A drilling device for rock drilling and a drilling method for construction
By introducing hydraulic cylinder and blade structures into the drilling device, the problems of soil collapse and lag during the drilling process are solved, and the stability and efficiency of drilling are achieved, which is suitable for construction needs of different terrains.
Patent Information
- Application Number
- CN202311474144.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-08
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2043-11-08
AI Technical Summary
The existing drilling devices for construction are prone to drilling rod lags and soil collapse during the drilling process, which cannot meet the actual use needs.
A drilling device including drill rod, drill bit, motor, slide rail, hydraulic cylinder and blade is designed. The spacing between the base plate and soil is adjusted through the hydraulic cylinder, the tube and annular tube are wrapped around the soil, and the blades are agitated to cool down and Scrub the soil to achieve stability and efficiency of drilling.
It effectively avoids soil collapse and drilling rod lag during drilling, achieves rapid and stable drilling, and is suitable for construction needs of different terrains.
Smart Images

Figure CN117404010B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction, and in particular relates to a drilling device for building construction used for drilling rock formations and a drilling method thereof. Background Art
[0002] When construction is being carried out at a construction site, workers need to use drilling equipment to drill holes in the rock strata at the construction site, which can facilitate subsequent workers to carry out construction at the construction site. The drilling equipment currently used in construction sites on the market usually uses a drill rod to drill holes in the rock strata on the construction site. The drilling method is relatively simple. When the drill rod drills holes in the rock strata at the construction site, the drill rod often gets stuck inside the rock strata. In order to avoid this phenomenon, workers usually supply water to the inside of the borehole. At the same time, when the drill rod drills into a certain depth inside the rock stratum, the staff will adjust the drill rod to reverse to ensure that the drill rod can drill holes in the rock stratum normally. This method can indeed enable the drilling device to drill holes in the rock strata at the construction site, but when the water is transported to the inside of the borehole, it will also cause the soil at the upper edge of the borehole to collapse, thereby affecting the normal construction of the construction site.
[0003] Therefore, the existing drilling devices for construction cannot meet the needs in actual use, so there is an urgent need for improved technology in the market to solve the above problems. Summary of the invention
[0004] The object of the present invention is to provide a drilling device for construction and a drilling method for rock drilling to solve the above-mentioned problems.
[0005] In order to solve the above technical problems, the present invention is achieved through the following technical solutions:
[0006] The present invention discloses a drilling device for construction use for drilling in rock formations, comprising a drill rod and a drill bit, the drill bit being fixed on the lower end of the drill rod, the upper end of the drill rod being fixed to the output shaft of a second motor, the second motor being fixed to a mounting block, the output shaft of the second motor penetrating the mounting block, the mounting block being fixed to an adjusting structure, the adjusting structure comprising a slide rail, a sliding block slidably connected to the inside of the slide rail, a rectangular hole provided on one side of the slide rail, a fixing bar penetrating the rectangular hole, an upper fixing plate fixed to one side of the slide rail at the upper part, a lower fixing plate fixed to one side of the slide rail at the bottom, a moving block fixed to the end of the fixing bar, a screw rod penetrating the moving block and a first motor connected to the upper end of the screw rod, the interior of the drill rod being a hollow structure, and a spiral blade being fixed to the inner wall of the drill rod cavity, and a sewage outlet being provided on the upper part of the drill rod.
[0007] Furthermore, a through hole is opened on the moving block, and an internal thread is opened inside the through hole. The moving block is threadedly connected to the screw rod through the through hole. The lower end of the screw rod is connected to a bearing seat, and the lower end of the screw rod is fixed to the lower fixed plate through the bearing seat.
[0008] Furthermore, a baffle cover is fixed to the front side of the slide rail, a rear cover is fixed to the rear side of the slide rail, a support block is fixed to the front side of the slider, an end of the support block is fixed to the mounting block, a connecting rod is fixed to the lower end of the slide rail, an abutment device is fixed to the lower end of the connecting rod, a through nut is connected to the baffle cover, and the through nut passes through the baffle cover and is fixed to the slide rail.
