Automatic wire drawing process based on rotary bamboo skewers

By setting up support rods and clamping components on the rotary assembly, the continuous drawing of multiple bamboo sticks is achieved, which solves the problem of low production efficiency of existing devices, improves production efficiency and saves energy.

CN117600918BActive Publication Date: 2024-11-15NANJING LVSHANG AGRICULTURAL DEVELOPMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310967356.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-03
Publication Date
2024-11-15
Estimated Expiration
2043-08-03

AI Technical Summary

Technical Problem

The existing bamboo stick processing device can only be processed one by one when drawing wire, resulting in low production efficiency.

Method used

Several supporting rods are provided on the rotating assembly, and clamping components are slid on the support rod. The bamboo sticks are sent to the placement groove through the conveying assembly, and the multiple bamboo sticks are continuously drawn using the clamping assembly and the guide assembly.

Benefits of technology

Multiple bamboo sticks are simultaneously drawn, which improves production efficiency and saves energy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117600918B_ABST
    Figure CN117600918B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of wood production, and in particular to an automated wire drawing process based on a rotary bamboo skewer, comprising step one, a loading process; step two, a conveying process; step three, a clamping process; step four, a wire drawing process; and step five, a unloading process. After step five is completed, a material taking process is also provided, and the bamboo skewer that has completed wire drawing in a material frame is manually aligned and transported to a next device for sharpening. A plurality of support rods are provided on a rotary component, a clamping component is slidably provided on the support rod, and a plurality of placement grooves corresponding to the support rods are opened on a conveying component, and the bamboo skewer is delivered to the placement groove under the action of a rotating component, and the bamboo skewer is subjected to wire drawing through the action of a clamping component and a guide component, so that a plurality of bamboo skewer are subjected to wire drawing at the same time, and the device can continuously process the bamboo skewer, thereby improving production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wood production, in particular to an automated wire drawing process based on a rotary bamboo skewer. Background Art

[0002] In people's daily production and life, bamboo sticks are used more and more, such as barbecue sticks, medical cotton swabs, etc. The general production process of bamboo sticks is: sawing bamboo - breaking bamboo - slicing - drawing - sawing wire - polishing. A Chinese invention patent with application publication number CN106363754B discloses an integrated bamboo stick processing robot, including a first bracket, a feeding roller, a first stepper motor, a disk saw, a drawing component, an electric cylinder, a dovetail groove, a bamboo and wood slicing knife, a third bracket, two first tooth discs, a first chain, a second stepper motor, a push column component, two slide rails, a fourth bracket, and a first roller. The invention combines multiple steps of bamboo stick processing together, and has the following advantages: compact structure, high degree of integration, and relatively small size, and can realize the automation and integration of bamboo stick processing, thereby improving production efficiency.

[0003] However, the inventors found that in actual use, the device can only draw the bamboo sticks one by one by setting two drawing blades, and the production efficiency is low. Summary of the invention

[0004] The purpose of the present invention is to address the deficiencies of the prior art. By arranging a plurality of support rods on a rotating assembly, a clamping assembly is slidably arranged on the support rods, and a plurality of placement grooves corresponding to the support rods are opened on the conveying assembly, the bamboo sticks are sent to the placement grooves under the action of the rotating assembly, and the bamboo sticks are subjected to wire drawing through the action of the clamping assembly and the guide assembly, so that a plurality of bamboo sticks can be subjected to wire drawing at the same time, and the device can continuously process the bamboo sticks, thereby solving the problem that the existing device can only perform wire drawing on the bamboo sticks one by one by arranging two wire drawing blades for wire drawing, and the production efficiency is low.

[0005] In view of the above technical problems, the technical solutions adopted by the present invention are as follows:

[0006] Based on the automatic wire drawing process of rotary bamboo skewers, including:

[0007] Step 1, loading process, manually putting a number of bamboo sticks into the loading frame, and sending the bamboo sticks into the placement slot under the action of the rotating component to complete the loading;

[0008] Step 2, the conveying process, the bamboo stick is driven to rotate by the conveying component, and the bamboo stick is driven to move to the right end to complete the conveying;

[0009] Step 3, clamping process, the clamping component is driven to rotate by the rotating component, moves forward under the action of the guide rail b, and drives the clamping component to clamp the bamboo stick by the guide rail c;

[0010] Step 4, wire drawing process, the clamping assembly is driven backward by the guide rail b, and the bamboo stick is wire drawn under the action of the scraper;

[0011] Step five, the unloading process, the guide rail d drives the clamping assembly to loosen the bamboo sticks, and the unloading rack makes the bamboo sticks fall into the material frame.

