An environmentally friendly and efficient sewage treatment process
Through the combination of the primary filtration settlement and adsorption linkage mechanism, the problems of blockage and incomplete removal of impurities in sewage treatment equipment are solved, the quality and efficiency of sewage treatment are improved, and equipment maintenance is simplified.
Patent Information
- Application Number
- CN202410069236.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-01-17
AI Technical Summary
Existing sewage treatment equipment is prone to blockage and impurities in the water are not thoroughly removed, resulting in low treatment efficiency and poor quality.
The primary filtration settlement mechanism and adsorption linkage mechanism are used to remove large particles of impurities through initial filtration, settle down and remove floating objects, adsorption and odor removal, and clean them up through the joint cleaning of the flocculation baffle and the wiping plate to avoid clogging and equipment failure.
It improves the quality and efficiency of sewage treatment, ensures stable operation and convenient maintenance of equipment, and enhances treatment efficiency and convenience of equipment use.
Smart Images

Figure CN117886473B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of sewage treatment, and in particular to an environmentally friendly and efficient sewage treatment process. Background Art
[0002] Sewage usually refers to the polluted water from life and production. Sewage mainly includes domestic sewage, industrial wastewater and initial rainwater. Water that has lost its original function is simply called sewage. Sewage is caused by the addition of new substances into the water or changes in external conditions, which leads to the deterioration of water and can no longer maintain its original function. At present, there are problems with incomplete purification in sewage treatment. For example, there are still particles in the sewage after purification, and the odor of sewage cannot be completely removed. Now there are patent documents to improve this.
[0003] For example, Chinese patent CN214192950U, a sewage treatment and purification device with good adsorption effect, relates to the field of sewage treatment, and includes an integral device, the integral device includes a sedimentation tank, a decomposition tank and a purification tank, the purification tank is provided with a first filter plate and a second filter plate, both ends of the first filter plate and the second filter plate are provided with slides, and the slides are fixed to the inner wall of the integral device, and the first filter plate and the second filter plate are both slidably connected to the slides, the purification tank is provided with a liquid outlet on the side, and the end of the liquid outlet is fixedly connected to the surface of the integral device. The second filter plate inside the purification tank mainly filters the fine particles inside the sewage, and the third filter plate mainly treats the odor inside the sewage to achieve a better purification effect, and an odor adsorption plate is set, and the sewage is first treated in the sedimentation tank, and the odor emitted by the sewage will be adsorbed by the odor adsorption plate, and finally the odor is adsorbed by the first filter plate, and the two adsorptions are more sufficient to treat the sewage.
[0004] Although the above document adds multiple filter plates and adsorption plates inside the equipment to filter impurities and adsorb odors from sewage, it still has defects that need to be improved during actual use, such as:
[0005] The equipment only uses filter plates and chemical agents to filter sewage. In addition to microorganisms, general sewage also contains a large number of tiny floating objects, which need to be left to settle before adsorption. Otherwise, the quality of water treatment will not meet the standards. In addition, the equipment relies entirely on the filter plates for filtration. The first filter plate filters the most stains and is prone to blockage after a short period of use, resulting in a gradual decrease in the flow rate during sewage treatment, affecting the treatment efficiency.
[0006] Therefore, an environmentally friendly and efficient sewage treatment equipment is now designed to improve the quality and efficiency of sewage treatment to solve such defects. Summary of the invention
[0007] In view of the deficiencies of the prior art, the present invention provides an environmentally friendly and efficient sewage treatment process, which solves the problems that the existing sewage treatment equipment is prone to clogging and imperfect removal of impurities in the water.
[0008] To achieve the above objectives, the present invention is implemented through the following technical solutions: an environmentally friendly and efficient sewage treatment process, specifically comprising the following steps:
[0009] S1. Primary filtration: The sewage is injected into the water tank in the primary filtration sedimentation mechanism, and the large particles of impurities are filtered out by the primary filter screen;
[0010] S2, sedimentation: The filtered sewage enters the water storage sedimentation frame, and then the reagent is added for flocculation and sedimentation;
[0011] S3, switching: after the settling time is reached, the sewage is pumped into the adsorption water tank by the water pump in the adsorption linkage mechanism, and the second drainage pipe is pressed by the lowering of the adsorption water tank to start the cylinder to switch the two water storage and settling frames. After the switching is completed, the water storage and settling frames are filled with water again for settling, so that the buoyancy frame floats up and drives the flocculation baffle for flocculation to rise to the top;
[0012] S4, adsorption: after the adsorption water tank is filled with water and descends, the adsorption net frame is lowered into the water for adsorption through the linkage of the first gear plate and the second gear plate;
[0013] S5, drainage: after the adsorption is completed, open the second drainage pipe to drain the water, and use the spring rebound to make the adsorption water tank rise;
[0014] S6. Cleaning: During the rising process of the adsorption water tank, the flocculation baffle is scraped and cleaned by the wiping plate driven by linkage.