[0009] Furthermore, the abutment device includes a top plate, a telescopic tube fixed to the bottom surface of the top plate, a second hydraulic cylinder fixed to the top surface of the top plate and a bottom plate fixed to the bottom surface of the telescopic tube, the output end of the second hydraulic cylinder passes through the top plate and is fixed to the top surface of the bottom plate, a drain pipe is fixed to the outer wall of the telescopic tube, a drain port is opened on the telescopic tube, the drain pipe is connected to the inner cavity of the telescopic tube through the drain port, a connecting block is fixed to the output end of the second hydraulic cylinder, and the output end of the second hydraulic cylinder is fixed to the bottom plate through the connecting block.
[0010] Furthermore, a fixing ring is fixed to the outer wall of the telescopic tube, fixing nuts are provided at equal intervals on the fixing ring, a recess is provided on the top surface of the bottom plate, the fixing ring abuts against the bottom plate through the recess, and the fixing nuts penetrate the fixing ring and are fixed to the bottom plate.
[0011] Furthermore, a plug is fixed to the bottom surface of the bottom plate, a ring tube is fixed to the bottom end of the plug, a water pipe is fixed to the outer wall of the plug, the ring tube is connected to the inner cavity of the water pipe, and a hole is opened on the ring tube.
[0012] Furthermore, the rear side of the rear cover is fixed to the output end of the first hydraulic cylinder, a mounting seat is fixed to the fixed end of the first hydraulic cylinder, the first hydraulic cylinder is fixed to a fixed rod through the mounting seat, a fixed seat is fixed to the lower end of the fixed rod, the fixed rod is fixed to the transport vehicle through the fixed seat, and a truck bucket is fixed to the rear of the transport vehicle.
[0013] Furthermore, blades are fixed to the outer wall of the drill rod, and the blades are evenly spaced about the axis of the drill rod. There are multiple groups of blades evenly spaced, and the axis of the drill rod is colinear with the axis of the telescopic tube.
[0014] A drilling method for rock formation drilling in construction, using the above-mentioned drilling device, comprises the following steps:
[0015] S1, the transport vehicle drives the slide rail to move to a suitable position in advance, and then the first motor drives the drill rod to move downward through the screw rod;
[0016] S2. When the drill rod drives the drill bit to contact the ground, the output end of the second motor drives the drill bit to drill a hole in the rock formation at the construction site through the drill rod. At this time, the spiral blades in the inner cavity of the drill rod can drive the sludge inside the well into the inside of the drill rod, and then the sludge inside the drill rod is discharged through the sewage outlet;
[0017] S3. After the rock formation at the construction site is drilled by the drill bit, the output end of the second hydraulic cylinder can drive the bottom plate to abut against the bottom surface. At this time, the cannula and the annular tube can be inserted into the inner cavity of the rock formation borehole. When the cannula and the annular tube are inserted into the rock formation borehole, it is necessary to ensure that the water pipe is exposed to the outside;
[0018] S4. The user transports water to the inside of the rock formation borehole through the water delivery pipe. When there is a lot of water in the rock formation borehole, the water source in the rock formation borehole can be discharged to the outside through the drainage pipe;
[0019] S5. While the second motor drives the drill bit to drill a hole in the rock formation through the drill rod, the paddles on the drill rod can stir the water inside the borehole. On the one hand, the water can cool the drill rod and the drill bit, and on the other hand, the water can change the density of the soil, making it easier for the drill rod to drive the drill bit to drill a hole in the rock formation.
