Digital assetization method and platform for multi-source heterogeneous bridge component construction data

By formulating customized collection plans and data collection scripts, the problem of unrealistic data collection during the construction period of bridge components and difficulty in processing multi-source heterogeneous data has been solved, and real, targeted and efficient digitalization of data during the construction period of bridge components has been achieved. Asset processing.

CN117592920BActive Publication Date: 2024-10-29CCCC SECOND HIGHWAY ENG CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202311438261.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-10-31
Publication Date
2024-10-29
Estimated Expiration
2043-10-31

AI Technical Summary

Technical Problem

The existing technology cannot effectively digitalize the construction period data of bridge components, resulting in data collection that is unreal, untargeted, and unintuitive, and cannot uniformly process multi-source heterogeneous data, affecting the pertinence, validity, and reliability of the data. sex and efficiency.

Method used

By setting the key components, construction process links and data types of the target bridge construction project, we develop a customized collection plan, form a data collection script, collect, filter, process and classify storage of multi-source heterogeneous data to form the target digital assets. data.

Benefits of technology

It achieves true, targeted, intuitive and lightweight processing of data during the construction period of bridge components, improves the effectiveness and efficiency of data collection, and facilitates the sharing of data by all parties involved in bridge construction, management and maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117592920B_ABST
    Figure CN117592920B_ABST
Patent Text Reader

Abstract

The present application provides a method and platform for digital assetization of multi-source heterogeneous bridge component construction period data, the method comprising: setting key components, key construction process links and collection data types for the target bridge construction project, and setting a custom collection plan to form a data collection script for the target bridge construction project; collecting data for the multi-source heterogeneous bridge component construction period data based on the data collection script, and screening and processing the collection result data in turn and storing them by category, to obtain the current target digital asset data of the target bridge construction project for calling and viewing. The present application can perform unified and comprehensive integrated digital asset processing based on real multi-source heterogeneous bridge component construction period data, and can effectively improve the pertinence, intuitiveness and lightweight degree of data collection, and can effectively reduce data collection resource consumption on the basis of improving the pertinence, effectiveness, reliability and efficiency of digital assetization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of bridge construction data processing, and in particular to a method and platform for digital assetization of multi-source heterogeneous bridge component construction period data. Background Art

[0002] As an important part of infrastructure construction, bridges need to collect key data from the beginning of the construction period to ensure the quality and health of the project throughout its life cycle. The data should be archived in time as a basis for analysis to guide construction and subsequent management, maintenance, and demolition work. For large-scale bridge construction, due to the high technical difficulty, complex structure, long construction period, and many types of data, the data collected during the construction process are often scattered among several parties involved in the construction. Moreover, these data are often massive and will not be retained for a long time. They will disappear with the completion of the construction. When other parties need relevant data in the future, they have no way to obtain them. It is impossible to retain, process, and share data in a timely manner, and it is difficult to meet the production and management needs of all parties involved in the construction and maintenance at different stages. With the continuous development of technologies such as big data, artificial intelligence, and cloud computing, how to introduce advanced information technology to improve the digital level of transportation infrastructure and support the ability to accurately perceive, analyze, manage, and provide services for bridge status has become a key research issue.

[0003] At present, no existing technology has been found for the digital assetization of bridge component construction period data. The closest related existing technology is the application of BIM technology in the bridge construction period. The basis of BIM technology application is an idealized three-dimensional model, which is established based on theoretical design parameters. However, the construction parameters in the real environment are often different from the design parameters, and they change with the progress of the construction period. Therefore, this application method cannot guarantee the authenticity of the data collected during the bridge construction period. Other existing construction data collection processes cannot guarantee that the collected data is targeted, intuitive and lightweight, and cannot balance the consumption of data collection resources and the effectiveness of data collection. It is also impossible to uniformly and comprehensively process the data assets of heterogeneous and multi-source bridge component construction period data, which will affect the targeting, effectiveness, reliability and efficiency of the digital assetization of bridge component construction period data. Summary of the invention

[0004] In view of this, the embodiments of the present application provide a method and platform for digital assetization of multi-source heterogeneous bridge component construction period data to eliminate or improve one or more defects existing in the prior art.

[0005] One aspect of the present application provides a method for digital assetization of multi-source heterogeneous bridge component construction period data, including:

[0006] Set key components, key construction process links and data types for the target bridge construction project, and set corresponding custom collection plans for the key components, key construction processes and data types to form a data collection script for the target bridge construction project;

[0007] Based on the data collection script, data collection is performed on the construction period data of multi-source heterogeneous bridge components corresponding to the target bridge construction project, and the collected result data are filtered, processed and classified and stored in turn to obtain the current target digital asset data of the target bridge construction project for calling and viewing.

[0008] In some embodiments of the present application, the settings are for key components, key construction process links and collected data types of the target bridge construction project, including:

[0009] Select multiple key components for the target bridge construction project;

[0010] In each construction process corresponding to the target bridge construction project, the key construction process links and the corresponding collected data types corresponding to each of the key components are selected respectively.

[0011] In some embodiments of the present application, the selecting of multiple key components for the target bridge construction project includes:

[0012] According to the target bridge type to which the target bridge construction project belongs, extracting the bridge basic information corresponding to the target bridge type from the preset bridge basic information corresponding to each bridge type, wherein the bridge basic information includes a multi-level component structure;

[0013] A plurality of the key components are selected from the multi-level component architecture in the basic bridge information corresponding to the target bridge type.

[0014] In some embodiments of the present application, the multi-level component architecture includes: a primary bridge type layer, a secondary bridge component layer, and a third component layer connected sequentially from top to bottom;

[0015] The first-level bridge type layer is used to display the bridge type applicable to the current multi-level component architecture;

[0016] The secondary bridge component layer is used to display a plurality of component structures divided according to the bridge components corresponding to the bridge type;

[0017] The three-layer component layer is used to display the components corresponding to each of the component structures.

[0018] In some embodiments of the present application, the basic information of the bridge also includes a construction process flow corresponding to the bridge type and a plurality of optional data types, wherein the optional data types include carrier forms corresponding to the data indicators of each type;

[0019] Correspondingly, in each construction process corresponding to the target bridge construction project, the key construction process links and the corresponding collected data types corresponding to each of the key components are selected respectively, including:

[0020] Selecting key construction process links corresponding to each of the key components from the construction process flow in the basic bridge information corresponding to the target bridge type;

[0021] From each of the optional data types in the basic information of the bridge corresponding to the target bridge type, the collected data type for each of the key construction process links is selected respectively, wherein the collected data type includes mechanical data.

[0022] In some embodiments of the present application, the custom collection scheme corresponding to the key components, key construction processes and collection data types is set, including:

[0023] According to the key components, key construction processes and data types to be collected, corresponding data collection methods, measuring point layout diagrams, measuring point layout time, measuring instruments and equipment, collection time and data collection instruments corresponding to each measuring point are set to form a corresponding custom collection plan.

[0024] In some embodiments of the present application, the data collection script is used to collect data during the construction period of multi-source heterogeneous bridge components corresponding to the target bridge construction project, and the collected result data is filtered, processed and classified and stored in sequence to obtain the current target digital asset data of the target bridge construction project for calling and viewing, including:

[0025] After arranging and debugging measuring instruments and data acquisition instruments at each measuring point in the data acquisition scenario, collecting multi-source heterogeneous bridge component construction period data at each measuring point based on the data acquisition scenario to obtain current measured data of the target bridge construction project;

[0026] Screening and processing the measured data to obtain corresponding target digital asset data;

[0027] Classifying and storing the target digital asset data;

[0028] If a call request for the target digital asset data is received, the corresponding digital asset data is extracted from the target digital asset data stored in the classification according to the keyword in the call request and output for display.