[0015] Preferably, the primary filtration sedimentation mechanism includes a U-shaped switching table, and the bottom of the U-shaped switching table is fixedly connected to a bottom plate, a sliding groove is opened at the bottom of the inner cavity of the U-shaped switching table, and a sliding plate is slidably installed on the inner side of the sliding groove, and both sides of the top of the sliding plate are fixedly connected to a water storage sedimentation frame used in conjunction with the U-shaped switching table through fixed blocks, and a flocculation baffle is arranged inside the water storage sedimentation frame, and the opposite sides of the bottom of the two water storage sedimentation frames are fixedly connected to a rectangular sealing table used in conjunction with the flocculation baffle, a buoyancy frame is placed on the top of the rectangular sealing table, and a bent stretching rod is fixedly connected to the top of the buoyancy frame, and one end of the two bent stretching rods are respectively fixedly connected to the relative flocculation baffles.
[0016] Preferably, the top of the U-shaped switching table is fixedly connected to a water tank via a bracket, the front and rear portions of the water tank are slidably installed with primary filter screen plates via openings, the top of the water tank is fixedly connected to a threaded connecting pipe via an opening, both sides of the bottom of the water tank are fixedly connected to a first drain pipe used in conjunction with a water storage and sedimentation frame, the left side of the U-shaped switching table is fixedly connected to a cylinder via a fixing block, and the front end of the cylinder is fixedly connected to the front water storage and sedimentation frame via a fixing plate.
[0017] Preferably, the adsorption linkage mechanism includes a linkage operation box, and the linkage operation box is fixedly installed on the right side of the top of the bottom plate through a fixing plate, and the upper part of the inner wall of the linkage operation box is fixedly connected with a circular upper resistance plate, and the front and rear parts of both sides of the bottom of the circular upper resistance plate are fixedly connected with vertical sliding rods, and the bottom end of the vertical sliding rod is fixedly connected to the bottom of the inner cavity of the linkage operation box, an adsorption water tank is slidably installed between the four vertical sliding rods, and a spring is provided on the surface of the vertical sliding rod, and a button used in conjunction with the adsorption water tank is fixedly installed at the bottom of the inner cavity of the linkage operation box through an opening.
[0018] Preferably, a second movable port is provided on the surface of the linkage operation box, and a second drain pipe used in conjunction with the second movable port is fixedly connected to the lower part of the adsorption water tank surface through an opening, and a first gear plate and a second gear plate that mesh with each other are rotatably connected to the upper parts on both sides between the front and rear parts of the inner cavity of the linkage operation box through bearing parts, and a first movable port is provided on the top of the linkage operation box.
[0019] Preferably, a first tooth plate is meshed on one side of the first gear disc, a second tooth plate is meshed on one side of the second gear disc, and the top ends of the first tooth plate and the second tooth plate pass through the first movable opening and extend to the upper part of the linkage operating box, guide grooves are provided on the opposite sides of the first tooth plate and the second tooth plate, and guide blocks used in conjunction with the guide grooves are fixedly connected on both sides of the inner side of the first movable opening.
[0020] Preferably, the bottom end of the second tooth plate is fixedly connected to an adsorption screen frame used in conjunction with the adsorption water tank, and the bottom end of the first tooth plate is fixedly connected to the inner wall of the adsorption water tank through a fixed block, and an operating port used in conjunction with the adsorption screen frame is opened on the right side of the linkage operating box.
[0021] Preferably, a third moving opening is provided at the rear portion of the linkage operating box, the rear portion of the linkage operating box is rotatably connected to a gear cylinder through a bearing member, the rear portion of the adsorption water tank is fixedly connected to a fourth tooth plate meshing with the gear cylinder through a bracket, the top of the gear cylinder is meshed with a third tooth plate, and a horizontal sliding opening is provided at the top of the third tooth plate, and the rear portion of the linkage operating box is fixedly connected to a sliding frame used in conjunction with the horizontal sliding opening.
[0022] Preferably, the left end of the third tooth plate is fixedly connected to a U-shaped rod via a fixing block, and both ends of the U-shaped rod are fixedly connected to a wiping plate used in conjunction with a water storage sedimentation frame.