[0020] The present invention has the following beneficial effects:
[0021] 1. When the drilling device is actually used, the transport vehicle drives the slide rail to move to a suitable position in advance, and then the first motor drives the drill rod to move downward through the screw rod. When the drill rod drives the drill bit to abut against the ground, the output end of the second motor drives the drill bit to drill a rock formation at the construction site through the drill rod. After the rock formation at the construction site is drilled by the drill bit, the output end of the second hydraulic cylinder can drive the bottom plate to abut against the bottom surface. At this time, the insert pipe and the annular tube can be inserted into the inner cavity of the rock formation borehole, so that the insert pipe and the annular tube can wrap the soil on the upper edge of the borehole, which can avoid the soil on the upper edge of the borehole inner cavity from collapsing when the device is drilling a rock formation.
[0022] 2. When the drilling device is actually used, when the insert tube and the annular tube are inserted into the borehole of the rock formation, it is necessary to ensure that the water pipe is exposed to the outside. The user transports water to the inside of the rock formation borehole through the water pipe. When there is a lot of water inside the rock formation borehole, the water source inside the rock formation borehole can be discharged to the outside through the drainage pipe. While the second motor drives the drill bit to drill the rock formation through the drill rod, the paddles on the drill rod can stir the water inside the borehole. On the one hand, the water can cool the drill rod and the drill bit, and on the other hand, the water can change the density of the soil, which can facilitate the drill rod to drive the drill bit to drill the rock formation.
[0023] 3. When the drilling device is actually used, the blades on the drill rod can stir the water inside the borehole. While stirring, the water can drive the water inside the borehole to flush the soil. At this time, the muddy water mixed with the water and the soil can be discharged through the drainage pipe, so that the drill rod can drive the drill bit to drill the rock formation quickly. At the same time, it can also avoid the jamming of the drill rod, the drill bit and the borehole, and avoid the drill rod from twisting off.
[0024] 4. When the drilling device is actually used, the first hydraulic cylinder can adjust the distance between the rear cover and the transport vehicle, which makes it easier for the drilling device to drill holes in the rock layer. When the slide rail moves to a suitable position, the second hydraulic cylinder can adjust the distance between the base plate and the soil, thereby enabling the drilling device to be used in different terrains of construction sites. At the same time, it can also enable the insert pipe and the annular tube on the base plate to wrap the soil on the upper edge of the borehole. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0026] Figure 1 It is a structural schematic diagram of the present invention;
[0027] Figure 2 This is a structural diagram of the connection between the screw rod and the moving block in the present invention;
[0028] Figure 3 This is a structural diagram of the connection between the telescopic tube and the top plate in the present invention;
[0029] Figure 4 This is a structural diagram of the connection between the cannula and the base plate in the present invention;
[0030] Figure 5 This is a structural diagram of the connection between the screw rod, the drill rod and the slide rail in the present invention;
[0031] Figure 6 This is a diagram showing the connection structure between the bottom plate and the top plate in the present invention;
[0032] Figure 7 This is a structural diagram of the connection between the slider, the cover and the slide rail in the present invention;
[0033] Figure 8 It is a structural diagram of the connection between the drill rod and the second motor and the mounting block in the present invention;
[0034] Fig. 9 It is a cross-sectional structural diagram of the drill rod in the present invention.
