A seashore muddy construction road and construction method thereof

By cleaning and crushing mud on mudflats, laying permeable geotextiles and filling multi-layer structures, the problem of difficulty in building roads that can be passed through heavy vehicle by seaside mudflats is solved, and rapid and low-cost construction road construction is achieved, which improves transportation efficiency and Protected the marine ecological environment.

CN117822368BActive Publication Date: 2024-12-06POWERCHINA CHONGQING ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410164889.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-02-05
Publication Date
2024-12-06
Estimated Expiration
2044-02-05

AI Technical Summary

Technical Problem

The silt on the beach is not suitable for use as the foundation of a building or road. The existing construction methods require a large amount of materials, have a long time, are high in cost, and are not conducive to the protection of the marine ecological environment. It is difficult to quickly build construction roads with heavy vehicles that can pass through.

Method used

By cleaning up the debris on the mud flat silt foundation and initially rolling it to form a flat site, laying permeable geotextiles and polymer material geotextile chambers, filling fine sand, gravel and gravel layer by layer to form a permeable layer, lower base layer, and middle layer The grassroots and upper grassroots are strengthened and the stability and bearing capacity of the road are improved.

Benefits of technology

It has achieved rapid construction of construction roads with passable heavy vehicles, improved the efficiency of seaside material transportation, simplified the construction process, reduced costs, and protected the marine ecological environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117822368B_ABST
    Figure CN117822368B_ABST
Patent Text Reader

Abstract

The invention provides a seashore mud construction road and a construction method thereof. The construction method comprises: cleaning up debris on the mud foundation of the seashore, preliminarily rolling the mud foundation of the seashore to form a flat site; laying a permeable geotextile on the flat site to form a permeable layer; laying a first layer of geocells on the permeable layer; within 48 hours, filling the first layer of geocells with fine powder sand; filling the first layer of sand, gravel or crushed stone on the fine powder sand, compacting the layer to form a lower base; laying a second layer of geocells on the lower base; within 48 hours, filling the second layer of sand, gravel or crushed stone in the second layer of geocells, compacting the layer to form a middle base; filling the third layer of sand, gravel or crushed stone on the middle base, compacting the layer to form an upper base; adopting the construction method provided by the application, a seashore mud construction road can be quickly formed, which is convenient for heavy vehicles to pass through and improves the efficiency of seashore material transportation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of tidal flat road construction, and in particular relates to a seaside tidal flat mud construction road and a construction method thereof. Background Art

[0002] The coastal tidal flats are rich land resources, and the use of coastal tidal flats can vigorously develop aquaculture, tourism and new energy industries. However, the coastal tidal flats are usually composed of silt and silty clay, which have the characteristics of low permeability, high water content, low shear strength, high compressibility, weak bearing capacity, and strong thixotropy, and are not suitable as the foundation bearing layer of buildings or roads.

[0003] In order to make full use of tidal flat resources for development and construction, it is necessary to build temporary roads on the tidal flats so that heavy vehicles can transport materials. Usually, thicker sand and gravel filling and concrete hardening are used to reinforce the silt in the tidal flats. However, this construction method not only requires a large amount of materials, is heavy, takes a long time to build, and is expensive, but is also not conducive to the protection of the marine ecological environment.

[0004] Therefore, how to provide a method for constructing a construction road on a seaside mud flat so as to quickly build a construction road on the seaside mud flat that can accommodate heavy vehicles and improve the efficiency of seaside material transportation is a technical problem that technical personnel in this field urgently need to solve. Summary of the invention

[0005] The object of the present invention is to provide a seashore mud construction road and a construction method thereof, so as to solve at least one of the above-mentioned technical problems.

[0006] To achieve the above-mentioned purpose, the first aspect of the present invention provides a method for constructing a road in a tidal flat mud construction, the method comprising: S1, cleaning up debris on the tidal flat mud foundation, and preliminarily rolling the tidal flat mud foundation to form a flat site; S2, laying a permeable geotextile on the flat site to form a permeable layer; S3, laying a first layer of geocells on the permeable layer; S4, filling fine sand into the first layer of geocells within 48 hours; S5, filling a first layer of gravel on the fine sand. or crushed stone, and compact it to form a lower base; S6, paving the second layer of geocells on the lower base; S7, within 48 hours, filling the second layer of sand, gravel or crushed stone into the second layer of geocells, and compacting it to form a middle base; S8, filling the third layer of sand, gravel or crushed stone on the middle base, and compacting it to form an upper base; wherein the first layer of geocells and the second layer of geocells are both made of polymer materials; the heights of the first layer of geocells and the second layer of geocells are both 5 cm.