[0023] Preferably, a water pump is fixedly connected to the left side of the linkage operation box through a fixing plate, and hoses are connected to the surface and rear of the water pump, the opposite ends of the two hoses respectively penetrate the water storage and sedimentation frame on the same side and extend to the interior of the water storage and sedimentation frame, the bottom of the water pump is connected to a third drain pipe, and the top end of the third drain pipe penetrates the linkage operation box and extends to the interior of the linkage operation box. Beneficial Effects
[0024] The present invention provides an environmentally friendly and efficient sewage treatment process. Compared with the existing technology, it has the following beneficial effects:
[0025] (1) This environmentally friendly and efficient sewage treatment process has a primary filtration sedimentation mechanism and an adsorption linkage mechanism installed on the top of the bottom plate, which can be used in conjunction with each other. The arrangement of these two mechanisms can perform primary filtration on the sewage to remove large particles of impurities, then perform sedimentation to remove floating objects, and finally perform adsorption to remove odors in the water, thereby improving the treatment quality of sewage. In addition, in this process, the linkage of the structure can be used to clean the flocculation baffle and switch the water storage sedimentation frame, thereby avoiding equipment blockage and making its operation stable and satisfying current use.
[0026] (2) This environmentally friendly and efficient sewage treatment process is characterized by providing a flocculation baffle at the bottom of the water storage and sedimentation frame, and connecting it to the buoyancy frame using a bent stretching rod, and using it in conjunction with a wiping plate. The arrangement of these structures can drive the flocculation baffle on the other side to rise after the buoyancy frame drives the flocculation baffle on the other side to rise, and then drive the wiping plate to move by the adsorption water tank drainage rising, thereby scraping off the flocculation on the top of the flocculation baffle, which can not only ensure the continuous operation of the equipment, but also facilitate the work of the staff.
[0027] (3) This environmentally friendly and efficient sewage treatment process is used by rotating and connecting two first and second gear plates of different sizes and meshing with each other inside the linkage operation box, and using them in combination with an adsorption net frame and an operation port. The arrangement of these structures can enable the adsorption net frame to descend faster and dock with the adsorption water tank through the different ratios of the first and second gear plates when the adsorption water tank descends, thereby completing the adsorption of sewage. At the same time, after the adsorption water tank rises, the adsorption net frame can be located at the operation port, and the staff can conveniently replace the activated carbon through the operation port, thereby improving the convenience of equipment use.
[0028] (4) This environmentally friendly and efficient sewage treatment process is achieved by installing a button that is used in conjunction with the adsorption water tank at the bottom of the inner cavity of the linkage operation box and using it in conjunction with a cylinder. The arrangement of these structures can trigger the button after the adsorption water tank descends, thereby driving the cylinder to interchange the positions of the two water storage and sedimentation frames, and continuing sewage treatment without affecting the cleaning of the other flocculation baffle, thereby improving the treatment efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the process of the present invention;
[0030] Figure 2 It is a structural schematic diagram of the present invention;
[0031] Figure 3 It is a rear view of the structure of the primary filtration sedimentation mechanism and the adsorption linkage mechanism of the present invention;
[0032] Figure 4 For the present invention Figure 3 A partial enlarged view of the middle A;
[0033] Figure 5 It is a schematic diagram of the structure of the primary filtration and sedimentation mechanism of the present invention;
[0034] Figure 6 It is a schematic diagram of the third tooth plate, the horizontal sliding mouth and the U-shaped rod structure of the present invention;
[0035] Figure 7 It is a schematic diagram of the flocculation baffle, buoyancy frame and bent stretch rod structure of the present invention;
[0036] Figure 8 It is a cross-sectional view of the water storage and settlement frame structure of the present invention;
[0037] Fig. 9 It is a schematic diagram of the water tank, the primary filter screen plate and the threaded connection pipe structure of the present invention;
[0038] Fig.10 It is a cross-sectional view of the linkage operation box structure of the present invention;
[0039] Fig.11 It is a schematic diagram of the first gear plate, the second gear plate and the second tooth plate structure of the present invention;
[0040] Fig.12 It is a schematic diagram of the internal structure of the linkage operation box of the present invention.