[0035] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0036] 1. Slide rail; 2. Back cover; 3. First motor; 4. Upper fixed plate; 5. Cover; 6. Second motor; 7. Slider; 8. Fixed bar; 9. Moving block; 10. Mounting block; 11. Drill rod; 12. Support block; 13. Screw rod; 14. Paddle; 15. First hydraulic cylinder; 16. Fixed rod; 17. Cargo box; 18. Drill bit; 19. Drain pipe; 20. Top plate; 21. Bottom plate; 22. Fixed ring; 23. Insert pipe; 24, telescopic pipe; 25, connecting rod; 26, bearing seat; 27, second hydraulic cylinder; 28, lower fixing plate; 29, annular pipe; 30, recessed part; 31, water pipe; 32, fixing nut; 33, connecting block; 34, through nut; 35, drain port; 36, through port; 37, rectangular hole; 38, fixing seat; 39, transport vehicle; 40, mounting seat; 41, sewage outlet; 42, spiral blade. DETAILED DESCRIPTION
[0037] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0038] See also Figure 1-9 As shown, the present invention is a drilling device for construction used for rock drilling, comprising a drill rod 11 and a drill bit 18, the drill bit 18 is fixed to the lower end of the drill rod 11, the upper end of the drill rod 11 is fixed to the output shaft of the second motor 6, the second motor 6 is fixed to the mounting block 10, the output shaft of the second motor 6 penetrates the mounting block 10, the mounting block 10 is fixed to the adjustment structure, the adjustment structure comprises a slide rail 1, a slider 7 slidably connected to the inside of the slide rail 1, a rectangular hole 37 opened on one side of the slide rail 1, a fixing bar 8 penetrating the rectangular hole 37, an upper fixing plate 4 fixed to one side of the slide rail 1 at the upper part, a lower fixing plate 28 fixed to one side of the slide rail 1 at the bottom, a moving block 9 fixed to the end of the fixing bar 8, a screw rod 13 penetrating the moving block 9 and a first motor 3 connected to the upper end of the screw rod 13, the interior of the drill rod 11 is a hollow structure, and a spiral blade 42 is fixed to the inner wall of the cavity of the drill rod 11, and a sewage outlet 41 is opened at the upper part of the drill rod 11;
[0039] When the drilling device is actually used, the transport vehicle 39 drives the slide rail 1 to move to a suitable position in advance, and then the first motor 3 drives the drill rod 11 to move downward through the screw rod 13. When the drill rod 11 drives the drill bit 18 to abut against the ground, the output end of the second motor 6 drives the drill bit 18 to drill a rock formation at the construction site through the drill rod 11. After the rock formation at the construction site is drilled by the drill bit 18, the output end of the second hydraulic cylinder 27 can drive the bottom plate 21 to abut against the bottom surface. At this time, the insert pipe 23 and the annular tube 29 can be inserted into the inner cavity of the rock formation borehole, so that the insert pipe 23 and the annular tube 29 can wrap the soil on the upper edge of the borehole, which can avoid the soil on the upper edge of the borehole inner cavity from collapsing when the device is drilling a rock formation. When inserting the drill hole into the rock formation, it is necessary to ensure that the water pipe 31 is exposed to the outside. The user transports water to the inside of the rock formation borehole through the water pipe 31. When there is more water inside the rock formation borehole, the water source inside the rock formation borehole can be discharged to the outside through the drainage pipe 19. While the second motor 6 drives the drill bit 18 to drill the rock formation through the drill rod 11, the blades 14 on the drill rod 11 can stir the water inside the borehole. On the one hand, the water can cool the drill rod 11 and the drill bit 18. On the other hand, the water can change the density of the soil, which can facilitate the drill rod 11 to drive the drill bit 18 to drill the rock formation. The spiral blades 42 in the inner cavity of the drill rod 11 can drive the sludge inside the well into the inside of the drill rod 11, and then the sludge is discharged through the sewage outlet 41.