[0029] In some embodiments of the present application, the screening and processing of the measured data to obtain corresponding target digital asset data includes:

[0030] Performing noise reduction and screening processing on the measured data;

[0031] Performing data processing on the measured data after noise reduction and screening to obtain the corresponding target digital asset data;

[0032] Among them, the data processing includes: extracting features from the measured data after noise reduction and screening based on a preset bridge calculation algorithm, and / or issuing risk warnings for the indicator data according to preset thresholds corresponding to the indicator data in the measured data after noise reduction and screening.

[0033] In some embodiments of the present application, the classified storage of the target digital asset data includes:

[0034] Setting multiple levels of classification attributes according to the key components, key construction process links, data types, collection time and data format;

[0035] The target digital asset data is classified and stored according to the classification attributes of each level and a corresponding data extraction interface is constructed.

[0036] Another aspect of the present application provides a digital asset platform for multi-source heterogeneous bridge component construction period data, including:

[0037] A data collection script design module is used to set key components, key construction process links and collection data types for the target bridge construction project, and set corresponding custom collection plans for the key components, key construction processes and collection data types to form a data collection script for the target bridge construction project;

[0038] The digital assetization module is used to collect data on the construction period data of multi-source heterogeneous bridge components corresponding to the target bridge construction project based on the data collection script, and to filter, process and classify the collected result data in turn to obtain the current target digital asset data of the target bridge construction project for calling and viewing.

[0039] In some embodiments of the present application, the digital asset module includes:

[0040] A data acquisition module, for collecting the multi-source heterogeneous bridge component construction period data of each measuring point based on the data acquisition script after arranging and debugging the measuring instruments and data acquisition instruments at each measuring point based on the data acquisition script, so as to obtain the current measured data of the target bridge construction project;

[0041] A data screening and processing module, used to screen and process the measured data to obtain corresponding target digital asset data;

[0042] A classification storage module, used for classifying and storing the target digital asset data;

[0043] The data calling and viewing module is used to extract the corresponding digital asset data from the target digital asset data stored in the classification according to the keywords in the calling request and output it for display if a calling request for the target digital asset data is received.

[0044] The third aspect of the present application provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the method for digitalizing the construction period data of multi-source heterogeneous bridge components when executing the computer program.

[0045] The fourth aspect of the present application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the method for digitalizing the construction period data of multi-source heterogeneous bridge components.

[0046] The method for digitalizing the construction period data of multi-source heterogeneous bridge components provided in the present application forms a data collection script for the target bridge construction project by setting key components, key construction process links and collected data types for the target bridge construction project, and setting corresponding custom collection schemes for the key components, key construction processes and collected data types; based on the data collection script, data collection is performed on the construction period data of the multi-source heterogeneous bridge components corresponding to the target bridge construction project, and the collected result data is filtered, processed and classified and stored in turn to obtain the current target digital asset data of the target bridge construction project for calling and viewing. This application proposes a digital asset technology based on the construction period data of multi-source heterogeneous bridge components based on various types of bridges, especially large-span and complex structure bridges. It can monitor data / information, collect and transmit, archive data, extract and call, and display information for key components during the construction period of various types of bridges. It can perform unified and comprehensive integrated digital asset processing based on real multi-source heterogeneous bridge component construction period data, and can effectively improve the pertinence, intuitiveness and lightweight degree of data collection. It can effectively reduce data collection resource consumption on the basis of improving the pertinence, effectiveness, reliability and efficiency of digital assetization. It is convenient for all parties involved in bridge construction, management and maintenance to share data and carry out various business tasks.

[0047] Additional advantages, purposes, and features of the present application will be partially described in the following description, and will become partially apparent to those skilled in the art after studying the following, or may be learned from the practice of the present application. The purposes and other advantages of the present application can be achieved and obtained by the structures specifically pointed out in the specification and the drawings.

[0048] Those skilled in the art will understand that the purposes and advantages that can be achieved by the present application are not limited to the above specific description, and the above and other purposes that can be achieved by the present application will be more clearly understood based on the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] The drawings described herein are used to provide a further understanding of the present application, constitute a part of the present application, and do not constitute a limitation of the present application. The components in the drawings are not drawn to scale, but are only for the purpose of illustrating the principles of the present application. In order to facilitate the illustration and description of some parts of the present application, the corresponding parts in the drawings may be enlarged, that is, they may become larger relative to other components in the exemplary device actually manufactured according to the present application. In the drawings:

[0050] Figure 1 This is a first flow chart of a method for digitalizing construction period data of multi-source heterogeneous bridge components in one embodiment of the present application.

[0051] Figure 2This is a second specific flow chart of the method for digital assetization of multi-source heterogeneous bridge component construction period data in one embodiment of the present application.

[0052] Figure 3 This is a third specific flow chart of the method for digitalizing construction period data of multi-source heterogeneous bridge components in one embodiment of the present application.

[0053] Figure 4 This is a schematic diagram of basic information of a ground-anchored suspension bridge in an example of the present application.

[0054] Figure 5 This is a schematic diagram of the first structure of a digital asset platform for multi-source heterogeneous bridge component construction data in one embodiment of the present application.

[0055] Figure 6 This is a second structural diagram of the digital asset platform for multi-source heterogeneous bridge component construction data in one embodiment of the present application.

[0056] Figure 7 A schematic diagram of the execution logic of the digital asset method and platform for multi-source heterogeneous bridge component construction period data in one embodiment of the present application.

[0057] Figure 8 This is a schematic diagram of the functional division of the administrator side and the user side of the digital asset platform for the construction period data of multi-source heterogeneous suspension bridge components in an application example of the present application. DETAILED DESCRIPTION

[0058] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the implementation modes and the accompanying drawings. Here, the illustrative implementation modes and descriptions of the present application are used to explain the present application, but are not intended to limit the present application.

[0059] It should also be noted here that in order to avoid obscuring the present application due to unnecessary details, only the structures and / or processing steps closely related to the scheme according to the present application are shown in the accompanying drawings, while other details that are not very relevant to the present application are omitted.

[0060] It should be emphasized that the term “include / comprises” when used herein refers to the presence of features, elements, steps or components, but does not exclude the presence or addition of one or more other features, elements, steps or components.

[0061] It should also be noted that, unless otherwise specified, the term “connection” herein may refer not only to a direct connection but also to an indirect connection involving an intermediate.

[0062] Hereinafter, embodiments of the present application will be described with reference to the accompanying drawings. In the accompanying drawings, the same reference numerals represent the same or similar components, or the same or similar steps.

[0063] Since there is no existing technology for digital assetization of bridge component construction period data, the application of the relatively close BIM technology in the bridge construction period is used to explain the existing technology:

[0064] The main content of BIM is to provide three-dimensional visual information services for all stages and participants of the engineering project. Managers and technical personnel can make reasonable and efficient judgments and decisions based on the information provided by BIM technology and the actual situation.

[0065] BIM model creation: The creation of a three-dimensional BIM model is the basis of construction simulation. The corresponding BIM model can be established through software provided by platforms such as Bentley: use software such as Open Roads Designer to create the bridge centerline, bridge deck paving template, three-dimensional terrain environment, etc.; use software such as Open Bridge Modeler to complete the creation of the main bridge model, and use software such as Micro Station to build models of bridge ancillary facilities components; use software such as Synchro 4D as the final construction simulation environment for model integration and display.

[0066] Application of BIM technology: Based on the BIM model, various specific tasks in the construction process can be intuitively simulated and displayed, including: engineering component collision inspection, construction site layout, construction progress simulation, key construction process simulation, etc. The current BIM technology is mainly based on three-dimensional simulation of ideal conditions and design parameters, and is displayed in a three-dimensional visual way before actual construction, so as to evaluate and optimize various design schemes in advance.