[0012] As a preferred embodiment, in step one, a number of bamboo sticks are manually placed in a loading frame, an acceleration roller a is driven to rotate by a motor c, and an acceleration roller b is driven to rotate by a belt, thereby driving the bristles to beat the bamboo sticks downward, and the bamboo sticks are accelerated to fall into the placement groove under the action of the brush, thereby completing the loading.

[0013] As a preferred embodiment, in the step 2, the conveying roller a is driven to rotate by the motor b, thereby driving the conveyor belt to rotate, so that the bamboo sticks in the slot rotate under the action of the motor b to complete the transportation.

[0014] As a preferred embodiment, in step three, the driving gear is driven to rotate by motor a, and the rotary chain performs a rotary motion under the action of the motor a, thereby driving the support rod to perform a rotary motion.

[0015] As a preferred embodiment, in step three, the clamping assembly performs a rotational motion driven by the support rod, and is driven forward by the forward moving section a, while the guide rail a drives the bamboo stick to move backward, and under the action of the starting section b, the clamping assembly clamps the bamboo stick.

[0016] As a preferred embodiment, in step 4, the clamping assembly is moved backward under the action of the retreat section and the spring, thereby driving the bamboo stick to move backward, and the bamboo stick is subjected to wire drawing processing under the action of the scraper.

[0017] As a preferred embodiment, in step five, the clamping assembly is driven by the guide rail d to loosen the bamboo sticks, and the bamboo sticks slide into the material frame through the inclined plate to complete the unloading.

[0018] As a preferred embodiment, a material taking process is further provided after the step five is completed.

[0019] As another preferred embodiment, in the material taking process, the bamboo sticks that have completed wire drawing in the material frame are manually aligned and transported to the next equipment for sharpening.

[0020] The present invention also provides an automatic wire drawing device based on a rotary bamboo stick that matches the automatic wire drawing process based on a rotary bamboo stick, comprising a support frame a and a support frame b, wherein the support frame a is provided with a rotary component, the rotary component is provided with a plurality of support rods, the support rods are slidably provided with a clamping component, the support frame a is provided with a guide component, the support frame b is provided with a transmission component, the transmission component is provided with a plurality of placement grooves corresponding to the support rods, the front ends of the placement grooves are all provided with scrapers, the support frame b is provided with a guide rail a, the left end of the support frame b is provided with a loading frame, the lower end of the loading frame is provided with a rotating component, the right end of the support frame a is provided with a unloading frame, the loading frame drives the bamboo sticks to fall into the placement grooves through the rotating component, the bamboo sticks are transmitted through the transmission component, the clamping component performs a rotary motion under the action of the rotary component, the clamping component clamps and draws the bamboo sticks through the guide component, and the bamboo sticks after the wire drawing are completed fall into the material frame through the unloading frame.

[0021] Preferably, the rotary assembly includes a motor a arranged on a support frame a, a driving gear driven by the motor a, a driven gear rotatably arranged on the support frame a, and a rotary chain arranged between the driving gear and the driven gear.

[0022] Preferably, the clamping assembly includes a support plate slidably arranged on the support rod, a push block slidably arranged on the support plate, a clamping block a hinged at the left end of the push block, a clamping block b hinged at the right end of the push block, a connecting member a hinged on the clamping block a, and a connecting member b hinged on the clamping block b, a push rod is arranged at the rear end of the support plate, and anti-slip pads are arranged at the front ends of the clamping blocks a and b.

[0023] As a preference, a material discharge chute is provided on the support rod, a slide groove is provided in the middle portion of the support rod, and a spring is provided between the support rod and the support plate.

[0024] Preferably, the guide assembly includes a guide rail b arranged on a support frame a, a guide rail c arranged on the guide rail b, and a guide rail d arranged at the right end of the guide rail b, the guide rail b is provided with a starting section a, a forward section a, a retaining section a and a backward section, and the guide rail c is provided with a starting section b, a clamping section and a retaining section b.