[0041] In the figure: 1, bottom plate; 2, primary filter sedimentation mechanism; 3, adsorption linkage mechanism; 201, U-shaped switching table; 202, sliding groove; 203, sliding plate; 204, water storage sedimentation frame; 205, flocculation baffle; 206, buoyancy frame; 207, curved stretching rod; 208, rectangular sealing platform; 209, water tank; 210, primary filter screen plate; 211, threaded connecting pipe; 212, first drainage pipe; 213, cylinder; 301, linkage operation box; 302, first moving port; 303, return type upper baffle plate; 304, vertical sliding rod; 305, adsorption water tank; 306, elastic Spring; 307, second moving port; 308, second drain pipe; 309, first gear plate; 310, second gear plate; 311, first tooth plate; 312, second tooth plate; 313, guide groove; 314, guide block; 315, adsorption net frame; 316, operation port; 317, third moving port; 318, gear cylinder; 319, third tooth plate; 320, horizontal sliding port; 321, sliding frame; 322, fourth tooth plate; 323, U-shaped rod; 324, wiper plate; 325, water pump; 326, third drain pipe; 327, hose; 328, button. DETAILED DESCRIPTION
[0042] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0043] See also Figure 1-12 , the present invention provides two technical solutions:
[0044] Embodiment 1
[0045] An environmentally friendly and efficient sewage treatment process specifically comprises the following steps:
[0046] S1, primary filtration: firstly, a pipe is threadedly connected to the threaded connection pipe 211, and then the sewage is injected into the water tank 209 in the primary filtration sedimentation mechanism 2 through the pipe, and the sewage passes through the primary filtration screen 210 and filters the large particles of impurities, and the filtered sewage is discharged into the inner side of the water storage sedimentation frame 204 through the first drainage pipe 212;
[0047] S2, sedimentation: The filtered sewage enters the water storage sedimentation frame 204, and then flocculants are added therein, and then the sewage is allowed to settle. After a period of time, the water pump 325 is started to use the third drainage pipe 326 and the hose 327 to pump the settled sewage into the linkage operation box 301 and spray it to the adsorption water tank 305. Since the hose 327 is located below the flocculation baffle 205, the flocculation property will not be pumped out during pumping. After the water is pumped out, the flocculants are accumulated on the top of the flocculation baffle 205;
[0048] S3, switching: after the sewage in the water storage sedimentation frame 204 is injected into the adsorption water tank 305 through the water pump 325, the adsorption water tank 305 is lowered through the limit of the vertical slide bar 304, and the adsorption water tank 305 will simultaneously drive the first tooth plate 311 and the fourth tooth plate 322 to descend during the descent process, and the fourth tooth plate 322 will drive the gear cylinder 318 to rotate when it descends, and the rotation of the gear cylinder 318 drives the third tooth plate 319 to move rightward, so that the two wipe plates 324 move rightward and reset. After the adsorption water tank 305 is completely lowered, the second drainage pipe 308 will be pressed. After the second drainage pipe 308 is triggered, the cylinder 213 is started to switch the two water storage and sedimentation frames 204, and the water storage and sedimentation frame 204 that has completed flocculation and the vacant water storage and sedimentation frame 204 are exchanged. After the switching is completed, the vacant water storage and sedimentation frame 204 is filled with water and medicine again for sedimentation, so that the buoyancy frame 206 inside it floats up and uses the curved stretch rod 207 to drive the flocculation baffle 205 with accumulated flocculants to rise to the top;
[0049] S4, adsorption: When the adsorption water tank 305 is filled with water and descends, the first tooth plate 311 is used to drive the first gear plate 309 and the second gear plate 310 to rotate. Since the first gear plate 309 is larger than the second gear plate 310, the second gear plate 310 drives the second tooth plate 312 and the adsorption net frame 315 to descend at a speed exceeding the adsorption water tank 305. When the adsorption water tank 305 reaches the bottom completely, the adsorption net frame 315 can also be located on the inner side of the adsorption water tank 305. At this time, the activated carbon particles inside the adsorption net frame 315 adsorb water;
[0050] S5, drainage: after the adsorption time is reached, the electromagnetic valve on the surface of the second drainage pipe 308 is opened to drain water. As the water is gradually discharged, the adsorption water tank 305 rises due to the elastic force of the spring 306. During the rising process of the adsorption water tank 305, the fourth tooth plate 322 drives the gear cylinder 318 to rotate in the opposite direction. The third tooth plate 319 moves leftward under the drive of the gear cylinder 318, so that the wiping plate 324 pushes and scrapes the top of the flocculation baffle 205 to push out the flocculation, and at the same time drives the adsorption net frame 315 to rise and detach from the inside of the adsorption water tank 305. At this time, after the sewage inside the water storage sedimentation frame 204 is flocculated, the sewage treatment is carried out again;
[0051] S6. Cleaning: After the sewage treatment is completed, the activated carbon particles inside the adsorption mesh frame 315 are replaced through the operation port 316, and the primary filter mesh plate 210 is pulled to remove impurities on the top thereof.