[0067] However, combined with the application of BIM technology during the construction period, because the basis of BIM technology application is an idealized three-dimensional model, the three-dimensional model is established based on theoretical design parameters, but the construction parameters in the real environment are often different from the design parameters, and they change as the construction period progresses. Therefore, the simulation work carried out by BIM technology cannot fully reflect the actual situation of the bridge structure and the construction process in principle. Other existing real construction data collection processes cannot guarantee that the collected data is targeted, intuitive and lightweight, and cannot balance the consumption of data collection resources and the effectiveness of data collection. It is also impossible to uniformly and comprehensively process the data assets of heterogeneous and multi-source bridge components during the construction period, which will affect the pertinence, effectiveness, reliability and efficiency of the digital assetization of bridge component construction period data.

[0068] Based on this, in order to solve the problems that the prior art cannot perform unified and comprehensive integrated digital asset processing based on real multi-source heterogeneous bridge component construction period data, and cannot improve the pertinence, intuitiveness and lightweight degree of data collection, the embodiments of the present application respectively provide a digital asset method for multi-source heterogeneous bridge component construction period data, a digital asset platform for multi-source heterogeneous bridge component construction period data for implementing the digital asset method for multi-source heterogeneous bridge component construction period data, a physical device and a computer-readable storage medium, which can perform unified and comprehensive integrated digital asset processing based on real multi-source heterogeneous bridge component construction period data, and can effectively improve the pertinence, intuitiveness and lightweight degree of data collection.

[0069] The details are described in detail through the following examples.

[0070] Based on this, the embodiment of the present application provides a method for digital assetization of multi-source heterogeneous bridge component construction period data that can be implemented by a digital asset platform for multi-source heterogeneous bridge component construction period data, see Figure 1 The digital assetization method of the multi-source heterogeneous bridge component construction period data specifically includes the following contents:

[0071] Step 100: Set key components, key construction process links and collection data types for the target bridge construction project, and set corresponding custom collection plans for the key components, key construction processes and collection data types to form a data collection script for the target bridge construction project.

[0072] It can be understood that the data collection script is used to make detailed designs and regulations for the collection details of each data, so as to facilitate the subsequent data collection work to be carried out in an orderly manner according to the data collection script.

[0073] The specific form of the data collection script can be a data file stored in a tabular or topological form, which at least needs to include key components, key construction process links, collection data types and customized collection plans for the target bridge construction project.

[0074] Among them, the custom collection plan is the measurement method, measurement equipment, collection method and collection equipment used for the key components, key construction processes and collection data types specified by the user according to actual needs, which will be described in detail in subsequent embodiments.

[0075] In step 100, for each bridge construction project to be digitized as an asset, it is taken as the current target bridge construction project, and its key components, key construction process links, collection data types and customized collection plans are set in a targeted manner, which can effectively improve the pertinence, intuitiveness and lightweight degree of data collection, and can effectively reduce data collection resource consumption on the basis of improving the pertinence, effectiveness, reliability and efficiency of digital assetization.

[0076] In one or more embodiments of the present application, the key component refers to a component that has monitoring requirements selected from various components involved in the target bridge construction project. The key construction process link refers to a key construction process link that has monitoring requirements selected from various construction process links corresponding to the key component in the construction process flow of the target bridge construction project. The acquisition data type refers to a targeted data type selected for the key component and the corresponding key construction process link, which can be selected according to actual needs to further improve the pertinence and flexibility. For example, for the same key component in different key construction process links, different acquisition data types for the key component can be selected according to the environmental characteristics and process characteristics of each key construction process link.

[0077] Step 200: Based on the data collection script, data collection is performed on the construction period data of multi-source heterogeneous bridge components corresponding to the target bridge construction project, and the collected result data is filtered, processed and classified and stored in turn to obtain the current target digital asset data of the target bridge construction project for calling and viewing.

[0078] In step 200, by collecting various real measurement data and construction images that can be perceived by key components during the bridge construction period, the real conditions during the bridge construction period can be reflected with real data results.

[0079] It can be understood that the multi-source heterogeneous bridge component construction period data refers to multi-source and heterogeneous bridge component construction period data, specifically refers to data and information related to the construction period of bridge components from different sources and different types. These data and information may come from different data sources, databases, file systems, networks, etc., and may also have different formats, structures, semantics, and granularity.

[0080] Among them, the data of bridge components during the construction period specifically refers to: as a large-scale structure, bridges have different structural types. Each type of bridge is composed of different components. During the construction period, various components are constructed to form a complete bridge structure for delivery and operation. The data of bridge components during the construction period reflects their manufacturing and installation. Improper manufacturing and installation may cause the alignment and stress state of the bridge to deviate from the target state when it is completed, resulting in initial defects in the bridge. The actual perception of the data of bridge components during the construction period is of great significance for the future tracing of bridge defects.

[0081] In addition, the digital assetization mentioned in one or more embodiments of the present application specifically refers to converting the construction period data of multi-source heterogeneous bridge components into corresponding digital assets for storage and for retrieval at any time.

[0082] From the above description, it can be seen that the digital assetization method of multi-source heterogeneous bridge component construction period data provided by the embodiment of the present application is based on various types of bridges, especially large-span and complex structure bridges, and proposes a digital assetization technology based on multi-source heterogeneous bridge component construction period data. It can monitor data / information, collect and transmit, archive data, extract and call, and display information for key components during the construction period of various types of bridges. It can perform unified and comprehensive integrated digital assetization based on real multi-source heterogeneous bridge component construction period data, and can effectively improve the pertinence, intuitiveness and lightweight degree of data collection. It can effectively reduce data collection resource consumption on the basis of improving the pertinence, effectiveness, reliability and efficiency of digital assetization. It is convenient for all parties involved in bridge construction, management and maintenance to share data and carry out various business tasks.

[0083] In order to further improve the pertinence and data validity of data collection and reduce the consumption of collection resources, in a digital assetization method for multi-source heterogeneous bridge component construction period data provided in an embodiment of the present application, see Figure 2 Step 100 of the method for digitalizing construction period data of multi-source heterogeneous bridge components specifically includes the following contents:

[0084] Step 110: Select multiple key components for the target bridge construction project.

[0085] Step 120: In each construction process corresponding to the target bridge construction project, respectively select the key construction process links and the corresponding collected data types corresponding to each of the key components.

[0086] Specifically, in the stage of designing the data collection script, the key components of the bridge project are first selected, and then the construction process of each key component is combined to choose which data indicators to measure or which image data to collect. This can effectively improve the setting efficiency of the key construction process links and the corresponding collection data types, improve the pertinence and validity of data collection, and reduce the consumption of collection resources.

[0087] In order to improve the efficiency and reliability of key component selection and avoid omissions, in a digital assetization method for multi-source heterogeneous bridge component construction period data provided in an embodiment of the present application, see Figure 3 Step 110 of the method for digitalizing construction period data of multi-source heterogeneous bridge components specifically includes the following contents:

[0088] Step 111: according to the target bridge type to which the target bridge construction project belongs, extract the bridge basic information corresponding to the target bridge type from the preset bridge basic information corresponding to each bridge type, wherein the bridge basic information includes a multi-level component architecture.

[0089] In step 111, the digital asset platform for multi-source heterogeneous bridge component construction period data can search and extract the basic bridge information corresponding to the target bridge type to which the target bridge construction project belongs from the basic bridge information corresponding to each bridge type pre-stored in the platform or in the corresponding database.