[0007] In the first aspect, in S4, the thickness of the fine sand is 5 cm.

[0008] In the first aspect, in S5, the thickness of the first layer of gravel or crushed stone is 12-13 cm, and it is compacted by a roller with a compaction degree of 85%-90%. The compacted road surface is 15 cm higher than the road surface of the leveled site.

[0009] In the first aspect, in S7, the second layer of gravel or crushed stone has a thickness of 17-18 cm and is compacted by a roller, and the compacted road surface is 30 cm higher than the road surface of the leveled site.

[0010] In the first aspect, in S8, the third layer of gravel or crushed stone has a thickness of 23-25 ​​cm and is compacted by a roller with a compaction degree of 90%. The compacted road surface is 50 cm higher than the road surface of the leveled site.

[0011] In the first aspect, the step S3 of laying a first layer of geocells on the permeable layer specifically includes: placing each geocell on the permeable layer in sequence, fully opening each geocell, and fixing them to form the first layer of geocells.

[0012] In the first aspect, each of the geocells is fixed by anchors on all sides, and the middle of each geocell is fixed by anchors in a plum blossom shape. The anchors are bent from steel bars with a diameter of 10 mm, and the anchoring depth is 40 cm. Two adjacent geocells are connected by special plug-ins.

[0013] In the first aspect, after the first layer of geocells is paved, the first layer of geocells is filled along the periphery of the first layer of geocells toward the center of the first layer of geocells.

[0014] In the first aspect, in S6, the paving method of the second layer of geocells is the same as the paving method of the first layer of geocells.

[0015] The second aspect of the present invention provides a seaside tidal flat mud construction road, comprising preliminary rolling of the seaside tidal flat mud foundation to form a flat site, and laying a permeable layer, a lower base layer, a middle base layer and an upper base layer on the flat site in sequence; the permeable layer is composed of a permeable geotextile; the lower base layer is composed of geocells, fine sand and gravel; the middle base layer is composed of geocells and gravel; the upper base layer is composed of gravel; the seaside tidal flat mud construction road is constructed by the seaside tidal flat mud construction road construction method described in the first aspect.

[0016] Beneficial effects:

[0017] The present invention provides a method for constructing a road in a tidal flat mud construction. First, debris on the tidal flat mud foundation is cleaned, and the tidal flat mud foundation is preliminarily rolled to form a flat site, so that a layer of permeable geotextile is laid on it to form a permeable layer, so that the permeable layer is in close contact with the tidal flat mud foundation to prevent the mud from entering the first geocell through the permeable geotextile; secondly, within 48 hours, fine sand is filled into the first geocell to avoid uneven force on the first geocell, so that the water in the mud under the tidal flat foundation can enter the fine sand in the geocell and flow; then, the first layer of gravel or crushed stone is continuously filled on the fine sand and compacted to fix the geocell and Fine sand is used to form a lower base layer, which provides a basic fulcrum for the construction road; then, a second layer of geocells is laid on top of the lower base layer to further strengthen the foundation of the construction road. To improve the strength of the construction road, the second layer of geocells is filled with sand, gravel or crushed stone, and the thickness of the filled sand, gravel or crushed stone is higher than the height of the second geocell. The filled sand, gravel or crushed stone is compacted to form a middle base layer, which improves the stability and bearing capacity of the mud foundation of the tidal flat; finally, a third layer of sand, gravel or crushed stone is continued to be filled on top of the middle base layer, which is compacted to form an upper base layer, which further improves the stability and bearing capacity of the mud foundation of the tidal flat, so that heavy vehicles can stably travel on the upper surface of the upper base layer. That is, by adopting the construction method provided by this application, a construction road for the beach tidal flat can be quickly formed, which is convenient for heavy vehicles to pass through and improves the efficiency of transporting materials by the beach. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the embodiments of this specification or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 It is a flow chart of a method for constructing a road in muddy seashore in the present invention;

[0020] Figure 2 It is a structural schematic diagram of a seashore mud construction road in the present invention;

[0021] Reference numerals:

[0022] 1. Permeable layer; 2. Lower base layer; 21. First layer of geocell; 22. First layer of gravel or crushed stone; 3. Middle base layer; 31. Second layer of geocell; 33. Second layer of gravel or crushed stone; 4. Lower base layer. DETAILED DESCRIPTION

[0023] The technical scheme of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.