[0040] The moving block 9 is provided with a through hole 36, and an internal thread is provided inside the through hole 36. The moving block 9 is threadedly connected to the screw rod 13 through the through hole 36. The lower end of the screw rod 13 is connected to the bearing seat 26, and the lower end of the screw rod 13 is fixed to the lower fixing plate 28 through the bearing seat 26. The front side of the slide rail 1 is fixed with a cover 5, the rear side of the slide rail 1 is fixed with a rear cover 2, the front side of the slider 7 is fixed with a support block 12, the end of the support block 12 is fixed to the mounting block 10, the lower end of the slide rail 1 is fixed with a connecting rod 25, the lower end of the connecting rod 25 is fixed with an abutment device, and the cover 5 is connected with a through hole 36. The nut 34 is passed through the blocking cover 5 and fixed to the slide rail 1. The abutment device includes a top plate 20, a telescopic tube 24 fixed to the bottom surface of the top plate 20, a second hydraulic cylinder 27 fixed to the top surface of the top plate 20, and a bottom plate 21 fixed to the bottom surface of the telescopic tube 24. The output end of the second hydraulic cylinder 27 passes through the top plate 20 and is fixed to the top surface of the bottom plate 21. A drain pipe 19 is fixed to the outer wall of the telescopic tube 24. A drain port 35 is provided on the telescopic tube 24. The drain pipe 19 is connected to the inner cavity of the telescopic tube 24 through the drain port 35. A connecting block 33 is fixed to the output end of the second hydraulic cylinder 27. The output end of the hydraulic cylinder 27 is fixed to the bottom plate 21 through a connecting block 33, a fixing ring 22 is fixed to the outer wall of the telescopic tube 24, and fixing nuts 32 are provided on the fixing ring 22 at equal intervals, a recess 30 is provided on the top surface of the bottom plate 21, the fixing ring 22 abuts against the bottom plate 21 through the recess 30, and the fixing nut 32 penetrates the fixing ring 22 and is fixed to the bottom plate 21, a plug 23 is fixed to the bottom surface of the bottom plate 21, a ring tube 29 is fixed to the bottom end of the plug 23, a water pipe 31 is fixed to the outer wall of the plug 23, the ring tube 29 is connected to the inner cavity of the water pipe 31, and a ring tube 29 is provided on the ring tube 29. A hole is provided, the rear side of the rear cover 2 is fixed to the output end of the first hydraulic cylinder 15, a mounting seat 40 is fixed to the fixed end of the first hydraulic cylinder 15, the first hydraulic cylinder 15 is fixed to the fixed rod 16 through the mounting seat 40, the lower end of the fixed rod 16 is fixed to the fixed seat 38, the fixed rod 16 is fixed to the transport vehicle 39 through the fixed seat 38, the rear part of the transport vehicle 39 is fixed to the bucket 17, the outer wall of the drill rod 11 is fixed with blades 14, the blades 14 are distributed at equal intervals along the axis of the drill rod 11, and there are multiple groups of blades 14 distributed at equal intervals, and the axis of the drill rod 11 is collinear with the axis of the telescopic tube 24;
[0041] When the drilling device is actually used, the paddles 14 on the drill rod 11 can stir the water inside the borehole. While stirring, the water can drive the water inside the borehole to flush the soil. At this time, the muddy water mixed with the water and the soil can be discharged through the drainage pipe 19, so that the drill rod 11 can drive the drill bit 18 to quickly drill the rock formation, and at the same time, it can also avoid the drill rod 11 and the drill bit 18 from getting stuck in the borehole, and avoid the drill rod 11 from twisting off. The first hydraulic cylinder 15 can adjust the distance between the rear cover 2 and the transport vehicle 39, which can facilitate the drilling of the rock formation by the drilling device. When the slide rail 1 moves to a suitable position, the second hydraulic cylinder 27 can adjust the distance between the bottom plate 21 and the soil, thereby realizing that the drilling device can be used for the terrain of different construction sites, and at the same time, the insert pipe 23 and the annular tube 29 on the bottom plate 21 can wrap the soil on the upper edge of the borehole.
[0042] A drilling method for rock formation drilling in construction, using the above-mentioned drilling device, comprises the following steps:
[0043] S1, the transport vehicle 39 drives the slide rail 1 to move to a suitable position in advance, and then the first motor 3 drives the drill rod 11 to move downward through the screw rod 13;
[0044] S2. When the drill rod 11 drives the drill bit 18 to abut against the ground, the output end of the second motor 6 drives the drill bit 18 to drill a hole in the rock formation at the construction site through the drill rod 11. At this time, the spiral blades 42 in the inner cavity of the drill rod 11 can drive the sludge inside the drilling well to enter the inside of the drill rod 11, and then the sludge inside the drill rod 11 is discharged through the sewage outlet 41;
[0045] S3. After the rock formation at the construction site is drilled by the drill bit 18, the output end of the second hydraulic cylinder 27 can drive the bottom plate 21 to abut against the bottom surface. At this time, the insert pipe 23 and the annular tube 29 can be inserted into the inner cavity of the rock formation borehole. When the insert pipe 23 and the annular tube 29 are inserted into the rock formation borehole, it is necessary to ensure that the water pipe 31 is exposed to the outside;
[0046] S4. The user transports water to the inside of the rock formation borehole through the water delivery pipe 31. When there is a lot of water in the rock formation borehole, the water source in the rock formation borehole can be discharged to the outside through the drainage pipe 19.