[0090] It is understandable that before step 111, the digital asset platform for the construction period data of multi-source heterogeneous bridge components can pre-receive and store the basic bridge information corresponding to each bridge type pre-constructed by the user, so as to effectively improve the search efficiency and convenience of the basic bridge information corresponding to the target bridge type.

[0091] Step 112: Select a plurality of key components from the multi-level component architecture in the basic bridge information corresponding to the target bridge type.

[0092] In step 112, the digital asset platform for the multi-source heterogeneous bridge component construction period data may first output and display the basic bridge information corresponding to the target bridge type obtained in step 111, so that the user can intuitively, quickly and specifically select key components in the multi-level component architecture within the basic bridge information corresponding to the target bridge type. Then, the digital asset platform for the multi-source heterogeneous bridge component construction period data receives the key component selection operation instruction or information issued by the user, and determines the multiple key components selected by the user in the multi-level component architecture within the basic bridge information corresponding to the target bridge type according to the instruction or information.

[0093] In a digital assetization method for multi-source heterogeneous bridge component construction period data provided in an embodiment of the present application, the multi-level component architecture in the digital assetization method for multi-source heterogeneous bridge component construction period data specifically includes the following contents:

[0094] The first-level bridge type layer, the second-level bridge component layer and the third-level structural component layer are connected in sequence from top to bottom;

[0095] The first-level bridge type layer is used to display the bridge type applicable to the current multi-level component architecture;

[0096] The secondary bridge component layer is used to display a plurality of component structures divided according to the bridge components corresponding to the bridge type;

[0097] The three-layer component layer is used to display the components corresponding to each of the component structures.

[0098] By clearly dividing the three levels of bridge components and their corresponding relationships, the efficiency of the multi-level component architecture of the preset target bridge construction project can be improved and omissions can be avoided. The efficiency and reliability of the selection of key components can also be further improved and omissions can be avoided.

[0099] The above multi-level component architecture is illustrated by taking a suspension bridge as an example. Suspension bridges are divided into self-anchored suspension bridges and ground-anchored suspension bridges. For example, if the bridge type corresponding to the target bridge construction project is a ground-anchored suspension bridge, then the following is selected: Figure 4 Basic information of the bridge shown.

[0100] exist Figure 4 Among the basic information of the bridge shown, the first-level bridge type layer shows that the bridge type is: ground-anchored suspension bridge; the second-level bridge component layer is divided into superstructure, substructure, ancillary facilities and supports according to the components of the bridge; the third-level component layer subdivides the component components, the superstructure includes catwalks, main cables, suspenders, stiffening beams, pylons, etc., the substructure includes anchors, piers, abutments, foundations, etc., and the ancillary structures include bridge deck pavement, bridge deck drainage, bridge head slabs, expansion joints, anti-collision guardrails, etc.

[0101] In order to improve the efficiency and reliability of key construction process links and the selection of collected data types and avoid omissions, in a digital asset method for multi-source heterogeneous bridge component construction period data provided in an embodiment of the present application, the basic bridge information also includes the construction process flow corresponding to the bridge type and multiple optional data types, wherein the optional data types include the carrier forms corresponding to each type of data indicator.

[0102] Likewise Figure 4Taking the example of the bridge as an example, the construction process consists of various construction processes, such as the upper structure construction, including the construction of cable towers, installation of cable saddles, erection of catwalks, installation of traction cables, installation of reference cables, general cables, main cable tightening, installation of cable clamps, installation of slings, installation of stiffening beams, and main cable winding protection, etc. Similarly, the optional data types can also be reflected in the basic information of the bridge, such as mechanical data, environmental data, image data, animation data, model data, etc.

[0103] It can be understood that the optional data types include the carrier forms corresponding to each type of data indicator. For example, the data indicator is the pressure data for a certain component, and its carrier form is the electrical signal converted from the pressure mechanical energy sent back by the pressure sensor; the data indicator is the construction personnel monitoring data for a certain component in a certain construction process link, and its carrier form is the image data sent back by the image acquisition equipment deployed on site, etc.

[0104] Based on the above basic information of bridges including the construction process corresponding to the bridge type and multiple optional data types, see Figure 3 Step 120 of the method for digitalizing construction period data of multi-source heterogeneous bridge components specifically includes the following contents:

[0105] Step 121: Select the key construction process links corresponding to each of the key components from the construction process flow in the basic bridge information corresponding to the target bridge type.

[0106] Step 122: Selecting a collection data type for each of the key construction process links from each of the optional data types in the basic bridge information corresponding to the target bridge type, wherein the collection data type includes mechanical data.

[0107] It is understandable that the collected data types include at least mechanical data, and may also include other types of data, such as pressure data, displacement data, wheelbase data, and the like.

[0108] In step 122, in response to the technical problem that BIM technology cannot simulate bridge structures or components from the perspective of structural force, the embodiment of the present application selects mechanical data and other types of data for each of the key construction process links, and can reflect the mechanical properties of key components in the construction process through limited data, thereby further improving the effectiveness of digital assetization of construction period data of multi-source heterogeneous bridge components.

[0109] In order to further improve the personalization and pertinence of data collection script design, and improve the reliability and effectiveness of collected data, in a digital assetization method for multi-source heterogeneous bridge component construction period data provided in an embodiment of the present application, see Figure 2 or Figure 3 Step 100 of the method for digitalizing construction period data of multi-source heterogeneous bridge components further specifically includes the following contents after step 120:

[0110] Step 130: According to the key components, key construction processes and data types to be collected, corresponding data collection methods, measurement point layout diagrams, measurement point layout time, measuring instruments and equipment, collection time and data collection instruments corresponding to each measurement point are set to form a corresponding custom collection plan.

[0111] Specifically, users can determine the detailed data collection method, measurement point layout diagram, measurement point layout timing, select appropriate measuring instruments and equipment (such as sensors, cameras and other components) according to the established measurement project, clarify the specific collection time of each measurement point, and select and arrange data collection instruments that can meet the project data collection requirements (referring to equipment that can receive and summarize various data transmitted from measuring instruments and equipment). Then, the digital asset platform for multi-source heterogeneous bridge component construction period data records the user's selection content according to the instructions or information corresponding to the above-mentioned selection sent by the user to form a corresponding customized collection plan.

[0112] In order to further improve the reliability and effectiveness of the digital asset conversion of construction period data, in a digital asset conversion method for multi-source heterogeneous bridge component construction period data provided in an embodiment of the present application, see Figure 2 Step 200 of the method for digitalizing construction period data of multi-source heterogeneous bridge components specifically includes the following contents:

[0113] Step 210: After arranging and debugging the measuring instruments and data acquisition instruments at each measuring point based on the data acquisition script, the multi-source heterogeneous bridge component construction period data of each measuring point is collected based on the data acquisition script to obtain the current measured data of the target bridge construction project.

[0114] Specifically, data collection installs the specified measuring instruments and equipment at the specified time and location according to the data collection script, completes data collection within the specified time range, and transmits the acquired multi-source heterogeneous data to the data collection instrument.

[0115] In one or more embodiments of the present application, the data collection process involves a large number of sensor transmissions, which can be wired transmissions or wireless transmissions, and the specific transmission distance can be determined according to the transmission distance, deployment conditions and transmission efficiency.

[0116] Step 220: Screen and process the measured data to obtain corresponding target digital asset data.

[0117] Step 230: Classify and store the target digital asset data.

[0118] Step 240: If a call request for the target digital asset data is received, the corresponding digital asset data is extracted from the target digital asset data stored in the category according to the keyword in the call request and output for display.

