4, the measured sag of the reference strand control section is measured using a sag measuring caliper; the length offset adjustment value of the reference strand is calculated using the difference between the measured sag of the reference strand control section and the target linear theoretical sag of the reference strand control section, and the installed strand is adjusted according to the length offset adjustment value; Calculating the target linear theoretical sag of the reference strand and the target linear theoretical sag of the newly erected strand based on the temperature average of the reference strand and the temperature average of the newly erected strand specifically includes: Calculate the target linear theoretical cable length of the reference cable strand based on the temperature average of the reference cable strand; The target linear theoretical cable length of the newly erected cable strand is calculated based on the temperature average of the newly erected cable strand; The specific calculation formula is as follows: Δl=α(TT 0 )L 0 L=L 0 +Δl Where Δl represents the average expansion of the cable strand, α represents the linear expansion coefficient of the reference cable strand or the newly erected cable strand material, T represents the average temperature of the cable strand, and T 0 represents the design reference temperature of the cable strand, L 0 It represents the main cable length of the cable strand at the design basis temperature; The relationship between cable length and sag is derived according to the cable strand linear shape formula, and the target linear shape theoretical sag of the reference cable strand and / or the target linear shape theoretical sag of the newly erected cable strand are calculated; The catenary line shape formula is as follows: The length of the catenary line is: The sag of the catenary is: In the formula, c=y 1 -y 2 ; l = x 2 -x 1 ;(x 1 ,y 1 )、(x 2 ,y 2 ) represent the longitudinal coordinates and elevation coordinates of the two end points of the catenary respectively.
2. The method according to claim 1, Features: In step S1, the temperature average of the reference strand and the temperature average of the newly erected strand are obtained by temperature measurement with a sensor.
3. The method according to claim 2, It is characterized in that In step S1, obtaining the average temperature of the reference strand and the average temperature of the newly erected strand by measuring the temperature with a sensor specifically includes: Temperature sensors are installed on the reference cables after they are erected, and the actual temperature is read throughout the process; There are several newly erected cables, and temperature sensors are arranged on each of the newly erected cables and the actual temperature is read only during the period when the cable is adjusted in line shape.
4. The method according to claim 2, It is characterized in that In step S1, obtaining the average temperature of the reference strand and the average temperature of the newly erected strand by measuring the temperature with a sensor specifically includes: Temperature sensors are arranged in layers on the inner and outer sides of the cross section to be measured of the reference cable strand and / or the newly erected cable strand; The plurality of cross sections to be measured are evenly distributed along the span direction of the reference cable strand and / or the newly erected cable strand, and the density of the measuring points is adjusted according to the actual ambient temperature difference; The temperature average of the reference strand and / or the temperature average of the newly erected strand are obtained according to the temperature average of each temperature sensor arranged in each section to be measured.
5. The method according to claim 1, Features: In step S1, the temperature average of the reference strand and the temperature average of the newly erected strand are obtained by temperature field simulation.
6. The method according to claim 5, It is characterized in that The step S1 of obtaining the average temperature of the reference strand and the average temperature of the newly erected strand by means of temperature field simulation specifically includes: The temperature field of the reference cable strand and / or the newly installed cable strand is established in the temperature field simulation system, and the temperature mean of the reference cable strand and / or the newly installed cable strand is obtained by integral operation; the integral operation formula is as follows: Where T(τ 0 ) represents the average temperature of a single cable strand, V represents the volume of a single cable strand, τ 0 represents the time variable, and x, y, and z represent the three-dimensional coordinate positions of the cable strand along the horizontal, vertical, and longitudinal directions of the cross section, respectively.
7. The method according to claim 1, It is characterized in that In step S3, adjusting the linearity of the reference strand and / or the newly erected strand based on the target linearity theoretical sag of the reference strand and the target linearity theoretical sag of the newly erected strand specifically includes: The target linearity relative sag is obtained by subtracting the target linearity theoretical sag of the newly erected cable strand from the target linearity theoretical sag of the reference cable strand. The target linearity relative sag is used as a control parameter to adjust the linearity of the newly erected cable strand.
8. The method according to claim 1, It is characterized in that Verifying the result of the alignment adjustment by re-measuring the actual absolute elevation or relative verticality of the reference cable strand control section and / or the newly erected cable strand control section in step S4 specifically includes: The actual sag of the newly erected cable strand control section is measured using a sag measuring caliper; The length offset adjustment value of the newly erected cable strand is calculated by using the difference between the measured sag of the newly erected cable strand control section and the target linear theoretical sag of the newly erected cable strand control section, and the erected cable strand is adjusted according to the length offset adjustment value; Determine whether to readjust the alignment of the reference strand and / or the newly erected strand based on the difference between the measured sag of the reference strand control section and / or the newly erected strand control section and the target alignment theoretical sag of the reference strand control section and / or the newly erected strand control section.