[0047] S5. When the second motor 6 drives the drill bit 18 to drill a hole in the rock formation through the drill rod 11, the paddles 14 on the drill rod 11 can stir the water inside the borehole. On the one hand, the water can cool the drill rod 11 and the drill bit 18, and on the other hand, the water can change the density of the soil, which makes it easier for the drill rod 11 to drive the drill bit 18 to drill a hole in the rock formation.
[0048] The above are only preferred embodiments of the present invention and do not limit the present invention. Any modification to the technical solutions recorded in the aforementioned embodiments, any equivalent replacement of some of the technical features therein, and any modification, equivalent replacement, and improvement made are all within the protection scope of the present invention.
Claims
1. A drilling device for construction used for drilling in rock formations, comprising a drill rod (11) and a drill bit (18), wherein the drill bit (18) is fixed to the lower end of the drill rod (11), the upper end of the drill rod (11) is fixed to the output shaft of a second motor (6), the second motor (6) is fixed to a mounting block (10), and the output shaft of the second motor (6) penetrates the mounting block (10), characterized in that: The mounting block (10) is fixed on the adjustment structure, and the adjustment structure comprises a slide rail (1), a slider (7) slidably connected to the inside of the slide rail (1), a rectangular hole (37) opened on one side of the slide rail (1), a fixing strip (8) penetrating the rectangular hole (37), an upper fixing plate (4) fixed on one side of the slide rail (1) at the upper part, a lower fixing plate (28) fixed on one side of the slide rail (1) at the bottom, a moving block (9) fixed on the end of the fixing strip (8), a screw rod (13) penetrating the moving block (9), and a first motor (3) connected to the upper end of the screw rod (13); the interior of the drill rod (11) is a hollow structure, and a spiral blade (42) is fixed to the inner wall of the cavity of the drill rod (11); and a sewage outlet (41) is opened on the upper part of the drill rod (11); The moving block (9) is provided with a through hole (36), and an internal thread is provided inside the through hole (36). The moving block (9) is threadedly connected to the screw rod (13) through the through hole (36). The lower end of the screw rod (13) is connected to a bearing seat (26). The lower end of the screw rod (13) is fixed to the lower fixing plate (28) through the bearing seat (26). A blocking cover (5) is fixed on the front side of the slide rail (1), a rear cover (2) is fixed on the rear side of the slide rail (1), a support block (12) is fixed on the front side of the slider (7), an end of the support block (12) is fixed to the mounting block (10), a connecting rod (25) is fixed to the lower end of the slide rail (1), an abutment device is fixed to the lower end of the connecting rod (25), a through nut (34) is connected to the blocking cover (5), and the through nut (34) passes through the blocking cover (5) and is fixed to the slide rail (1); The abutment device comprises a top plate (20), a telescopic tube (24) fixed to the bottom surface of the top plate (20), a second hydraulic cylinder (27) fixed to the top surface of the top plate (20), and a bottom plate (21) fixed to the bottom surface of the telescopic tube (24); the output end of the second hydraulic cylinder (27) penetrates through the top plate (20) and is fixed to the top surface of the bottom plate (21); a drainage pipe (19) is fixed to the outer wall of the telescopic tube (24); a drainage port (35) is provided on the telescopic tube (24); the drainage pipe (19) is communicated with the inner cavity of the telescopic tube (24) through the drainage port (35); a connecting block (33) is fixed to the output end of the second hydraulic cylinder (27); and the output end of the second hydraulic cylinder (27) is fixed to the bottom plate (21) through the connecting block (33); A fixing ring (22) is fixed to the outer wall of the telescopic tube (24), fixing nuts (32) are provided on the fixing