[0119] In step 240, the data call corresponds to the storage file one by one. You can choose but not be limited to the attributes of the classified storage, intercept by keywords (such as time, process, bridge composition, etc.) and export the data. At the same time, you can also display the data situation, including the display of relevant characteristic indicators obtained after data screening and preprocessing, time charts, frequency domain charts, location schematic diagrams, video previews corresponding to different construction processes, etc.

[0120] In order to further improve the reliability and effectiveness of digital asset conversion of construction period data and realize the automation of risk monitoring of indicator data in bridge component construction period data, in a digital asset conversion method for multi-source heterogeneous bridge component construction period data provided in an embodiment of the present application, see Figure 3 Step 220 of the method for digitalizing construction period data of multi-source heterogeneous bridge components specifically includes the following contents:

[0121] Step 221: performing noise reduction and screening processing on the measured data.

[0122] Step 222: Process the measured data after the noise reduction and filtering process to obtain the corresponding target digital asset data; wherein the data processing includes: extracting features from the measured data after the noise reduction and filtering process based on a preset bridge calculation algorithm, and / or issuing risk warnings for the indicator data according to preset thresholds corresponding to the indicator data in the measured data after the noise reduction and filtering process.

[0123] Specifically, firstly, since measured data are prone to generate noise or anomalies during the collection process, it is necessary to perform noise reduction screening for each data type to further realize the lightweight of measured data; for some data, characteristic values ​​with professional significance can be extracted from them, and some bridge calculation modules and algorithms can be embedded in combination with the characteristics of the bridge and the data to extract some characteristic parameters with professional value (for example, measuring the vibration acceleration of the cable structure can analyze its frequency, and then the cable force information can be calculated, so as to know the actual tension value of the cable at each stage); for some indicator-type measurement parameters, the specification limit values ​​can be input in advance to determine whether certain indicators of the bridge need early warning.

[0124] In order to further improve the efficiency of data calling, in a digital assetization method for multi-source heterogeneous bridge component construction period data provided in an embodiment of the present application, see Figure 3 Step 230 of the method for digitalizing construction period data of multi-source heterogeneous bridge components specifically includes the following contents:

[0125] Step 231: setting multiple levels of classification attributes according to the key components, key construction process links, collection data types, collection time and data format.

[0126] Step 232: Classify and store the target digital asset data according to the classification attributes of each level and construct a corresponding data extraction interface.

[0127] Specifically, for the filtered and processed data, the main classification attributes and secondary classification attributes can be set according to the key component information of the bridge construction, important construction steps, the time of data collection, data format and other information, and then the data collected in each channel can be divided into storage space according to the primary and secondary classification attributes, and the data storage address can be specified. Then, a data extraction interface can be established based on the division basis of the data storage.

[0128] From the software level, the present application also provides a digital asset platform for executing all or part of the digital assetization method for the multi-source heterogeneous bridge component construction period data, see Figure 5 The digital asset platform for multi-source heterogeneous bridge component construction period data specifically includes the following contents:

[0129] The data collection script design module 10 is used to set key components, key construction process links and collection data types for the target bridge construction project, and set corresponding custom collection plans for the key components, key construction processes and collection data types to form a data collection script for the target bridge construction project.

[0130] The digital assetization module 20 is used to collect data on the construction period data of multi-source heterogeneous bridge components corresponding to the target bridge construction project based on the data collection script, and to filter, process and classify the collected result data in turn to obtain the current target digital asset data of the target bridge construction project for calling and viewing.

[0131] It should be noted that the digital asset platform provided in the embodiment of the present application can be in the form of software, a network cloud server, or other carrier forms that can embody the principles of the present technology. In addition, the digital asset platform can be used as a digital asset during the construction period, or it can be handed over to the subsequent bridge maintenance unit as a platform for continuing data collection work, providing data for studying the initial state of the bridge.

[0132] In one or more embodiments of the present application, the digital asset platform can be understood as: through the platform, the collected data information can be integrated and archived, extracted and called, and the result display and other information interaction functions can be realized, so as to facilitate the relevant parties to obtain and upload information. The so-called bridge digital assets based on construction period data refer to the real perception data that can reflect the actual construction conditions of the main components. After screening and processing, it reflects the key construction information and state evolution information of such components. The amount of data during the construction period of a typical component may be 100, but the amount of information constituting the digital asset may be only 1, that is, the digital asset has achieved lightweight based on the original data and retained the most critical information.

[0133] The embodiment of the digital asset platform for multi-source heterogeneous bridge component construction period data provided in the present application can be specifically used to execute the processing flow of the embodiment of the method for digital assetization of multi-source heterogeneous bridge component construction period data in the above-mentioned embodiment. Its functions will not be repeated here, and reference can be made to the detailed description of the embodiment of the method for digital assetization of multi-source heterogeneous bridge component construction period data in the above-mentioned embodiment.

[0134] The part of the digital asset platform for the construction period data of multi-source heterogeneous bridge components that performs the digital assetization of the construction period data of multi-source heterogeneous bridge components can be executed in the server or completed in the client device. The specific selection can be based on the processing capability of the client device and the limitations of the user's usage scenario. This application does not limit this. If all operations are completed in the client device, the client device may also include a processor for the specific processing of the digital assetization of the construction period data of multi-source heterogeneous bridge components.

[0135] The client device may have a communication module (i.e., a communication unit) that can communicate with a remote server to achieve data transmission with the server. The server may include a server on the task scheduling center side, and other implementation scenarios may also include a server on an intermediate platform, such as a server on a third-party server platform that has a communication link with the task scheduling center server. The server may include a single computer device, or a server cluster consisting of multiple servers, or a server structure of a distributed device.

[0136] The server and the client device may communicate with each other using any suitable network protocol, including network protocols that have not yet been developed on the date of filing this application. The network protocols may include, for example, TCP / IP, UDP / IP, HTTP, HTTPS, etc. Of course, the network protocols may also include, for example, RPC (Remote Procedure Call Protocol) and REST (Representational State Transfer) protocols used on top of the above protocols.

[0137] From the above description, it can be seen that the digital asset platform for multi-source heterogeneous bridge component construction data provided by the embodiment of the present application is based on various types of bridges, especially large-span and complex structure bridges, and proposes digital asset technology based on multi-source heterogeneous bridge component construction data. It can monitor data / information, collect and transmit, archive data, extract and call, and display information for key components during the construction period of various types of bridges. It can perform unified and comprehensive integrated digital asset processing based on real multi-source heterogeneous bridge component construction data, and can effectively improve the pertinence, intuitiveness and lightweight of data collection. It can effectively reduce data collection resource consumption on the basis of improving the pertinence, effectiveness, reliability and efficiency of digital assetization. It is convenient for all parties involved in bridge construction, management and maintenance to share data and carry out various business tasks.

[0138] On this basis, in view of the technical problems that BIM technology involves too many application software, insufficient software integration, and the file formats between software cannot read each other, which is not conducive to the rapid extraction and use of information, and the technical threshold for mastering multiple professional software is high, the embodiment of the present application is based on various types of bridges, especially large-span and complex system structure bridges, and proposes a digital asset platform based on the construction period data of multi-source heterogeneous bridge components. Relying on this technology, a digital asset platform framework for the bridge construction period is built, and finally a multifunctional integrated information platform for data / information monitoring, collection and transmission, data archiving and storage, extraction and calling, information display, etc. is established for key components of various types of bridges during the construction period. It does not involve too much special software, and all functions are realized through the platform itself. The multi-source heterogeneous data involved can be compatible and displayed within the platform, and it has good operability.

