An auxiliary tool for power communication towers that is easy to repair
By designing power communication tower auxiliary tools for easy maintenance, the height adjustment and movement of the equipment box is achieved by using climbing tracks and moving rollers, solving the problems of cumbersome and low efficiency of equipment installation in the prior art, and improving installation efficiency and safety.
Patent Information
- Application Number
- CN202311624791.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-30
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2043-11-30
AI Technical Summary
When installing and operating at high altitudes, existing power communication tower auxiliary tools require cranes or climbing tools. The process is cumbersome and reduces the efficiency of equipment installation.
A power communication tower auxiliary tool for easy maintenance is designed, including alarm equipment box, speaker, camera monitoring, flash light and climbing track and other components. Through the design of climbing track and moving rollers, the height adjustment of the equipment box and Move, simplifying the installation process.
Through the design of climbing tracks and moving rollers, the efficiency of equipment installation is improved, the risk of manual climbing is reduced, and the stability and safety of equipment when installed at high altitudes are enhanced.
Smart Images

Figure CN117578734B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system equipment, and in particular to an auxiliary tool for a power communication tower which is convenient for maintenance. Background Art
[0002] In the power communication system, a large number of wires and cables need to be built. After the cables and wires are installed, there will be a lot of safety hazards. Therefore, it is necessary to use power safety monitoring devices to monitor abnormal conditions of the cables.
[0003] At present, since the installation of cables is at a high altitude of the power communication tower, the existing alarm equipment for monitoring the cables needs to be installed at a higher position to monitor and alarm the abnormal conditions of the cables. The existing auxiliary equipment of the power communication tower has the following disadvantages:
[0004] When installing auxiliary maintenance devices on existing power communication towers, since the auxiliary maintenance devices cannot move by themselves, it is necessary to manually climb to the top of the power communication tower to check the equipment lines. However, since the power communication tower is very high, after climbing up, the manual workers need to ensure their own stability while performing maintenance, which is very dangerous.
[0005] When an existing power communication tower fails, there is no auxiliary maintenance mechanism on the tower to help maintenance personnel check the line status in advance. As a result, they need to climb directly to the top of the tower to check. When the maintenance tools do not match the maintenance problem, they need to climb down and up again, which is very dangerous and has low maintenance efficiency.
[0006] When an existing power communication tower fails, the line may fall, posing a certain safety hazard to people near the power communication tower. However, the existing power communication tower does not have a remote warning device and cannot remind passers-by to stay away. Summary of the invention
[0007] 1. Technical issues to be resolved
[0008] In view of the deficiencies in the prior art, the present invention provides an auxiliary tool for power communication towers that is easy to maintain, which solves the technical problem that since the cables are installed at a high height on the poles, the existing alarm equipment for monitoring the cables needs to be installed at a high position in order to monitor and alarm abnormal conditions of the cables, while ordinary sound alarm platforms need to be installed with the aid of cranes or climbing tools when performing high-altitude installation operations, and the process is relatively cumbersome, thereby reducing the work efficiency of equipment installation.
[0009] (II) Technical solution
[0010] To achieve the above objectives, the present invention is implemented through the following technical solutions:
[0011] An auxiliary tool for electric communication towers that is easy to repair, comprising an alarm device box, a speaker is fixedly installed on the side end of the alarm device box, a top plate is fixedly installed on the upper end of the alarm device box, a solar panel is fixedly installed on the upper end of the top plate, a support rod is fixedly installed on the side end of the alarm device box, a connecting seat is fixedly installed on the upper end of the support rod, a rotating cover is rotatably installed on the upper end of the connecting seat, two support plates are fixedly installed on the upper end of the rotating cover, a video surveillance is rotatably installed between the two support plates, two support blocks 1 are fixedly installed on the side end of the alarm device box, and flashing lights are fixedly installed on the upper ends of the two support blocks 1;
[0012] Wherein, a storage battery is arranged on the inner side wall of the alarm device housing, the support rod is located on one side of the speaker, and the support rod is located above the speaker;
[0013] A bearing plate 1 is fixedly installed on the side end of the alarm device box, a linkage plate is arranged on the side end of the bearing plate 1, and a limit bolt is threadedly installed on the side end of the linkage plate;
[0014] The first supporting plate is located at a side away from the speaker, and the limiting bolt is threadedly mounted on the side end of the first supporting plate.