[0025] Preferably, the conveying assembly includes a motor b arranged on a support frame b, a conveying roller a driven by the motor b, a conveying roller b rotatably arranged on the support frame b, and a conveyor belt arranged between the conveying roller a and the conveying roller b.

[0026] As a preference, the guide rail a is provided with a starting section c, a forward section b, a retaining section c and an ending section.

[0027] As a preferred embodiment, square grooves are provided on both sides of the lower end of the loading frame, and the rotating assembly includes a motor c arranged on the loading frame, an acceleration roller a driven by the motor c, and an acceleration roller b rotatably arranged on a fixed block, and a plurality of bristles are provided on the acceleration roller a and the acceleration roller b, and a belt is provided between the acceleration roller a and the acceleration roller b.

[0028] As another preferred embodiment, a slanted plate is provided at the front end of the unloading rack, and the angle between the slanted plate and the support rod is set to degrees.

[0029] Beneficial effects of the present invention:

[0030] 1. In the present invention, a plurality of support rods are arranged on the rotating assembly, a clamping assembly is slidably arranged on the support rods, a plurality of placement grooves corresponding to the support rods are opened on the transmission assembly, and the bamboo sticks are sent to the placement grooves under the action of the rotating assembly, and the bamboo sticks are subjected to wire drawing through the action of the clamping assembly and the guide assembly, so that a plurality of bamboo sticks can be subjected to wire drawing at the same time, and the device can continuously process the bamboo sticks, thereby improving the production efficiency.

[0031] 2. In the present invention, the guide rail b is provided so that the clamping assembly moves forward under its action, and the bamboo sticks are clamped under the action of the guide rail c. The guide rail d is used to release the clamping assembly and drop it into the material frame. There is no need to provide power to the clamping assembly, thereby achieving the purpose of saving energy.

[0032] In summary, the equipment has the advantages of improving production efficiency and saving energy, and is particularly suitable for the field of wood production technology. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0034] Figure 1 It is a process flow chart of the automatic wire drawing device based on the rotary bamboo skewer;

[0035] Figure 2 It is a structural schematic diagram of an automatic wire drawing device based on a rotary bamboo skewer;

[0036] Figure 3 for Figure 2 A magnified image;

[0037] Figure 4 It is a schematic diagram of the structure of the rotary component;

[0038] Figure 5It is a structural schematic diagram of the support rod and the clamping assembly;

[0039] Figure 6 A schematic diagram of the structure of the guide component;

[0040] Figure 7 It is a schematic diagram of the structure of the transmission component and the guide rail a;

[0041] Figure 8 It is a schematic diagram of the structure of the loading rack and the rotating assembly;

[0042] Fig. 9 It is a cross-sectional view of the loading rack and the rotating assembly;

[0043] Fig.10 It is a structural schematic diagram of the unloading rack;

[0044] Fig.11 This is a working status diagram of the automatic wire drawing device based on a rotary bamboo skewer.

[0045] 1. Support frame a; 2. Support frame b; 3. Rotating assembly; 4. Support rod; 5. Clamping assembly; 6. Guide assembly; 7. Transmission assembly; 8. Guide rail a; 9. Rotating assembly; 10. Loading frame; 20. Bamboo stick; 30. Material frame; 31. Motor a; 32. Driving gear a; 33. Driven gear a; 34. Chain a; 40. Unloading frame; 41. Unloading chute; 42. Slide; 43. Spring; 51. Support plate; 52. Push block; 53. Clamping block a; 54. Clamping block b; 55. Connector a; 56. Connector b; 57. Ejector rod; 61. Guide rail b; 62. Guide rail c; 63. Guide rail d; 71. Placement slot; 72. Scraper; 73. Motor b; 74. Conveyor roller a; 75. Conveyor roller b; 76. Conveyor belt; 81. Starting section c; 82. Forward section b; 83. Holding section c; 84. End section; 91. Motor c; 92. Acceleration roller a; 93. Acceleration roller b; 94. Brush; 101. Square slot; 611. Starting section a; 612. Forward section a; 613. Holding section a; 614. Retracting section; 621. Starting section b; 622. Clamping section; 623. Holding section b; 401. Inclined plate DETAILED DESCRIPTION

[0046] The technical solutions in the embodiments of the present invention are clearly and completely described below in conjunction with the accompanying drawings. Example