[0139] In order to further improve the reliability and effectiveness of the digital asset conversion of construction period data, in a digital asset platform for multi-source heterogeneous bridge component construction period data provided in the embodiment of the present application, see Figure 6 The digital assetization module 20 in the digital asset platform for multi-source heterogeneous bridge component construction period data specifically includes the following contents:

[0140] The data acquisition module 21 is used to collect the construction period data of multi-source heterogeneous bridge components at each measuring point based on the data acquisition script after the measuring instruments and data acquisition instruments are arranged and debugged at each measuring point based on the data acquisition script, so as to obtain the current measured data of the target bridge construction project.

[0141] The data screening and processing module 22 is used to screen and process the measured data to obtain corresponding target digital asset data.

[0142] The classification storage module 23 is used to classify and store the target digital asset data.

[0143] The data calling and viewing module 24 is used to extract the corresponding digital asset data from the target digital asset data stored in the classification according to the keywords in the calling request and output it for display if a calling request for the target digital asset data is received.

[0144] That is to say, the digital assetization method and platform for multi-source heterogeneous bridge component construction period data provided by the embodiment of the present application mainly includes five main technical contents: data collection script design, data collection, data screening and processing, classification storage, data calling and viewing. For specific logic, see Figure 7 .

[0145] 1. Data collection script design is the most important part of the embodiment of the present application. The service object of the embodiment of the present application is a bridge construction project. In order to collect valuable measured data for the key construction process of the key components of the bridge, it is necessary to design a data collection script for a specific bridge project by combining the construction process and the construction organization plan through professional bridge technicians. The data collection script includes: (1) Select the key components of the bridge project, (2) Select which data indicators to measure or which image data to collect in which construction link in combination with the construction process of each key component, (3) Determine the detailed data collection method, measurement point layout diagram, measurement point layout timing, and select appropriate measurement instruments and equipment (such as sensors, cameras and other components) according to the established measurement project, (4) Clarify the specific collection time of each measurement point, (5) Select and arrange data collection instruments that can meet the project data collection requirements (referring to equipment that can receive and summarize various data transmitted from measurement instruments and equipment). The data collection script is not static throughout the process. Relevant personnel need to make timely adjustments to the data collection script according to the actual construction progress so as to collect the field data that best meets the actual construction situation in a timely manner. The measurement point layout and sampling time of the data should be representative. The density of the measurement point layout and the length of the sampling time should be determined in combination with the actual project hardware and software conditions, while achieving the effect of data lightweighting.

[0146] 2. Data collection: According to the data collection script, the specified measuring instruments and equipment are installed at the specified time and location, and data collection is completed within the specified time range, and the obtained multi-source heterogeneous data is transmitted to the data collection instrument.

[0147] 3. Data screening and processing, (1) First, since measured data are prone to noise or anomalies during the collection process, it is necessary to perform noise reduction screening for each data type to further achieve lightweight measured data; (2) For some data, characteristic values ​​with professional significance can be extracted from them. This technology can combine the characteristics of bridges and data, embed some bridge calculation modules and algorithms, and extract some characteristic parameters with professional value (for example, measuring the vibration acceleration of the cable structure can analyze its frequency, and then the cable force information can be calculated, so as to know the actual tension value of the cable at each stage); (3) For some indicator-type measurement parameters, the standard limit values ​​can be input in advance to determine whether certain indicators of the bridge need to be warned.

[0148] 4. Classification storage. For the filtered and processed data, (1) set the primary and secondary classification attributes according to the key components of bridge construction, important construction procedures, data collection time, data format and other information; (2) divide the storage space for the data collected in each channel according to the primary and secondary classification attributes, and specify the data storage address; (3) establish a data extraction interface based on the data storage division basis.

[0149] 5. Data calling and viewing. This part of the technology is used to call and view the stored data assets. Data calling corresponds to the storage file one by one. You can choose but not be limited to the attributes of classified storage, intercept by keywords (such as time, process, bridge composition, etc.) and export data. At the same time, you can also display the data situation, including the display of relevant characteristic indicators obtained after data screening and preprocessing, time charts, frequency domain charts, location schematic diagrams, video previews corresponding to different construction processes, etc.

[0150] In summary, the method and platform for digital assetization of multi-source heterogeneous bridge component construction period data provided in the embodiments of the present application can collect, process and extract various real measurement data and construction images that can be perceived by each key component during the bridge construction period, and reflect the actual conditions of the bridge construction period with real data results; the formed digital assets include mechanical data during the construction period, and reflect the mechanical properties of key components during the construction process through limited data; the carrier is a specific platform system, and the use does not involve too much special software. All functions are implemented through the platform itself, and the multi-source heterogeneous data involved can be compatible and displayed within the platform, with good operability.

[0151] Therefore, the digital assetization method and platform for multi-source heterogeneous bridge component construction period data provided by the embodiments of the present application have the following beneficial effects:

[0152] 1. The data collection content can collect and receive various real measurement data and construction images that can be perceived by key components during the bridge construction period, realize the integration of "multi-source heterogeneous data", and reflect the real conditions of each stage of the bridge construction period with real data;

[0153] 2. Digital assets include mechanical measurement data during the construction period. Mechanical analysis can be carried out by calling the mechanical performance data of key components in the corresponding construction process. It can also provide relevant information for the management, maintenance and demolition of the bridge after completion.

[0154] 3. The application process does not involve too much dedicated software. All functions are realized through an integrated technology carrier such as a technology platform and program software. The multi-source heterogeneous data involved can be compatible and displayed within the platform, which has good operability;

[0155] 4. By pre-setting data collection scripts, limited data collection is performed on key components, key processes, and specific time periods during construction, thereby achieving targeted data collection and storage of key information during the construction period, while also achieving lightweight data volume;

[0156] 5. Through data calling and content viewing, multi-scenario and multi-functional applications can be realized. For example, the measured data and real images in the key links of construction can be collected and stored, which can be used as first-hand information for the construction party to respond to the owner's inspection and for the marketing of construction technology. Multi-source heterogeneous data can better carry out talent training with its diverse display methods. The reserved data assets can be used to review and discuss the construction process and on-site conditions at any time to improve the construction process.

[0157] In order to further illustrate the above technical solution of the present application, the present application also provides an application example of the digital asset platform for the construction period data of the multi-source heterogeneous bridge components. In this application example, a suspension bridge is taken as an example, and still based on Figure 4 For example, see the basic information of the anchored suspension bridge. Figure 8 , explained from the perspective of the administrator and the user:

[0158] Among them, the administrator refers to a professional bridge technician who builds a digital asset platform based on the construction period data of multi-source heterogeneous bridge components for a certain bridge project. He is responsible for the relevant background settings and management. The administrator can input and modify data collection scripts, access the transmission connection channels of each sensor, set the classification properties of the storage / call module, etc.

[0159] A user refers to a user of a digital asset platform based on construction period data of multi-source heterogeneous bridge components that has been completed for a certain bridge project. The user can upload data, set up and use data viewing / display modules through the manual upload interface of the platform.

[0160] Based on the above content, the specific implementation process of this application example is as follows:

[0161] (I) Administrator builds the platform

[0162] (1) First, set up the basic information module of the bridge. Suspension bridges are divided into self-anchored suspension bridges and ground-anchored suspension bridges. For example, choose a ground-anchored suspension bridge based on the actual bridge project. According to the components of the bridge, it is divided into superstructure, support, substructure and ancillary facilities. The components are subdivided into superstructure, including catwalk, main cable, sling, stiffening beam, pylon, etc. The substructure includes anchor, pier, abutment, foundation, etc. The ancillary structure includes bridge deck pavement, bridge deck drainage, bridge head slab, expansion joint, anti-collision guardrail, etc. Input the key construction process for each component. Take the superstructure construction as an example, including the construction of pylon, installation of cable saddle, erection of catwalk, installation of traction cable, installation of reference cable strand, general cable strand, main cable tightening, installation of cable clamp, installation of sling, installation of stiffening beam and main cable wire wrapping protection, etc. Figure 4 The above basic information is expanded layer by layer from general to specific, with specific construction links as the basic unit.