[0015] Preferably: two support blocks three are fixedly mounted on the inner side wall of the first carrier plate, and a servo motor one is fixedly mounted on the lower end of the third support block located below;
[0016] Among them, the output shaft of the servo motor one is installed through the lower end of the support block three.
[0017] A winding roller is rotatably installed between the two support blocks three;
[0018] Wherein, the rotating shaft of the winding roller is fixedly connected to the output shaft of the servo motor 1.
[0019] Two connecting blocks are fixedly installed on the side ends of the linkage plate, and a plurality of limit blocks are hingedly installed on the side ends of the two connecting blocks;
[0020] Wherein, the side end portion of the limit block is fixedly connected to the winding roller, and the limit block is wound around the circumferential surface of the winding roller.
[0021] A sliding opening is provided through the side end of each of the limit blocks, and a limit gasket is fixedly installed on the upper end of each of the limit blocks;
[0022] Wherein, each of the limit gaskets is located at the upper end of the sliding opening.
[0023] The inner side wall of each sliding opening is provided with two sliding grooves 2, and the inner side walls of the two sliding grooves 2 are both slidably mounted with a slider 1;
[0024] The two slide grooves are symmetrically arranged.
[0025] A moving roller is rotatably installed between the two sliders 1, and springs 2 are fixedly installed on the inner side walls of the two slide grooves 2;
[0026] Wherein, the two springs 2 are both fixedly connected to the side ends of the slider 1.
[0027] Preferably: four support blocks 2 are fixedly installed on the side end of the carrier plate 1, a rotating roller is rotatably installed between every two support blocks 2, and two winding openings are penetrated through the side end of the carrier plate 1;
[0028] Wherein, the two winding ports are both located on one side of the rotating roller, and the two groups of limit blocks are both installed through the inner side wall of the winding port.
[0029] The inner side wall of the bearing plate 1 is provided with two slide grooves 1, the inner side walls of the two slide grooves 1 are both fixedly installed with springs 1, and the inner side walls of the two slide grooves 1 are both slidably installed with sliders 2;
[0030] Wherein, the two springs 1 are both fixedly connected to the side ends of the slider 2.
[0031] A same bearing plate 2 is fixedly installed between the two sliders 2, an active roller is rotatably installed on the inner side wall of the bearing plate 2, a driven roller is rotatably installed on the inner side wall of the bearing plate 2, a climbing crawler is arranged between the active roller and the driven roller, and a servo motor 2 is fixedly installed on the side end of the bearing plate 2;
[0032] Wherein, the output shaft of the servo motor 2 is fixedly connected to the rotating shaft of the active roller.
[0033] (III) Beneficial effects
[0034] 1. The winding roller rotates to drive the limit block to reel up, and the limit block reels up to reduce the internal space surrounding the electric pole. When the moving roller fits the electric pole, the servo motor 1 is turned off, and the climbing track on the side of the bearing plate 1 fits the electric pole. Then the servo motor 2 is started, and the output shaft of the servo motor 2 rotates to drive the active roller to rotate. The rotation of the active roller drives the climbing track, and the climbing track moves to drive the bearing plate 2. The bearing plate 2 is forced to drive the slider 2, and the slider 2 is forced to drive the bearing plate 1. The bearing plate 1 is forced to drive the alarm device box to move. By adding a rotating climbing track to the sound alarm platform of the electric power monitoring safety equipment, when the monitoring alarm equipment is installed, after the limit block is limited around the electric pole, the climbing track can drive the alarm device box to adjust the height, thereby effectively improving the installation efficiency of the equipment.