[0024] Meanwhile, in the embodiments of this specification, when a component is referred to as being "fixed to" another component, it may be directly on the other component or there may be a central component. When a component is considered to be "connected to" another component, it may be directly connected to the other component or there may be a central component at the same time. When a component is considered to be "set on" another component, it may be directly set on the other component or there may be a central component at the same time.

[0025] Embodiment 1:

[0026] See also Figure 1 The present invention provides a method for constructing a road in a tidal flat mud construction at the seaside, the method comprising: S1, cleaning debris on the tidal flat mud foundation, and preliminarily rolling the tidal flat mud foundation to form a flat site; S2, laying a permeable geotextile on the flat site to form a permeable layer; S3, laying a first layer of geocells on the permeable layer; S4, filling fine sand into the first layer of geocells within 48 hours; S5, filling a first layer of gravel or crushed stone on the fine sand, and Compact to form a lower base; S6, lay the second layer of geocells on the lower base; S7, within 48 hours, fill the second layer of gravel or crushed stone into the second layer of geocells, compact them to form a middle base; S8, fill the third layer of gravel or crushed stone on the middle base, compact them to form an upper base; wherein the first layer of geocells and the second layer of geocells are both made of polymer materials; the height of the first layer of geocells and the second layer of geocells are both 5 cm.

[0027] Specifically, the present invention provides a method for constructing a road in a tidal flat mud. First, the debris on the tidal flat mud foundation is cleaned, and the tidal flat mud foundation is preliminarily rolled to form a flat site, so that a layer of permeable geotextile is laid on it to form a permeable layer, so that the permeable layer is in close contact with the tidal flat mud foundation to prevent the silt from entering the first geocell through the permeable geotextile; secondly, within 48 hours, the first geocell is filled with fine sand to avoid uneven force on the first geocell, so that the water in the silt under the tidal flat foundation can enter the fine sand in the geocell and flow; then, the first layer of gravel or crushed stone is continued to be filled on the fine sand and compacted to fix the geocell. The cells and fine sand form a lower base layer to provide a basic fulcrum for the construction road; then, the second layer of geocells is paved on top of the lower base layer to further strengthen the foundation of the construction road. In order to improve the strength of the construction road, the second layer of geocells is filled with sand and gravel or crushed stone, and the thickness of the filled sand and gravel or crushed stone is higher than the height of the second geocell. The filled sand and gravel or crushed stone is compacted to form a middle base layer to improve the stability and bearing capacity of the mud foundation of the tidal flat; finally, the third layer of sand and gravel or crushed stone is continued to be filled on top of the middle base layer, and compacted to form an upper base layer to further improve the stability and bearing capacity of the mud foundation of the tidal flat, so that heavy vehicles can stably drive on the upper surface of the upper base layer. That is, by adopting the construction method provided by this application, a construction road for the beach tidal flat can be quickly formed, which is convenient for heavy vehicles to pass through and improves the efficiency of transporting materials by the beach.

[0028] In some possible implementations, in S4, the thickness of the fine sand is 5 cm.

[0029] Those skilled in the art can understand that the thickness of the fine sand is the same as the height of the geocell, and the fine sand has a small particle size, which can be in close contact with the permeable geotextile, reducing the wear on the permeable geotextile.

[0030] In some possible implementations, in S5, the first layer of gravel or crushed stone has a thickness of 12 to 13 cm and is compacted by a roller with a compaction degree of 85% to 90%. The compacted road surface is 15 cm higher than the road surface of the leveled site.

[0031] This is because a layer of gravel or crushed stone with a thickness of 12 to 13 cm is continuously built on the first layer of geocells filled with fine sand. The particle size of gravel or crushed stone is larger than that of fine sand and has higher strength. It is compacted by a roller with a compaction degree of 85% to 90% to reduce the spacing between gravel or crushed stone, making them more tightly combined and providing a foundation for the construction road. The compacted road surface is 15 cm higher than the road surface of the leveled site.

[0032] In some possible implementations, in S7, the second layer of gravel or crushed stone has a thickness of 17-18 cm and is compacted by a roller, and the compacted road surface is 30 cm higher than the road surface of the leveled site.