[0163] (2) Before the project construction work is carried out, relevant construction organization documents will be compiled to facilitate the coordination and guidance of the construction work. The role of the data collection script is similar to that of the bridge project, which is used to facilitate the coordination and guidance of data collection work, and is further refined and expanded in combination with the basic information of the bridge. The data collection script includes (1) the key components of the bridge project, (2) the data indicators and images to be collected for each key component and the corresponding construction links, (3) the detailed collection method of each indicator, including the measurement point layout diagram, the timing of measurement point layout, and the measurement instruments and equipment of each measurement point (such as sensors, cameras and other components), (4) the specific collection time of each measurement point (accurate to the time period corresponding to the construction link), and (5) the setting of the transmission channel between each measurement instrument and the data collection instrument.

[0164] (3) Set up the data acquisition module, install the measuring instruments of the entire bridge according to the design arrangements of the data acquisition script, connect the data transmission channels of each sensor, debug the data acquisition interface, check whether the data of each channel can be transmitted normally, and set the start and end time points of each measuring instrument in advance.

[0165] (4) Setting up a storage / calling module, setting up primary and secondary classification attributes. In this embodiment, the bridge composition is used as the primary attribute, and a tree menu is set up hierarchically based on the key components of the basic information of the bridge in (1) - the construction process. The storage unit (each construction process) of the last level tree menu is used as the basic storage unit. A folder is established in each basic storage unit according to the file format. Each file format is named and stored according to the time node. After the hierarchical menu is established, each sensor connection channel in (2) and (3) is linked to a specific storage location, and the naming format of each transmission file is set (for user indexing). In addition, a user manual upload interface can be reserved and connected to this module to facilitate users to upload data independently.

[0166] (5) In combination with construction needs, some algorithms and calculation modules are embedded to perform preliminary processing on the measured data, extract some representative characteristic parameters, and make preliminary evaluations on the structural components. For example, the acceleration sensors installed on the stiffening beams can calculate the modal parameters and evaluate the overall stiffness of the actual bridge compared with the designed bridge. The elevation data of the main cable installation process can be used to evaluate the installation line shape and guide the adjustment of the main cable line shape. The vibration acceleration of the slings can be analyzed to obtain the fundamental frequency information of the slings, which can be converted into the sling force.

[0167] (II) User use of the platform:

[0168] After the administrator completes the construction of a digital asset platform based on multi-source heterogeneous bridge component construction data, it will be delivered to users.

[0169] (1) Storage / call module: Users can upload some 3D models, 3D animations, and other data related to the process flow used in the construction process to the storage / call module and select the appropriate storage location. Users can also use the primary and secondary classification attributes set by the administrator as keyword options to call the required data files. This function is reflected in the data viewing / display module.

[0170] (2) Data viewing / display module: users can use functions such as data capture, feature indicator display, and process image display according to their needs.

[0171] In summary, the technical means provided by the embodiments and application examples of the present application are summarized as follows:

[0172] 1. Provides the technical principles for forming a digital asset platform during the bridge construction period, including five main technical contents: data collection script design, data collection, data screening and processing, classified storage, data calling and viewing.

[0173] 2. A data collection script is proposed. By compiling a detailed data collection plan, the data collection process is guided, and the data collection script is adjusted in a timely manner according to the actual construction progress. (The role of the data collection script is similar to the script used in filming a movie. It makes detailed designs and regulations for the collection details of each data, so that the subsequent data collection work can be carried out in an orderly manner according to the data collection script.)

[0174] 3. The collected data can be processed in a lightweight way. The initial lightweighting can be achieved through targeted, timed and fixed-point collection, and then the secondary lightweighting can be achieved through data noise reduction and screening, so as to extract the maximum amount of valuable data with limited storage space.

[0175] 4. The collected data can be processed in a targeted manner, and relevant characteristic parameters can be extracted through embedded modules and algorithms, or the specification limit parameters can be imported for comparison with the measured parameters to achieve preliminary evaluation.

[0176] 5. It can provide data collection, classification storage and extraction for the entire process of bridge project construction, and can perform hierarchical classification storage according to certain primary and secondary attributes, and extract and call according to keywords;

[0177] 6. Relevant technical platforms, program software and other technical carriers can be developed to realize the various functional concepts of this technology.

[0178] The embodiment of the present application also provides an electronic device, which may include a processor, a memory, a receiver and a transmitter, wherein the processor is used to execute the digital assetization method of the multi-source heterogeneous bridge component construction period data mentioned in the above embodiment, wherein the processor and the memory may be connected via a bus or other means, taking the bus connection as an example. The receiver may be connected to the processor and the memory via a wired or wireless manner.

[0179] The processor may be a central processing unit (CPU). The processor may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or a combination of the above chips.

[0180] As a non-transient computer-readable storage medium, the memory can be used to store non-transient software programs, non-transient computer executable programs and modules, such as the program instructions / modules corresponding to the digital assetization method for the construction period data of multi-source heterogeneous bridge components in the embodiment of the present application. The processor executes various functional applications and data processing of the processor by running the non-transient software programs, instructions and modules stored in the memory, that is, the digital assetization method for the construction period data of multi-source heterogeneous bridge components in the above method embodiment is implemented.

[0181] The memory may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created by the processor, etc. In addition, the memory may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some embodiments, the memory may optionally include a memory remotely arranged relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0182] The one or more modules are stored in the memory, and when executed by the processor, the method for digitalizing construction period data of multi-source heterogeneous bridge components in the embodiment is performed.

[0183] In some embodiments of the present application, the user equipment may include a processor, a memory, and a transceiver unit, which may include a receiver and a transmitter. The processor, memory, receiver, and transmitter may be connected through a bus system. The memory is used to store computer instructions, and the processor is used to execute the computer instructions stored in the memory to control the transceiver unit to send and receive signals.

[0184] As an implementation method, the functions of the receiver and the transmitter in the present application can be considered to be implemented through a transceiver circuit or a dedicated chip for transceiver, and the processor can be considered to be implemented through a dedicated processing chip, a processing circuit or a general chip.

[0185] As another implementation method, it is possible to use a general-purpose computer to implement the server provided in the embodiment of the present application, that is, to store the program code for implementing the functions of the processor, receiver, and transmitter in a memory, and the general-purpose processor implements the functions of the processor, receiver, and transmitter by executing the code in the memory.

[0186] The embodiment of the present application also provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the digital assetization method of the construction period data of multi-source heterogeneous bridge components are implemented. The computer-readable storage medium can be a tangible storage medium, such as a random access memory (RAM), a memory, a read-only memory (ROM), an electrically programmable ROM, an electrically erasable programmable ROM, a register, a floppy disk, a hard disk, a removable storage disk, a CD-ROM, or any other form of storage medium known in the technical field.

[0187] It should be understood by those skilled in the art that the exemplary components, systems and methods described in conjunction with the embodiments disclosed herein can be implemented in hardware, software or a combination of the two. Whether it is specifically performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application. When implemented in hardware, it can be, for example, an electronic circuit, an application specific integrated circuit (ASIC), appropriate firmware, a plug-in, a function card, etc. When implemented in software, the elements of this application are programs or code segments used to perform the required tasks. The program or code segment can be stored in a machine-readable medium, or transmitted on a transmission medium or a communication link via a data signal carried in a carrier.