[0035] 2. The load-bearing plate is subjected to force to drive the limit bolt, the limit bolt is subjected to force to drive the connecting block to move, the connecting block is subjected to force to drive the limit block to move, the limit block is subjected to force to drive the moving roller to move, and the moving roller is subjected to force to roll. By adding a rotating moving roller to the sound alarm platform of the electric power monitoring safety equipment, when the monitoring alarm equipment is installed, the climbing track drives the alarm equipment box to adjust the height, and the rolling moving roller reduces the friction between the electric pole, thereby improving the work efficiency of the climbing track driving the alarm equipment box to move, thereby effectively improving the installation efficiency of the equipment.
[0036] 3. The rotation of the winding roller drives the limit block to reel in. The reeling of the limit block reduces the internal space surrounding the electric pole. The limit block is forced to move in the reeling mouth. The limit block moves to squeeze the rotating roller, and the rotating roller is forced to roll. The rolling of the rotating roller reduces the friction between the limit block and the reeling mouth. When the moving roller fits the electric pole, the servo motor is turned off. By adding a rotating rotating roller to the sound alarm platform of the electric power monitoring safety equipment, the rotating rotating roller reduces the friction between the limit block and the reeling mouth during the reeling process, thereby effectively improving the practicability of the reeling roller to reel in the limit block.
[0037] Fourth, slider one is subjected to force to slide on the inner wall of slide groove two, slider one slides and squeezes spring two, spring two is subjected to force and deforms, spring two is deformed to release the limit on slider one, and then slider one drives the moving roller to move in the sliding opening, when the position of the moving roller is located on the inner side of the limiting gasket, the limiting gasket contacts with the electric pole, and the surrounding limiting gasket limits and fixes the electric pole, and the moving roller of the sound alarm platform of the electric power monitoring safety equipment is designed to slide horizontally, so that when the monitoring alarm equipment is installed, the climbing crawler drives the alarm equipment box to reach the specified height, and continues to reel in the limiting block, the limiting block is subjected to force to drive the moving roller, the moving roller slides into the sliding opening, and the limiting gasket limits and fixes the alarm equipment and the electric pole, thereby effectively improving the work efficiency of equipment installation.
[0038] 5. The moving roller slides out from the sliding opening, contacts the electric pole, and then starts the servo motor 2. The output shaft of the servo motor 2 rotates to drive the active roller to rotate. The active roller rotates to drive the climbing track. The climbing track moves to drive the bearing plate 2. The bearing plate 2 is forced to drive the slider 2. The slider 2 is forced to drive the bearing plate 1. The bearing plate 1 is forced to drive the alarm device box to move. By adding a rotating climbing track and moving roller to the sound alarm platform of the electric power monitoring safety equipment, when the monitoring alarm device is inspected and maintained, the moving roller on the limit block is limited around the electric pole, and the climbing track drives the alarm device box to descend, thereby effectively improving the work efficiency of equipment inspection and maintenance.
[0039] 6. This device installs auxiliary maintenance devices on the power communication tower. When the power communication tower fails, the user can remotely activate the speaker and flashing light inside the device to remind passers-by not to approach, thus serving as a safety warning. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings.
[0041] Figure 1 This is a structural diagram of the overall sound alarm platform for power monitoring safety equipment of the present invention;
[0042] Figure 2 It is a structural diagram of the support rod of the present invention;
[0043] Figure 3 It is a structural diagram of the linkage plate of the present invention;
[0044] Figure 4 It is a structural diagram of the connection block of the present invention;
[0045] Figure 5This is a structural diagram of a load-bearing plate 1 of the present invention;
[0046] Figure 6 It is a structural diagram of the second bearing plate of the present invention;
[0047] Figure 7 It is a structural diagram of the limiting gasket of the present invention;
[0048] Figure 8 This is a structural diagram of the limit block analysis of the present invention.