ring (22) at equal intervals, a recessed portion (30) is provided on the top surface of the bottom plate (21), the fixing ring (22) abuts against the bottom plate (21) through the recessed portion (30), and the fixing nut (32) penetrates the fixing ring (22) and is fixed to the bottom plate (21); The bottom surface of the bottom plate (21) is fixed with an insertion tube (23), the bottom end of the insertion tube (23) is fixed with an annular tube (29), the outer wall of the insertion tube (23) is fixed with a water delivery tube (31), the annular tube (29) is connected with the inner cavity of the water delivery tube (31), and a hole is opened on the annular tube (29); The rear side of the rear cover (2) is fixed to the output end of the first hydraulic cylinder (15); a mounting seat (40) is fixed to the fixed end of the first hydraulic cylinder (15); the first hydraulic cylinder (15) is fixed to a fixing rod (16) via the mounting seat (40); a fixing seat (38) is fixed to the lower end of the fixing rod (16); the fixing rod (16) is fixed to a transport vehicle (39) via the fixing seat (38); and a bucket (17) is fixed to the rear of the transport vehicle (39).
2. A drilling device for construction used for rock drilling according to claim 1, characterized in that: The outer wall of the drill rod (11) is fixed with paddles (14), and the paddles (14) are distributed at equal intervals along the axis of the drill rod (11). There are multiple groups of paddles (14) distributed at equal intervals, and the axis of the drill rod (11) is colinear with the axis of the telescopic tube (24).
3. A drilling method for construction used for drilling in rock formations, characterized in that: Using the drilling device according to any one of claims 1 to 2 above, comprising the following steps: S1, the transport vehicle (39) drives the slide rail (1) to move to a suitable position in advance, and then the first motor (3) drives the drill rod (11) to move downward through the screw rod (13); S2. When the drill rod (11) drives the drill bit (18) to contact the ground, the output end of the second motor (6) drives the drill bit (18) to drill a hole in the rock formation at the construction site through the drill rod (11). At this time, the spiral blade (42) in the inner cavity of the drill rod (11) can drive the sludge inside the drilling well to enter the inside of the drill rod (11), and then the sludge inside the drill rod (11) is discharged through the sewage outlet (41); S3. After the rock formation at the construction site is drilled by the drill bit (18), the output end of the second hydraulic cylinder (27) can drive the bottom plate (21) to abut against the bottom surface. At this time, the insert pipe (23) and the annular tube (29) can be inserted into the inner cavity of the rock formation borehole. When the insert pipe (23) and the annular tube (29) are inserted into the rock formation borehole, it is necessary to ensure that the water pipe (31) is exposed to the outside. S4. The user transports water to the inside of the rock formation borehole through the water delivery pipe (31). When there is a lot of water inside the rock formation borehole, the water inside the rock formation borehole can be discharged to the outside through the drainage pipe (19); S5. When the second motor (6) drives the drill bit (18) to drill a hole in the rock formation via the drill rod (11), the paddles (14) on the drill rod (11) can stir the water inside the borehole. On the one hand, the water can cool the drill rod (11) and the drill bit (18). On the other hand, the water can change the density of the soil, making it easier for the drill rod (11) to drive the drill bit (18) to drill a hole in the rock formation.
Citation Information
Patent Citations
Omni-directional ultrahigh-pressure water jet rock cutting rotary excavating drilling system
CN112983266A
Building construction foundation drilling equipment with low carbon emission
CN116398043A
Novel pick cylinder drill
CN211201762U
Drilling device capable of simultaneously pumping water for rock and soil exploration
CN218624206U
Deep piling equipment for civil building foundation
CN219864851U