[0188] It should be clear that the present application is not limited to the specific configuration and processing described above and shown in the figures. For the sake of simplicity, a detailed description of the known method is omitted here. In the above embodiments, several specific steps are described and shown as examples. However, the method process of the present application is not limited to the specific steps described and shown, and those skilled in the art can make various changes, modifications and additions, or change the order between the steps after understanding the spirit of the present application.

[0189] In the present application, features described and / or illustrated for one embodiment may be used in the same manner or in a similar manner in one or more other embodiments, and / or combined with features of other embodiments or replace features of other embodiments.

[0190] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the embodiments of the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A method for digital assetization of multi-source heterogeneous bridge component construction period data, characterized in that: include: Set key components, key construction process links and data types for the target bridge construction project, and set corresponding custom collection plans for the key components, key construction processes and data types to form a data collection script for the target bridge construction project; Based on the data collection script, data is collected for the construction period data of multi-source heterogeneous bridge components corresponding to the target bridge construction project, and the collected result data is filtered, processed and classified and stored in turn to obtain the current target digital asset data of the target bridge construction project for calling and viewing; The settings are for key components, key construction process links and data types collected for the target bridge construction project, including: Select multiple key components for the target bridge construction project; In each construction process corresponding to the target bridge construction project, respectively select the key construction process link and the corresponding collection data type corresponding to each of the key components; The selection of multiple key components for the target bridge construction project includes: According to the target bridge type to which the target bridge construction project belongs, extracting the bridge basic information corresponding to the target bridge type from the preset bridge basic information corresponding to each bridge type, wherein the bridge basic information includes a multi-level component structure; Selecting a plurality of key components from the multi-level component architecture in the basic bridge information corresponding to the target bridge type; The multi-level component architecture includes: a first-level bridge type layer, a second-level bridge component layer, and a third-level component layer connected in sequence from top to bottom; The first-level bridge type layer is used to display the bridge type applicable to the current multi-level component architecture; The secondary bridge component layer is used to display a plurality of component structures divided according to the bridge components corresponding to the bridge type; The three-layer component layer is used to display the components corresponding to each of the component structures.

2. The method for digitalizing construction period data of multi-source heterogeneous bridge components according to claim 1 is characterized in that: The basic information of the bridge also includes the construction process flow corresponding to the bridge type and multiple optional data types, wherein the optional data types include the carrier forms corresponding to the data indicators of each type; Correspondingly, in each construction process corresponding to the target bridge construction project, the key construction process links and the corresponding collected data types corresponding to each of the key components are selected respectively, including: Selecting key construction process links corresponding to each of the key components from the construction process flow in the basic bridge information corresponding to the target bridge type; From each of the optional data types in the basic information of the bridge corresponding to the target bridge type, the collected data type for each of the key construction process links is selected respectively, wherein the collected data type includes mechanical data.

3. The method for digitalizing construction period data of multi-source heterogeneous bridge components according to claim 1 is characterized in that: The custom collection scheme corresponding to the key components, key construction processes and collection data types is set, including: According to the key components, key construction processes and data types to be collected, corresponding data collection methods, measuring point layout diagrams, measuring point layout time, measuring instruments and equipment, collection time and data collection instruments corresponding to each measuring point are set to form a corresponding custom collection plan.

4. The method for digitalizing construction period data of multi-source heterogeneous bridge components according to any one of claims 1 to 3, characterized in that: The data collection script is based on which the data of the multi-source heterogeneous bridge components corresponding to the target bridge construction project are collected during the construction period, and the collected result data are filtered, processed and classified and stored in sequence to obtain the current target digital asset data of the target bridge construction project for calling and viewing, including: After arranging and debugging measuring instruments and data acquisition instruments at each measuring point in the data acquisition scenario, collecting multi-source heterogeneous bridge component construction period data at each measuring point based on the data acquisition scenario to obtain current measured data of the target bridge construction project; Screening and processing the measured data to obtain corresponding target digital asset data; Classifying and storing the target digital asset data; If a call request for the target digital asset data is received, the corresponding digital asset data is extracted from the target digital asset data stored in the classification according to the keyword in the call request and output for display.

5. The method for digitalizing construction period data of multi-source heterogeneous bridge components according to claim 4 is characterized in that: The screening and processing of the measured data to obtain corresponding target digital asset data includes: Performing noise reduction and screening processing on the measured data; Performing data processing on the measured data after noise reduction and screening to obtain the corresponding target digital asset data; Among them, the data processing includes: extracting features from the measured data after noise reduction and screening based on a preset bridge calculation algorithm, and / or issuing risk warnings for the indicator data according to preset thresholds corresponding to the indicator data in the measured data after noise reduction and screening.

6. The method for digitalizing construction period data of multi-source heterogeneous bridge components according to claim 4 is characterized in that: The classifying and storing the target digital asset data includes: Setting multiple levels of classification attributes according to the key components, key construction process links, data types, collection time and data format; The target digital asset data is classified and stored according to the classification attributes of each level and a corresponding data extraction interface is constructed.

7. A digital asset platform for multi-source heterogeneous bridge component construction data, characterized in that: include: A data collection script design module is used to set key components, key construction process links and collection data types for the target bridge construction project, and set corresponding custom collection plans for the key components, key construction processes and collection data types to form a data collection script for the target bridge construction project; A digital assetization module is used to collect data during the construction period of multi-source heterogeneous bridge components corresponding to the target bridge construction project based on the data collection script, and to filter, process and classify the collected result data in turn to obtain the current target digital asset data of the target bridge construction project for calling and viewing; The settings are for key components, key construction process links and data types collected for the target bridge construction project, including: Select multiple key components for the target bridge construction project; In each construction process corresponding to the target bridge construction project, respectively select the key construction process link and the corresponding collection data type corresponding to each of the key components; The selection of multiple key components for the target bridge construction project includes: According to the target bridge type to which the target bridge construction project belongs, extracting the bridge basic information corresponding to the target bridge type from the preset bridge basic information corresponding to each bridge type, wherein the bridge basic information includes a multi-level component structure; Selecting a plurality of key components from the multi-level component architecture in the basic bridge information corresponding to the target bridge type; The multi-level component architecture includes: a first-level bridge type layer, a second-level bridge component layer, and a third-level component layer connected in sequence from top to bottom; The first-level bridge type layer is used to display the bridge type applicable to the current multi-level component architecture; The secondary bridge component layer is used to display a plurality of component structures divided according to the bridge components corresponding to the bridge type; The three-layer component layer is used to display the components corresponding to each of the component structures.

8. The digital asset platform for multi-source heterogeneous bridge component construction data according to claim 7, characterized in that: The digital asset module includes: A data acquisition module, for collecting the multi-source heterogeneous bridge component construction period data of each measuring point based on the data acquisition script after arranging and debugging the measuring instruments and data acquisition instruments at each measuring point based on the data acquisition script, so as to obtain the current measured data of the target bridge construction project; A data screening and processing module, used to screen and process the measured data to obtain corresponding target digital asset data; A classification storage module, used for classifying and storing the target digital asset data; The data calling and viewing module is used to extract the corresponding digital asset data from the target digital asset data stored in the classification according to the keywords in the calling request and output it for display if a calling request for the target digital asset data is received.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method for digitalizing the construction period data of multi-source heterogeneous bridge components as described in any one of claims 1 to 6 is implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for digitalizing construction period data of multi-source heterogeneous bridge components as described in any one of claims 1 to 6 is implemented.

Citation Information

Patent Citations

  • Bridge construction and maintenance whole-process intelligent monitoring, assessment, alarming and decision-making system and method

    CN108460231A

  • Bridge health state monitoring method and system and electronic equipment

    CN115687983A

  • Bridge construction linear control system based on cloud computing

    CN115962803A