[0049] Legend: 1. Alarm device box; 11. Speaker; 12. Top plate; 13. Solar panel; 14. Support rod; 15. Connecting seat; 16. Rotating cover; 17. Support plate; 18. Camera monitoring; 19. Support block one; 2. Strobe light; 21. Loading plate one; 22. Linkage plate; 23. Limit bolt; 24. Connecting block; 25. Support block two; 26. Rotating roller; 27. Winding mouth; 28. Slide one; 29. Spring one; 3. Limit block; 31. Sliding mouth; 32. Limit gasket; 33. Slide two; 34. Slider one; 35. Moving roller; 36. Spring two; 4. Slider two; 41. Loading plate two; 42. Active roller; 43. Driven roller; 44. Climbing track; 45. Servo motor two; 5. Support block three; 51. Servo motor one; 52. Winding roller. DETAILED DESCRIPTION
[0050] The embodiment of the present application provides an auxiliary tool for power communication towers that is easy to maintain, thereby effectively solving the technical problem that since the cables are installed at a high height on the poles, the existing alarm equipment for monitoring the cables needs to be installed at a high position to monitor and alarm abnormal conditions of the cables, while ordinary sound alarm platforms need to be installed with the help of cranes or climbing tools when performing high-altitude installation operations, and the process is relatively cumbersome, thereby reducing the work efficiency of equipment installation. Example
[0051] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 ,and Figure 8 As shown, the technical solution in the embodiment of the present application effectively solves the problem that the existing alarm devices for monitoring the cables need to be installed at a higher position because the cables are installed at a higher height of the electric poles, so as to monitor and alarm the abnormal conditions of the cables. When the ordinary sound alarm platform is installed at a high altitude, it needs to be installed with the help of a crane or climbing tools, and the process is relatively cumbersome, thereby reducing the work efficiency of the equipment installation. The overall idea is based on the following:
[0052] In view of the problems existing in the prior art, the present invention provides an auxiliary tool for an electric communication tower that is easy to maintain, comprising an alarm device box 1, a loudspeaker 11 is fixedly installed on the side end portion of the alarm device box 1, a top plate 12 is fixedly installed on the upper end portion of the alarm device box 1, a solar panel 13 is fixedly installed on the upper end portion of the top plate 12, a support rod 14 is fixedly installed on the side end portion of the alarm device box 1, a connecting seat 15 is fixedly installed on the upper end portion of the support rod 14, a rotating cover 16 is rotatably installed on the upper end portion of the connecting seat 15, two support plates 17 are fixedly installed on the upper end portion of the rotating cover 16, a video monitoring system 18 is rotatably installed between the two support plates 17, two support blocks 19 are fixedly installed on the side end portion of the alarm device box 1, and the upper ends of the two support blocks 19 are fixedly installed with Strobe light 2; wherein, a battery is arranged on the inner wall of the alarm device housing 1, the support rod 14 is located on one side of the speaker 11, and the support rod 14 is located above the speaker 11; a bearing plate 21 is fixedly installed on the side end of the alarm device housing 1, a linkage plate 22 is arranged on the side end of the bearing plate 21, and a limiting bolt 23 is threadedly installed on the side end of the linkage plate 22; wherein, the bearing plate 21 is located on the side away from the speaker 11, the limiting bolt 23 is threadedly installed on the side end of the bearing plate 21, and the limiting bolt 23 is rotated, and the limiting bolt 23 is subjected to force to threadably rotate in the bearing plate 21 and the linkage plate 22, and when the limiting bolt 23 limits and fixes the bearing plate 21 and the linkage plate 22, the limiting bolt 23 is stopped from rotating.