[0033] Those skilled in the art can understand that the first layer of geocells is in close contact with the permeable geotextile, so the internal filler needs to be filled with fine sand with a smaller particle size and lower strength so as not to destroy the effect of the permeable geotextile in blocking silt; and the second layer of geocells is in close contact with the sand, gravel or crushed stone layer. In order to improve the compactness of the second layer of geocells and the lower base layer, it is necessary to fill the second layer of geocells with the same sand, gravel or crushed stone as the upper surface of the lower base layer. In addition, in order to avoid directly rolling the second layer of geocells, the thickness of the second layer of sand, gravel or crushed stone is greater than the height of the geocell, and the thickness of the second layer of sand, gravel or crushed stone is 17 to 18 cm, and a press is used for compaction. The compacted road surface is 30 cm higher than the road surface of the leveled site.

[0034] In some possible implementations, in S8, the third layer of gravel or crushed stone has a thickness of 23-25 ​​cm and is compacted by a roller with a compaction degree of 90%. The compacted road surface is 50 cm higher than the road surface of the leveled site.

[0035] In order to further improve the bearing capacity of the construction road, a third layer of gravel or crushed stone is laid on the middle base with a thickness of 23 to 25 cm and compacted by a roller with a compaction degree of 90%. The compacted road surface is 50 cm higher than the road surface of the leveled site.

[0036] In some possible implementations, the step S3 of paving the first layer of geocells on the permeable layer specifically includes: placing each geocell on the permeable layer in sequence, fully opening each geocell, and fixing them to form the first layer of geocells.

[0037] In some possible implementations, each of the geocells is fixed by anchors on all sides, and the middle of each geocell is fixed by anchors in a plum blossom shape, the anchors are bent from steel bars with a diameter of 10 mm, and the anchoring depth is 40 cm; two adjacent geocells are connected by special plug-ins.

[0038] Those skilled in the art can understand that the technical requirements of geocells are: cell height 50mm±1mm, grid size 400mm×400mm; longitudinal tensile strength of the cell sheet (cell sheet mesh belt direction) ≥160kN / m, transverse tensile strength of the cell sheet (cell sheet height direction) ≥20kN / m, elongation at break of the cell sheet ≤10%, tensile (pull) strength at the injection molding point ≥150KN / m, peel strength at the injection molding point ≥40KN / m, the cell sheet connection points are connected by injection molding process, and metal connection methods are prohibited. Plastic card connections are required for connection between cell groups.

[0039] Construction requirements for geocell laying: When laying geocells, they should be straightened by hand to ensure that they are evenly tensioned and effectively anchored. They should be buried in time and exposure to the sun is strictly prohibited. After the geocell is fully opened (the expansion direction of the cell should be perpendicular to the longitudinal center line of the roadbed), the cells are fixed with anchors at each connection point around them (the longitudinal and transverse joints between the cells can be connected by special plug-ins or on-site connection), and the middle is fixed with anchor steel bars in a plum blossom shape (2m×2m); the anchors are made of 10mm diameter steel bars bent, and the anchoring depth is 40cm.

[0040] In some possible implementations, after the first layer of geocells is paved, the first layer of geocells is filled along the periphery of the first layer of geocells toward the center of the first layer of geocells.

[0041] The filling requirements for geocell interior filling are as follows: after the cells are laid, the filling should be filled in time (within 48 hours), and should be carried out symmetrically according to the principle of "first the two sides, then the middle", and it is strictly forbidden to fill the middle of the roadbed first. The filling is not allowed to be unloaded directly on the geocell, but should be unloaded on the paved soil surface. All vehicles and construction machinery are not allowed to drive directly on the paved geocell, and are only allowed to drive on the soil surface along the axis of the embankment.

[0042] In some possible implementations, in S6, the paving method of the second layer of geocells is the same as the paving method of the first layer of geocells.

[0043] In summary, compared with the prior art, the construction method provided by this application has the following advantages:

[0044] (1) This application does not require special reinforcement of the soft foundation of the beach mud. It only needs to clean up the debris on the beach mud foundation and make the beach foundation flat to facilitate the laying of the permeable geotextile. In addition, the cleaning process needs to avoid sharp protrusions to prevent the permeable geotextile from being punctured during the subsequent construction process.