[0052] Embodiment 2
[0053] An environmentally friendly and efficient sewage treatment process specifically comprises the following steps:
[0054] S1, primary filtration: firstly, a pipe is threadedly connected to the threaded connection pipe 211, and then the sewage is injected into the water tank 209 in the primary filtration sedimentation mechanism 2 through the pipe, and the sewage passes through the primary filtration screen 210 and filters the large particles of impurities, and the filtered sewage is discharged into the inner side of the water storage sedimentation frame 204 through the first drainage pipe 212;
[0055] S2, sedimentation: The filtered sewage enters the water storage sedimentation frame 204, and then flocculants are added therein, and then the sewage is allowed to settle. After a period of time, the water pump 325 is started to use the third drainage pipe 326 and the hose 327 to pump the settled sewage into the linkage operation box 301 and spray it to the adsorption water tank 305. Since the hose 327 is located below the flocculation baffle 205, the flocculation property will not be pumped out during pumping. After the water is pumped out, the flocculants are accumulated on the top of the flocculation baffle 205;
[0056] S3, switching: after the sewage in the water storage sedimentation frame 204 is injected into the adsorption water tank 305 through the water pump 325, the adsorption water tank 305 is lowered through the limit of the vertical slide bar 304, and the adsorption water tank 305 will simultaneously drive the first tooth plate 311 and the fourth tooth plate 322 to descend during the descent process, and the fourth tooth plate 322 will drive the gear cylinder 318 to rotate when it descends, and the rotation of the gear cylinder 318 drives the third tooth plate 319 to move rightward, so that the two wipe plates 324 move rightward and reset. After the adsorption water tank 305 is completely lowered, the second drainage pipe 308 will be pressed. After the second drainage pipe 308 is triggered, the cylinder 213 is started to switch the two water storage and sedimentation frames 204, and the water storage and sedimentation frame 204 that has completed flocculation and the vacant water storage and sedimentation frame 204 are exchanged. After the switching is completed, the vacant water storage and sedimentation frame 204 is filled with water and medicine again for sedimentation, so that the buoyancy frame 206 inside it floats up and uses the curved stretch rod 207 to drive the flocculation baffle 205 with accumulated flocculants to rise to the top;
[0057] S4, adsorption: When the adsorption water tank 305 is filled with water and descends, the first tooth plate 311 is used to drive the first gear plate 309 and the second gear plate 310 to rotate. Since the first gear plate 309 is larger than the second gear plate 310, the second gear plate 310 drives the second tooth plate 312 and the adsorption net frame 315 to descend at a speed exceeding the adsorption water tank 305. When the adsorption water tank 305 reaches the bottom completely, the adsorption net frame 315 can also be located on the inner side of the adsorption water tank 305. At this time, the activated carbon particles inside the adsorption net frame 315 adsorb water;
[0058] S5, drainage: after the adsorption time is reached, the electromagnetic valve on the surface of the second drainage pipe 308 is opened to drain water. As the water is gradually discharged, the adsorption water tank 305 rises due to the elastic force of the spring 306. During the rising process of the adsorption water tank 305, the fourth tooth plate 322 drives the gear cylinder 318 to rotate in the opposite direction. The third tooth plate 319 moves leftward under the drive of the gear cylinder 318, so that the wiping plate 324 pushes and scrapes the top of the flocculation baffle 205 to push out the flocculation, and at the same time drives the adsorption net frame 315 to rise and detach from the inside of the adsorption water tank 305. At this time, after the sewage inside the water storage sedimentation frame 204 is flocculated, the sewage treatment is carried out again;
[0059] S6. Cleaning: After the sewage treatment is completed, the activated carbon particles inside the adsorption mesh frame 315 are replaced through the operation port 316, and the primary filter mesh plate 210 is pulled to remove impurities on the top thereof.
[0060] Please refer to Figure 5 , Figure 6 , Figure 7 , Figure 8 and Fig. 9 , showing the overall structure of the primary filtration sedimentation mechanism 2, the primary filtration sedimentation mechanism 2 includes a U-shaped switching platform 201, and the bottom of the U-shaped switching platform 201 is fixedly connected to the bottom plate 1, the bottom of the inner cavity of the U-shaped switching platform 201 is provided with a sliding groove 202, the inner side of the sliding groove 202 is slidably installed with a sliding plate 203, both sides of the top of the sliding plate 203 are fixedly connected with a water storage sedimentation frame 204 used in conjunction with the U-shaped switching platform 201 through a fixed block, a flocculation baffle 205 is arranged inside the water storage sedimentation frame 204, the water injection amount of the water storage sedimentation frame 204 is only enough to allow the flocculation baffle 205 to be located at the top of the water storage sedimentation frame 204 flush position, the two opposite sides of the bottom of the two water storage sedimentation frames 204 are fixedly connected with a rectangular sealing platform 208 used in conjunction with the flocculation baffle 205, the rectangular sealing platform 208 can prevent flocculants from entering The flocculation baffle 205 is inserted into the lower part, and a buoyancy frame 206 is placed on the top of the rectangular sealing platform 208, and a curved stretching rod 207 is fixedly connected to the top of the buoyancy frame 206, and one end of the two curved stretching rods 207 is fixedly connected to the relative flocculation baffle 205, and the top of the U-shaped switching platform 201 is fixedly connected to a water tank 209 through a bracket, and the front and rear parts of the water tank 209 are slidably installed with a primary filter screen plate 210, and the top of the water tank 209 is fixedly connected with a threaded connecting pipe 211 through an opening, and both sides of the bottom of the water tank 209 are fixedly connected with a first drainage pipe 212 used in conjunction with the water storage and sedimentation frame 204, and the left side of the U-shaped switching platform 201 is fixedly connected with a cylinder 213 through a fixed block, and the front end of the cylinder 213 is fixedly connected to the front water storage and sedimentation frame 204 through a fixed plate.