[0047] like Figures 1 to 11 As shown, the automatic wire drawing process based on the rotary bamboo stick includes:

[0048] Step 1, a loading process, manually placing a plurality of bamboo sticks 20 into the loading frame 10, and sending the bamboo sticks 20 into the placement slot 71 under the action of the rotating component 9, to complete the loading;

[0049] Step 2, the conveying process, the conveying component 7 drives the bamboo stick 20 to make a rotational motion, drives the bamboo stick 20 to move to the right end, and completes the conveying;

[0050] Step 3, clamping process, the clamping assembly 5 is driven to rotate by the rotating assembly 3, moves forward under the action of the guide rail b61, and drives the clamping assembly 5 to clamp the bamboo stick 20 by the guide rail c62;

[0051] Step 4, wire drawing process, the guide rail b61 drives the clamping assembly 5 to retreat, and the bamboo skewers 20 are wire drawn under the action of the scraper 72;

[0052] Step five, the unloading process, the guide rail d63 drives the clamping assembly 5 to loosen the bamboo stick 20, and the unloading rack 40 causes the bamboo stick 20 to fall into the material frame 30.

[0053] It is worth mentioning here that by setting the guide rail b61, the clamping assembly 5 moves forward under its action, and the bamboo stick 20 is clamped under the action of the guide rail c62. The guide rail d63 is used to release the clamping assembly 5 and fall into the material frame 30. There is no need to provide power to the clamping assembly 5, thereby achieving the purpose of saving energy.

[0054] like Fig. 9 As shown, in step one, a number of bamboo sticks 20 are manually placed into the loading frame 10, the motor c91 drives the acceleration roller a92 to rotate, and the belt drives the acceleration roller b93 to rotate, thereby driving the bristles 94 to beat the bamboo sticks 20 downward, under which the bamboo sticks 20 are accelerated to fall into the placement groove 71, completing the loading.

[0055] like Figure 7 As shown, in step 2, the conveying roller a74 is driven to rotate by the motor b73, thereby driving the conveying belt 76 to make a rotational motion, so that the bamboo sticks 20 in the placement groove 71 make a rotational motion under its action to complete the transportation.

[0056] like Figure 4 As shown, in step three, the driving gear 32 is driven to rotate by the motor a31, and the rotary chain 34 performs a rotary motion under the action of the motor a31, thereby driving the support rod 4 to perform a rotary motion.

[0057] like Figure 3 , 6 As shown, in step three, the clamping assembly 5 performs a rotational motion driven by the support rod 4, and is driven to move forward by the forward moving section a612. At the same time, the guide rail a8 drives the bamboo stick 20 to move backward, and under the action of the starting section b621, the clamping assembly 5 clamps the bamboo stick 20.

[0058] In the step 4, the clamping assembly is driven to move backward under the action of the retreat section 614 and the spring 43 , thereby driving the bamboo skewer 20 to move backward, and the bamboo skewer 20 is subjected to the wire drawing process under the action of the scraper 72 .

[0059] like Fig.10 As shown, in step five, the clamping assembly 5 is driven by the guide rail d63 to loosen the bamboo stick 20, and the bamboo stick 20 slides into the material frame 30 through the inclined plate 401 to complete the unloading.

[0060] After the step 5 is completed, a material taking process is also provided.

[0061] In the material taking process, the 20 bamboo sticks that have been finished drawing in the material frame 30 are manually aligned and transported to the next equipment for sharpening. Example

[0062] like Figures 1 to 11 As shown, the rotary bamboo stick automatic wire drawing device includes a support frame a1 and a support frame b2, the support frame a1 is provided with a rotary component 3, the rotary component 3 is provided with a plurality of support rods 4, the support rods 4 are slidably provided with a clamping component 5, the support frame a1 is provided with a guide component 6, the support frame b2 is provided with a transmission component 7, the transmission component 7 is provided with a plurality of placement grooves 71 corresponding to the support rods 4, the front end of the placement groove 71 is provided with a scraper 72, and the support frame b2 is provided with a guide component 6. There is a guide rail a8, a loading frame 10 is arranged at the left end of the support frame b2, a rotating component 9 is arranged at the lower end of the loading frame 10, and a unloading frame 40 is arranged at the right end of the support frame a1. The loading frame 10 drives the bamboo sticks 20 to fall into the placement groove 71 through the rotating component 9, and the bamboo sticks 20 are transmitted through the transmission component 7. The clamping component 5 rotates under the action of the rotating component 3. The clamping component 5 clamps and draws the bamboo sticks 20 through the guide component 6. After the drawing, the bamboo sticks 20 fall into the material frame 30 through the unloading frame 40.