[0053] Two support blocks 35 are fixedly installed on the inner wall of the carrier plate 21, and a servo motor 51 is fixedly installed on the lower end of the support block 35 located below; wherein, the output shaft of the servo motor 51 is installed through the lower end of the support block 35; a winding roller 52 is rotatably installed between the two support blocks 35; wherein, the rotating shaft of the winding roller 52 is fixedly connected to the output shaft of the servo motor 51; two connecting blocks 24 are fixedly installed on the side ends of the linkage plate 22, and the side ends of the two connecting blocks 24 are hingedly installed with a plurality of limiting The limit block 3 is fixedly connected to the winding roller 52 at its side end, and the limit block 3 is wound around the circumferential surface of the winding roller 52; a sliding opening 31 is provided through the side end of each limit block 3, and a limit gasket 32 is fixedly installed at the upper end of each limit block 3; each limit gasket 32 is located at the upper end of the sliding opening 31; the inner side wall of each sliding opening 31 is provided with two slide grooves 2 33, and the inner side walls of the two slide grooves 2 33 are slidably installed with sliders 1 34; the two slide grooves The two slide blocks 33 are symmetrically opened; a moving roller 35 is rotatably installed between the two slide blocks 34, and springs 36 are fixedly installed on the inner side walls of the two slide grooves 33; wherein, the two springs 36 are fixedly connected to the side ends of the slide blocks 34, and the servo motor 51 is started, and the servo motor 51 rotates to drive the winding roller 52, and the winding roller 52 is forced to rotate in the support block 3 5, and the winding roller 52 rotates to drive the limit block 3 to rewind, and the limit block 3 rewinds to reduce the internal space surrounding the electric pole, and the electric pole is squeezed by force. The movable roller 35 is pressed, and the movable roller 35 is forced to drive the slider 1 34 to move. The slider 1 34 is forced to slide on the inner wall of the slide groove 2 33. The slider 1 34 slides and squeezes the spring 2 36. The spring 2 36 is forced to deform. The deformation of the spring 2 36 releases the limit on the slider 1 34, and then the slider 1 34 drives the movable roller 35 to move in the sliding opening 31. When the position of the movable roller 35 is located on the inner side of the limit gasket 32, the limit gasket 32 contacts the electric pole, and the surrounding limit gasket 32 limits and fixes the electric pole.
[0054] Four support blocks 25 are fixedly installed on the side end of the carrier plate 21, and a rotating roller 26 is rotatably installed between every two support blocks 25. Two winding openings 27 are penetrated and provided at the side end of the carrier plate 21; wherein the two winding openings 27 are both located on one side of the rotating roller 26, and two groups of limit blocks 3 are penetrated and installed on the inner side wall of the winding opening 27; two slide grooves 28 are provided on the inner side wall of the carrier plate 21, and springs 29 are fixedly installed on the inner side walls of the two slide grooves 28, and sliders 4 are slidably installed on the inner side walls of the two slide grooves 28; wherein the two springs 29 are fixedly connected to the side end of the slider 4; the same carrier plate 241 is fixedly installed between the two sliders 4, and the carrier plate 24 1 is rotatably mounted with an active roller 42, and an inner wall of the bearing plate 41 is rotatably mounted with a driven roller 43, a climbing track 44 is arranged between the active roller 42 and the driven roller 43, and a servo motor 45 is fixedly mounted on the side end of the bearing plate 41; wherein, the output shaft of the servo motor 45 is fixedly connected with the rotating shaft of the active roller 42, and the servo motor 45 is started, and the output shaft of the servo motor 45 rotates to drive the active roller 42 to rotate, and the active roller 42 rotates to drive the climbing track 44, and the climbing track 44 moves to drive the bearing plate 41, and the bearing plate 41 is subjected to force to drive the slider 4, and the slider 4 is subjected to force to drive the bearing plate 21, and the bearing plate 21 is subjected to force to drive the alarm device box 1 to move.