[0061] Please refer to Figure 4 , Fig.10 , Fig.11 and Fig.12, showing the overall structure of the adsorption linkage mechanism 3, the adsorption linkage mechanism 3 includes a linkage operation box 301, and the linkage operation box 301 is fixedly installed on the right side of the top of the bottom plate 1 through a fixing plate, the upper part of the inner wall of the linkage operation box 301 is fixedly connected with a circular upper resistance plate 303, the front and rear parts of both sides of the bottom of the circular upper resistance plate 303 are fixedly connected with vertical sliding rods 304, and the bottom ends of the vertical sliding rods 304 are fixedly connected to the bottom of the inner cavity of the linkage operation box 301, an adsorption water tank 305 is slidably installed between the four vertical sliding rods 304, and the surface of the vertical sliding rods 304 is sleeved with a spring 306, and the bottom of the inner cavity of the linkage operation box 301 is fixedly installed with a button 328 used in conjunction with the adsorption water tank 305 through an opening, and the button 328 is pressed once to trigger The cylinder 213 will be driven to extend or retract, a second moving port 307 is provided on the surface of the linkage operation box 301, and a second drain pipe 308 used in conjunction with the second moving port 307 is fixedly connected to the lower part of the surface of the adsorption water tank 305 through an opening, and the second drain pipe 308 is provided with a solenoid valve, and the solenoid valve is opened for drainage after a certain period of adsorption is preset, and the upper parts of both sides between the front and rear parts of the inner cavity of the linkage operation box 301 are rotatably connected with a first gear plate 309 and a second gear plate 310 meshing with each other through bearing parts, and a first moving port 302 is provided on the top of the linkage operation box 301, one side of the first gear plate 309 is meshed with a first tooth plate 311, and one side of the second gear plate 310 is meshed with a second tooth plate 311. 12, and the top ends of the first tooth plate 311 and the second tooth plate 312 pass through the first moving opening 302 and extend to the upper part of the linkage operation box 301, the first tooth plate 311 and the second tooth plate 312 are provided with a guide groove 313 on the opposite side, and the two sides of the inner side of the first moving opening 302 are fixedly connected with a guide block 314 used in conjunction with the guide groove 313, and the bottom end of the second tooth plate 312 is fixedly connected with an adsorption net frame 315 used in conjunction with the adsorption water tank 305, and the activated carbon particles built in the adsorption net frame 315 can be opened for replacement, and the bottom end of the first tooth plate 311 is fixedly connected to the inner wall of the adsorption water tank 305 through a fixed block, and the right side of the linkage operation box 301 is provided with an operation opening 313 used in conjunction with the adsorption net frame 315 16. A third moving opening 317 is provided at the rear of the linkage operation box 301. The rear of the linkage operation box 301 is rotatably connected to a gear cylinder 318 through a bearing. A fourth tooth plate 322 meshing with the gear cylinder 318 is fixedly connected to the rear of the adsorption water tank 305 through a bracket. A third tooth plate 319 is meshed with the top of the gear cylinder 318. A horizontal sliding opening 320 is provided at the top of the third tooth plate 319. A sliding frame 321 used in conjunction with the horizontal sliding opening 320 is fixedly connected to the rear of the linkage operation box 301. A U-shaped rod 323 is fixedly connected to the left end of the third tooth plate 319 through a fixed block. Both ends of the U-shaped rod 323 are fixedly connected to a wiping plate 324 used in conjunction with the water storage sedimentation frame 204. The wiping plate 324 is made of rubber.The left side of the linkage operation box 301 is fixedly connected with a water pump 325 through a fixing plate. The water pump 325 starts pumping water after the sewage in the water storage and sedimentation frame 204 is set to settle for a certain period of time. The surface and rear of the water pump 325 are connected with hoses 327. The opposite ends of the two hoses 327 penetrate the water storage and sedimentation frame 204 on the same side and extend to the inside of the water storage and sedimentation frame 204. The bottom of the water pump 325 is connected with a third drainage pipe 326, and the top of the third drainage pipe 326 penetrates the linkage operation box 301 and extends to the inside of the linkage operation box 301.