[0063] It is worth mentioning here that by arranging a plurality of support rods 4 on the rotating component 3, a clamping component 5 is slidably arranged on the support rod 4, and a plurality of placement grooves 71 corresponding to the support rod 4 are opened on the conveying component 7, the bamboo sticks 20 are sent to the placement grooves 71 under the action of the rotating component 9, and the bamboo sticks 20 are subjected to wire drawing processing through the action of the clamping component 5 and the guide component 6, so that multiple bamboo sticks 20 can be subjected to wire drawing processing at the same time, and the device can continuously process the bamboo sticks 20, thereby improving the production efficiency.

[0064] In this example, the scraper 72 is disposed on a metal base, and the metal base is connected to the conveyor belt 76 via bolts and nuts.

[0065] like Figure 4As shown, the rotating assembly 3 includes a motor a31 arranged on the support frame a1, a driving gear 32 driven by the motor a31, a driven gear 33 rotatably arranged on the support frame a1, and a rotating chain 34 arranged between the driving gear 32 and the driven gear 33.

[0066] like Figure 5 As shown, the clamping assembly 5 includes a support plate 51 slidably set on the support rod 4, a push block 52 slidably set on the support plate 51, a clamping block a53 hinged at the left end of the push block 52, a clamping block b54 hinged at the right end of the push block 52, a connecting member a55 hinged on the clamping block a53 and a connecting member b56 hinged on the clamping block b54, a push rod 57 is set at the rear end of the support plate 51, and anti-slip pads are set at the front ends of the clamping blocks a53 and b54.

[0067] In this example, by providing an anti-skid pad, the clamping assembly 5 will not slip or shift when clamping the bamboo sticks 20 .

[0068] like Figure 5 As shown, a material discharge chute 41 is provided on the support rod 4 , a slide groove 42 is provided in the middle portion of the support rod 4 , and a spring 43 is provided between the support rod 4 and the support plate 51 .

[0069] like Figure 4 , 6 As shown, the guide assembly 6 includes a guide rail b61 arranged on the support frame a1, a guide rail c62 arranged on the guide rail b61, and a guide rail d63 arranged at the right end of the guide rail b61, the guide rail b61 is provided with a starting section a611, a forward section a612, a retaining section a613 and a backward section 614, and the guide rail c62 is provided with a starting section b621, a clamping section 622 and a retaining section b623.

[0070] In this example, by providing the clamping segment 622 and the retaining segment b623, the clamping assembly 5 is always kept in a clamped state.

[0071] like Figure 7 As shown, the conveying assembly 7 includes a motor b73 arranged on the support frame b2, a conveying roller a74 driven by the motor b73, a conveying roller b75 rotatably arranged on the support frame b2, and a conveyor belt 76 arranged between the conveying roller a74 and the conveying roller b75.

[0072] like Figure 7 As shown, the guide rail a8 is provided with a starting section c81, a forward section b82, a holding section c83 and an ending section 84.

[0073] like Figure 8 , 9As shown, square grooves 101 are provided on both sides of the lower end of the loading frame 10, and the rotating component 9 includes a motor c91 arranged on the loading frame 10, an accelerating roller a92 driven by the motor c91, and an accelerating roller b93 rotatably arranged on the fixed block 102, and a plurality of bristles 94 are provided on the accelerating roller a92 and the accelerating roller b93, and a belt is provided between the accelerating roller a92 and the accelerating roller b93.

[0074] In this example, a plurality of bristles 94 are disposed on the accelerating roller a92 and the accelerating roller b93 to accelerate the bamboo skewers 20 so that they can quickly fall into the placement groove 71 .

[0075] like Fig.10 As shown, a slanted plate 401 is provided at the front end of the unloading rack 40, and the angle between the slanted plate 401 and the supporting rod 4 is set to 15 degrees.