[0055] Working principle:
[0056] The first step is that when the power monitoring safety equipment sound alarm platform is used, the solar panel 13 converts solar energy into electrical energy, and then stores it in the battery in the alarm device box 1. The battery supplies power to the video monitoring 18, and the video monitoring 18 monitors the power line. When the power line has problems such as falling off or short circuit, the staff starts the speaker 11 and the flashing light 2 to issue a warning to remind people to stay away from the dangerous area. When the power monitoring safety equipment sound alarm platform is installed, the staff places the alarm device box 1 on one side of the electric pole, and then pulls the linkage plate 22. The linkage plate 22 is forced to drive the connecting block 24 to move, and the connecting block 24 moves to drive the limit block 3. When the limit block 3 is wound around the electric pole, the limit bolt 23 is rotated. The limit bolt 23 is forced to rotate in the bearing plate 21 and the linkage plate 22. When the limit bolt 23 limits and fixes the bearing plate 21 and the linkage plate 22, the limit bolt 23 is stopped, and then the servo motor 51 is started. The servo motor 51 rotates with The winding roller 52 is driven to rotate in the support block 3 5, and the rotation of the winding roller 52 drives the limit block 3 to reel, and the limit block 3 reels and reduces the internal space surrounding the electric pole. When the moving roller 35 fits with the electric pole, the servo motor 1 51 is turned off, and the climbing crawler 44 on one side of the bearing plate 1 21 fits with the electric pole, and then the servo motor 2 45 is started, and the output shaft of the servo motor 2 45 rotates to drive the active roller 42 to rotate, and the active roller 42 rotates to drive the climbing crawler 44, The movement of the climbing crawler 44 drives the bearing plate 2 41, the bearing plate 2 41 is forced to drive the slider 2 4, the slider 24 is forced to drive the bearing plate 1 21, and the bearing plate 1 21 is forced to drive the alarm device box 1 to move. By adding a rotating climbing crawler 44 to the sound alarm platform of the electric power monitoring safety equipment, when the monitoring alarm equipment is installed, after the limit block 3 is limited around the electric pole, the climbing crawler 44 can drive the alarm device box 1 to adjust the height, thereby effectively improving the installation efficiency of the equipment.
[0057] In the second step, when the electric power monitoring safety equipment sound alarm platform is installed, the servo motor 51 is started, the servo motor 51 rotates to drive the winding roller 52, the winding roller 52 is forced to rotate in the support block 3 5, the winding roller 52 rotates to drive the limit block 3 to reel, the limit block 3 reels and shrinks the internal space surrounding the electric pole, when the moving roller 35 fits the electric pole, the servo motor 51 is turned off, when the climbing crawler 44 moves to drive the bearing plate 2 41, the bearing plate 2 41 is forced to drive the slider 2 4, the slider 2 4 is forced to drive the bearing plate 1 21, and the bearing plate 1 21 is forced to drive the limit bolt 23 The limit bolt 23 is subjected to force to drive the connecting block 24 to move, the connecting block 24 is subjected to force to drive the limit block 3 to move, the limit block 3 is subjected to force to drive the moving roller 35 to move, and the moving roller 35 is subjected to force to roll. By adding a rotating moving roller 35 to the sound alarm platform of the electric power monitoring safety equipment, when the monitoring alarm equipment is installed, the climbing track 44 drives the alarm equipment box 1 to adjust the height, and the rolling moving roller 35 reduces the friction between the electric pole, thereby improving the work efficiency of the climbing track 44 driving the alarm equipment box 1 to move, thereby effectively improving the installation efficiency of the equipment.
[0058] The third step, when the electric power monitoring safety equipment sound alarm platform is installed, start the servo motor 51, the servo motor 51 rotates to drive the winding roller 52, the winding roller 52 is forced to rotate in the support block 3 5, the winding roller 52 rotates to drive the limit block 3 to reel, the limit block 3 reels and reduces the internal space surrounding the electric pole, the limit block 3 is forced to move in the reeling mouth 27, the limit block 3 moves to squeeze the rotating roller 26, the rotating roller 26 is forced to roll, and the rolling of the rotating roller 26 reduces the friction between the limit block 3 and the reeling mouth 27, when the moving roller 35 is in contact with the electric pole, turn off the servo motor 51, by adding a rotating rotating roller 26 to the electric power monitoring safety equipment sound alarm platform, during the process of reeling the limit block 3, the rotating rotating roller 26 reduces the friction between the limit block 3 and the reeling mouth 27 during the reeling process, thereby effectively improving the practicability of the reeling roller 52 for reeling the limit block 3.