[0062] The advantages of the second embodiment over the first embodiment are that: by arranging a flocculation baffle 205 at the bottom of the water storage sedimentation frame 204, and connecting it to the buoyancy frame 206 by means of a bent stretching rod 207, and using it in conjunction with a wiping plate 324, the arrangement of these structures can, after the buoyancy frame 206 drives the flocculation baffle 205 on the other side to rise, drive the wiping plate 324 to move by the adsorption water tank 305 to drain and rise, thereby scraping off the flocculants on the top of the flocculation baffle 205, which can not only ensure the continuous operation of the equipment, but also facilitate the work of the staff, by rotatably connecting two first gear plates 309 and second gear plates 310 of different sizes and meshing with each other inside the linkage operation box 301, and using it in conjunction with an adsorption net frame 315 and an operation port 316, the arrangement of these structures can, when the adsorption water tank 305 descends, Through the different ratios of the first gear plate 309 and the second gear plate 310, the adsorption net frame 315 can descend faster to dock with the adsorption water tank 305, thereby completing the adsorption of sewage. At the same time, after the adsorption water tank 305 rises, the adsorption net frame 315 can be located at the operation port 316, and the staff can conveniently replace the activated carbon through the operation port 316, thereby improving the convenience of equipment use. By installing a button 328 for use with the adsorption water tank 305 at the bottom of the inner cavity of the linkage operation box 301, and using it in conjunction with the cylinder 213, the settings of these structures can trigger the button 328 after the adsorption water tank 305 descends, thereby driving the cylinder 213 to interchange the positions of the two water storage sedimentation frames 204, and continue to treat sewage without affecting the cleaning of the other flocculation baffle 205, thereby improving the treatment efficiency.
Claims
1. An environmentally friendly and efficient sewage treatment process, characterized by: The specific steps include: S1, primary filtration: the sewage is injected into the water tank (209) in the primary filtration sedimentation mechanism (2), and large particles of impurities are filtered out using the primary filtration screen (210); S2, sedimentation: the filtered sewage enters the water storage sedimentation frame (204), and then a reagent is added for flocculation and sedimentation; S3, switching: after the settling time is reached, the sewage is pumped into the adsorption water tank (305) by using the water pump (325) in the adsorption linkage mechanism (3), and the second drainage pipe (308) is pressed by the descent of the adsorption water tank (305), thereby starting the cylinder (213) to switch the two water storage and settling frames (204). After the switching is completed, the water storage and settling frames (204) are filled with water again for settling, so that the buoyancy frame (206) floats up and drives the flocculation baffle (205) for accumulating flocculation to rise to the top; S4, adsorption: after the adsorption water tank (305) is filled with water and descends, the adsorption net frame (315) is lowered into the water for adsorption through the linkage of the first gear plate (309) and the second gear plate (310); S5, drainage: after the adsorption is completed, the second drainage pipe (308) is opened to drain the water, and at the same time, the spring (306) is used to rebound to raise the adsorption water tank (305); S6, cleaning: during the process of the adsorption water tank (305) rising, the wiping plate (324) is driven by linkage to scrape and clean the flocculation baffle (205); The primary filtration sedimentation mechanism (2) comprises a U-shaped switching platform (201), wherein the bottom of the U-shaped switching platform (201) is fixedly connected to a bottom plate (1), a sliding groove (202) is provided at the bottom of the inner cavity of the U-shaped switching platform (201), a sliding plate (203) is slidably mounted inside the sliding groove (202), and both sides of the top of the sliding plate (203) are fixedly connected to a water storage sedimentation frame (204) used in conjunction with the U-shaped switching platform (201) via a fixing block, and the water storage sedimentation frame A flocculation baffle (205) is arranged inside (204), and a rectangular sealing platform (208) used in conjunction with the flocculation baffle (205) is fixedly connected to the opposite sides of the bottom of the two water storage sedimentation frames (204), a buoyancy frame (206) is placed on the top of the rectangular sealing platform (208), and a curved stretching rod (207) is fixedly connected to the top of the buoyancy frame (206), and one end of the two curved stretching rods (207) is respectively fixedly connected to the opposite flocculation baffle (205); The top of the U-shaped switching platform (201) is fixedly connected to a water tank (209) via a bracket, the front and rear of the water tank (209) are both slidably mounted with a primary filter screen (210) via openings, the top of the water tank (209) is fixedly connected to a threaded connection pipe (211) via an opening, both sides of the bottom of the water tank (209) are fixedly connected to a first drainage pipe (212) used in conjunction with a water storage and sedimentation frame (204), the left side of the U-shaped switching platform (201) is fixedly connected to a cylinder (213) via a fixing block, and the front end of the cylinder (213) is fixedly connected to the front water storage and sedimentation frame (204) via a fixing plate; The adsorption linkage mechanism (3) comprises a linkage operation box (301), and the linkage operation box (301) is fixedly mounted on the right side of the top of the bottom plate (1) via a fixing plate, a circular upper resistance plate (303) is fixedly connected to the upper part of the inner wall of the linkage operation box (301), the front and rear parts of the bottom sides of the circular upper resistance plate (303) are fixedly connected to vertical sliding rods (304), and the bottom ends of the vertical sliding rods (304) are fixedly connected to the bottom of the inner cavity of the linkage operation box (301), an adsorption water tank (305) is slidably mounted between the four vertical sliding rods (304), and a spring (306) is sleeved on the surface of the vertical sliding rod (304), and a button (328) used in conjunction with the adsorption water tank (305) is fixedly mounted at the bottom of the inner cavity of the linkage operation box (301) via an opening.