[0076] A plurality of bamboo sticks 20 are manually placed into the loading frame 10, and the bamboo sticks 20 fall from the upper end of the loading frame 10 to the lower end of the loading frame 10, and the motor b73 is started to drive the conveying roller a74 to rotate, thereby driving the conveyor belt 76 to make a rotary motion, and at the same time, the motor c91 is started to drive the acceleration roller a92 to rotate, and the acceleration roller b93 is driven to rotate through the belt, thereby driving the bristles 94 to beat the bamboo sticks 20 downward, when the placement groove 71 on the conveyor belt 76 moves to the lower end of the loading frame 10, the bamboo sticks 20 are accelerated to fall into the placement groove 71 under the action of the bristles 94, and the bamboo sticks 20 are driven by the conveyor belt 76 to make a rotary motion;

[0077] Start the motor a31 to drive the driving gear 32 to rotate, thereby driving the slewing chain 34 to make a slewing motion, and the support rod 4 to make a slewing motion under its action, thereby driving the clamping assembly 5 to make a slewing motion. When the clamping assembly 5 passes through the forward moving section a612, it moves forward. At this time, the bamboo stick 20 passes through the forward moving section b82 and moves backward under the action of the forward moving section b82. When the clamping assembly 5 and the bamboo stick 20 reach the holding section a613 and the holding section c83, the bamboo stick 20 enters the clamping range of the clamping assembly 5;

[0078] When the push block 52 enters the starting section b621, the clamping assembly 5 clamps and fixes the bamboo stick 20. When the clamping assembly enters the retreat section 614, the clamping assembly 5 drives the bamboo stick 20 to move backward and performs a wire drawing process on it under the action of the scraper 72. When the clamping assembly 5 drives the bamboo stick 20 to move out of the retreat section 614, the bamboo stick 20 completes the wire drawing. Through the action of the guide rail d63, the clamping assembly 5 releases the bamboo stick 20, and the bamboo stick 20 falls into the material frame 30 through the inclined plate 401.

[0079] Of course, in the present technical solution, those skilled in the art should understand that the term "one" should be understood as "at least one" or "one or more", that is, in one embodiment, the number of an element may be one, while in another embodiment, the number of the element may be multiple, and the term "one" should not be understood as a limitation on the quantity.

[0080] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art under the technical guidance of the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. Based on the automatic wire drawing process of rotary bamboo skewers, it is characterized by: The process adopts an automatic wire drawing device based on a rotary bamboo skewer, comprising a support frame a (1) and a support frame b (2), wherein the support frame a (1) is provided with a rotary component (3), the rotary component (3) is provided with a plurality of support rods (4), the support rods (4) are slidably provided with a clamping component (5), the clamping component (5) comprises a support plate (51) slidably provided on the support rod (4), a push block (52) slidably provided on the support plate (51), a clamping block a (53) hinged at the left end of the push block (52), and a clamping block b (54) hinged at the right end of the push block (52). 4), a connecting member a (55) hinged on the clamping block a (53) and a connecting member b (56) hinged on the clamping block b (54), a push rod (57) is provided at the rear end of the support plate (51), and anti-slip pads are provided at the front ends of the clamping block a (53) and the clamping block b (54), and a guide assembly (6) is provided on the support frame a (1), and the guide assembly (6) includes a guide rail b (61) provided on the support frame a (1), a guide rail c (62) provided on the guide rail b (61), and a guide rail d (63) provided at the right end of the guide rail b (61), and the guide rail b (6 1) is provided with a starting section a (611), a forward moving section a (612), a holding section a (613) and a backward moving section (614); the guide rail c (62) is provided with a starting section b (621), a clamping section (622) and a holding section b (623); the support frame b (2) is provided with a conveying assembly (7); the conveying assembly (7) is provided with a plurality of placement grooves (71) corresponding to the support rods (4); the front ends of the placement grooves (71) are provided with scrapers (72); the support frame b (2) is provided with a guide rail a (8); the support frame b (2 ) is provided with a loading frame (10) at the left end thereof, a rotating assembly (9) is provided at the lower end thereof, the rotating assembly (9) comprising a motor c (91) provided on the loading frame (10), an accelerating roller a (92) driven by the motor c (91), and an accelerating roller b (93) rotatably provided on a fixed block (102), a plurality of bristles (94) being provided on each of the accelerating roller a (92) and the accelerating roller b (93), a belt being provided between the accelerating roller a (92) and the accelerating roller b (93), and a loading frame (40) being provided at the right end thereof; The process includes the following steps: Step 1, a loading process, manually placing a plurality of bamboo sticks (20) into a loading frame (10), and sending the bamboo sticks (20) into a placement groove (71) under the action of a rotating component (9), thereby completing the loading; Step 2, a conveying process, wherein the conveying component (7) drives the bamboo stick (20) to perform a rotational motion, thereby driving the bamboo stick (20) to move to the right end, thereby completing the conveying; Step three, a clamping process, wherein the clamping component (5) is driven by the rotary component (3) to perform a rotary motion, and moves forward under the action of the guide rail b (61), and the guide rail c (62) drives the clamping component (5) to clamp the bamboo skewers (20); Step 4, a wire drawing process, wherein the guide rail b (61) drives the clamping assembly (5) to move backward, and the bamboo skewers (20) are subjected to wire drawing processing under the action of the scraper (72); Step five, a material unloading process, wherein the guide rail d (63) drives the clamping assembly (5) to release the bamboo skewers (20), and the bamboo skewers (20) fall into the material frame (30) under the action of the unloading frame (40).