[0059] In the fourth step, when the electric power monitoring safety equipment sound alarm platform is installed, after the climbing crawler 44 drives the alarm device box 1 to reach the specified height, the servo motor 51 is started, and the servo motor 51 rotates to drive the winding roller 52, and the winding roller 52 is forced to rotate in the support block 3 5, and the winding roller 52 rotates to drive the limit block 3 to reel, and the limit block 3 reels to reduce the internal space surrounding the electric pole, and the electric pole is forced to squeeze the moving roller 35, and the moving roller 35 is forced to drive the slider 34 to move, and the slider 34 is forced to slide on the inner wall of the slide groove 2 33, and the slider 34 slides to squeeze the spring 2 36, and the spring 2 36 is deformed under the force, and the deformation of the spring 2 36 releases the slider 3 4, and then the slider 34 drives the moving roller 35 to move in the sliding opening 31. When the position of the moving roller 35 is located on the inner side of the limiting gasket 32, the limiting gasket 32 contacts the electric pole, and the surrounding limiting gasket 32 limits and fixes the electric pole. By designing the moving roller 35 of the electric power monitoring safety equipment sound alarm platform to be able to slide horizontally, when the monitoring alarm equipment is installed, the climbing crawler 44 drives the alarm equipment box 1 to reach the specified height, and continues to reel in the limiting block 3. The limiting block 3 is forced to drive the moving roller 35, and the moving roller 35 slides into the sliding opening 31. The limiting gasket 32 limits and fixes the alarm equipment and the electric pole, thereby effectively improving the work efficiency of equipment installation.
[0060] Step 5. When the electric power monitoring safety equipment sound alarm platform needs to be inspected and maintained, start the servo motor 1 51. The servo motor 1 51 rotates to drive the winding roller 52. The winding roller 52 is forced to rotate in the support block 3 5. The winding roller 52 rotates to release the winding of the limit block 3. The limit block 3 gradually releases the internal space surrounding the electric pole. When the limit gasket 32 is separated from the electric pole, the moving roller 35 slides out of the sliding opening 31. The moving roller 35 contacts the electric pole, and then start the servo motor 2 45. The output shaft of the servo motor 2 45 rotates to drive the active roller 42 to rotate. The active roller 42 rotates. The climbing crawler 44 is driven by the movement, the climbing crawler 44 moves and drives the bearing plate 2 41, the bearing plate 2 41 is subjected to the force to drive the slider 2 4, the slider 2 4 is subjected to the force to drive the bearing plate 1 21, and the bearing plate 1 21 is subjected to the force to drive the alarm device box 1 to move. By adding a rotating climbing crawler 44 and a moving roller 35 to the sound alarm platform of the electric power monitoring safety equipment, when the monitoring alarm device is inspected and maintained, after the moving roller 35 on the limit block 3 is limited by the electric pole, the climbing crawler 44 drives the alarm device box 1 to descend, thereby effectively improving the work efficiency of equipment inspection and maintenance.
[0061] Finally, it should be noted that: Obviously, the above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the implementation methods. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from this are still within the scope of protection of the present invention.