[0045] (2) This application lays two layers of geocells and fills the geocells with permeable materials (fine sand, gravel or crushed stone) to allow water to flow vertically in the construction road. Permeable geotextiles are used to prevent the loss of fillers, and the high strength and low tensile properties of the geocells are used to reduce the settlement deformation caused by heavy loads on the road surface.

[0046] (3) The construction method of the construction road of the present application has a simple construction process, short time and low cost.

[0047] Embodiment 2

[0048] See also Figure 2 The present invention also provides a seaside tidal flat mud construction road, comprising: performing preliminary rolling on the seaside tidal flat mud foundation to form a flat site, and laying a permeable layer 1, a lower base layer 2, a middle base layer 3 and an upper base layer 4 on the flat site in sequence; the permeable layer 1 is composed of a permeable geotextile; the lower base layer 2 is composed of geocells, fine sand and gravel; the middle base layer 3 is composed of geocells and gravel; the upper base layer 4 is composed of gravel; the seaside tidal flat mud construction road is constructed by the seaside tidal flat mud construction road construction method described in the first aspect.

[0049] Since the second embodiment and the first embodiment are embodiments of the same inventive concept and some of their structures are exactly the same, the structures in the second embodiment that are substantially the same as those in the first embodiment will not be elaborated in detail. For the parts not described in detail, please refer to the first embodiment.

[0050] Finally, it should be noted that the above embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention. They should all be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

[0051] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.

Claims

1. A method for constructing a road in seashore mud, characterized in that: The construction method comprises: S1, cleaning up the debris on the mud foundation of the beach, and preliminarily rolling the mud foundation of the beach to form a flat site; S2. Laying a permeable geotextile on the leveled site to form a permeable layer; S3, laying a first layer of geocells on the permeable layer; S4. Fill the first geocell with fine sand within 48 hours; S5, filling a first layer of sand, gravel or crushed stone on the fine sand, and compacting it to form a lower base; S6, laying a second layer of geocells on the lower base; S7. Within 48 hours, fill the second layer of gravel or crushed stone into the second layer of geocell and compact it to form a middle base; S8, filling a third layer of gravel or crushed stone on the middle base and compacting it to form an upper base; Wherein, the first layer of geocells and the second layer of geocells are both made of polymer materials; the heights of the first layer of geocells and the second layer of geocells are both 5 cm; In S4, the thickness of the fine sand is 5 cm; In S5, the thickness of the first layer of gravel or crushed stone is 12-13 cm, and it is compacted by a roller with a compaction degree of 85%-90%. The compacted road surface is 15 cm higher than the road surface of the leveled site; In S7, the second layer of gravel or crushed stone has a thickness of 17-18 cm and is compacted by a roller, and the compacted road surface is 30 cm higher than the road surface of the leveled site; In S8, the thickness of the third layer of gravel or crushed stone is 23-25 ​​cm, and it is compacted by a roller with a compaction degree of 90%. The compacted road surface is 50 cm higher than the road surface of the leveled site.

2. The method for constructing a road in seashore mud according to claim 1, characterized in that: The S3 of laying the first layer of geocells on the permeable layer specifically comprises: Each geocell is sequentially placed on the permeable layer, each geocell is fully opened, and fixed to form the first layer of geocells.

3. The method for constructing a road in seashore mud according to claim 2, characterized in that: Each of the geocells is fixed around by anchors, and the middle of each geocell is fixed by anchors in a plum blossom shape, the anchors are bent from steel bars with a diameter of 10 mm, and the anchoring depth is 40 cm; Two adjacent geocells are connected by using a special plug-in.

4. The method for constructing a road in seashore mud according to claim 3, characterized in that: After the first layer of geocells is paved, the first layer of geocells is filled along the periphery of the first layer of geocells toward the center of the first layer of geocells.

5. The method for constructing a road in seashore mud according to claim 4, characterized in that: In S6, the paving method of the second layer of geocells is the same as the paving method of the first layer of geocells.

6. A seashore muddy road construction method, characterized in that: The method comprises the following steps: preliminarily rolling the mud foundation of the beach to form a flat site, and sequentially laying a permeable layer, a lower base layer, a middle base layer and an upper base layer on the flat site; The permeable layer is composed of a permeable geotextile; the lower base is composed of geocells, fine sand and gravel; the middle base is composed of geocells and gravel; the upper base is composed of gravel; The seaside tidal flat mud construction road is constructed by the seaside tidal flat mud construction road construction method described in any one of claims 1-5.