2. The automatic wire drawing process based on a rotary bamboo skewer according to claim 1 is characterized in that: The conveying assembly (7) comprises a motor b (73) arranged on a support frame b (2), a conveying roller a (74) driven by the motor b (73), a conveying roller b (75) rotatably arranged on the support frame b (2), and a conveying belt (76) arranged between the conveying roller a (74) and the conveying roller b (75). In the second step, the conveying roller a (74) is driven to rotate by the motor b (73), thereby driving the conveying belt (76) to perform a rotary motion, so that the bamboo sticks (20) in the placement groove (71) perform a rotary motion under the action of the motor b (73), thereby completing the conveying.

3. The automatic wire drawing process based on a rotary bamboo skewer according to claim 1 is characterized in that: The rotary assembly (3) comprises a motor a (31) arranged on the support frame a (1), a driving gear (32) driven by the motor a (31), a driven gear (33) rotatably arranged on the support frame a (1), and a rotary chain (34) arranged between the driving gear (32) and the driven gear (33). In the step 3, the driving gear (32) is driven to rotate by the motor a (31), and the rotary chain (34) performs a rotary motion under the action of the motor a (31), thereby driving the support rod (4) to perform a rotary motion.

4. The automatic wire drawing process based on a rotary bamboo skewer according to claim 1 is characterized in that: The guide rail a (8) is provided with a starting section c (81), a forward section b (82), a holding section c (83) and an ending section (84). In the step 3, the clamping assembly (5) performs a rotational motion under the drive of the support rod (4), and is driven to move forward by the forward section a (612). At the same time, the forward section b (82) drives the bamboo stick (20) to move backward, and under the action of the starting section b (621), the clamping assembly (5) clamps the bamboo stick (20).

5. The automatic wire drawing process based on a rotary bamboo skewer according to claim 1 is characterized in that: A material discharge trough (41) is provided on the support rod (4), a slide groove (42) is provided in the middle portion of the support rod (4), and a spring (43) is provided between the support rod (4) and the support plate (51). In the step 4, the clamping assembly is driven to move backward under the action of the retreat section (614) and the spring (43), thereby driving the bamboo skewers (20) to move backward, and the bamboo skewers (20) are subjected to wire drawing processing under the action of the scraper (72).

6. The automatic wire drawing process based on a rotary bamboo skewer according to claim 1 is characterized in that: The front end of the unloading frame (40) is provided with an inclined plate (401), and the angle between the inclined plate (401) and the support rod (4) is set to 15 degrees. In the step 5, the clamping assembly (5) is driven by the guide rail d (63) to release the bamboo stick (20), and the bamboo stick (20) slides through the inclined plate (401) into the material frame (30), thereby completing the unloading.

7. The automatic wire drawing process based on a rotary bamboo skewer according to claim 1 is characterized in that: After the step 5 is completed, a material taking process is also provided.

8. The automatic wire drawing process based on a rotary bamboo skewer according to claim 7 is characterized in that: In the material taking process, the bamboo sticks (20) that have completed wire drawing in the material frame (30) are manually aligned and transported to the next device for sharpening.