Claims
1. An auxiliary tool for power communication tower maintenance, comprising an alarm device box (1), characterized in that: A loudspeaker (11) is fixedly mounted on the side end of the alarm device housing (1), a top plate (12) is fixedly mounted on the upper end of the alarm device housing (1), a solar panel (13) is fixedly mounted on the upper end of the top plate (12), a support rod (14) is fixedly mounted on the side end of the alarm device housing (1), a connecting seat (15) is fixedly mounted on the upper end of the support rod (14), a rotating cover (16) is rotatably mounted on the upper end of the connecting seat (15), two support plates (17) are fixedly mounted on the upper end of the rotating cover (16), a video monitoring device (18) is rotatably mounted between the two support plates (17), two support blocks (19) are fixedly mounted on the side end of the alarm device housing (1), and a flashing light (2) is fixedly mounted on the upper ends of the two support blocks (19); Wherein, a storage battery is arranged on the inner side wall of the alarm device housing (1), the support rod (14) is located on one side of the speaker (11), and the support rod (14) is located above the speaker (11); A bearing plate (21) is fixedly mounted on the side end of the alarm device housing (1), a linkage plate (22) is arranged on the side end of the bearing plate (21), and a limit bolt (23) is threadedly mounted through the side end of the linkage plate (22); The position of the first bearing plate (21) is located on a side away from the loudspeaker (11), and the limiting bolt (23) is threadedly mounted on the side end of the first bearing plate (21); Two support blocks three (5) are fixedly mounted on the inner side wall of the carrier plate one (21), and a servo motor one (51) is fixedly mounted on the lower end of the support block three (5) located below; Wherein, the output shaft of the servo motor 1 (51) is installed through the lower end of the support block 3 (5); A winding roller (52) is rotatably mounted between the two support blocks (5); Wherein, the rotating shaft of the winding roller (52) is fixedly connected to the output shaft of the servo motor 1 (51); Two connecting blocks (24) are fixedly mounted on the side ends of the linkage plate (22), and a plurality of limit blocks (3) are hingedly mounted on the side ends of the two connecting blocks (24); The side end of the limit block (3) is fixedly connected to the winding roller (52), and the limit block (3) is wound around the circumferential surface of the winding roller (52); A sliding opening (31) is provided through the side end of each of the limit blocks (3), and a limit gasket (32) is fixedly mounted on the upper end of each of the limit blocks (3); Wherein, each of the limiting gaskets (32) is located at the upper end of the sliding opening (31); The inner side wall of each sliding opening (31) is provided with two second sliding grooves (33), and the inner side walls of the two second sliding grooves (33) are both slidably mounted with a sliding block (34); Wherein, the two chute slots 2 (33) are symmetrically arranged; A movable roller (35) is rotatably mounted between the two sliders (34), and springs (36) are fixedly mounted on the inner side walls of the two slide grooves (33); Wherein, the two springs 2 (36) are fixedly connected to the side ends of the slider 1 (34); Four support blocks (25) are fixedly mounted on the side end of the carrier plate (21), a rotating roller (26) is rotatably mounted between every two support blocks (25), and two winding openings (27) are formed through the side end of the carrier plate (21); The two winding openings (27) are both located on one side of the rotating roller (26), and the two sets of limit blocks (3) are both installed through the inner side wall of the winding opening (27); The inner side wall of the bearing plate 1 (21) is provided with two slide grooves 1 (28), the inner side walls of the two slide grooves 1 (28) are both fixedly mounted with springs 1 (29), and the inner side walls of the two slide grooves 1 (28) are both slidably mounted with sliders 2 (4); Wherein, the two springs 1 (29) are fixedly connected to the side ends of the slider 2 (4); A same bearing plate (41) is fixedly mounted between the two sliders (4), an active roller (42) is rotatably mounted on the inner side wall of the bearing plate (41), a driven roller (43) is rotatably mounted on the inner side wall of the bearing plate (41), a climbing crawler (44) is arranged between the active roller (42) and the driven roller (43), and a servo motor (45) is fixedly mounted on the side end of the bearing plate (41); Wherein, the output shaft of the second servo motor (45) is fixedly connected to the rotating shaft of the active roller (42).
Citation Information
Patent Citations
A multi-functional power transmission line monitoring device
CN218825760U