2. An apparatus for an environmentally friendly and efficient sewage treatment process according to claim 1, characterized in that: The surface of the linkage operation box (301) is provided with a second movable opening (307); the lower part of the surface of the adsorption water tank (305) is fixedly connected to a second drainage pipe (308) used in conjunction with the second movable opening (307) through an opening; the upper parts of both sides between the front and rear parts of the inner cavity of the linkage operation box (301) are rotatably connected to a first gear plate (309) and a second gear plate (310) that mesh with each other through bearing parts; and the top of the linkage operation box (301) is provided with a first movable opening (302).
3. An apparatus for an environmentally friendly and efficient sewage treatment process according to claim 2, characterized in that: A first tooth plate (311) is meshed on one side of the first gear plate (309), and a second tooth plate (312) is meshed on one side of the second gear plate (310), and the top ends of the first tooth plate (311) and the second tooth plate (312) pass through the first movable opening (302) and extend to the upper part of the linkage operation box (301), and guide grooves (313) are provided on the opposite sides of the first tooth plate (311) and the second tooth plate (312), and guide blocks (314) used in conjunction with the guide grooves (313) are fixedly connected to both sides of the inner side of the first movable opening (302).
4. An apparatus for an environmentally friendly and efficient sewage treatment process according to claim 3, characterized in that: The bottom end of the second tooth plate (312) is fixedly connected to an adsorption screen frame (315) used in conjunction with the adsorption water tank (305), and the bottom end of the first tooth plate (311) is fixedly connected to the inner wall of the adsorption water tank (305) via a fixing block, and an operating port (316) used in conjunction with the adsorption screen frame (315) is provided on the right side of the linkage operating box (301).
5. An apparatus for an environmentally friendly and efficient sewage treatment process according to claim 4, characterized in that: The linkage operation box (301) has a third moving opening (317) at its rear, the linkage operation box (301) is rotatably connected to a gear cylinder (318) at its rear via a bearing, the adsorption water tank (305) has a fourth tooth plate (322) meshed with the gear cylinder (318) at its rear via a bracket, the gear cylinder (318) has a third tooth plate (319) meshed with its top, and the third tooth plate (319) has a horizontal sliding opening (320) at its top, and the linkage operation box (301) has a sliding frame (321) fixedly connected to the rear for use with the horizontal sliding opening (320).
6. An apparatus for an environmentally friendly and efficient sewage treatment process according to claim 5, characterized in that: The left end of the third tooth plate (319) is fixedly connected to a U-shaped rod (323) via a fixing block, and both ends of the U-shaped rod (323) are fixedly connected to wiping plates (324) used in conjunction with the water storage sedimentation frame (204).
7. An apparatus for an environmentally friendly and efficient sewage treatment process according to claim 6, characterized in that: The left side of the linkage operation box (301) is fixedly connected to a water pump (325) via a fixing plate, and the surface and rear of the water pump (325) are both connected to hoses (327), and the opposite ends of the two hoses (327) respectively penetrate the water storage and sedimentation frame (204) on the same side and extend to the inside of the water storage and sedimentation frame (204), and the bottom of the water pump (325) is connected to a third drainage pipe (326), and the top end of the third drainage pipe (326) penetrates the linkage operation box (301) and extends to the inside of the linkage operation box (301).
